BERT HOWE
  • Nationwide: (800) 482-1822    
    Medical building expert witness West Green Georgia multi family housing expert witness West Green Georgia Subterranean parking expert witness West Green Georgia townhome construction expert witness West Green Georgia casino resort expert witness West Green Georgia landscaping construction expert witness West Green Georgia structural steel construction expert witness West Green Georgia hospital construction expert witness West Green Georgia condominium expert witness West Green Georgia parking structure expert witness West Green Georgia custom home expert witness West Green Georgia tract home expert witness West Green Georgia housing expert witness West Green Georgia concrete tilt-up expert witness West Green Georgia office building expert witness West Green Georgia production housing expert witness West Green Georgia low-income housing expert witness West Green Georgia condominiums expert witness West Green Georgia mid-rise construction expert witness West Green Georgia retail construction expert witness West Green Georgia industrial building expert witness West Green Georgia custom homes expert witness West Green Georgia
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    West Green, Georgia

    Georgia Builders Right To Repair Current Law Summary:

    Current Law Summary: SB 563 stipulates that prior to filing a claim, a homeowner must give the contractor 30 day written notice detailing the nature of the defect. In response, contractor must provide (within 30 days of receipt) a written reply containing an offer of settlement, requirement of inspection or rejection. The law provides definitions relating to construction; offers immunity from liability for certain conditions; and sets up an alternative dispute resolution process.


    Construction Expert Witness Contractors Licensing
    Guidelines West Green Georgia

    No state license for general contracting required. License is required for Air Conditioning, Electrical, and Plumbing trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Home Builders Association of Albany & SW GA Inc
    Local # 1108
    PO Box 70424
    Albany, GA 31708
    http://www.hbaofalbany.com

    Home Builders Association of Greater Savannah
    Local # 1188
    7116 Hodgson Memorial Dr
    Savannah, GA 31406
    http://www.homebuildersofsavannah.com

    Golden Isles Home Builders Association
    Local # 1135
    218 Rose Drive
    Brunswick, GA 31520


    Home Builders Association of South GA
    Local # 1194
    PO Box 2950
    Valdosta, GA 31603
    http://www.hbasg.org

    Statesboro Home Builders Association
    Local # 1191
    1223 Merchants Way
    Statesboro, GA 30458


    Greater Columbus Home Builders Association
    Local # 1148
    6432 Bradley Park Dr
    Columbus, GA 31904
    http://www.gchba.com

    Home Builders Association Of Warner Robins
    Local # 1196
    PO Box 8297
    Warner Robins, GA 31095
    http://homebuilderswr.com/


    Construction Expert Witness News and Information
    For West Green Georgia
    Corporate Profile

    WEST GREEN GEORGIA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through more than four thousand construction defect and claims related expert designations, the West Green, Georgia Construction Expert Directory provides a streamlined multi-disciplinary expert retention and support solution to legal professionals and construction practice groups concerned with the effective resolution of construction defect and claims litigation. BHA provides building related consulting and expert witness support services to the industry's leading construction attorneys, Fortune 500 builders, insurers, owners, as well as a variety of public entities. Employing in house resources which comprise construction cost, scheduling, and delay experts, professional engineers, ASPE certified professional estimators, and construction safety professionals, the firm brings specialized expertise and local capabilities to the West Green region.

    West Green Georgia civil engineer expert witnessWest Green Georgia reconstruction expert witnessWest Green Georgia construction code expert witnessWest Green Georgia construction expert witnessWest Green Georgia slope failure expert witnessWest Green Georgia construction expert witnessesWest Green Georgia fenestration expert witness
    Construction Expert Witness News & Info
    West Green, Georgia

    Can Anything Supersede Excel in AEC?

    April 27, 2026 —
    If there’s one piece of software that dominates the business world across industries, it’s Microsoft Excel. Can AI finally dethrone the mighty spreadsheet? Memorable Spreadsheet Moments Everyone has memorable spreadsheet moments. I have a few. For example, my then-architecture firm was involved in more than a dozen housing developments abroad. I developed an Excel workbook that took the required number of households as input and automatically generated a breakdown of buildings and their apartment types for AutoCAD. This was urban planning and architectural design done with a spreadsheet. I also developed business software using Excel for project portfolio management. The prototype was later scaled into a commercial SaaS that is now used globally. Another memorable moment was when a property owner told me their Excel file grew so large that it ran out of rows and columns. That must have been before 2007, when the maximum number of columns on a sheet was still just 256 and the maximum number of rows was 65,536. The current limits are 1,048,576 rows and 16,384 columns, which I hope no one will exceed. Read the full story...
    Reprinted courtesy of Aarni Heiskanen, AEC Business
    Mr. Heiskanen may be contacted at aec-business@aepartners.fi

    Navigating Timelines and Technology: Patent Strategies for Space and Earth

    June 01, 2026 —
    More than half a century after the Apollo 11 landing fulfilled President John F. Kennedy’s bold vision, the global race back to the Moon is no longer theoretical. With renewed attention on NASA’s Artemis program and a surge of commercial investment in space infrastructure, lunar exploration is again shaping technology priorities here on Earth. Reprinted courtesy of Kate Nuehring Su, Engineering News-Record and Vanessa Wang, Engineering News-Record Read the full story...
    ENR may be contacted at enr@enr.com

    Late Notice Bars Insured’s Claim for Water Leak Damage

    August 11, 2026 —
    The federal district court granted the insurer’s motion for summary judgment dismissing the insured’s claim due to late notice. Global Approach, Inc. v. Scottsdale Ins. Co., 2026 U.S. Dist. LEXIS 120183 (S. D. Fla. June 1, 2026). Global suffered water damage on September 3, 2021, which originated in the bathroom of one of its rental properties. Global reported the claim to its insurer, Scottsdale, on October 19, 2021. Prior to reporting the claim, Global hired a handyman to inspect the property and then demolished the damaged area and repaired the bathroom. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Fraud Allegations Stymie Additional Insured’s Request for a Defense

    May 14, 2026 —
    The Federal District Court granted the insurer’s motion to dismiss the insured’s complaint seeking a defense of the underlying case alleging fraud. Renovation Realty, Inc. v. Colony Ins. Co., 2026 U.S. Dist. LEXIS 21409 (S.D. Cal. Jan. 30, 2026). Mara Fortin sued Renovation Realty and others (“Fortin litigation”) from the fraudulent sale of a residence. The underlying complaint alleged Renovation “deliberately misrepresented of the residence as ‘completely remodeled’ and ‘meticulously maintained’.” The defendants, however, including Renovation, “knew from sources including a pre-renovation termite report documenting fungus and dry rot . . . that the Property harbored pre-existing material defects.” Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Late Notice Bars Insured’s Claim for Wind Damage

    June 29, 2026 —
    The court found that a six-month delay in reporting damage from wind did not comply with the policy’s notice requirements. Touchmark Hotel Group, LLC v. Mt. Hawley Ins. Co., 2026 U.S. Dist. LEXIS 61910 (S.D. N. Y. March 24, 2026). A storm caused damage to Touchstone’s hotel on January 4, 2023. Touchstone’s corporate representative, Rohit Patel, testified that he was not at the property on the day of the storm. In a telephone call the next day, the manager of the property reported to Patel that he observed detached shingles from the roof the hotel in the parking lot. Patel testified that he did not file a claim at that time because Touchmark’s employees did not detect any water leakage in the building and because he did not believe that the cost of the damage from the storm would exceed the policy’s deductible. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Integration Can Inoculate in Utah

    July 20, 2026 —
    The Utah Court of Appeals recently reaffirmed, in the construction context, Utah’s strict approach to enforcing integration clauses to preclude parol evidence and other legal theories that would vary the written terms of a contract. In Reid v. All Surface LC, 2025 UT App 134, decided last September, the court affirmed in all respects the trial court’s grant of summary judgment based on the strength of an integration clause against a homeowner who sued a contractor for breach of contract, breach of the covenant of good faith and fair dealing, fraud, negligent misrepresentation, civil conspiracy, negligence, and breach of the implied warranty of habitability. More recently, however, the same court rejected those same arguments in Tidwell v. Jensen, 2026 UT App 13 as to tort claims arising from a used car sale. The facts in Reid were sympathetic to the plaintiff. After being told she had a mold issue near a defective basement shower, the plaintiff solicited bids. A remediation contractor advised that while it could address the mold, the shower replacement should be handled by someone else. The plaintiff contacted All Surface LC, a shower replacement contractor. During an interview, the sales representative stated that All Surface could “do full mold remediation, tear everything out, and reframe the shower.” The plaintiff ultimately retained All Surface, expecting it would both resolve the mold issues and replace the shower. Read the full story...
    Reprinted courtesy of Mark O. Morris, Snell & Wilmer
    Mr. Morris may be contacted at mmorris@swlaw.com

    Risks of Using an AI Chatbot for Legal Advice: Lessons from United States v. Heppner

    April 08, 2026 —
    Imagine that you are an executive (who is not a lawyer) and are concerned about what your company plans to do is legal. You could call your lawyer who might bill you for the call. Or, you can ask your AI chatbot, such as Claude or ChatGPT, about the legal risk. The chatbot will likely compliment you on the incisive question, provide you with highly confident answer (that may or may not be right) and will not bill you on an hourly basis. That is essentially what financial services executive Bradley Heppner did. It did not end well. A federal court recently ruled that Heppner’s chats with the AI tool Claude were not protected by attorney-client privilege or the work-product doctrine. That means that the other side (in this case, the federal government) could get access to his chatbot prompts, uploads and responses, and learn a great deal about, for example, whether Heppner knew what he was doing was illegal. Read the full story...
    Reprinted courtesy of Payne & Fears LLP

    PJM’s Reliability Backstop Procurement Proposal—Fast-Track Capacity to Meet Rising Large-Load Demand

    May 12, 2026 —
    In January, we discussed the Statement of Principles jointly signed by the National Energy Dominance Council and governors across the mid-Atlantic region—framing accelerating demand (especially from large-scale data centers) as an emergency reliability issue for PJM Interconnection, L.L.C. (PJM), the nation’s largest power grid operator. That policy signal is now becoming a near-term, accelerated procurement and contracting exercise. On April 8, 2026, PJM notified stakeholders of a critical issue fast path reliability backstop procurement process. PJM subsequently released a request for information (RFI) with respect to a proposed Reliability Backstop Procurement (RBP)—a one-time mechanism intended to attract significant new capacity to address projected reliability shortfalls driven by large-load growth. RBP compresses what is often a multiyear market and regulatory conversation into a fast-moving set of commercial choices. Developers, large loads, utilities and capital providers should be preparing now for (i) an accelerated bilateral contracting window and (ii) a standardized PJM-led backstop procurement if bilateral deals do not clear enough capacity. Reprinted courtesy of Stephen J. Humes, Pillsbury, Alicia M. McKnight, Pillsbury, Jason Drogin Atwood, Pillsbury and Andrew H. Jacobs, Pillsbury Mr. Humes may be contacted at stephen
    Attorney’s Fees Entitlement And Application Under Subcontract Default Provision

    Using Ambient Sound as Construction Progress Indicator

    “Other Insurance” and Indemnity Provisions Determine Which Insurer Must Cover
    Proposition 65: OEHHA to Consider Adding and Delisting Certain Chemicals of Concern

    Colorado Legislature Considers Series of Bills Aimed at Boosting Affordable Housing Construction in Colorado — What Homebuilders Need to Know

    Three's a Trend: Second, Fourth and Ninth Circuits Uphold Broad "Related Claims" Language

    Timber Prices Likely to Keep Rising

    New York Restaurant and Bar Fire Caused by Electric Defect

    Banks Loosening U.S. Mortgage Standards: Chart of the Day

    Skanska Found Negligent for Damages From Breakaway Barges

    Sales of Existing Homes in U.S. Fall to Lowest Since 2012

    Wendel Rosen Construction Attorneys Recognized by Super Lawyers

    The Court Rules in Favor of Partners Benjamin Price and Ajay Ahluwalia’s Arbitration Ruling Awarding Damages!

    A Word to the Wise: The AIA Revised Contract Documents Could Lead to New and Unanticipated Risks - Part II

    FirstEnergy Fined $3.9M in Scandal Involving Nuke Plants

    Is It Time to Digitize Safety?

    Insureds Prevail on Summary Judgment Addressing Responsibility for Water Leak

    Five New Laws to Know Before They Take Effect On Jan. 1, 2022

    Macron Visits Notre Dame 2 Years After Devastating Fire

    Want to Use Drones in Your Construction Project? FAA Has Just Made It Easier.

    One Industry, One Goal: Construction Safety Week 2026

    Home Prices in 20 U.S. Cities Increased 5% in Year to June

    Common Law Indemnification - A Primer

    Court of Appeal Confirms Privette Doctrine as Applied to Passive Conduct of Property Owner

    Ambiguity Kills in Construction Contracting

    Can a Lease Force a Tenant's Insurer to Defend the Landlord?

    Partner Vik Nagpal is Recognized as a Top Lawyer of 2020

    Negligent Construction an Occurrence Says Ninth Circuit

    Preventing Acts of God: Construction Accidents Caused by Outside Factors

    Coverage Established for Property Damage Caused by Added Product

    Insurer's In-House Counsel's Involvement in Coverage Decision Opens Door to Discovery

    Terminating Contracts for Convenience — “Just Because”

    Appraisers’ Failure to Perform Assessment of Property’s Existence or Damage is Reversible Error

    Stay of Coverage Case Appropriate While Court Determines Arbitrability of Dispute

    Axa Unveils Plans to Transform ‘Stump’ Into London Skyscraper

    Chicago Makes First Major Update to City's Building Code in 70 Years

    NEW DEFECT WARRANTY LAWS – Now Applicable to Condominiums and HOAs transitioning from Developer to Homeowner Control. Is Your Community Aware of its Rights Under the New Laws?

    Equitable Lien Designed to Prevent Unjust Enrichment

    With Wildfires at a Peak, “Firetech” Is Joining Smart City Lineups

    Designing the Process to Deliver Zero-Carbon Construction – Computational Design in Practice

    The World’s Largest 3D-Printed Neighborhood Is Here

    Climate-Proofing Your Home: Upgrades to Weather a Drought

    California Posts Nation’s Largest Gain in Construction Jobs

    New Report: Civil Engineering Salaries and Job Satisfaction Are Strong and Climbing at a Faster Rate Than Past Reports

    Paycheck Protection Program Forgiveness Requirements Adjusted

    House Passes Bill to Delay EPA Ozone Rule

    Building Materials Price Increase Clause for Contractors and Subcontractors – Three Options

    Ahead of the Storm: Preparing for Dorian

    Construction Liens and the “Substantial Performance” Doctrine

    Court Rejects Insurer's Argument That Two Triggers Required

    #1 CDJ Topic: McMillin Albany LLC v Superior Court of California

    Save a Legal Fee: Prevent Costly Lawsuits With Claim Limitation Clauses

    Defense Victory in Breach of Fiduciary Action