Turning Expert Services into Products
July 20, 2026 —
Aarni Heiskanen - AEC BusinessA Finnish engineering, architecture, and project consulting company, AINS Group, recently opened an online store to purchase fixed-price services. The store presents specialist work in a product-like format, with fixed service names, defined scopes, and visible prices, such as a building history report, a zoning plan cost analysis, and a technical preliminary survey for a property transaction.
Is this productization a smart move or a sign that expert services are being commoditized?
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Bridging the Gap at Alaska’s Juneau Creek
September 21, 2026 —
Tim Newcomb - Engineering News-RecordThe largest single-span steel plate girder bridge launch in the nation wasn’t about setting records. Alaska’s Juneau Creek Bridge design was a matter of necessity. The fully erected steel plate girder bridge, featuring a 440-ft main span hovering 285 ft above the Juneau Creek, was part of the larger Sterling Highway project. It offered a logistical challenge but was chosen among over a dozen bridge types due to the unique constraints brought by the mountainous site.
Read the full story...Reprinted courtesy of
Tim Newcomb, Engineering News-RecordENR may be contacted at
enr@enr.com
Jurisdiction Over Foreign Manufacturers in Construction Litigation
May 14, 2026 —
Timothy J. Repass & Miki J. Saito - Wood Smith Henning BermanA recent decision from the Washington Court of Appeals provides important guidance on personal jurisdiction over foreign product manufacturers in construction and infrastructure litigation. In King County v. Aquatherm GmbH, No. 85572-7-I (Wash.Ct. App.Div.I)(unpublished), the court addressed whether a German manufacturer could be sued in Washington for alleged defects in piping used in major public infrastructure projects. The ruling offers a detailed, fact-driven roadmap for how Washington courts evaluate jurisdiction over foreign manufacturers operating through layered distribution networks. It also reflects a broader trend toward focusing on real-world commercial conduct rather than formal corporate structure.
Background of the Case
King County sued after widespread failures in polypropylene piping installed at the King County Correctional Facility. The pipe, manufactured by Aquatherm GmbH in Germany, was marketed, distributed, and installed through a network of U.S.-based entities. Following a six-week trial, the jury returned a verdict exceeding $18 million on claims under the Washington Product Liability Act and Consumer Protection Act. Aquatherm challenged, among other things, the trial court's exercise of personal jurisdiction.
Reprinted courtesy of
Timothy J. Repass, Wood Smith Henning Berman and
Miki J. Saito, Wood Smith Henning Berman
Mr. Repass may be contacted at trepass@wshblaw.com
Ms. Saito may be contacted at msaito@wshblaw.com
Read the full story...
Consider The Limited Warranty from Your Homebuilder
July 06, 2026 —
David Adelstein - Florida Construction Legal UpdatesWhen purchasing a home from a homebuilder, there is an important consideration when it comes to the limited warranty you receive around the time you close on the home. That limited warranty likely includes an arbitration provision requiring you to arbitrate your disputes, such as construction defect claims, against the homebuilder. That arbitration provision will most likely include all claims, including statutory claims (such as a statutory violation of a building code claim), requiring you to arbitrate, as opposed to litigate, your disputes against the homebuilder. This is an important consideration. If the arbitration provision does not allow you to arbitrate all of your claims, and eliminates your rights to legitimate statutory claims, the arbitration provision could be unenforceable.
By way of example, in a residential construction defect dispute, Anderson v. Taylor Morrison of Florida, Inc., 223 So.3d 1088 (Fla. 2d DCA 2017), the appeal turned on whether the arbitration provision in the homebuilder’s limited warranty was valid. The homeowners took possession of their home in 2009. In 2015, the homeowners served a Florida Statutes Chapter 558 notice of construction defects that included a statutory violation of a building code claim under Florida Statute §553.84. The limited warranty included an arbitration provision that specified it was the “exclusive remedy” for all disputes arising out of or related to the warranty or issues with the home and property. When read together with the warranty’s disclaimer that precluded claims not covered by the warranty “whether in contract, tort, or otherwise,” the statutory building code violation claim could not be remedied through arbitration because it fell outside the warranty’s coverage.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Inaccurate Representations Can Lead to Differing Site Conditions Claim
May 26, 2026 —
David Adelstein - Florida Construction Legal UpdatesIn the
prior posting, I discussed a case dealing with a differing site condition. In that case, the owner did not have an affirmative duty to make a representation and there was no inaccurate representation made by the owner that misled the contractor.
Well, what about when there is an inaccurate misrepresentation regarding the site? This was the circumstance in an older Florida case where a dredging contractor had a successful differing site conditions claim. See Jacksonville Port Authority v. Parkhill-Goodloe, Co., Inc., 362 So.2d 1009 (Fla. 1st DCA 1978).
The government provided inaccurate information as to the lack of rock that would be encountered during the dredging that was relied on by the dredging contractor. But the government had “
superior knowledge” that there was rock in an adjacent location based on a prior claim from a contractor, yet the government did not disclose the possibility that rock could be encountered.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
SDV Celebrates 30th Anniversary Press Release
April 08, 2026 —
Saxe Doernberger & Vita, P.C.Trumbull, Connecticut – Saxe Doernberger & Vita, P.C. (SDV) is proud to announce the celebration of its 30th anniversary.
Founded in 1996 by three attorneys in a small New Haven, Connecticut office, SDV was built on a clear and focused mission: representing policyholders in insurance coverage matters. Three decades later, that commitment remains at the core of the firm’s identity and has been instrumental in its continued success and reputation nationwide.
Today, SDV is a nationally recognized boutique firm with 50 attorneys serving policyholders across the United States. Building on its longstanding reputation for excellence and client advocacy, the firm is pleased to announce the opening of its newest office in Massachusetts—an exciting milestone that reflects SDV’s continued growth. The new office is led by Managing Partner Anna Perry.
Read the full story...Reprinted courtesy of
Saxe Doernberger & Vita, P.C.
Surety Liability Is Coextensive with Its Bond Principal
April 14, 2026 —
David Adelstein - Florida Construction Legal UpdatesA recent Miller act payment bond case, U.S. f/u/b/o Whitetail General Constructors v. Northcon, Inc., 2026 WL 46671 (D.Mont. 2026), contains a short noteworthy discussion as to a surety’s liability being coextensive with that of its bond principal. If you are bonded, or you are pursuing a bond, you need to appreciate this, which is why this is a noteworthy discussion:
A “surety’s liability on a Miller Act bond must be at least coextensive with the obligations imposed by the Act if the bond is to have its intended effect.” “Therefore, ‘the liability of a surety and its principal on a Miller Act payment bond is coextensive with the contractual liability of the principal only to the extent that it is consistent with the rights and obligations created under the Miller Act.’” In other words, “[w]here a subcontract’s terms are consistent with the Miller Act’s provisions, the surety’s liability on the Miller Act bond is coextensive with the contractual liability of its princip[al].”
“The liability of a surety under the Miller Act is controlled by federal law, rather than state contract law[.]” The court may, however, “look to state law when interpreting contractual provisions” in a Miller Act case.
“[T]he measure of recovery under the Miller Act is generally determined by the terms of the subcontract [or underlying contract].”
Northcon, supra, at *4-5 (internal citations omitted).
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Kahana Feld Obtains Favorable Result in High-Exposure NY Premises Liability Case
June 15, 2026 —
Leigh Katz - Kahana FeldKahana Feld partner Leigh Katz obtained a significant victory in a recent matter involving a videotaped alleged trip and fall on the sidewalk in front of the client’s commercial residence. The plaintiff claimed he suffered a knee injury that necessitated surgery, along with other assorted injuries that prevented him from continuing high-level athletic activities. Leigh was able to demonstrate that the fall was staged and received a voluntary discontinuance with prejudice.
At mediation, Leigh emphasized that KF’s expert witness challenged the plaintiff’s claim that the fall was caused by a sidewalk height differential after reviewing the videotape footage and determining the plaintiff’s fall began before his feet made contact with the alleged defect. Based on this analysis, the expert concluded the reported height differential did not initiate the fall, which supported KF’s position that the incident depicted in the video was unrealistic and appeared staged.
Read the full story...Reprinted courtesy of
Leigh Katz, Kahana FeldMs. Katz may be contacted at
lkatz@kahanafeld.com