BERT HOWE
  • Nationwide: (800) 482-1822    
    housing expert witness Marquette Kansas custom homes expert witness Marquette Kansas landscaping construction expert witness Marquette Kansas parking structure expert witness Marquette Kansas production housing expert witness Marquette Kansas custom home expert witness Marquette Kansas industrial building expert witness Marquette Kansas low-income housing expert witness Marquette Kansas Subterranean parking expert witness Marquette Kansas condominium expert witness Marquette Kansas townhome construction expert witness Marquette Kansas concrete tilt-up expert witness Marquette Kansas condominiums expert witness Marquette Kansas hospital construction expert witness Marquette Kansas mid-rise construction expert witness Marquette Kansas high-rise construction expert witness Marquette Kansas institutional building expert witness Marquette Kansas office building expert witness Marquette Kansas multi family housing expert witness Marquette Kansas retail construction expert witness Marquette Kansas structural steel construction expert witness Marquette Kansas casino resort expert witness Marquette Kansas
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Marquette, Kansas

    Kansas Builders Right To Repair Current Law Summary:

    Current Law Summary: HB 2294 requires a claimant to serve a written notice of claim upon the contractor prior to filing a lawsuit. The law places deadlines on the contractor to serve notice on each subcontractor (15 days) and provide a written response to the claimant (30 days). It permits the claimant to file a lawsuit without further notice if the contractor disputes the claim, does not respond to the notice, does not complete work on the defect on a timely basis or does not make a payment in the time allowed.


    Construction Expert Witness Contractors Licensing
    Guidelines Marquette Kansas

    No state license for general contracting. All businesses must register with the Department of Revenue.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    McPherson Area Contractors Association
    Local # 1735
    PO Box 38
    McPherson, KS 67460


    Home Builders Association of Salina
    Local # 1750
    2125 Crawford Place
    Salina, KS 67401
    http://www.salinahba.com

    Lawrence Home Builders Association
    Local # 1723
    PO Box 3490
    Lawrence, KS 66046
    http://www.lhba.net

    Topeka Home Builders Association
    Local # 1765
    1505 SW Fairlawn Rd
    Topeka, KS 66604
    http://www.thba.com

    Kansas Home Builders Association
    Local # 1700
    212 SW 8th Ave Ste 201
    Topeka, KS 66603
    http://www.kansasbuilders.org

    Home Builders Association of Hutchinson
    Local # 1720
    PO Box 2209
    Hutchinson, KS 67504
    http://www.hutchbuilders.org

    Flint Hills Area Builders Association
    Local # 1726
    2601 Anderson Ave Ste 207
    Manhattan, KS 66502
    http://www.flinthillsbuilders.com


    Construction Expert Witness News and Information
    For Marquette Kansas

    On-Site Supersensing and the Future of Construction Automation – Discussion with Aviad Almagor

    Caveat Emptor (“Buyer Beware!”) Exceptions

    Minnesota Civil Engineers Give the State's Infrastructure a "C" Grade for the Second Time

    Asbestos Confirmed After New York City Steam Pipe Blast

    Pennsylvania Superior Court Fires up a Case-By-Case Analysis for Landlord-Tenant, Implied Co-Insured Questions

    Insurer Must Defend Claims of Negligence and Private Nuisance

    $57M Settlement Keeps Red River Diversion Project Claims Out of Court

    Avoid the Headache – Submit the Sworn Proof of Loss to Property Insurer

    Europe Is Stepping Up to Be the World’s Climate Sheriff

    New York Bridge to Be Largest Infrastructure Project in North America

    Thank You for 14 Consecutive Years of Legal Elite Elections

    Columbus, Ohio’s Tallest Building to be Inspected for Construction Defects

    Time to Update Your Virginia Mechanic’s Lien Forms (July 1, 2019)

    The Air in There: Offices, and Issues, That Seem to Make Us Stupid

    Near-Zero Carbon Cement Powers Sustainable 3D-Printed Homes

    Benefits to Insureds Under Property Insurance Policy – Concurrent Cause Doctrine

    Buffett’s $11 Million Beach House Is Still on the Market

    Federal District Court Finds Coverage Barred Because of Lack of Allegations of Damage During the Policy Period and Because of Late Notice

    Revisiting Termination For Convenience Clauses In Uncertain And Ever-Changing Economic Times

    Excess Carrier Successfully Appeals Primary Insurer’s Summary Judgment Award

    Not Pandemic-Proof: The Ongoing Impact of COVID-19 on the Commercial Construction Industry

    Is a Violation of a COVID-19 Order the Basis For Civil Liability?

    Congratulations to Wilke Fleury’s 2025 Super Lawyers and Rising Stars!

    Pushing the Edge: Crews Carve Dam Out of Remote Turkish Mountains

    Proposed Florida Construction Defect Act

    Florida Governor Bans Foreign Citizens From Buying Land in Florida

    Sales of Existing Homes in U.S. Fall to Lowest Since 2012

    A Place to Study Eternity: Building the Giant Magellan Telescope

    GRSM Named “Powerhouse in Litigation” in 2026 Industry Report

    Bert L. Howe & Associates Returns as a Sponsor at the 30th Annual Construction Law Conference in San Antonio

    California Supreme Court Rules Developers can be Required to Include Affordable Housing

    Pending Sales of U.S. Existing Homes Increase 0.8% in November

    Congratulations to BWB&O for Ranking #4 in Orange County Business Journal’s 2023 Book of Lists for Law Firms!

    White House Reverses Trump Administration NEPA Cutbacks

    AB 685 and COVID-19 Workplace Exposure: New California Notice and Reporting Requirements of COVID Exposure Starting January 1, 2021

    Handling Insurance Claims in the Wake of the Los Angeles Wildfires

    Colorado SB 15-177 UPDATE: Senate Business, Labor, & Technology Committee Refers Construction Defect Reform Bill to Full Senate

    Claims for Negligence? Duty to Defend Triggered

    Who, Me?

    Claim for Punitive Damages Based on Insurers' Alleged Bad Faith Business Practices Fails

    Los Angeles Seeks Speedier Way to Build New Affordable Homes

    Building Codes Evolve With High Wind Events

    Res Judicata Bars Insured from Challenging Insurer's Use of Schedule to Deduct Depreciation from the Loss

    Real Estate & Construction News Round-Up (05/11/22)

    Cross-Office Team Secures Defense Verdict in Favor of Client in Asbestos Case

    The Construction Lawyer as Problem Solver

    Mass Timber Reduces Construction’s Carbon Footprint, But Introduces New Risk Scenarios

    Bay Area Counties Issue Less Restrictive “Shelter in Place” Orders, Including for Construction

    Buyers Are Flocking to NYC’s Suburbs. Too Bad There Aren’t Many Homes to Sell.

    Know Your Obligations Under Both the Prime Contract and Subcontract
    Corporate Profile

    MARQUETTE KANSAS CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from approximately 5000 engineering, construction, and builders standard of care related expert designations, the Marquette, Kansas Construction Expert Directory delivers a comprehensive construction and design expert support solution to builders and construction practice groups seeking effective resolution of construction defect, scheduling, and delay matters. BHA provides construction related litigation support and expert witness services to widely recognized construction practice groups, Fortune 500 builders, CGL carriers, owners, as well as a variety of public entities. Utilizing in house resources which comprise licensed architects, civil engineers, building envelope experts, general and specialty contractors focused on the evaluation of construction claims, the construction experts group brings specialized experience and local capabilities to Marquette and the surrounding areas.

    Marquette Kansas construction defect expert witnessMarquette Kansas building consultant expertMarquette Kansas structural concrete expertMarquette Kansas construction forensic expert witnessMarquette Kansas roofing and waterproofing expert witnessMarquette Kansas window expert witnessMarquette Kansas construction safety expert
    Construction Expert Witness News & Info
    Marquette, Kansas

    Data Center Construction: Contractors Must Step Up

    May 26, 2026 —
    I attended the Datacenter Forum 2026 in Helsinki last week. Over 400 people packed the room. Walking out, I had one overriding thought: Is construction operating in a different century from the technology it is being asked to house? Is Our Industry on Par? Ciarán Forde, Senior Vice President at CTS Nordics, opened the forum with a statement that set the tone for everything that followed: data centers are no longer just a technical challenge; they are a national strategy. Before AI, Ciarán had worked in telecoms, where data centers were already complex. But now, he said flatly, everything has changed, and the industry must rethink everything. The numbers behind the claim are staggering. Current AI data center racks run at 40 to 100 kW. In three years, 800 kW per rack is on the roadmap. And the development cycle for a new chip is roughly one year, which means deployments begin aging out almost as soon as they are commissioned. Read the full story...
    Reprinted courtesy of Aarni Heiskanen, AEC Business
    Mr. Heiskanen may be contacted at aec-business@aepartners.fi

    New York Amends Prompt Payment Act: Retainage Above 5% in Private Construction Contracts Now Void

    February 10, 2026 —
    In 2023 New York overhauled its Prompt Payment Act. The 2023 amendments, largely aimed at restricting the amount of retainage that can be withheld on private projects, were unclear about whether parties could contract around the statute, as they can with other provisions of the statute. The State Legislature recently clarified that issue. On December 19, 2025, New York enacted a new law, tightening the State’s Prompt Payment Act retainage laws by amending the Prompt Payment Act under General Business Law § 757. Under § 757, the new law renders void any contract provision in private construction contracts that requires retainage in excess of 5% of the total contract sum, meaning owners cannot hold more than 5% from their prime contractors and prime contractors cannot hold more than 5% from their subcontractors. Reprinted courtesy of Mark A. Snyder, Peckar & Abramson, P.C., Levi W. Barrett, Peckar & Abramson, P.C., Patrick T. Murray, Peckar & Abramson, P.C. and Skyler L. Santomartino, Peckar & Abramson, P.C. Mr. Snyder may be contacted at msnyder@pecklaw.com Mr. Barrett may be contacted at lbarrett@pecklaw.com Mr. Murray may be contacted at pmurray@pecklaw.com Mr. Santomartino may be contacted at ssantomartino@pecklaw.com Read the full story...

    ZEC 2.0: New York’s Zero Emissions Credit Program Gets an Extension and a Reboot

    February 10, 2026 —
    In a landmark move that could shape New York’s energy landscape for decades, state officials have taken steps to both preserve its existing nuclear power facilities and significantly expand its advanced nuclear capacity. These actions are part of a broader strategy to maintain grid reliability and meet both escalating energy demand and the state’s ambitious greenhouse gas reduction and zero carbon goals. Renewing the Zero Emissions Credit Program On January 22, 2026, the New York Public Services Commission (PSC) unanimously voted to extend and reboot the Zero Emissions Credit program (now called ZEC 2.0) to ensure that New York’s four upstate nuclear reactors maintain operations through 2049. The program, which began in 2016, is designed to provide revenue subsidies for legacy nuclear facilities that have been facing financial difficulties in New York’s competitive wholesale power markets. State officials have stated that the benefits of ensuring the continued operations of these reactors far outweigh the costs due to the lack of zero-emissions alternatives and the importance of ensuring grid reliability in the face of escalating energy demand from large loads like data centers. Reprinted courtesy of Stephen J. Humes, Pillsbury and Jason Drogin Atwood, Pillsbury Mr. Humes may be contacted at stephen.humes@pillsburylaw.com Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com Read the full story...

    Buffalo, NY Stadium Work Resumes After Suspects ID'ed in $150K Graffiti Vandalism

    March 17, 2026 —
    Construction work is back on track at Highmark Stadium in Orchard Park, N.Y., after police identifed, but did not arrest two suspects in connection with $150,000 in property damage that paused work for nearly one week at the $2.1 billion stadium project, said the Gilbane Building Cos. and Turner Construction joint venture building it for the National Football League’s Buffalo Bills. Read the full story...
    Reprinted courtesy of Emell D. Adolphus, Engineering News-Record
    Mr. Adolphus may be contacted at adolphuse@enr.com

    Late Notice Bars Insured’s Claim for Wind Damage

    June 29, 2026 —
    The court found that a six-month delay in reporting damage from wind did not comply with the policy’s notice requirements. Touchmark Hotel Group, LLC v. Mt. Hawley Ins. Co., 2026 U.S. Dist. LEXIS 61910 (S.D. N. Y. March 24, 2026). A storm caused damage to Touchstone’s hotel on January 4, 2023. Touchstone’s corporate representative, Rohit Patel, testified that he was not at the property on the day of the storm. In a telephone call the next day, the manager of the property reported to Patel that he observed detached shingles from the roof the hotel in the parking lot. Patel testified that he did not file a claim at that time because Touchmark’s employees did not detect any water leakage in the building and because he did not believe that the cost of the damage from the storm would exceed the policy’s deductible. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    New York Enacts First-in-the-Nation Statewide Data Center Moratorium

    August 03, 2026 —
    As of May 2026, nearly 12 gigawatts of data center load requests were in the New York Independent System Operator interconnection queue, with more than two-thirds of capacity requests entering the queue in 2025 alone. On July 14, 2026, in response to concerns over this rapid growth, Governor Kathy Hochul issued Executive Order No. 62 (the “Order”) imposing a temporary moratorium on data centers in New York State. Among the concerns cited in the Order are the cost burden on ratepayers associated with transmission upgrades required to accommodate large loads, potential environmental impacts, and large-scale water use. The moratorium is intended to halt activities while the state government develops a comprehensive legal framework for data center development. While dozens of municipal and county-level moratoriums are in place throughout the U.S., and while the legislatures of several states, including Maine, have proposed moratoriums, the Order is the first statewide moratorium to be enacted nationally. Read the full story...
    Reprinted courtesy of Joshua L. Sturtevant, Sheppard
    Mr. Sturtevant may be contacted at jsturtevant@sheppard.com

    Court Rules Cook County Misspent $243M in Transportation Funds

    March 10, 2026 —
    A Cook County Illinois Circuit Court judge has ruled that the county violated the state constitution by using $243 million in transportation tax revenue during fiscal 2023 for non-transportation purposes, handing a legal win to a statewide coalition of construction trade groups. Read the full story...
    Reprinted courtesy of Annemarie Mannion, Engineering News-Record
    Ms. Mannion may be contacted at manniona@enr.com

    Nevada’s Mandatory Nonbinding Arbitration Law for Civil Cases is Going Through Changes

    May 14, 2026 —
    Nevada currently operates an expedited litigation program designed to resolve civil disputes with a value up to $50,000 without incurring the “usual” expense of litigating these disputes. Over time, however, the number of civil cases that have been “exempted” from this program based on the claimed damages exceeding $50,000 has grown dramatically. In response, the Nevada Legislature recently enacted a number of rule changes designed to streamline Nevada’s arbitration process and include more cases. Among these changes are increasing the arbitration “cap” from $50,000 to $100,000. By way of background, the Nevada’s Court Annexed Arbitration program is a mandatory, non-binding program for civil cases in judicial districts that have county populations of 100,000 or more [1]. Nevada’s Court Annexed Arbitration was born out of NRS 38.250, which was enacted in 1991 and went into effect in the summer of 1992. The newly enacted NRS 38.250 was regarded as a way to address the problem of increased court caseloads while promoting judicial economy and efficiency in civil cases having a probable jury award of less than $25,000 [2]. Initially, cases that were automatically exempt from the program included class actions, medical malpractice disputes, divorce proceedings, and other domestic relations matters [3]. Reprinted courtesy of Brandon Wright, Lewis Brisbois and Manuel Gurule, Lewis Brisbois Mr. Wright may be contacted at Brandon.Wright@lewisbrisbois.com Mr. Gurule may be contacted at Manuel.Gurule@lewisbrisbois.com Read the full story...