BERT HOWE
  • Nationwide: (800) 482-1822    
    tract home expert witness Midland Indiana office building expert witness Midland Indiana institutional building expert witness Midland Indiana concrete tilt-up expert witness Midland Indiana structural steel construction expert witness Midland Indiana Medical building expert witness Midland Indiana townhome construction expert witness Midland Indiana high-rise construction expert witness Midland Indiana casino resort expert witness Midland Indiana parking structure expert witness Midland Indiana low-income housing expert witness Midland Indiana Subterranean parking expert witness Midland Indiana retail construction expert witness Midland Indiana housing expert witness Midland Indiana industrial building expert witness Midland Indiana multi family housing expert witness Midland Indiana condominiums expert witness Midland Indiana custom homes expert witness Midland Indiana condominium expert witness Midland Indiana hospital construction expert witness Midland Indiana mid-rise construction expert witness Midland Indiana landscaping construction expert witness Midland Indiana
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Midland, Indiana

    Indiana Builders Right To Repair Current Law Summary:

    Current Law Summary: According to SB45160, §IC 32-27-3-1&2 a claimant must provide written notice 60 days before filing an action. Within 21 days after service of the notice, the construction professional must serve a written response. Claimant must file list of known construction defects, description, and the construction professional responsible for each alleged defect (to the extent known).


    Construction Expert Witness Contractors Licensing
    Guidelines Midland Indiana

    License required for plumbing. All other licensing is done at the local county level.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Monroe County Building Association
    Local # 1508
    3901 E Hagan St Ste H
    Bloomington, IN 47401
    http://www.mcbaindiana.org

    Dearborn Co Home Builders Association
    Local # 1522
    PO Box 21
    Aurora, IN 47001


    Jackson-Jennings Builders Association
    Local # 1574
    11990 W Mt Healthy Rd
    Columbus, IN 47201
    http://www.jjba.org

    Southeastern Indiana chapter
    Local # 1536
    394 W County Road 400 N
    Greensburg, IN 47240


    Lawrence County Chapter
    Local # 1535
    201 Main Street c/o Hoosier Door
    Oolitic, IN 47451


    Home Builders Association of Gtr Terre Haute
    Local # 1582
    2747 Sidenbender Rd
    Terre Haute, IN 47802
    http://www.hbaterrehaute.com

    River Valley Chapter of National Associated Home Builders
    Local # 1576
    PO Box 365
    Hanover, IN 47243



    Construction Expert Witness News and Information
    For Midland Indiana

    Palo Alto Proposes Time Limits on Building Permits

    Navigating the Diverging Landscape of Climate Disclosure Laws

    Robinson+Cole’s Amicus Brief Adopted and Cited by Massachusetts’s High Court

    Kadeejah Kelly Named to The National Black Lawyers’ “Top 40 Under 40” List

    Newmeyer & Dillion Announces New Partner Bahaar Cadambi

    Crypto and NFTs Could Help People Become Real Estate Tycoons

    Hiring the Right Expert For Your Construction Dispute

    Policy Renewals: Has Your Insurer Been Naughty or Nice?

    Florida Decides Against Adopting Daubert

    Miami's Condo Craze Burns Out on Strong Dollar

    Virginia General Assembly Tweaks Pay-if-Paid Ban

    Quick Note: Attorney’s Fees on Attorney’s Fees

    Contractor Disputes Report Amid Amazon Warehouse Collapse Lawsuit

    ACS Obtains Overwhelming Jury Trial Victory for General Contractor Client

    Changes to the Federal Rules – 2024

    Before Celebrating the Market Rebound, Builders Need to Read the Fine Print: New Changes in Construction Law Coming Out of the Recession

    Duty to Defend Broadly Applies to Entire Action; Insured Need Not Apportion Defense Costs, Says Maryland Appeals Court

    Commercial Construction Lenders Rejoice: The Pennsylvania Legislature Provides a Statutory fix for the “Kessler” Decision

    Toolbox Talk Series Recap - The New Science of Jury Trial Advocacy

    Official Tried to Influence Judge against Shortchanged Subcontractor

    No Coverage for Additional Insured for Construction Defect Claim

    Standing When It Comes to Real Property Owned by a Trust

    Contractors Struggle with Cash & Difficult Payment Terms, Could Benefit From Legal Advice, According to New Survey

    No Coverage Based Upon Your Prior Work Exclusion

    Suit Limitation Provisions in New York

    Digitalizing Cross-Laminated Timber Construction

    EPC Contractors Procuring from Foreign Companies need to Reconsider their Contracts

    Helsinki Stream City: A Re-imagining Outside the System

    Insureds' Experts Insufficient to Survive Insurer's Motion for Summary Judgment

    Lease-Leaseback Battle Continues as First District Court of Appeals Sides with Contractor and School District

    Dust Infiltration Due to Construction Defect Excluded from Policy

    Illinois Supreme Court Finds Construction Defect Claim Triggers Initial Grant of Coverage

    Did New York Zero Tolerance Campaign Improve Jobsite Safety?

    Celebrating 29 Years – Thank You for Your Continued Trust!

    Let the 90-Day Countdown Begin

    CDJ’s #5 Topic of the Year: Beacon Residential Community Association v. Skidmore, Owings & Merrill, et al.

    Differences in Types of Damages Matter

    Fixed Price, Fluid Quantities: The Hidden Risks in Lump Sum Agreements with Variable Units

    Ex-San Francisco DPW Director Sentenced to Seven Years in Corruption Case

    After 15 Years, Settlement Arrested at San Francisco's Millennium Tower

    Pass-Through Subcontractor Claims, Liquidating Agreements, and Avoiding a Two-Front War

    Court Sharpens The “Sword” And Strengthens The “Shield” Of Contractors’ License Law

    Quick Note: Be Careful with Pay if Paid Clauses (Both Subcontractors and General Contractors)

    Judgment for Insured Upheld After Insurer Rejects Claim for Hurricane Damage

    Veterans Day – Thank You for Your Service

    A Recap of the Supreme Court’s 2019 Summer Slate

    China Allows Construction to Resume of High-Rise Stopped for Last Decade

    Lien Waivers Should Be Fair — And Efficient

    Nine Firm Members Recognized as Super Lawyers or Rising Stars

    California Insurance Commissioner Lacks Authority to Regulate Formula for Estimating Replacement Cost Value
    Corporate Profile

    MIDLAND INDIANA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through more than four thousand construction claims related expert witness designations, the Midland, Indiana Construction Expert Directory provides a single point of reference for construction defect and claims related support to legal professionals and construction practice groups seeking effective resolution of construction defect and claims litigation. BHA provides building related consulting and expert witness support services to the nation's leading construction practice groups, Fortune 500 builders, general liability carriers, owners, as well as a variety of public entities. Employing in house resources which comprise construction delay claims experts, registered design professionals, professional engineers, and credentailed construction consultants, the firm brings national experience and local capabilities to Midland and the surrounding areas.

    Midland Indiana construction expert witnessesMidland Indiana defective construction expertMidland Indiana multi family design expert witnessMidland Indiana ada design expert witnessMidland Indiana architect expert witnessMidland Indiana engineering expert witnessMidland Indiana expert witness roofing
    Construction Expert Witness News & Info
    Midland, Indiana

    Substantial Evidence of Flood Loss is Not a Substitute for Required Proof of Loss

    April 20, 2026 —
    The court found that the insurer properly denied the insured’s claim for loss due to flood because a proof of loss was never submitted. Bay Haven at Coco Bay Condominium Association, Inc. v. Hartford Ins. Co. of the Midwest, 2026 U.S. Dist. LEXIS 6847 (M.D. Fla. Jan. 14, 2026). Bay Haven managed several condo buildings. When Hurricane Ian hit, it caused significant flood damage to these properties. Bay Haven held federal flood insurance policies through Hartford under “Write-Your-Own” policies. This meant Hartford was essentially a fiscal agent that managed policies and handled claims but paid them using federal funds. Following the storm, FEMA extended the usual 60-day deadline for filing a proof of loss to one year, or until September 28, 2023. Bay Haven did not submit its proofs of loss until November 2023. FEMA granted an extension but only for the specific amounts in the November requests. Hartford did not waive the 60-day proof of loss requirement for any other proof of loss. Hartford paid the amounts reflected in the November submissions. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    FERC Issues Show-Cause Orders: Impacts on California and Other Regional Power Markets

    July 13, 2026 —
    At an open meeting on June 18, 2026, the Federal Energy Regulatory Commission (FERC) issued show-cause orders under Section 206 of the Federal Power Act to the six FERC-jurisdictional RTOs/ISOs—PJM Interconnection, ISO New England, Midcontinent Independent System Operator, Southwest Power Pool, New York Independent System Operator and California Independent System Operator—along with their transmission owners (TOs), directing each region and the TOs to justify or revise tariff provisions governing how data centers and other large loads connect to and receive transmission service from the grid. These show-cause orders will impact several power markets across the country, including California. Reprinted courtesy of Stephen J. Humes, Pillsbury, Alicia M. McKnight, Pillsbury and Jason Drogin Atwood, Pillsbury Mr. Humes may be contacted at stephen.humes@pillsburylaw.com Ms. McKnight may be contacted at alicia.mcknight@pillsburylaw.com Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com Read the full story...

    Four Families Now Live in the Season Six Rock the Block Homes in Grantsville, Utah

    April 20, 2026 —
    SALT LAKE CITY, April 20, 2026 /PRNewswire/ -- The premier of Rock the Block season seven aired last Monday and is set in Las Vegas, Nevada. Rock The Block is HGTV's highest rated show. Last year, season six was set in Utah and had HGTV's highest rating yet, with over 14 million viewers. All episodes of season six were filmed in the Worthington Ranch community in Grantsville, Utah. The four homes on the show were built by Utah builder Hamlet Homes. During the show, the location of the four Rock The Block homes had to be kept secret and were surrounded by a locked gate. After over a year of being inaccessible, the Utah public was invited in May 2025 to tour the homes and help raise money together for charity. On May 30-31, 2025, Hamlet hosted a 'Rock The Block Party' where the public was able to walk through the homes made famous by the show. Hamlet Owner, VP of Marketing & Design Tami Ostmark shares stories from the show and her perspective of what it's like to be the builder on a national show like this. Ostmark was on set almost the entire time. "As expected, there were times when there was tension on the set. All four designers were super competitive with each other. It's amazing that the production team was able to produce the show as well as they did. I'm very impressed," said Ostmark. Another interesting point related to the show is how much work the local builder is responsible for. Some nights as many as 30 Hamlet team members worked through the night to keep up with the pace of production. "Each designer provided their own trusted carpenters to do finishing work. In two of the cases, designers' flew their favorite carpenters in to carry out their visions. Given the quick turnaround, it's not always practical for finishing work to be permanent. Sometimes, it just needs to look appealing on camera," said Ostmark. This is frequently referred to as 'TV Magic'. "When the show was over, Hamlet re-did any areas that required extra attention". The show really does shoot in only 7 weeks as depicted. This creates a fast pace that was very exciting to be a part of", continued Ostmark. All four of the homes featured on the show have since been purchased; four Utah families currently call them home. ABOUT HAMLET HOMES Hamlet Homes (www.hamlethomes.com) crafts quality customer-oriented townhomes and single-family homes located in attractively designed communities in Utah and Idaho. Since the company's founding in 1995, Hamlet has built over 5,000 homes in 80 communities. The company is a proud recipient of many awards on Sustainable Business & Design, Quality Builder Awards; recognized both locally and nationally. Named by the Salt Lake Chamber of Commerce as the 'Veteran Owned Small Business of the Year, in 2019'. Hamlet has since been named several times to the Professional Builder's Housing Giants List and annual HOME AWARDS Best Customer Experience. Most recently in 2026, Hamlet was named Utah's 'Best of State for Real Estate Development and Utah Businesses 'Best Companies to Work For' for the 6th consecutive year.

    2026 Colorado Super Lawyers Recognizes 11 Snell & Wilmer Attorneys

    May 05, 2026 —
    DENVER – Snell & Wilmer is pleased to announce that eleven attorneys in its Denver office have been selected for inclusion in the 2026 Colorado Super Lawyers publication. Of those eleven, four were recognized as Rising Stars. Super Lawyers is a listing of lawyers from more than 70 practice areas who have attained a high degree of peer recognition and professional achievement. The selection process is multi-phased and includes independent research, peer nominations, and peer evaluations. The final published list represents no more than 5 percent of the lawyers in the state. Read the full story...
    Reprinted courtesy of Snell & Wilmer

    Congratulations to BWB&O’s Orange County Team for Securing a Strong MSJ Result in a Residential Gas Explosion Matter!

    May 14, 2026 —
    Huge Congratulations to Partner Kevin Wheeler and Associate Lindsey Wells for securing a strong result on a Motion for Summary Judgment / Summary Adjudication filed on behalf of their client, the City of Murrieta. This was a complex, multi-party matter arising from a residential gas leak and explosion, where Plaintiffs alleged the City and MFPD failed to properly respond to the incident. After multiple complaints were consolidated and extensive defense work narrowed the case, eighteen plaintiffs remained asserting five causes of action against the City, prompting a comprehensive MSJ/MSA targeting liability, causation, and damages. The Court’s ruling reflects a significant win, particularly on the immunity framework. The Court eliminated the core negligence and assumed-duty claims arising from fire protection and emergency response activities. It further disposed of the misrepresentation and public nuisance claims. At the end of the day, three plaintiffs were dismissed entirely for failure to comply with Government Claims Act requirements, further reducing the scope of the case. While the dangerous condition claim remains, it does so in a very limited posture. Read the full story...
    Reprinted courtesy of Bremer Whyte Brown & O'Meara LLP

    The AI Knows Too Much: When Employees Feed Trade Secrets into Generative AI Tools

    April 14, 2026 —
    Every time an employee pastes proprietary source code, a customer list, or a confidential business strategy into ChatGPT, Claude, or Google Gemini, they may be quietly dismantling the legal protections that make those secrets worth protecting. Courts and regulators are only beginning to grapple with this problem, and right now, the burden of preventing it falls squarely on employers. The Legal Stakes Under the federal Defend Trade Secrets Act (“DTSA”) and the Uniform Trade Secrets Act (“UTSA”) as adopted across most states, a trade secret plaintiff must show that the information at issue was subject to reasonable measures to maintain its secrecy. Courts have historically credited measures like confidentiality agreements, physical access controls, and employee training—but those safeguards were designed for a world of thumb drives and disgruntled employees. They were not built for a world where a well-meaning engineer can, in seconds, transmit an entire corpus of proprietary data to a third-party AI platform operating under terms of service that may permit the provider to use inputs for model training. Reprinted courtesy of Kazim A. Naqvi, Sheppard and John V. Mysliwiec, Sheppard Mr. Naqvi may be contacted at knaqvi@sheppard.com Mr. Mysliwiec may be contacted at jmysliwiec@sheppard.com Read the full story...

    Generic Complaint Alleging Bad Faith is Insufficient

    August 24, 2026 —
    The federal district court granted the insurer’s motion for judgment on the pleadings after determining that the insured’s claims for bad faith and unfair claims settlement practices were insufficiently pled. Navia v. State Farm Fire & Cas. Co., 2026 U.S. Dist. LEXIS 111261 (W.D. N. C. May 20, 2026). The insured submitted a claim for damages to real property owned by the insured allegedly caused by Hurricane Helene. State Farm advised the insured that only some of the claimed damages were covered by the policy and payment for such damages were denied because the estimate for the covered damages did not exceed the policy’s deductible. The insured sued asserting claims for breach of contract, bad faith, and unfair claim settlement practices. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    World's Longest Immersed Tunnel Passes Milestone, But Faces Delays

    August 03, 2026 —
    Work on the $8-billion Fehmarnbelt Tunnel, which is planned to link Germany and Denmark as the world’s longest immersed tunnel, is progressing as crews achieved a milestone last month with the successful immersion of its first precast concrete element. But Danish state-owned project owner Femern A/S says the plan is now running at least two years behind schedule and the tunnel’s road and rail portions will open in two separate stages. Read the full story...
    Reprinted courtesy of James Leggate, Engineering News-Record
    Mr. Leggate may be contacted at leggatej@enr.com