Insufficient Notice of Commencement and Construction Lien Rights
August 03, 2026 —
David Adelstein - Florida Construction Legal UpdatesWhen a party is preserving their construction lien rights, the party will look to the recorded Notice of Commencement. This is the recorded document that provides the lienor with the information for purposes of preserving construction lien rights. A Notice to Owner company will typically rely on the Notice of Commencement to serve Notices to Owners from lower tiers not in contract with the owner. However, when it comes to preparing the lien, a lienor should look beyond just the Notice of Commencement and also look to the property appraiser’s website as a backstop.
In a recent case, a window company had the homeowner sign the Notice of Commencement and then filled in the information. The company naturally did this for the convenience of the homeowner that probably was unfamiliar with the Notice of Commencement process. Regardless, information in the Notice of Commencement was inaccurate. It failed to include all the real property owners. Thus, when a payment dispute arose and a construction lien was prepared, it did not identify all of the real property owners. All of the real property owners were added later during the pendency of a lien foreclosure lawsuit. The trial court denied the lien because of the defective / insufficient Notice of Commencement — the lienor assumed the risk of error by filling out the information in the Notice of Commencement. The trial court further denied the lien holding that because the work did not commence within 90 days of the Notice of Commencement, the Notice of Commencement is void.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Sometimes a General Damages Assessment is Enough. . .
July 06, 2026 —
Christopher G. Hill - Construction Law MusingsIt has been a while since I last posted here at
Construction Law Musings. Life, law practice, and “blogger’s block” have taken their toll on the posting schedule. Hopefully this will be one of several upcoming posts now that the litigation schedule has lightened a bit over the summer.
Today’s post is about damages. Specifically damage to a homeowner’s roof and her legal damages therefor. That last is of course a sentence that only a
construction attorney (or other litigator) could possibly craft and have it make sense. Now, on with the case. . .In
Hardesty Construction, Inc. v. Weedon, the facts are as follows:
Ms. Weedon had hail damage to the roof of her home. She hired Hardesty Construction to repair and replace the roof. After the first roof was installed and failed inspection, a second roof was installed. The issue was that the first roof had a warranty and the second roof, installed similarly to the first (and allegedly with the same construction issues according to Ms. Weedon’s expert), was not provided with the promised warranty. As one may expect, Weedon sued Hardesty and Hardesty Construction for fraudulent inducement and breach of contract. At trial, Weedon testified, without objection, that her home was worth $40,000 less because of Hardesty Construction’s work, which was based partially on quotes Weedon received to fix the roof. The Circuit Court granted Hardesty Construction’s motion to strike Weedon’s fraudulent inducement claim, but not her other claims. A jury awarded Weedon $30,253.30 on her breach of contract claim. Hardesty Construction appealed, arguing the Circuit Court erred in (a) allowing the jury to consider Weedon’s valuation testimony because it was not based on her personal knowledge and (b) denying its motion to strike based on insufficient evidence as to damages. Weedon assigned cross-error in the Circuit Court’s decision to grant the motion to strike her fraudulent inducement claim against Samual Hardesty.
Read the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Benchmark Litigation Recognizes Andrea DeField Among Nation’s Top Young Litigators
September 08, 2026 —
Hunton Insurance Recovery BlogHunton’s insurance coverage team is proud to celebrate the recognition of
Andrea DeField on
Benchmark Litigation’s 2026 40 & Under List, an annual ranking that highlights the nation’s leading litigators age 40 and under. Andrea was one of only six Hunton lawyers selected and was recognized in the South region. Benchmark Litigation’s 40 & Under List honors attorneys who have distinguished themselves through significant case work, client feedback, and peer review.
This honor reflects Andrea’s reputation as one of the country’s leading policyholder-side insurance recovery litigators and her standing as a trusted advisor to companies facing some of today’s most complex insurance and risk management challenges. As head of Hunton’s cyber insurance practice, Andrea has built her career helping companies manage risk and maximize insurance recovery. Her practice spans the full spectrum of insurance-related issues, from advising clients on contractual risk transfer and insurance program design to representing policyholders in high-stakes coverage and bad faith disputes. She has guided clients through some of the most complex and widely publicized losses in recent years and helps companies recover under a broad range of insurance products, including D&O, professional liability, crime, property, cyber, and general liability policies.
Read the full story...Reprinted courtesy of
Hunton Andrews Kurth LLP
Dotted Line: How Construction Is Dealing with Cybersecurity in the Age of AI
October 12, 2026 —
Richard R. Volack - Peckar & Abramson, PCRichard R. Volack, Partner in P&A’s New York office and Chair of the firm’s Cyber Security & Data Privacy practice, was recently quoted in “Dotted Line: How Construction Is Dealing with Cybersecurity in the Age of AI,” an article written by
Construction Dive. The article examines how contractors’ increasing reliance on interconnected technologies and AI can make cyberattacks more sophisticated. It discusses the heightened risks for government contractors and smaller subcontractors, including the potential exposure of sensitive project information, personal data, and financial records. It also explores practical measures contractors can take to mitigate these risks, such as strengthening contractual protections, conducting penetration testing, obtaining appropriate cyber insurance, implementing multifactor authentication, and providing employees with regular cybersecurity training.
Read the full story...Reprinted courtesy of
Richard R. Volack, Peckar & Abramson, PCMr. Volack may be contacted at
rvolack@pecklaw.com
David Samani Joins BHBA Podcast on Mediation Best Practices
May 05, 2026 —
Lewis BrisboisLos Angeles Partner David Samani recently joined a Beverly Hills Bar Association (BHBA) podcast titled, “Mediation 360: Preparation from the Defense, Plaintiff, and Mediator Perspectives,” during which he shared his insights on various aspects of the mediation process. Mr. Samani, along with a plaintiff’s attorney and a mediator, presented their thoughts on topics including how to determine whether a case is appropriate for mediation, preparing to mediate a case, communicating with clients, and handling the mediation itself.
Mr. Samani explained that early communication with clients is critical so that attorneys may learn what a client’s objectives are and develop an assessment of the case. He described that “from an early stage,” attorneys should determine the cost of litigation and ensure that the client understands “what an aggressive defense might entail.” As the matter progresses, attorneys and clients should “continue the dialogue” regarding costs as well as the strengths and weaknesses of the case, “making sure the client is apprised of the various alternatives that exist.” In addition, Mr. Samani discussed factors to consider when choosing a mediator, noting, “All mediators have their own styles and backgrounds.” He explained that some cases may call for a mediator with specialized knowledge in a particular area such as bankruptcy or securities, while other mediations may benefit from a mediator who understands the realities of private practice.
Read the full story...Reprinted courtesy of
Lewis Brisbois
Late Notice Bars Insured’s Claim for Wind Damage
June 29, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe court found that a six-month delay in reporting damage from wind did not comply with the policy’s notice requirements. Touchmark Hotel Group, LLC v. Mt. Hawley Ins. Co., 2026 U.S. Dist. LEXIS 61910 (S.D. N. Y. March 24, 2026).
A storm caused damage to Touchstone’s hotel on January 4, 2023. Touchstone’s corporate representative, Rohit Patel, testified that he was not at the property on the day of the storm. In a telephone call the next day, the manager of the property reported to Patel that he observed detached shingles from the roof the hotel in the parking lot. Patel testified that he did not file a claim at that time because Touchmark’s employees did not detect any water leakage in the building and because he did not believe that the cost of the damage from the storm would exceed the policy’s deductible.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Late Notice Bars Insured’s Claim for Water Leak Damage
August 11, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court granted the insurer’s motion for summary judgment dismissing the insured’s claim due to late notice. Global Approach, Inc. v. Scottsdale Ins. Co., 2026 U.S. Dist. LEXIS 120183 (S. D. Fla. June 1, 2026).
Global suffered water damage on September 3, 2021, which originated in the bathroom of one of its rental properties. Global reported the claim to its insurer, Scottsdale, on October 19, 2021. Prior to reporting the claim, Global hired a handyman to inspect the property and then demolished the damaged area and repaired the bathroom.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Structural Concerns Force Emergency Closure of Maryland Office Building
August 16, 2026 —
Jim Parsons - Engineering News-RecordA 10-story Baltimore-area office building was evacuated after an underground parking structure was compromised during construction work.
Read the full story...Reprinted courtesy of
Jim Parsons, Engineering News-RecordENR may be contacted at
enr@enr.com