Tariffs As Taxes — What Learning Resources, Inc. v. Trump Means for Contractors and the WSDOT Specifications
March 17, 2026 —
Brett M. Hill - Ahlers Cressman & Sleight PLLCIn October 2025, we explored a pressing question for public works contractors:
should post-contract award tariffs be reimbursable? The crux of that analysis was whether tariffs imposed after contract award constitute a tax under the Washington State Department of Transportation (WSDOT) Standard Specifications, triggering reimbursement under Section 1-07.1(5)B (“tax changes”).
Since then, a landmark Supreme Court ruling in Learning Resources, Inc. v. Trump has clarified the legal nature of tariffs in a way that could significantly affect this debate.
In Learning Resources, Inc. v. Trump, 607 U.S. (2026), the U.S. Supreme Court addressed whether the President had the authority under the International Emergency Economic Powers Act (IEEPA) to unilaterally impose broad tariffs on imports.
Read the full story...Reprinted courtesy of
Brett M. Hill, Ahlers Cressman & Sleight PLLCMr. Hill may be contacted at
brett.hill@acslawyers.com
Supply Chain Is a Legal Exposure—Not Just a Force Majeure Problem
September 08, 2026 —
Owen Newman - Construction ExecutiveThis is not another force majeure article. The supply-chain related legal exposure that contractors are carrying today—in sanctions risk, specification non-compliance, warranty exposure and regulatory volatility—extends well beyond what even a well-drafted force majeure clause protects.
An engineering, procurement and construction contractor on a gas-fired power plant discovers during commissioning that transformer oil in a critical unit contains Russian-origin naphthenic base oil, which is a prohibited source under Office of Foreign Assets Control sanctions. The contractor didn’t source it. A subsupplier two tiers below made the substitution when disruptions in the Strait of Hormuz tightened the primary supply chain for this specialty product and no one in the purchase-order chain flagged it. The procurement decision is long done and the documentation trail that should have caught it doesn’t exist.
Reprinted courtesy of
Owen Newman, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...Mr. Newman may be contacted at
oknewman@duanemorris.com
Engineering Seals Versus Contracts ‘Under Seal’ (Two Very Different Things)
May 05, 2026 —
Melissa Dewey Brumback - Construction Law in North CarolinaRecently, I was asked by a reader to explain the difference between a document that is
‘sealed’ by an engineer (or architect) and one that is
signed ‘under seal’. This question prompted this post, as others may also be wondering about the distinction. [Hi Ed! Thanks for your question]
Professionals have ‘seals’ that show that they are registered (Engineers) or licensed (Architects). As most of you likely know, your professional seal is something that is hard won and which is used when—and only when—your plans were made by you or someone under your direct supervisory control. Your signature represents that you were in
responsible control over the documents, and that they have met the required professional standard of care. (21 NC Admin Code 2-0206 (a)(11)).
Read the full story...Reprinted courtesy of
Melissa Dewey Brumback, Ragsdale Liggett PLLCMs. Brumback may be contacted at
mbrumback@rl-law.com
Pulling the Plug, Preserving the Product: Protecting Rights to a Modular Subcontractor’s Work Post-Termination
June 08, 2026 —
Paul Williamson - ConsensusDocsVolumetric Modular Construction (VMC) is a building method where a structure is divided into large components or modules, fabricated in an offsite factory and then transported to a construction site for assembly.[
1] Proponents of VMC hail it as a cost-efficient alternative to traditional building methods that leads to more consistent quality and shorter construction duration.[
2] Due to a growing labor shortage, high demand for compressed project schedules, and stagnant construction productivity rates, the construction industry is embracing VMC.[
3] A recent report on the market size of prefabricated construction estimates that from 2026 to 2031, VMC will grow at a compound annual growth rate of 7.16% and become a 413.11-billion-dollar industry.[
4]
As VMC becomes more prevalent, owners, general contractors, and subcontractors must consider how to effectively contract for modular construction. One important consideration, which this article focuses on, is navigating termination of a modular subcontractor.
Read the full story...Reprinted courtesy of
Paul Williamson, Peckar & Abramson, P.C.Mr. Williamson may be contacted at
pwilliamson@pecklaw.com
Kahana Feld Obtains Favorable Result in High-Exposure NY Premises Liability Case
June 15, 2026 —
Leigh Katz - Kahana FeldKahana Feld partner Leigh Katz obtained a significant victory in a recent matter involving a videotaped alleged trip and fall on the sidewalk in front of the client’s commercial residence. The plaintiff claimed he suffered a knee injury that necessitated surgery, along with other assorted injuries that prevented him from continuing high-level athletic activities. Leigh was able to demonstrate that the fall was staged and received a voluntary discontinuance with prejudice.
At mediation, Leigh emphasized that KF’s expert witness challenged the plaintiff’s claim that the fall was caused by a sidewalk height differential after reviewing the videotape footage and determining the plaintiff’s fall began before his feet made contact with the alleged defect. Based on this analysis, the expert concluded the reported height differential did not initiate the fall, which supported KF’s position that the incident depicted in the video was unrealistic and appeared staged.
Read the full story...Reprinted courtesy of
Leigh Katz, Kahana FeldMs. Katz may be contacted at
lkatz@kahanafeld.com
Insurer Cannot Dispose of Water Leak or Bad Faith Claims on Motion for Summary Judgment
July 20, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer’s motion for summary judgment seeking to eliminate the insured’s claims for damage from a water leak, bad faith and punitive damages failed. Nargizyan v, State Farm General Ins. Co., 2026 Cal App. LEXIS 302 (Cal. Ct. App. April 15, 2026).
The insured noticed tiles on his kitchen floor were warmer than usual. He found water dripping from the top of the crawl space under the house. He noticed water was “dripping in different places” but not pouring like a faucet. “There were too many places to count where water was dripping and there was water all over the place.”
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
$27B Meta Data Center Pushes Louisiana Toward Massive Power Expansion
April 27, 2026 —
Vince Kong - Engineering News-RecordMeta Platforms has reached an agreement with Entergy Louisiana to fund new energy infrastructure to support its planned $27-billion data center in Richland Parish, a project the company says could ultimately scale to 5 GW, becoming its largest facility to date. CEO Mark Zuckerberg has described the site as large enough to cover a significant portion of Manhattan.
Read the full story...Reprinted courtesy of
Vince Kong, Engineering News-RecordMr. Kong may be contacted at
kongv@enr.com
It’s More Than a Feeling: Proving Construction Damages and When You Should Hire an Expert to Help Do It
July 27, 2026 —
Bradley E. Sands & Katie McCracken - ConsensusDocsWhen you win a bid, you might be singing that everything is going your way. Then something goes wrong. The owner hands you defective plans, sits on RFI responses or other critical information, or otherwise upends the work. The costs pile up through no fault of your own. You feel wronged, and you want to be made whole. But a feeling that you got burned is not enough. To recover, that feeling has to become something the law recognizes as damages. So, what are damages, and how do you prove them?
At bottom, contract damages are the money that puts the non-breaching party (i.e., the party that doesn’t breach the contract) in the position it would have occupied had the contract been performed.
Reprinted courtesy of
Bradley E. Sands, Jones Walker LLP and Katie McCracken, Summer Associate, University of Georgia School of Law
Read the full story...Mr. Sands may be contacted at