BERT HOWE
  • Nationwide: (800) 482-1822    
    mid-rise construction expert witness Leavenworth Indiana high-rise construction expert witness Leavenworth Indiana concrete tilt-up expert witness Leavenworth Indiana retail construction expert witness Leavenworth Indiana industrial building expert witness Leavenworth Indiana office building expert witness Leavenworth Indiana condominium expert witness Leavenworth Indiana townhome construction expert witness Leavenworth Indiana landscaping construction expert witness Leavenworth Indiana housing expert witness Leavenworth Indiana multi family housing expert witness Leavenworth Indiana production housing expert witness Leavenworth Indiana casino resort expert witness Leavenworth Indiana structural steel construction expert witness Leavenworth Indiana custom homes expert witness Leavenworth Indiana tract home expert witness Leavenworth Indiana Subterranean parking expert witness Leavenworth Indiana hospital construction expert witness Leavenworth Indiana condominiums expert witness Leavenworth Indiana institutional building expert witness Leavenworth Indiana Medical building expert witness Leavenworth Indiana low-income housing expert witness Leavenworth Indiana
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Leavenworth, Indiana

    Indiana Builders Right To Repair Current Law Summary:

    Current Law Summary: According to SB45160, §IC 32-27-3-1&2 a claimant must provide written notice 60 days before filing an action. Within 21 days after service of the notice, the construction professional must serve a written response. Claimant must file list of known construction defects, description, and the construction professional responsible for each alleged defect (to the extent known).


    Construction Expert Witness Contractors Licensing
    Guidelines Leavenworth Indiana

    License required for plumbing. All other licensing is done at the local county level.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Home Builders Association of Southern Indiana
    Local # 1566
    1601 Greentree Court
    Clarksville, IN 47129
    http://www.hbasi.net

    Gibson Co Chapter
    Local # 1530
    PO Box 386
    Princeton, IN 47670


    Southwestern Indiana Builders
    Local # 1524
    2175 N Cullen Avenue
    Evansville, IN 47715
    http://www.sibaonline.org

    Builders Association of Dubois County
    Local # 1511
    1813 S A St
    Jasper, IN 47546
    http://www.dcbuilder.org

    Vincennes Area Chapter
    Local # 1563
    PO Box 531
    Vincennes, IN 47591


    River Valley Chapter of National Associated Home Builders
    Local # 1576
    PO Box 365
    Hanover, IN 47243


    Lawrence County Chapter
    Local # 1535
    201 Main Street c/o Hoosier Door
    Oolitic, IN 47451



    Construction Expert Witness News and Information
    For Leavenworth Indiana

    Mexico's Richest Man Carlos Slim to Rebuild Collapsed Subway Line

    Pursuing Claims for Loss Caused by Recent Kona Low Storms for Homeowners and Businesses

    Environmental Regulatory Provisions Embedded in the Infrastructure Investment and Jobs Act

    Wildfires, Silica Exposures and ESG-Friendly Solutions

    Arizona Court Cites California Courts to Determine Construction Defect Coverage is Time Barred

    After More than Two Years, USDOT Rejects WSDOT’s Recommendation to Reinstate Non-Minority Women-Owned DBEs into DBE Participation Goals

    Practical Pointers for Change Orders on Commercial Construction Contracts

    Celebrating Dave McLain’s Recognition in the Best Lawyers in America® 2025

    No Hiring Surge by Homebuilders Says Industry Group

    Colorado Legislature Considering Making it Easier to Prevail on CCPA Claims

    Fourth Circuit Clarifies What Qualifies As “Labor” Under The Miller Act

    McGraw Hill to Sell off Construction-Data Unit

    Owner Can’t Pursue Statutory Show Cause Complaint to Cancel Lien… Fair Outcome?

    What If Your CCP 998 Offer is Silent on Costs?

    Can I Be Required to Mediate, Arbitrate or Litigate a California Construction Dispute in Some Other State?

    The Three L’s of Real Estate Have New, Urgent Meaning

    No Indemnity Coverage Where Insured Suffers No Loss

    Asbestos Confirmed After New York City Steam Pipe Blast

    Daniel Ferhat Receives Two Awards for Service to the Legal Community

    In Review: SCOTUS Environmental and Administrative Decisions in the 2020 Term

    Connecticut Court Holds Unresolved Coverage Issues Makes Appraisal Premature

    Surety Requiring Collateral Security Under General Agreement of Indemnity

    Construction Defects as Occurrences, Better Decided in Law than in Courts

    This Is the Most Remote and Magical Hotel on Earth

    Human Eye Resolution Virtual Reality for AEC

    IRMI Expert Commentary: NY Highest Court Confronts Downstream Risk Transfer for Subcontractor Bodily Injury Claims

    Sanibel Causeway Repair: Contractors Flooded Site With Crews, Resources

    Real Estate & Construction News Round-Up (08/24/22) – Local Law 97, Clean Energy, and IRA Tax Credits

    Best Lawyers Honors Hundreds of Lewis Brisbois Attorneys, Names Two Partners “Lawyers of the Year”

    Wall Street Journal Analyzes the Housing Market Direction

    “But it’s 2021!” Service of Motion to Vacate Via Email Found Insufficient by the Eleventh Circuit

    Drone Operation in a Construction Zone

    Common Construction Contract Provisions: No-Damages-for-Delay Clause

    Timely Written Notice to Insurer and Cooperating with Insurer

    Substituting Materials and Failure to Comply with Contractual Requirements

    Colorado’s Housing Crisis: How S.B. 25-131 Could Be a Step in the Right Direction

    Suing a Local Government in Land Use Cases – Part 1 – Substantive Due Process

    Ahead of the Storm: Preparing for Dorian

    Caterpillar Said to Be Focus of Senate Overseas Tax Probe

    2017 Susan G. Komen Race for the Cure

    President Trump Announces New Steel Tariffs

    Florida Condo Collapse Victims Reach $1 Billion Settlement

    How A Contractor Saved The Day On A Troubled Florida Condo Project

    Buyer's Demolishing of Insured's Home Not Barred by Faulty Construction Exclusion

    Connecticut Court Finds Anti-Concurrent Causation Clause Enforceable

    How Not to Frustrate an Arbitrator: Common Mistakes Attorneys Should Avoid in Arbitration

    Double-Wide World Cup Seats Available to 6-Foot, 221-Pound Fans

    Renee Zellweger Selling Connecticut Country Home

    Newport Beach Partners Jeremy Johnson, Courtney Serrato, and Associate Joseph Real Prevailed on a Demurrer in a Highly Publicized Shooting Case!

    New York Team Secures Dismissal of Premises Liability Action Against Client
    Corporate Profile

    LEAVENWORTH INDIANA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Drawing from more than four thousand engineering, construction, and builders standard of care related expert designations, the Leavenworth, Indiana Construction Expert Directory delivers a comprehensive construction and design expert support solution to legal professionals and construction practice groups seeking effective resolution of construction defect and claims matters. BHA provides construction related trial support and expert consulting services to the nation's leading construction practice groups, Fortune 500 builders, general liability carriers, owners, as well as a variety of public entities. Employing in house assets which comprise construction delay claims experts, registered design professionals, professional engineers, and credentailed construction consultants, the firm brings regional experience and flexible capabilities to the Leavenworth construction industry.

    Leavenworth Indiana expert witness commercial buildingsLeavenworth Indiana hospital construction expert witnessLeavenworth Indiana architectural engineering expert witnessLeavenworth Indiana consulting general contractorLeavenworth Indiana building code compliance expert witnessLeavenworth Indiana construction expertsLeavenworth Indiana construction scheduling and change order evaluation expert witness
    Construction Expert Witness News & Info
    Leavenworth, Indiana

    Properly Taking Judicial Notice of Florida’s Building Code

    October 12, 2026 —
    Many construction defects cases involve Florida’s Building Code. A recent non-construction case, BSREP II PBG Resort, LLC v Ginsburg, 2026 WL 265226 (Fla. 4th DCA 2026), discussed a court taking judicial notice of a provision in the Florida Building Code. This case was a premise liability case where the plaintiff tripped in an asphalt parking lot. The plaintiff, without complying with proper procedural notice protocol, asked the court to take judicial notice of a section of Florida’s Building Code, i.e., admitting this section as relevant evidence in the case. The trial court granted the request for judicial notice and the plaintiff used this as the basis of her cross-examination, the jury instructions, and closing argument that the violation of this section of Florida’s Building Code was evidence of negligence. This was in error. First, Florida’s Building Code is NOT a statute but an administrative rule. Ginsburg, supra. As an administrative rule, a court “may” but is not obligated to take judicial notice of the rule – it is a permissive judicial notice request per Florida Statute s. 90.203 and 90.202(9). This is important because the trial court viewed Florida’s Building Code as a statute it mandatorily had to take judicial notice of per Florida Statute s. 90.201, which was in error. Because it was permissive, the plaintiff needed to comply with statutory procedural notice protocols, which the plaintiff failed to do. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    The “Pay When Paid” Clause in California Construction—Strategies as the Battle Continues

    August 03, 2026 —
    It is well known in California Construction circles that the “Pay If Paid” clause is illegal in this state. There is a great distinction, though, between this clause and a similar clause, known as a “Pay When Paid” clause. A pay if paid clause allows a contractor to tell a subcontractor that if the contractor is unpaid for the subcontractor’s work, then the contractor has no legal obligation to pay the subcontractor, ever. For a great variety of reasons, the California Supreme Court, in the case of Wm. R. Clarke Corp v. Safeco Ins. Co. of America (1997) 15 Cal.4th 882, declared this type of clause illegal in California Construction. Although the pay if paid clause is illegal in California, the pay when paid clause is still perfectly legal and is found in many subcontracts that contractors issue to their subcontractors. The pay when paid clause allows a contractor to delay paying its subcontractors until the dispute between the contractor and the property owner over payment has been resolved and the contractor is paid by the property owner. Although seemingly reasonable (since it merely delays payment until the contractor is paid by the owner, thereby providing a funding source to pay subcontractors), significant problems still arise. Read the full story...
    Reprinted courtesy of William L. Porter, Porter Law Group
    Mr. Porter may be contacted at bporter@porterlaw.com

    Federal Court Strikes Down New York’s Climate Superfund Act: What It Means for the “Polluter Pays” Movement

    September 28, 2026 —
    A federal judge in the Northern District of New York has struck down New York’s Climate Change Superfund Act, ruling that the “polluter pays” climate law is preempted by federal law and “simply beyond the limits of state law.” The court concluded that the Clean Air Act (CAA) does not authorize New York’s compensation scheme, which calculates liability based on greenhouse gas (GHG) emissions attributable to worldwide fossil fuel extraction and refining. It separately held that any cost-recovery demand against a foreign producer would be preempted under the constitutional foreign affairs doctrine, which limits state intrusion into matters committed predominantly to the federal government. The court directed the parties to file a status report by September 14, leaving the form of further relief unresolved. In practical terms, the court has decided that the Act is preempted and cannot be enforced but has not yet determined the precise terms of its final order, including whether to formally enjoin its enforcement. The decision in West Virginia v. James, Case No. 1:25-cv-00168 (N.D.N.Y. Aug. 31, 2026), issued by Chief U.S. District Judge Brenda K. Sannes, who was appointed by President Obama, marks the first judicial invalidation of a state climate superfund statute and carries significant implications for the climate superfund landscape and the three remaining lawsuits challenging these laws. Reprinted courtesy of Amanda G. Halter, Pillsbury, Ashleigh K. Myers, Pillsbury and Jillian Marullo, Pillsbury Ms. Halter may be contacted at amanda.halter@pillsburylaw.com Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com Read the full story...

    GRSM Ranked Among Texas’ 50 Largest Law Firms by Texas Lawyer

    August 03, 2026 —
    Gordon Rees Scully Mansukhani has been recognized byTexas Lawyer in its 2026 Texas 100 ranking, earning the No. 49 spot among the state’s largest law firms by attorney headcount. The annual report spotlights the continued strength of Texas’ legal market, with firms across the state collectively increasing lawyer headcount by 2% in 2025. “Texas continues to be one of the country’s most thriving legal and business markets, and we are proud to be recognized among the state’s largest law firms,” said Laura De Santos, Regional Oversight Partner for Texas. “Our continued growth shows the confidence our clients place in us, the exceptional talent of our attorneys, and our commitment to delivering seamless, high-quality legal services throughout Texas and across our 50-state platform.” Read the full story...
    Reprinted courtesy of Gordon Rees Scully Mansukhani

    Pay-If-Paid: What You Need to Know Before Signing on the Dotted Line

    August 03, 2026 —
    Buried deep in the fine print of a subcontract, a pay-if-paid clause may be looming. If you are a subcontractor or supplier, misreading these clauses can put your cash flow at risk. If you are an owner or general contractor, drafting them incorrectly can leave you with obligations you never intended — or unenforceable protections you were counting on. It is more important than ever to understand when pay-if-paid clauses hold up and when they do not, as well as recent litigation and drafting trends. Whether you are negotiating a new agreement, reviewing your standard form contracts, or staring down a payment dispute, understanding how Arizona law treats pay-if-paid clauses is essential. In this article, we break down key considerations, walk through the legal standards Arizona courts apply, and offer practical tips to consider to help you protect your payment rights on the next project. Reprinted courtesy of Christian Fernandez, Snell & Wilmer and Matthew Racioppo, Snell & Wilmer Mr. Fernandez may be contacted at cfernandez@swlaw.com Mr. Racioppo may be contacted at mracioppo@swlaw.com Read the full story...

    Nomos LLP Partner Garret Murai Recognized by Super Lawyers

    July 13, 2026 —
    Nomos LLP Partner Garret Murai has been recognized as a 2026 Northern California Super Lawyer honoree in the area of Construction Litigation. This is the thirteenth consecutive year he has been recognized by Super Lawyers. Super Lawyers, an annual listing of outstanding lawyers from more than 70 practice areas who have attained a high degree of peer recognition and personal achievement, is limited to no more than five percent (5%) of lawyers in a state who are selected through a multiphase process that includes a statewide survey of lawyers, independent research evaluation and peer reviews by practice area. Read the full story...
    Reprinted courtesy of Garret D. Murai, Nomos LLP
    Mr. Murai may be contacted at gmurai@nomosllp.com

    Location, Location, Location — But Which One? The Few Words in Your Construction Contract that Pick Where You Fight

    June 29, 2026 —
    Most professionals know the old real estate line: location, location, location. It turns out to be just as true for construction contracts as it is for property. Consider a recent case involving a project owner that hired two design firms for a project. When issues arose during construction, the owner sued the design firms in state court in Brazoria County, Texas, pursuant to the forum selection clause in the parties’ contracts. The defendants then removed the case to the federal district court in Galveston, a courthouse in a different county. But the owner wanted the case back in Brazoria County state court. Whether it got its wish came down to two words in the contract: “situated in.” This article is about words like those. A construction contract’s forum selection clause names the place for the fight nobody plans to have, and where that fight happens can shape how it goes. This article explains why the wording in your forum selection clause deserves careful reading before you sign a construction contract. It is not a deep dive into the mechanics of federal removal jurisdiction, and it is not an academic comparison of the terms “forum” and “venue.” Instead, it is a practical look at how courts actually read these clauses, so the location of a future fight is the one you intended. Read the full story...
    Reprinted courtesy of Brad Sands, Jones Walker, LLP
    Mr. Sands may be contacted at bsands@joneswalker.com

    Lienor Dealing With “Show Cause” Summons by Condominium Unit Owner

    September 01, 2026 —
    One of the statutory vehicles to shorten a construction lienor’s statute of limitations to foreclose on a construction lien is through a “show cause” summons that essentially requires the lienor to foreclose on the lien within 20 days from receipt of the “show cause” summons. This is a statutory procedure under Florida’s Lien Law in Fla. Stat. s. 713.21(4). If a lienor receives a “show cause” summons and lawsuit, the lienor should, without delay, counterclaim or file a separate lien foreclosure lawsuit within the 20-day period without exception. This is provided the lienor wants to move forward with its lien. If a lienor does not, the lien will be discharged of record. If you are a lienor and receive a “show cause” summons, please immediately consult with construction counsel that can best advise you and perfect your lien rights. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com