One Year In: A Look at the Initial Impacts of LEED v5 on the Built Environment
October 20, 2026 —
Eric Haggstrom - Construction ExecutiveAs federal
climate policies shift, the built environment has entered a period of uncertainty where developers, designers and owners need to find pragmatic, forward-looking approaches to sustainability. A year after its launch on April 28, 2025,
LEED v5 is helping lead that charge by pushing the industry toward a stronger long-term focus on carbon reduction, climate resilience and building performance. The framework of this certification provides a snapshot of the current state of the industry and an indication of where it may be headed in the future.
LEED v5’s introduction has helped to begin reframing and informing the approaches of both mission-driven and cost-conscious clients, providing a framework to align their decisions more closely with sustainable priorities by emphasizing carbon reduction, energy efficiency and electrification. These standards can help teams make investments strategically by phasing in upgrades, planning for future technologies and demonstrating how the rating system is influencing long-term decision-making across projects.
Reprinted courtesy of
Eric Haggstrom, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
Every High-Tech Building Has Many Lifespans
August 16, 2026 —
Aarni Heiskanen - AEC BusinessWhen I worked as an architect, our team designed a laboratory for fuel research. The facility included a large research hall where various boilers and other devices were tested and analyzed. The setup required extensive floor channeling under the thick concrete floor. We suggested building a modular system that would allow flexibility in the future, when requirements would certainly change. They did not want that because of budget constraints.
The high-tech construction trend is spreading. Data centers, semiconductor fabs, battery plants, and life science facilities share one property that sets them apart from ordinary buildings. The technology inside turns over faster than the structure around it. Server generations change every three to five years. Rack densities have risen from 10 or 20 kW to 130 kW and beyond in just a few years.
A high-tech facility is really several buildings with different lifespans inside one envelope, and we keep designing them as if they were one. The failure is not that things become obsolete. It is that we never say when each layer is expected to.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Insured is Third Party Beneficiary of Forced-Place Policy
October 26, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe court denied the insurer’s motion to dismiss the insured’s fire damage claims under a forced-place policy because the insured was a third-party beneficiary of the policy. Fredericks v. Assurant Specialty, et al., 2026 U.S. Dist. LEXIS 179779 (E.D. Pa. Aug. 12, 2026).
The insureds’ home burned down on the same day their homeowner’s policy expired. The expiration automatically triggered a forced-placed policy issued by American Security Insurance Company (ASIC) to the insureds’ mortgage company, Rocket Mortgage Company, LLC.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Texas Prepares to Restart Data Center Construction, with Around 300 Projects Under Review And 6,608 MW Awaiting Energization Approval, Driving Demand for Rapid-Response Lifting Operations
October 20, 2026 —
SarensTexas is experiencing an unprecedented increase in power demand. The ERCOT (Electric Reliability Council of Texas) power grid reached a record peak demand of 91.1 GW in summer 2026, 6% above the previous record, according to the U.S. Energy Information Administration (EIA). This is compounded by interconnection requests totaling around 474 GW, more than five times the record peak, with approximately 90% of these requests related to data centers, according to the Office of the Governor of Texas. Within this context, authorities have launched a comprehensive review process. In August , the Governor directed the Public Utility Commission of Texas (PUCT) and ERCOT to audit all data centers progressing toward grid connection, covering around 300 projects. ERCOT has also suspended approvals to energize data centers of 75 MW or more and has set December 10 as the date for the publication of its reports.
For the industry, this pause creates a valuable planning window. Goldman Sachs notes that it takes 18 to 24 months to build a data center once permits have been secured, while only 50% to 60% of planned capacity is delivered on schedule. Supply chain constraints and labor shortages are among the most common causes of delays. In this context, construction agility is becoming increasingly critical. A one-month delay at a typical 60 MW U.S. data center is estimated to cost up to $14.2 million in lost revenue, additional costs and penalties, according to STL Partners data. Against this backdrop, Sarens, which has operated in the U.S. since 2009 and is headquartered in Houston, with offices also in Odessa and Beaumont, positions as a logistics partner for developers and contractors preparing for the execution phase.
Read the full story...Reprinted courtesy of
Sarens
The Leak Was Repaired. Why Is It Back? What California HOA Boards Should Document Next
November 09, 2026 —
The Naumann Law Firm, PCA resident reports water staining near a window. The HOA arranges a repair, the area dries, and the complaint is closed. Months later, the stain returns. Then another resident reports a similar problem elsewhere in the building.
At The Naumann Law Firm, we encourage HOA boards and property managers to pay attention to that sequence. A returning leak does not automatically mean the building has a construction defect. It does mean the board needs a clear record of what happened, what was repaired, and what changed afterward.
Start With the History, Not Just the New Stain
When a leak returns, the latest photograph tells only part of the story. Pull together the earlier maintenance request, inspection notes, photographs, repair proposal, invoice, and any messages from the resident or contractor.
Then ask:
- Was the leak reported in the same location before?
- What did the contractor identify as the cause?
- What work was completed, and when?
- Did the repair address the source of the water or only the visible damage?
- Have other units or common areas experienced similar symptoms?
These details help a board understand whether it is dealing with a new problem, an unsuccessful repair, or a pattern that needs a broader investigation.
Read the full story...Reprinted courtesy of
The Naumann Law Firm, PC
A Customized Approach to Data Center Construction
June 29, 2026 —
James P. Bobotek, Arielle L. Murphy & Robert A. James - Gravel2Gavel Construction & Real Estate Law BlogData center construction projects are, to put it mildly, distinct. They differ from traditional construction in a host of manners, and are particularly distinctive because the value of the facility depends on unique measures of performance. A center that cannot meet uptime, cooling, redundancy or connectivity standards will not achieve its mission, whether or not the structure itself meets standard industry contract-form “substantial completion” or “mechanical completion” definitions.
Owners, developers, lenders, operators and hyperscalers—especially hyperscalers!—want it all. They seek favorable and stable pricing, accelerated delivery and sophisticated components, all of which are evolving in “real project time.” Standard construction contract forms deserve extensive modifications to align clauses with expectations, with a heightened focus on systems integration, commissioning, and allocation of special risks. This article details customized considerations for drafting, negotiating and administering data center design and construction agreements.
Reprinted courtesy of
James P. Bobotek, Pillsbury,
Arielle L. Murphy, Pillsbury and
Robert A. James, Pillsbury
Mr. Bobotek may be contacted at james.bobotek@pillsburylaw.com
Ms. Murphy may be contacted at arielle.murphy@pillsburylaw.com
Mr. James may be contacted at rob.james@pillsburylaw.com
Read the full story...
Cal Unity Bar Names Angela Zanin as Statewide President
August 11, 2026 —
Lewis BrisboisThe California Unity Bar has named Los Angeles Partner Angela Zanin as its statewide president for the 2026-2027 term. This appointment follows Ms. Zanin's extensive involvement in the organization, including as the founding co-chair of the Los Angeles County Unity Bar in 2024 and as its chair for the 2024-2025 term. Ms. Zanin also has served as a member of the Executive Steering Committee of the California Unity Bar since 2025.
In her inaugural message as president, which the Cal Unity Bar published in its newsletter of July 2026, Ms. Zanin stated that she vowed to continue the organization’s “commitment to promoting equal opportunities and embracing diversity, equity, and inclusion in the State of California.” She also noted that as she assumed the role of president, she thought of “the famous words of Dr. Martin Luther King, Jr.: ‘The arc of the moral universe is long, but it bends toward justice.”’ Ms. Zanin closed her message by observing, “At a time when the rule of law faces challenges, our alliance stands strong, built on trust and confidence in each other.”
Read the full story...Reprinted courtesy of
Lewis Brisbois
11 Payne & Fears Attorneys Honored by Best Lawyers
August 24, 2026 —
Payne & FearsCongratulations to the 11 Payne & Fears attorneys included in the 2027 Edition of “Lawyer of the Year” and The Best Lawyers In America®. Attorneys have been recognized in the following practice areas:
“Lawyer of the Year” (2027 Edition)
Orange County
The Best Lawyers in America® (2027 Edition)
Irvine, CA
- Jeffrey K. Brown
- Employment Law – Management
- Labor Law – Management
- Litigation – Labor and Employment
- Daniel F. Fears
- Employment Law – Management
- Labor Law – Management
- Litigation – Labor and Employment
- Daniel M. Livingston
- Commercial Litigation
- Litigation – Real Estate
Read the full story...Reprinted courtesy of
Payne & Fears