The Deadline to File Suit on a Public Works Payment Payment Bond is Triggered by a Claimant’s Work on a Project Not by a Claimant’s Work Under a Contract
June 02, 2026 —
Garret D. Murai - California Construction Law BlogCalifornia law requires that prime contractors furnish a payment bond – providing for payment to lower-tiered subcontractors and suppliers – on state and local public works projects with a value in excess of $25,000. There are three conditions that must be satisfied when a claimant makes a claim against a payment bond on a public works project in California:
- First, generally, the claimant must have served a preliminary notice, unless the claimant is a first-tier subcontractor or supplier;
- The claimant must have “ceased to provide work” on the project; and
- The claimant must file suit against the payment bond no later than six (6) months after the period in which a stop payment notice must be given or, in other words, the earlier of 270 days after completion of the public works project or 210 days after a notice of completion or cessation was recorded on a public works project.
In
Tarlton & Sons, Inc. v. Great American Insurance Company, 111 Cal.App.5th 376 (2025), the 2nd District Court of Appeal examined whether a subcontractor timely filed a claim against a payment bond when a prime contractor was terminated and replaced by another prime contractor who the subcontractor continued to perform work for.
Read the full story...Reprinted courtesy of
Garret D. Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Late Notice Bars Insured’s Claim for Water Leak Damage
August 11, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court granted the insurer’s motion for summary judgment dismissing the insured’s claim due to late notice. Global Approach, Inc. v. Scottsdale Ins. Co., 2026 U.S. Dist. LEXIS 120183 (S. D. Fla. June 1, 2026).
Global suffered water damage on September 3, 2021, which originated in the bathroom of one of its rental properties. Global reported the claim to its insurer, Scottsdale, on October 19, 2021. Prior to reporting the claim, Global hired a handyman to inspect the property and then demolished the damaged area and repaired the bathroom.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Cuomo Bridge Lawsuit Adversaries Weigh Mediated Settlement
July 06, 2026 —
Richard Korman - Engineering News-RecordRival legal teams have reached a critical juncture as they consider a mediated settlement in one of two major payment lawsuits pending between a design-build contracting team and the New York State Thruway Authority over construction of the more than $3-billion Mario M. Cuomo Bridge north of New York City.
Read the full story...Reprinted courtesy of
Richard Korman, Engineering News-RecordMr. Korman may be contacted at
kormanr@enr.com
Ninth Circuit Holds That Policies Covering Environmental Claims Do Not Have Aggregate Limits
May 12, 2026 —
Lorelie S. Masters & Joseph T. Niczky - Hunton Insurance Recovery BlogIn the case of
County of San Bernardino v. Insurance Company of the State of Pennsylvania, the Ninth Circuit recently addressed the issue of whether general liability policies issued in the 1960s and 1970s included aggregate limits for claims arising under the premises-operations coverage in CGL policies. The difference between the policyholder’s interpretation of the policies’ limits clauses and the insurer’s interpretation was worth hundreds of millions of dollars in exposure for the insurer. The Court closely examined the policy language and extrinsic evidence from both the insurance industry’s drafting history and the parties before concluding that the policies were ambiguous. The Court construed that ambiguity in favor of the policyholder and ruled that aggregate limits did not apply to the claims at issue. The Court’s decision underscores the importance of carefully examining a policy’s limits, especially for older policies written before 1986 when the insurance industry revised the standard-form CGL policy to state the aggregate limits apply not only to products liability claims but to premises-operations claims as well. Decades of insurance industry drafting history confirms, as the policyholder’s submissions in this case indicate, that the industry well understood that operations claims like the environmental waste-disposal claims at issue here typically were not subject to aggregate limits.
Reprinted courtesy of
Lorelie S. Masters, Hunton Andrews Kurth LLP and
Joseph T. Niczky, Hunton Andrews Kurth LLP
Ms. Masters may be contacted at lmasters@hunton.com
Mr. Niczky may be contacted at jniczky@hunton.com
Read the full story...
Lost in Translation: AEC Tech’s Missing Role
May 12, 2026 —
Aarni Heiskanen - AEC BusinessI once visited a construction site where the contractor’s headquarters had commissioned a tech company to build an on-site quality-inspection application. The developer had admitted to the site engineer that they had never set foot on a construction site before. The engineer showed me what he was actually using: his own phone camera and an Excel sheet. The new app did not map to how work actually happened on site.
This is not an isolated story. The vendor builds something technically coherent but operationally disconnected. The client, somewhere up the chain, had fallen in love with the idea of the solution before anyone had built an honest business case for it.
The result is a tool that gets demonstrated at a board meeting but isn’t used in the field.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Insured’s Failure to Determine Depreciation When Presenting Claim for Replacement Cost Value
August 16, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe Third Circuit affirmed the district court’s granting of summary judgment to the insurer when the insured submitted replacement cost value of the loss but did not include a determination of depreciation. Kimmel v. Massachusetts Bay Ins. Co., 2026 U.S. App. LEXIS 16569 (3d Cir. June 9, 2026).
A lightning strike downed a tree on the insured’s property, causing extensive damage to the home. The insured had a homeowner’s policy with Massachusetts Bay Insurance Company (MBIC). MBIC denied the claim, determining that much of the claimed damage already existed and that several policy exclusions otherwise barred coverage. The insured filed suit for breach of contract and bad faith.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Shane Singh Named One of Los Angeles Business Journal's 'Top 100 Lawyers of Los Angeles' for 2026
April 27, 2026 —
Lewis BrisboisSacramento Partner Shane Singh has been named one of the Los Angeles Business Journal's "Top 100 Lawyers of Los Angeles" for 2026.
The LABJ’s annual list honors Los Angeles' top lawyers for their achievements within the city's business community.
Read the full story...Reprinted courtesy of
Lewis Brisbois
"Resilient Rebuild Hub" Helps Wildfire-Impacted Homeowners Build Back Stronger
September 21, 2026 —
California Nevada Cement AssociationNEWPORT BEACH, Calif., Sept. 21, 2026 /PRNewswire/ -- When homeowners in a fire-ravaged Pacific Palisades neighborhood banded together last year to rebuild with fire-hardened materials rather than standard wood framing, they weren't just rebuilding houses: they were rewriting the playbook for how California communities can rebuild after wildfire. Today, the Building with Resilience effort is making that playbook available to every homeowner facing the same decision with the launch of its new Resilient Rebuild Hub for exploring fire resistant, non-combustible construction options.
The Resilient Rebuild Hub helps homeowners understand options for fire-resistant, concrete-based construction and connect with architects, engineers, and contractors who can build them. This includes six noncombustible building systems:
- Insulated Concrete Forms (ICF): stackable, high-density foam blocks filled with concrete which save 20-50% on monthly heating and cooling costs, reduce outside noise by up to 80%, offer exceptional earthquake performance and 4-hour fire resistance rating.
- Insulated Composite Concrete Forms (ICCF): similar formwork to ICF construction with composite materials that enhance strength, simplify installation, and improve long-term performance.
- Concrete Masonry: strong, durable wall systems used for decades across California and the U.S.
- Precast Insulated Sandwich Panels: a complete building enclosure system consisting of two layers of concrete separated by a continuous layer of rigid insulation.
- 3D Shotcrete: air-sprayed concrete for strong, fast, and versatile wall systems that enable a high degree of artistic freedom together with unparalleled fire resistance.
- 3D Concrete Printing: the cutting edge of residential construction, a large-scale robotic 3D printer "squeezes" a specialized concrete mixture layer by layer to allow for organic, curved designs that are often too expensive or impossible to build with traditional methods.
The Resilient Rebuild Hub is available now at buildingwithresilience.com/how-to-build. Each part is free to access and includes case studies, technical resources, and a directory of architects, engineers, and contractors experienced in each building method.
CNCA is a not-for-profit organization committed to developing sustainable and economical construction solutions for California and Nevada with an emphasis on the use of cement and concrete. For more information, visit www.cncement.org.
CalCIMA is a trade association for the construction and essential mineral industries in California, including aggregate, essential and rare earth minerals, ready mixed concrete, and asphalt producers. In all, there are about 70 producer member companies that include 500 production sites in every county of California. Our members also include more than 100 suppliers and service providers to the industry.
Founded in 1930, the National Ready Mixed Concrete Association (NRMCA) is the leading industry advocate with a mission to provide exceptional value for our members by responsibly representing and serving the entire ready mixed concrete industry through leadership, promotion, education and partnering to ensure ready mixed concrete is the building material of choice.