Insurer Cannot Raise Issues on Appeal that Were Not Presented to the Trial Court
June 15, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe Florida Court of Appeals affirmed a judgment on a collapse claim for the insured, rejecting the insurer’s arguments that were not presented to the trial court. Homeowner’s Choice Prop. & Cas. Ins, Co. v. Oakes, 2026 Fl. App. LEXIS 2086 (Fl. Ct. App. March 18, 2026).
The insured’s ceiling collapsed in the secondary home on the insured’s property. The claim was reported to the insurer, but coverage was denied after its investigation.
The insured sued the insurer for breach of contract. Under the Additional Coverage provisions of the policy, collapse was covered if it was “abrupt.” An abrupt collapse was not covered, however, if exclusions for “Fungi, Wet or Dry Rot” and “faulty, inadequate or defective design, specifications, workmanship, repair, construction, renovation, remodeling, materials or maintenance” applied. The collapse provisions contained no language stating that the coverage granted in the provision was also subject to all the other exclusions in the policy.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Brandy Price, Dean Pillarella Named to Lawdragon's "Next Generation" List
June 22, 2026 —
Lewis BrisboisCharlotte/North Charleston Partner Brandy G. Price and New York Partner Dean Pillarella have been selected to "The 2026 Lawdragon 500 X – The Next Generation," which recognizes emerging leaders in law.
Lawdragon's annual Next Generation listing highlights up-and-coming attorneys with fewer than 15 years in practice. The legal media company selected these honorees through a combination of peer nominations, extensive journalistic research by Lawdragon editors, and independent vetting.
Read the full story...Reprinted courtesy of
Lewis Brisbois
Miller Act Payment Bond Claim “No Nos!”
October 06, 2026 —
David Adelstein - Florida Construction Legal UpdatesA recent federal district court opinion, Sauer Construction, LLC v. United Structures of Georgia, LLC, 2026 WL 2522849 (M.D.Fla. 2026), addressed two worthy considerations when it comes to a Miller Act payment bond claim. And, when I am talking about considerations, I am really talking about “no-nos.” These are things you don’t do.
First, don’t file an untimely Miller Act payment bond lawsuit. Make sure, as a claimant, you file that lawsuit within one year from your final furnishing. In this case, the subcontractor claimant did not and tried to argue around the statute of limitations with an equitable tolling argument, i.e., that the statute of limitations should be equitably tolled to accommodate the late filing of the lawsuit. Guess what? The subcontractor was not successful. You are fighting an uphill (losing) battle when arguing equitable tolling because “traditional equitable tolling principles require that the claimant demonstrate extraordinary circumstances, such as fraud, misinformation, or deliberate concealment.” Sauer Construction, supra. This means you need ultra-persuasive evidence to support such equitable tolling principles. Actually, having this evidence is doubtful. Thus, timely file the Miller Act payment bond lawsuit. There is no legitimate reason not to.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
California Poised for the Most Significant Residential Construction Defect Reforms in Decades
September 01, 2026 —
Thomas D. Fama & Andrew J. Mallon - Wood Smith Henning BermanThe California Legislature is considering legislation that would dramatically alter the landscape of residential construction defect litigation. Assembly Bill 1903, currently pending before the Senate Judiciary Committee, proposes extensive amendments to California's Right to Repair Act (Civil Code sections 895-945.5) that would substantially strengthen procedural protections for builders while narrowing the scope of recoverable construction defect claims.
If enacted, the legislation would affect virtually every stage of a construction defect dispute- from the initial notice of claim through litigation and settlement- and would introduce an entirely new certification process for newly constructed condominium projects. This article details some of the most significant proposed changes.
Higher Burden for Construction Defect Plaintiffs
Perhaps the most consequential change is the bill's modification of the proof required to establish liability. current law generally requires a claimant to demonstrate the residence fails to satisfy one of the statutory performance standards established under the Right to Repair Act. AB1903 would instead require claimants to establish three separate elements:
- A violation of an applicable statutory performance standard;
- The violation caused appreciable, present, non-speculative physical damage to another building component; and
- The violation resulted from the original construction.
Reprinted courtesy of
Thomas D. Fama, Wood Smith Henning Berman and
Andrew J. Mallon, Wood Smith Henning Berman
Mr. Fama may be contacted at tfama@wshblaw.com
Mr. Mallon may be contacted at amallon@wshblaw.com
Read the full story...
The ROI of Estimating Accuracy in Preconstruction
September 15, 2026 —
Aaron Kivett - Construction ExecutivePrecision is the foundation of profitability in construction. Even minor quantity or pricing mistakes can swing bids anywhere from 5-15%, leading to project delays, unprofitable jobs or margin erosion through change orders. And worse, these losses can damage client trust and jeopardize long-term relationships that drive repeat business and future bids. Consistently
estimating accurately builds confidence, speeds up bidding and positions your company to win more profitable projects.
Estimating accuracy is where profit is either protected or lost. In construction, you make your biggest financial decisions before a project ever starts. Once a bid is won, most of the project’s cost structure is locked in. If the estimate is wrong, no amount of execution can fully fix those mistakes. That makes estimating accuracy a business issue, not just an operations issue.
Reprinted courtesy of
Aaron Kivett, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
New Executive Order on AI Innovation and Security: Key Takeaways for the Construction Industry
June 15, 2026 —
Richard R. Volack & Denis Serkin - Peckar & Abramson, PCOn June 2, 2026, President Trump signed an Executive Order titled “Promoting Advanced Artificial Intelligence Innovation and Security.” At its core, the Order is a cybersecurity and national-security measure rather than a broad regulation of how private companies develop or use AI. It directs federal agencies to harden government systems against AI-enabled cyber threats, establishes voluntary frameworks for collaboration between the federal government and the AI and critical-infrastructure sectors, and strengthens criminal enforcement against the malicious use of AI.
Notably, the Order expressly disclaims any intent to create a “mandatory governmental licensing, preclearance, or permitting” regime for the “development, publication, release, or distribution of new AI models.” Instead, the Executive Order seeks to “promote AI innovation and security” by working with the private sector to modernize government and private-sector information systems and harden them against external threats, protect intellectual property from exploitation or theft, and cultivate American AI capabilities.
Reprinted courtesy of
Richard R. Volack, Peckar & Abramson, PC and
Denis Serkin, Peckar & Abramson, PC
Mr. Volack may be contacted at rvolack@pecklaw.com
Mr. Serkin may be contacted at dserkin@pecklaw.com
Read the full story...
Can Anything Supersede Excel in AEC?
April 27, 2026 —
Aarni Heiskanen - AEC BusinessIf there’s one piece of software that dominates the business world across industries, it’s Microsoft Excel. Can AI finally dethrone the mighty spreadsheet?
Memorable Spreadsheet Moments
Everyone has memorable spreadsheet moments. I have a few. For example, my then-architecture firm was involved in more than a dozen housing developments abroad. I developed an Excel workbook that took the required number of households as input and automatically generated a breakdown of buildings and their apartment types for AutoCAD. This was urban planning and architectural design done with a spreadsheet.
I also developed business software using Excel for project portfolio management. The prototype was later scaled into a commercial SaaS that is now used globally.
Another memorable moment was when a property owner told me their Excel file grew so large that it ran out of rows and columns. That must have been before 2007, when the maximum number of columns on a sheet was still just 256 and the maximum number of rows was 65,536. The current limits are 1,048,576 rows and 16,384 columns, which I hope no one will exceed.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
GRSM Partner Debra Ellwood Meppen Recognized as 2026 Legal Visionary by Los Angeles Times
June 02, 2026 —
Gordon Rees Scully MansukhaniGordon Rees Scully Mansukhani proudly congratulates Partner Debra Ellwood Meppen on being named a 2026 Legal Visionary by the Los Angeles Times. The LA Times Studios 2026 Legal Visionaries List recognizes lawyers in Southern California who “exemplify a forward-thinking approach to the law, elevating both their profession and the people who depend on it.” Meppen is recognized for helping shape the future of the legal profession through her leadership, professionalism, and integrity.
Published as part of the May 2026 issue highlighting Southern California’s leading law firms and attorneys, the Legal Visionaries section honors attorneys making a significant impact on the legal industry and the broader business community.
Read the full story...Reprinted courtesy of
Gordon Rees Scully Mansukhani