Properly Taking Judicial Notice of Florida’s Building Code
October 12, 2026 —
David Adelstein - Florida Construction Legal UpdatesMany construction defects cases involve Florida’s Building Code. A recent non-construction case, BSREP II PBG Resort, LLC v Ginsburg, 2026 WL 265226 (Fla. 4th DCA 2026), discussed a court taking judicial notice of a provision in the Florida Building Code. This case was a premise liability case where the plaintiff tripped in an asphalt parking lot. The plaintiff, without complying with proper procedural notice protocol, asked the court to take judicial notice of a section of Florida’s Building Code, i.e., admitting this section as relevant evidence in the case. The trial court granted the request for judicial notice and the plaintiff used this as the basis of her cross-examination, the jury instructions, and closing argument that the violation of this section of Florida’s Building Code was evidence of negligence. This was in error.
First, Florida’s Building Code is NOT a statute but an administrative rule. Ginsburg, supra. As an administrative rule, a court “may” but is not obligated to take judicial notice of the rule – it is a permissive judicial notice request per Florida Statute s. 90.203 and 90.202(9). This is important because the trial court viewed Florida’s Building Code as a statute it mandatorily had to take judicial notice of per Florida Statute s. 90.201, which was in error. Because it was permissive, the plaintiff needed to comply with statutory procedural notice protocols, which the plaintiff failed to do.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Every High-Tech Building Has Many Lifespans
August 16, 2026 —
Aarni Heiskanen - AEC BusinessWhen I worked as an architect, our team designed a laboratory for fuel research. The facility included a large research hall where various boilers and other devices were tested and analyzed. The setup required extensive floor channeling under the thick concrete floor. We suggested building a modular system that would allow flexibility in the future, when requirements would certainly change. They did not want that because of budget constraints.
The high-tech construction trend is spreading. Data centers, semiconductor fabs, battery plants, and life science facilities share one property that sets them apart from ordinary buildings. The technology inside turns over faster than the structure around it. Server generations change every three to five years. Rack densities have risen from 10 or 20 kW to 130 kW and beyond in just a few years.
A high-tech facility is really several buildings with different lifespans inside one envelope, and we keep designing them as if they were one. The failure is not that things become obsolete. It is that we never say when each layer is expected to.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
The Construction Defect Litigation Podcast: Navigating Multi-Party Construction Defect Litigation
September 08, 2026 —
Ivette Kincaid & Thomas McCarrick - Kahana FeldKahana Feld Construction Defect Practice Group Chair Ivette Kincaid and attorney Thomas McCarrick recently joined the Construction Defect Litigation podcast to discuss the challenges—and strategies—behind complex construction defect matters involving multiple stakeholders.
Drawing on their experience, Ivette and Thomas explore practical approaches to:
- Identifying key parties and understanding how claims and crossclaims develop
- Working with experts to evaluate defects, causation and damages
- Managing procedural challenges, including scheduling, document management and depositions
- Applying thoughtful case management strategies to position complex matters for successful resolution
Reprinted courtesy of
Ivette Kincaid, Kahana Feld and
Thomas McCarrick, Kahana Feld
Ms. Kincaid may be contacted at ikincaid@kahanafeld.com
Mr. McCarrick may be contacted at tmccarrick@kahanafeld.com
Read the full story...
Endorsement is Void Where Compliance is Impossible
September 21, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe Sixth Circuit found that the insured’s loss of property due to fire was covered despite noncompliance with an endorsement requiring encompassing the property. 3371 Reading, LLC v. Liberty Mut Group, Inc., et al., 2026 U.S. App. LEXIS 19156 (6th Cir. June 29, 2026).
The insured, 3371 Reading, owned a building undergoing renovation. After the structure burned down, 3371 Reading made a claim under its policy with Ohio Casualty Insurance Company. Ohio Casualty relied on an endorsement requiring fencing round the jobsite.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Sixth Circuit Revives Builder’s Risk Coverage, Refusing to Let Insurer Escape on a Technicality
July 27, 2026 —
Kevin V. Small & Adriana A. Perez - Hunton Insurance Recovery BlogIn 3371 Reading, LLC v. Liberty Mutual Group, the Sixth Circuit did something courts do not always do in coverage disputes: it refused to let an insurer avoid liability based on a technical policy condition that could never actually be satisfied.
The decision is a straightforward reminder of two core principles. First, policies must be interpreted from the standpoint of a reasonably prudent insured. Second, hyper-technical conditions cannot be used to deny coverage where compliance is never possible.
Reprinted courtesy of
Kevin V. Small, Hunton Andrews Kurth LLP and
Adriana A. Perez, Hunton Andrews Kurth LLP
Mr. Small may be contacted at ksmall@hunton.com
Ms. Perez may be contacted at pereza@hunton.com
Read the full story...
Pursuing Claims for Loss Caused by Recent Kona Low Storms for Homeowners and Businesses
May 12, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe recent Kona Low storms that hit all islands were devastating, causing significant property damage. Homeowners and businesses will be seeking coverage under their insurance policies to recover for their losses. Here is a brief look at what may be covered and which exclusions may be troublesome in homeowners’ and commercial property policies.
Typically, both a homeowners’ policy and a commercial property policy include a grant of coverage for “direct physical loss of or damage to Covered Property.” Covered perils are listed, including such events as fire, lightning, or windstorm. Covered Property includes dwellings, other structures on the property and personal property. Additional coverages are usually provided. This includes debris removal after a peril insured against or collapse of a structure. In a homeowners’ policy, additional living expenses are likely covered when the damaged home is not fit to live in.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
What Massachusetts Contractors and Developers Can Learn from Cannistraro v. Columbia Construction
July 13, 2026 —
Anthony LaPlaca & Luke Marston - The Construction SeytIntroduction
On June 26, 2026 the Massachusetts Supreme Judicial Court issued its decision in J.C. Cannistraro, LLC v. Columbia Construction Co.—a holding that sits at the intersection of Prompt Pay Act compliance and the Massachusetts Arbitration Act.
[1]
Most already know that the Massachusetts Prompt Pay Act (PPA) imposes strict timing and certification requirements for rejecting payment applications and proposed change orders on projects valued at $3 million or more. Most notably, the PPA requires the paying party to give the payee written notice of its approval or rejection of progress applications and proposed changes within 15 days of receipt, which notice must include a “factual and contractual basis for the rejection” and must be “certified as made in good faith.”
[2] In the absence of a timely certified notice, payment is “deemed to be approved” unless the payor properly rejects payment before it comes due.
[3]
Reprinted courtesy of
Anthony LaPlaca, Seyfarth Shaw LLP and
Luke Marston, Seyfarth Shaw LLP
Mr. LaPlaca may be contacted at alaplaca@seyfarth.com
Mr. Marston may be contacted at lmarston@seyfarth.com
Read the full story...
Texas Prepares to Restart Data Center Construction, with Around 300 Projects Under Review And 6,608 MW Awaiting Energization Approval, Driving Demand for Rapid-Response Lifting Operations
October 20, 2026 —
SarensTexas is experiencing an unprecedented increase in power demand. The ERCOT (Electric Reliability Council of Texas) power grid reached a record peak demand of 91.1 GW in summer 2026, 6% above the previous record, according to the U.S. Energy Information Administration (EIA). This is compounded by interconnection requests totaling around 474 GW, more than five times the record peak, with approximately 90% of these requests related to data centers, according to the Office of the Governor of Texas. Within this context, authorities have launched a comprehensive review process. In August , the Governor directed the Public Utility Commission of Texas (PUCT) and ERCOT to audit all data centers progressing toward grid connection, covering around 300 projects. ERCOT has also suspended approvals to energize data centers of 75 MW or more and has set December 10 as the date for the publication of its reports.
For the industry, this pause creates a valuable planning window. Goldman Sachs notes that it takes 18 to 24 months to build a data center once permits have been secured, while only 50% to 60% of planned capacity is delivered on schedule. Supply chain constraints and labor shortages are among the most common causes of delays. In this context, construction agility is becoming increasingly critical. A one-month delay at a typical 60 MW U.S. data center is estimated to cost up to $14.2 million in lost revenue, additional costs and penalties, according to STL Partners data. Against this backdrop, Sarens, which has operated in the U.S. since 2009 and is headquartered in Houston, with offices also in Odessa and Beaumont, positions as a logistics partner for developers and contractors preparing for the execution phase.
Read the full story...Reprinted courtesy of
Sarens