BERT HOWE
  • Nationwide: (800) 482-1822    
    mid-rise construction expert witness Parker Idaho parking structure expert witness Parker Idaho institutional building expert witness Parker Idaho high-rise construction expert witness Parker Idaho hospital construction expert witness Parker Idaho condominium expert witness Parker Idaho retail construction expert witness Parker Idaho custom homes expert witness Parker Idaho housing expert witness Parker Idaho concrete tilt-up expert witness Parker Idaho condominiums expert witness Parker Idaho structural steel construction expert witness Parker Idaho custom home expert witness Parker Idaho tract home expert witness Parker Idaho landscaping construction expert witness Parker Idaho multi family housing expert witness Parker Idaho office building expert witness Parker Idaho low-income housing expert witness Parker Idaho townhome construction expert witness Parker Idaho production housing expert witness Parker Idaho industrial building expert witness Parker Idaho Medical building expert witness Parker Idaho
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Parker, Idaho

    Idaho Builders Right To Repair Current Law Summary:

    Current Law Summary: HB133; title 6 increases builder liability by creating responsibility for attorney fees if the homeowner/HOA prevails; places stringent demands on builder to comply with statutes and repair/compromise/settle; compliance protects against liability for resultant personal property damage; NOR is triggered by any construction defect in a new or substantially remodeled dwelling; Owner must notice "professional"; pro must respond within 21 days; claimant must accept/reject within 30 days; or if the pro inspects, he must provide offer or statement within 14 days and claimant must accept/reject within 30 days; law appears, by definition, to impose same timelines on builder pro in cross-complaining


    Construction Expert Witness Contractors Licensing
    Guidelines Parker Idaho

    License required for electrical, plumbing, pesticide, manufactured housing, landscape architecture, and asbestos removal. No state license for general contracting.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Upper Valley Building Contractors Association
    Local # 1335
    310 North 2nd East Ste 143
    Rexburg, ID 83440
    http://www.uvbca.com

    Building Contractors Association of SW Idaho
    Local # 1325
    6206 N Discovery Way Ste A
    Boise, ID 83713
    http://www.bcaswi.org

    Idaho State Home Builders Association
    Local # 1300
    6206 N Discovery Way Ste A
    Boise, ID 83713
    http://www.ibca.org

    Building Contractors Association of Wood River Valley
    Local # 1395
    PO Box 2721
    Hailey, ID 83333


    Snake River Valley Building Contractors Association
    Local # 1375
    1123 12 Ave S
    Nampa, ID 83651
    http://www.srvbca.com

    Eastern Idaho Builders Association
    Local # 1340
    PO Box 1782
    Idaho Falls, ID 83403
    http://www.eihba.org

    Building Contractors Association of South East Idaho Afiil w/ National Associated Home Builders
    Local # 1305
    770 E Chubbuck Rd.
    Chubbuck, ID 83205
    http://www.idahohomebuilders.com


    Construction Expert Witness News and Information
    For Parker Idaho

    Court of Appeals Discusses Implied Duty of Good Faith and Fair Dealing in Public Works Contracting

    Reminder: Know Your Contractor Licensing Rules

    Microsoft Urges the Construction Industry to Deliver Lifecycle Value

    Construction Law- Where Pragmatism and Law Collide

    Residential Construction: Shrinking Now, Growing Later?

    Living With a Millennial. Or Grandma.

    City Council Authorizes Settlement of Basement Flooding Cases

    Federal Court Denies Summary Judgment in Leaky Condo Conversion

    Concrete Worker Wins Lawsuit and Settles with Other Defendant

    Key Amendments to Insurance Claims-Handling Regulations in Puerto Rico

    Corps Issues Draft EIS for Controversial Alaskan Copper Mine

    OSHA Aims to Address the Long Summer Days

    Denial of Coverage for Bulge in Wall Upheld

    Toolbox Talk Series Recap - Undocumented Change Work

    Hawaii Supreme Court Reaffirms an "Accident" Includes Reckless Conduct, Finds Green House Gases are Pollutants

    Signed, Sealed and (Almost) Delivered: EU Council Authorizes Signing of U.S. – EU Bilateral Insurance Agreement

    Ahlers Cressman & Sleight named one of the Top 50 Construction Law Firms

    Invest In America Act Offers 494 Billion In Funding to U.S. Infrastructure and Millions of New Jobs

    Property Owner’s Defense Goes Up in Smoke in Careless Smoking Case

    ASCE Releases New Report on Benefits and Burdens of Infrastructure Investment in Disadvantaged Communities

    Housing Starts in U.S. Beat 1 Million Pace for Second Month

    Handshake Deals Gone Wrong

    Supreme Court Addresses Newly Amended Statute of Repose for Construction Claims

    Limitations on the Ability to Withdraw and De-Annex Property from a Common Interest Community

    The Sounds of Silence: Pennsylvania’s Sutton Rule

    No Trial Credit in NJ Appellate Decision for Non-Settling Successive Tortfeasors – Must Demonstrate Proof of Initial Tortfeasor Negligence and Proximate Cause

    Sweat the Small Stuff – Don’t Overlook These Three (3) Clauses When Negotiating Your Construction Contract

    Three Steps to a Safer Jobsite

    Another Colorado District Court Refuses to Apply HB 10-1394 Retroactively

    Terminator’s Trench Rehab Drives L.A. Land Prices Crazy

    Contractor Underpaid Workers, Pocketed the Difference

    Detect and Prevent Construction Fraud

    Additional Dismissals of COVID Business Interruption, Civil Authority Claims

    Drill Rig Accident Kills Engineering Manager, Injures Operator in Philadelphia

    Construction Defects Lead to “A Pretty Shocking Sight”

    Why Are Developers Still Pouring Billions Into Waterlogged Miami?

    (Don’t) Go Fish

    Negligence Per Se Claim Based Upon Failure to Pay Benefits Fails

    Decline in Home Construction Brings Down Homebuilder Stocks

    Living Not So Large: The sprawl of television shows about very small houses

    Want to Make Your Jobsite Safer? Look to the Skies.

    Clean Water Act Cases: Of Irrigation and Navigability

    In Construction Your Contract May Not Always Preclude a Negligence Claim

    Steel Makeover Under Way for Brooklyn's Squibb Footbridge

    John Paulson’s $1 Billion Caribbean Empire Faces Betrayal

    Safety Guidance for the Prevention of the Coronavirus on Construction Sites

    Almost Half of Homes in New York and D.C. Are Now Losing Value

    Contractors: Revisit your Force Majeure Provisions to Account for Hurricanes

    New Jersey Court Washes Away Insurer’s Waiver of Subrogation Arguments

    The Godfather of Solar Predicts Its Future
    Corporate Profile

    PARKER IDAHO CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through more than 4500 construction and design related expert designations, the Parker, Idaho Construction Expert Directory delivers a superior construction and design expert support solution to attorneys and construction practice groups concerned with construction defect, scheduling, and delay matters. BHA provides building claims investigation, testimony, and support services to the building industry's most recognized companies, Fortune 500 builders, CGL carriers, risk managers, and a variety of municipalities. Employing in house resources which comprise testifying architects, design engineers, construction cost and standard of care experts, licensed general and specialty contractors, the firm brings national experience and local capabilities to Parker and the surrounding areas.

    Parker Idaho construction scheduling expert witnessParker Idaho hospital construction expert witnessParker Idaho consulting architect expert witnessParker Idaho building expertParker Idaho forensic architectParker Idaho expert witness roofingParker Idaho window expert witness
    Construction Expert Witness News & Info
    Parker, Idaho

    Conditional Payment Bond Consideration-Make Sure There Is Pay-If-Paid Provision

    June 29, 2026 —
    If a general contractor is going to have a conditional payment bond, it needs to ensure it subcontracts contain pay-if-paid or pay-when-paid provisions. This conditional payment language in subcontracts is the general contractor’s defense that it doesn’t have to pay a subcontractor UNTIL owner has paid the general contractor for the subcontractor’s work. The general contractor (and the surety) can look at the conditional payment bond with the s. 713.245 legend stamped on its face designating the conditional nature of the bond, and assume the conditional structure is locked in against the bond: no payment from the owner, no obligation to the subcontractors under the bond. But what happens when the subcontracts contain no express conditional payment language despite having a valid conditional payment bond? Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    2026 Top Business Risks for Construction and Engineering Companies

    May 26, 2026 —
    The 2026 Allianz Risk Barometer revealed some surprising findings for construction and engineering businesses. Now in its fifteenth year, this annual business risk ranking by corporate insurer Allianz Commercial incorporates the views of 3,338 global risk management professionals on the main perils on their radar for the year. Survey respondents included construction and engineering risk experts who identified the threats keeping them up at night. Here is how they ranked the top industry risks for 2026: Natural Catastrophes Natural catastrophe risk retains the top spot, with 38% of construction and engineering respondents citing this risk as their leading concern for 2026. From the insurance perspective, economic and insured losses remained high, albeit lower than the 10-year average. The evolving nature of natural catastrophes continues to pose significant challenges to businesses and the (re)insurance industry. Insured losses from natural catastrophes are set to reach $107 billion for 2025, according to Swiss Re—the sixth year in a row they have exceeded $100 billion, while economic losses are well in excess of $200 billion. Reprinted courtesy of Darren Tasker, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Dotted Line: How Construction Is Dealing with Cybersecurity in the Age of AI

    October 12, 2026 —
    Richard R. Volack, Partner in P&A’s New York office and Chair of the firm’s Cyber Security & Data Privacy practice, was recently quoted in “Dotted Line: How Construction Is Dealing with Cybersecurity in the Age of AI,” an article written by Construction Dive. The article examines how contractors’ increasing reliance on interconnected technologies and AI can make cyberattacks more sophisticated. It discusses the heightened risks for government contractors and smaller subcontractors, including the potential exposure of sensitive project information, personal data, and financial records. It also explores practical measures contractors can take to mitigate these risks, such as strengthening contractual protections, conducting penetration testing, obtaining appropriate cyber insurance, implementing multifactor authentication, and providing employees with regular cybersecurity training. Read the full story...
    Reprinted courtesy of Richard R. Volack, Peckar & Abramson, PC
    Mr. Volack may be contacted at rvolack@pecklaw.com

    Voluntary Dismissal of an Indemnity Claim Does Not Make the Subcontractor a “Prevailing Party,” Washington Court of Appeals Holds

    September 21, 2026 —
    In King County v. Walsh Construction Company II, LLC, No. 86503-0-I (Wash. Ct. App. Aug. 4, 2025), an unpublished decision from Division I of the Washington Court of Appeals, the Court affirmed the denial of a subcontractor’s request for prevailing-party attorney fees under an indemnity clause after the general contractor voluntarily dismissed its indemnity claims. Because the indemnity claim was no longer live and no determination of fault had occurred, the Court held that the trial court did not err in denying the request. ACS represented Walsh, the general contractor, in securing the denial of the fee request at the trial court that the Court of Appeals affirmed. A Pass-Through Indemnity Claim That Ended Before Fault Was Decided The dispute arose out of a public works contract under which King County hired Walsh Construction Company II, LLC (“Walsh”) to construct and install a conveyance pipeline. After the pipeline broke, King County sued Walsh for breach of contract and warranty, expressly identifying both Walsh and its subcontractor, Mears Group Inc., (“Mears”) as responsible. Walsh tendered defense and indemnity to Mears under the subcontract. Read the full story...
    Reprinted courtesy of Margarita Kutsin, Ahlers Cressman & Sleight PLLC
    Ms. Kutsin may be contacted at margarita.kutsin@acslawyers.com

    Urban Digital Twins: How Virtual Cities Could Help Build Smarter Cities

    August 11, 2026 —
    Traffic congestion, endless construction, flooded streets and power outages. For city leaders and residents alike, these disruptions are simply part of daily urban life. But an emerging tool, known as the urban digital twin, could help cities anticipate problems before they occur by allowing planners to simulate responses, stress-test infrastructure, and evaluate decisions before implementing them in the real world. What Is an Urban Digital Twin? An urban digital twin is a dynamic, data-driven virtual model of a real city. It uses AI analytics and combines 3D modeling with real-time data and information from sources such as IoT sensors, traffic cameras, satellite feeds, infrastructure databases, utility networks, and environmental data including weather systems and heat maps to create a continuously updated digital representation of the urban environment that mirrors infrastructure, movement and systems in real time. In other words, it is a living digital replica of a city. Read the full story...
    Reprinted courtesy of Pillsbury

    USDOT’s DBE Interim Final Rule: How It Affects Current and Out-to-Bid DOT and Airport Projects

    June 15, 2026 —
    In our April 16, 2026 post, we discussed the U.S. Department of Transportation’s Interim Final Rule (IFR) concerning Disadvantaged Business Enterprise (DBE) and Airport Concession Disadvantaged Business Enterprise (ACDBE) certification, specifically as it concerns transportation and airport projects in California. This post addresses a broader question: What does the IFR mean for current and out-to-bid DOT projects operating under pre-existing DBE goals? The answer is that the IFR did more than change who qualifies as a DBE. It also changed how federally funded transportation and airport projects must be handled during the re-evaluation period. This affects active contracts, pending procurements, airport projects, design-build teams, and anyone relying on old assumptions about DBE goals and counting of DBE and ACDBE credit. Read the full story...
    Reprinted courtesy of Zachary F. Jacobson, Seyfarth Shaw LLP
    Mr. Jacobson may be contacted at zjacobson@seyfarth.com

    Five Snell & Wilmer Partners Named to Utah Business’ 2026 Legal Elite

    September 29, 2026 —
    SALT LAKE CITY – Snell & Wilmer is pleased to announce that five partners have been named to Utah Business’ 2026 “Legal Elite.” The annual recognition honors leading Utah attorneys who are making a meaningful impact in their respective areas of practice. Honorees are peer-nominated and selected by a panel of experienced legal and law enforcement professionals based on their legal knowledge, commitment to ethical standards, and professional achievements. Wade R. Budge is a land use and real estate lawyer with significant experience advising developers and owners in all aspects of real estate development. He has negotiated entitlements for master planned communities, industrials projects, retail centers, office buildings, subdivisions, and mountain resorts throughout Utah. He also regularly represents clients in the use, acquisition, and disposition of real estate projects throughout the Western United States. Budge has advised developers in obtaining public incentives and using public finance tools, including tax increment financing, to facilitate new and redevelopment projects, and regularly advises clients with government relations matters involving state and local governments. Budge has negotiated public-private partnerships with dozens of local governments and with every one of the state’s development agencies, including the Point of the Mountain State Land Authority, the Military Installation Development Authority, and the Utah Fairpark Area Investment and Restoration District. Read the full story...
    Reprinted courtesy of Snell & Wilmer

    Insufficient Notice of Commencement and Construction Lien Rights

    August 03, 2026 —
    When a party is preserving their construction lien rights, the party will look to the recorded Notice of Commencement. This is the recorded document that provides the lienor with the information for purposes of preserving construction lien rights. A Notice to Owner company will typically rely on the Notice of Commencement to serve Notices to Owners from lower tiers not in contract with the owner. However, when it comes to preparing the lien, a lienor should look beyond just the Notice of Commencement and also look to the property appraiser’s website as a backstop. In a recent case, a window company had the homeowner sign the Notice of Commencement and then filled in the information. The company naturally did this for the convenience of the homeowner that probably was unfamiliar with the Notice of Commencement process. Regardless, information in the Notice of Commencement was inaccurate. It failed to include all the real property owners. Thus, when a payment dispute arose and a construction lien was prepared, it did not identify all of the real property owners. All of the real property owners were added later during the pendency of a lien foreclosure lawsuit. The trial court denied the lien because of the defective / insufficient Notice of Commencement — the lienor assumed the risk of error by filling out the information in the Notice of Commencement. The trial court further denied the lien holding that because the work did not commence within 90 days of the Notice of Commencement, the Notice of Commencement is void. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com