Jurisdiction Over Foreign Manufacturers in Construction Litigation
May 14, 2026 —
Timothy J. Repass & Miki J. Saito - Wood Smith Henning BermanA recent decision from the Washington Court of Appeals provides important guidance on personal jurisdiction over foreign product manufacturers in construction and infrastructure litigation. In King County v. Aquatherm GmbH, No. 85572-7-I (Wash.Ct. App.Div.I)(unpublished), the court addressed whether a German manufacturer could be sued in Washington for alleged defects in piping used in major public infrastructure projects. The ruling offers a detailed, fact-driven roadmap for how Washington courts evaluate jurisdiction over foreign manufacturers operating through layered distribution networks. It also reflects a broader trend toward focusing on real-world commercial conduct rather than formal corporate structure.
Background of the Case
King County sued after widespread failures in polypropylene piping installed at the King County Correctional Facility. The pipe, manufactured by Aquatherm GmbH in Germany, was marketed, distributed, and installed through a network of U.S.-based entities. Following a six-week trial, the jury returned a verdict exceeding $18 million on claims under the Washington Product Liability Act and Consumer Protection Act. Aquatherm challenged, among other things, the trial court's exercise of personal jurisdiction.
Reprinted courtesy of
Timothy J. Repass, Wood Smith Henning Berman and
Miki J. Saito, Wood Smith Henning Berman
Mr. Repass may be contacted at trepass@wshblaw.com
Ms. Saito may be contacted at msaito@wshblaw.com
Read the full story...
The GKN Aerospace Chemical Release and the Laws Designed to Address It
July 06, 2026 —
Sean M. Sherlock - Snell & WilmerOn May 21, 2026, a 34,000-gallon storage tank at the GKN Aerospace facility in Garden Grove, California began leaking methyl methacrylate (MMA), a volatile and highly flammable industrial chemical used to manufacture high-strength acrylic plastics. GKN Aerospace makes advanced military and commercial transparencies, such as aircraft canopies, windshields, cabin windows, bullet-resistant glass, and spacecraft windows.
In polymer chemistry lingo, MMA is known as a monomer. Monomers are like individual links to a chain. Under the right conditions they link up (react) with each other to form long-chained polymers, or plastics. MMA is an unstable monomer that requires controlled storage conditions to avoid setting off a polymerization (chain) reaction.
According to early reports, the MMA tank at GKN Aerospace overheated. The cause of the overheating is not yet clear, but the overheating may have created conditions enabling the MMA to initiate polymerization, which in turn generated heat, which in turn generated pressure, activating the tank’s pressure-relief system and releasing MMA vapor into the atmosphere. Concerns about a runaway reaction, massive release, and explosion led the Orange County Fire Authority to order evacuation of approximately 40,000 residents and closure of thirteen schools.
Read the full story...Reprinted courtesy of
Sean M. Sherlock, Snell & WilmerMr. Sherlock may be contacted at
ssherlock@swlaw.com
Traub Lieberman Partner Ryan Parker and Associates Robert Biferie and Matthew Groteke Win Final Summary Judgment on Behalf of Homeowner’s Insurance Company
November 02, 2026 —
Ryan S. Parker, Robert Biferie & Matthew Groteke - Traub LiebermanTraub Lieberman Partner Ryan Parker and Associates Robert Biferie and Matthew Groteke won final summary judgment on behalf of their client, a homeowner’s insurance company. The case related to a claim for damage caused by Hurricane Milton, which was reported more than ten months after the date of loss. The homeowner’s insurance company reviewed historical aerial photography of the roof and determined that there was no evidence of damage immediately after the Hurricane, which was inconsistent with the condition of the roof when it was inspected more than ten months later. Additionally, the homeowner’s insurance company was unable to determine when the interior water damage occurred due to the delay in reporting the claim. After a lawsuit was filed, the Traub Lieberman team took depositions of the Plaintiffs and the opposing expert and eventually filed a Motion for Summary Judgment based on the failure to timely report the claim and resulting prejudice to their client. The Court granted the Motion for Summary Judgment finding that notice of the claim was untimely as a matter of law and that the Plaintiffs failed to rebut the legal presumption of prejudice to the insurance company. As a result of the ruling, the insurance company has a valid claim for attorney’s fees.
Reprinted courtesy of
Ryan S. Parker, Traub Lieberman,
Robert Biferie, Traub Lieberman and
Matthew Groteke, Traub Lieberman
Mr. Parker may be contacted at rparker@tlsslaw.com
Mr. Biferie may be contacted at rbiferie@tlsslaw.com
Mr. Groteke may be contacted at mgroteke@tlsslaw.com
Read the full story...
Properly Taking Judicial Notice of Florida’s Building Code
October 12, 2026 —
David Adelstein - Florida Construction Legal UpdatesMany construction defects cases involve Florida’s Building Code. A recent non-construction case, BSREP II PBG Resort, LLC v Ginsburg, 2026 WL 265226 (Fla. 4th DCA 2026), discussed a court taking judicial notice of a provision in the Florida Building Code. This case was a premise liability case where the plaintiff tripped in an asphalt parking lot. The plaintiff, without complying with proper procedural notice protocol, asked the court to take judicial notice of a section of Florida’s Building Code, i.e., admitting this section as relevant evidence in the case. The trial court granted the request for judicial notice and the plaintiff used this as the basis of her cross-examination, the jury instructions, and closing argument that the violation of this section of Florida’s Building Code was evidence of negligence. This was in error.
First, Florida’s Building Code is NOT a statute but an administrative rule. Ginsburg, supra. As an administrative rule, a court “may” but is not obligated to take judicial notice of the rule – it is a permissive judicial notice request per Florida Statute s. 90.203 and 90.202(9). This is important because the trial court viewed Florida’s Building Code as a statute it mandatorily had to take judicial notice of per Florida Statute s. 90.201, which was in error. Because it was permissive, the plaintiff needed to comply with statutory procedural notice protocols, which the plaintiff failed to do.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Doctrine of Substantial Performance When It Comes to Payment
July 27, 2026 —
David Adelstein - Florida Construction Legal UpdatesA recent non-construction case touches upon the doctrine of substantial performance when it comes to payment. In this case, a club was to make two payments to secure a rapper’s attendance. The first payment was made. The second payment was made but was a few hundred dollars short of the agreed amount. The rapper did not show up. The club claimed it substantially performed its obligations. At first glance, the argument makes sense because the second payment fell only a few hundred dollars short. But that wasn’t the case when it comes to pre-commencement payment obligations:
Substantial performance applies only when the variance from the contract terms “is inadvertent or unintentional and unimportant so that the work actually performed is substantially what was called for in the contract.” However, when one party agrees to pay the other on or before a specific date, time is of the essence, and the payor is required to pay the payee on or before that date. “There is almost always no such thing as ‘substantial performance’ of payment between commercial parties when the duty is simply the general one to pay. Payment is either made in the amount and on the date due, or it is not.”
Big Gate Records, LLC v. Washington, 51 Fla.L.Weekly D1281a (Fla. 2nd DCA 2026) (internal citations omitted).
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
GRSM Ranked Among Top 5 Construction Law Firms by Construction Executive
September 21, 2026 —
Gordon Rees Scully MansukhaniGordon Rees Scully Mansukhani has been ranked the No. 5 construction law firm in the nation by Construction Executive in the magazine’s 2026 ranking of The Top 50 Construction Law Firms™.
“Being named in the top five underscores the talent, experience, and nationwide capabilities of our construction team,” said Allen Estes III and Angela Richie, Chairs of GRSM’s Construction practice. “We are honored to serve as trusted counsel to clients across the construction industry and remain committed to delivering strategic solutions that help them achieve their business and project objectives.”
In addition to this ranking, GRSM Construction practice group Co-Chairs Allen Estes and Angela Richie were featured in “Executive Insights 2026: Leaders in Construction Law,” where they shared insights on key risks to consider before signing construction contracts and discussed strategies for managing material cost volatility, supply-chain disruptions, and project delays.
Read the full story...Reprinted courtesy of
Gordon Rees Scully Mansukhani
When Arbitrators Overreach: Utah Supreme Court Trims an Award Built on an Unpled Claim
November 02, 2026 —
Tyson J. Prisbrey & Mark O. Morris - Snell & WilmerConstruction industry participants have long favored arbitration to resolve disputes, prizing its speed, confidentiality, and finality over traditional litigation. That finality, however, depends on arbitrators staying within the bounds of what the parties actually put before them. In RV Holdings 4, LLC, et al. v. Standard Fiber Investors, LLC, the Utah Supreme Court issued a rare rebuke of an arbitration award, holding that the arbitrator exceeded their authority by awarding damages on a claim the prevailing party never submitted for decision.
The dispute arose from a management-fee relationship between Standard Fiber, a bedding manufacturer, and several affiliated “Ridgeview” entities that provided financial and accounting oversight services. After Standard Fiber stopped paying management fees in 2020, the parties pursued their claims in arbitration. Ridgeview’s arbitration demand sought recovery under two specific theories: that a 2006 management services agreement remained in effect, and alternatively, that an oral “50/50 Agreement” entitled it to a share of fees paid to an affiliated entity. Notably, Ridgeview never asserted a claim for breach of a separate 2014 fee arrangement, and affirmatively disavowed reliance on it. The arbitrator rejected both of Ridgeview’s submitted theories and instead awarded Ridgeview $725,000 based on that unpled 2014 agreement. The district court confirmed the award, concluding that the arbitrator’s decision was rationally related to the parties’ arguments, including evidence Standard Fiber itself introduced about the 2014 arrangement.
Reprinted courtesy of
Tyson J. Prisbrey, Snell & Wilmer and
Mark O. Morris, Snell & Wilmer
Mr. Prisbrey may be contacted at tprisbrey@swlaw.com
Mr. Morris may be contacted at mmorris@swlaw.com
Read the full story...
Kahana Feld Obtains Favorable Result in High-Exposure NY Premises Liability Case
June 15, 2026 —
Leigh Katz - Kahana FeldKahana Feld partner Leigh Katz obtained a significant victory in a recent matter involving a videotaped alleged trip and fall on the sidewalk in front of the client’s commercial residence. The plaintiff claimed he suffered a knee injury that necessitated surgery, along with other assorted injuries that prevented him from continuing high-level athletic activities. Leigh was able to demonstrate that the fall was staged and received a voluntary discontinuance with prejudice.
At mediation, Leigh emphasized that KF’s expert witness challenged the plaintiff’s claim that the fall was caused by a sidewalk height differential after reviewing the videotape footage and determining the plaintiff’s fall began before his feet made contact with the alleged defect. Based on this analysis, the expert concluded the reported height differential did not initiate the fall, which supported KF’s position that the incident depicted in the video was unrealistic and appeared staged.
Read the full story...Reprinted courtesy of
Leigh Katz, Kahana FeldMs. Katz may be contacted at
lkatz@kahanafeld.com