Louisiana Enacts Important Tort Reform Legislation
May 12, 2026 —
Lee M. Peacocke & Benjamin Perkins - Lewis BrisboisThe Louisiana legislature enacted tort reform legislation in 2025 to address the increasing cost of insurance in Louisiana and to provide some predictability to the Louisiana legal system. While our colleagues, Jenny Michel and Jennifer Kretschmann, have provided an excellent and comprehensive analysis of the legislation in their article entitled “Louisiana State Legislature 2025 Regular Session: Tort Reform - Acts & Vetoed Insurance Bill,” which can be found
here, this article examines the anticipated impact of the tort reform legislation on personal injury trials in federal and state courts in Louisiana.
The most significant reform involves the institution of a modified defense of contributory negligence, which went into effect on January 1, 2026. Since 1996, Louisiana had operated as a pure comparative fault state; the liability of each party whose fault caused damages was to be allocated among the respective parties based upon their appropriate percentage of fault, regardless of the legal theory of liability asserted against each party. Thus, a plaintiff 55 percent at fault could recover 45 percent of their damages from the liable defendants. The 2025 Tort Reform Amendments now prohibit a plaintiff in a personal injury action from recovering any damages if they are found to be 51 percent or more at fault for their damages. The 55 percent at-fault party in the example above is now prohibited from recovering any damages from any party. Importantly, this new legislation now requires the trial court to instruct the jury that if they find a plaintiff to be more than 50 percent at fault, then the plaintiff will not recover any damages.
Reprinted courtesy of
Lee M. Peacocke, Lewis Brisbois and
Benjamin Perkins, Lewis Brisbois
Mr. Peacocke may be contacted at Lee.Peacocke@lewisbrisbois.com
Mr. Perkins may be contacted at Benjamin.Perkins@lewisbrisbois.com
Read the full story...
Self-Healing Infrastructure Could Pave the Road to the Future
May 05, 2026 —
Allan C. Van Vliet - Gravel2Gavel Construction & Real Estate Law BlogA single hairline crack in a bridge deck can seem insignificant. But left undetected, minor cracks and fissures expand, water seeps in, steel corrodes and repair costs start to increase. This risk multiplies across thousands of miles of aging highways and bridges nationwide.
As infrastructure endures increasing strain from heavier traffic, extreme weather and deferred maintenance, engineers are exploring “self-healing” systems, where streets and bridges are built with materials that can repair themselves. Concrete, asphalt and composites capable of detecting and mending microcracks autonomously are moving from laboratory research to pilot projects. But while emerging technology promises longer-lasting infrastructure, it also raises questions about long-term maintenance, performance guarantees, procurement frameworks and risk allocation.
Read the full story...Reprinted courtesy of
Allan C. Van Vliet, PillsburyMr. Van Vliet may be contacted at
allan.vanvliet@pillsburylaw.com
$356 Million Judgement Against Developer for Defective Construction of DC Condominium
August 16, 2026 —
Nicholas D. Cowie - Cowie Law GroupOn July 31, 2026, the Superior Court of the District of Columbia entered a $356,085,513.00 judgment against developers JBG Smith for defective construction and renovation of the Wardman Tower Residential Condominium in Washington, D.C. The case is Wardman Tower Residential Condominium Unit Owners Association v. JBG Smith Properties, et al., No. 2020 CA 004807 B (D.C. Super. Ct.). In a 148-page
Trial Order, the D.C. Superior Court awarded $118,695,171.00 in damages in favor of the condominium association and against the condominium developers, including JBG Smith. The Court trebled those damages pursuant to the District of Columbia Consumer Protection Procedures Act (“CPPA”) to reach an ultimate judgment of $356,085,513.00. See Cowie Law Group:
DC Condominium Construction Defects: Recovering Attorney’s Fees, Litigation Expenses & Treble Damages Under the Consumer Protection Procedures Act.
Cowie Law Group, P.C. filed the lawsuit on behalf of the Association in 2020. The firm represented the Association throughout years of pretrial discovery and ultimately served as trial counsel with Williams & Connolly LLP during a lengthy bench trial before the Honorable Yvonne Williams. The Cowie Law Group team included attorneys, George A. Bealefeld, III, Albert G. McCarraher, Stanford L. Kimmel, III and Nicholas D. Cowie.
Read the full story...Reprinted courtesy of
Nicholas D. Cowie, Cowie Law GroupMr. Cowie may be contacted at
ndc@cowielawgroup.com
Project Labor Agreements: A New Bid Protest Forum Split
May 14, 2026 —
Dirk D. Haire, David P.J. Timm and Michael J. Brewer - ConsensusDocsAdvertisements often include a disclaimer: “individual results may vary.” Similarly, lawyers are notorious for saying “it depends.” The mandatory Project Labor Agreement (“PLA”) regulations have recently placed into context this adage as it applies to federal contract bid protests, with very different results depending on which forum – the Court of Federal Claims (“COFC”) versus the Government Accountability Office (“GAO”) – different contractors have selected to bring PLA bid protests.
Over the last two years, over 30 protesters have successfully achieved removal of mandatory PLAs from large-scale federal construction contracts based on two landmark bid protest decisions issued by the COFC. Similar challenges to PLAs at the GAO, however, have not been successful in removing PLAs, highlighting an emerging trend that the COFC is often a more effective relief forum than GAO for government construction contractors.
Reprinted courtesy of
Dirk D. Haire, Burr & Forman LLP,
David P.J. Timm, Burr & Forman LLP and
Michael J. Brewer, Burr & Forman LLP
Mr. Haire may be contacted at dhaire@burr.com
Mr. Timm may be contacted at dtimm@burr.com
Mr. Brewer may be contacted at mbrewer@burr.com
Read the full story...
Construction Liens and the “Substantial Performance” Doctrine
April 08, 2026 —
David Adelstein - Florida Construction Legal UpdatesIn a recent case dealing with a construction lien, the driving issue was whether the air conditioning contractor “substantially performed” before recording its construction lien against residential property. The importance here pertains to the substantial performance doctrine with respect to construction liens. The Third District Court of Appeal explained, with relevant citations, this doctrine as follows:
Under Florida law, a contractor is entitled to a mechanic’s lien if he complies with all provisions of Chapter 713, governing construction liens, and “has substantially performed the contract.” Grant v. Wester, 679 So. 2d 1301, 1307 (Fla. 1st DCA 1996) (quotation omitted); Langley v. Knowles, 958 So. 2d 1149, 1151 (Fla. 5th DCA 2007) (“The substantial performance doctrine recognizes that a contactor who complies with all of the provisions of the contactor’s lien statute is entitled to enforce a lien if he has substantially, but not completely, performed his contractual obligations.”). Substantial performance is performance “so nearly equivalent to what was bargained for that it would be unreasonable to deny the promisee the full contract price subject to the promisor’s right to recover whatever damages may have been occasioned him by the promisee’s failure to render full performance.” Ocean Ridge Dev. Corp. v. Quality Plastering, Inc., 247 So. 2d 72, 75 (Fla. 4th DCA 1971).
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
What Is the Independent Tort Doctrine? New Case Explains…
August 24, 2026 —
David Adelstein - Florida Construction Legal UpdatesFlorida’s Sixth District Court of Appeals in Atout v. HHM Land Trust Dated October 29, 2013, 51 Fla.L.Weekly D1569a (Fla. 6th DCA 2026) recently included an extensive discussion on Florida’s independent tort doctrine. The independent tort doctrine is an important legal doctrine, particularly when parties are in contractual privity. This doctrine stands for the proposition that tort claims must be independent of any breach of contract. See Atout, supra. The Sixth District’s extensive discussion analyzed the indicators to determine this “independence,” which may arise from the source of the duty, the asserted conduct, the damages sought, or even public policy:
Unlike claims that rely on contractual relationships, an “independent” tort is often characterized by a duty imposed by law rather than by agreement. As to this consideration, United States District Court Judge Steven Merryday has explained that the independent tort doctrine honors the same divide as the economic loss rule, but rather than looking at the nature of the loss, it focuses on the source of the duty allegedly breached. “If a contract imposes a duty, and the defendant breaches that duty, the plaintiff must sue for breach of contract. If society imposes the duty, the plaintiff must sue in tort.” Following this reasoning, courts should consider whether the alleged breach of a duty in tort coincides or overlaps with a duty imposed by a contract. If the duty at issue is within the scope of a contract, and the relationship of the parties that led to the creation of that duty stems from a contract, then that duty’s source is from contract and any alleged tort claims based on a breach of those duties may not be “independent.”
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Achieving Sustainability Through Design-Build Delivery: Part I – An Overview
September 21, 2026 —
Joshua M. Pruett, Jennifer L. Harris & Tiffany A. Harrod - Peckar & Abramson, P.C.This article was written for the AGC’s Law in Brief and first appeared here.
Sustainability is no longer optional. What was once a matter of public policy or corporate preference has become a regulatory mandate and is reshaping how construction projects are designed, built, and operated. This mandate is not solely figurative. Rather, states have started to follow Europe’s lead by beginning to codify sustainability requirements into regulations and law. California led the charge by adding mandatory embodied-carbon emissions regulations into CALGreen, and other states, such as New York, have introduced bills to implement similar requirements. Owners, designers, and builders must now treat sustainability not as aspirational, but as a clearly defined contract issue from the outset, particularly where the project is expected to achieve a third-party rating, meet energy or resiliency targets, qualify for incentives, or comply with evolving green building codes.
In the federal public sector, construction contracts include a layered compliance framework—executive order-inspired policy, FAR-mandated clauses, and enduring statutory requirements—requiring contractors to integrate sustainability into design, material selection, and lifecycle management. Staying ahead means aligning with regulatory standards, conducting life-cycle cost analyses, and embedding sustainability into every procurement and construction decision.
Reprinted courtesy of
Joshua M. Pruett, Peckar & Abramson, P.C.,
Jennifer L. Harris, Peckar & Abramson, P.C. and
Tiffany A. Harrod, Peckar & Abramson, P.C.
Mr. Pruett may be contacted at jpruett@pecklaw.com
Ms. Harris may be contacted at jharris@pecklaw.com
Ms. Harrod may be contacted at tharrod@pecklaw.com
Read the full story...
Lienor Dealing With “Show Cause” Summons by Condominium Unit Owner
September 01, 2026 —
David Adelstein - Florida Construction Legal UpdatesOne of the statutory vehicles to shorten a construction lienor’s statute of limitations to foreclose on a construction lien is through a “show cause” summons that essentially requires the lienor to foreclose on the lien within 20 days from receipt of the “show cause” summons. This is a statutory procedure under Florida’s Lien Law in
Fla. Stat. s. 713.21(4). If a lienor receives a “show cause” summons and lawsuit, the lienor should, without delay, counterclaim or file a separate lien foreclosure lawsuit within the 20-day period without exception. This is provided the lienor wants to move forward with its lien. If a lienor does not, the lien will be discharged of record. If you are a lienor and receive a “show cause” summons, please immediately consult with construction counsel that can best advise you and perfect your lien rights.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com