BERT HOWE
  • Nationwide: (800) 482-1822    
    institutional building expert witness Bear Lake Michigan tract home expert witness Bear Lake Michigan condominium expert witness Bear Lake Michigan industrial building expert witness Bear Lake Michigan structural steel construction expert witness Bear Lake Michigan landscaping construction expert witness Bear Lake Michigan casino resort expert witness Bear Lake Michigan production housing expert witness Bear Lake Michigan parking structure expert witness Bear Lake Michigan townhome construction expert witness Bear Lake Michigan Medical building expert witness Bear Lake Michigan Subterranean parking expert witness Bear Lake Michigan retail construction expert witness Bear Lake Michigan multi family housing expert witness Bear Lake Michigan condominiums expert witness Bear Lake Michigan hospital construction expert witness Bear Lake Michigan custom homes expert witness Bear Lake Michigan low-income housing expert witness Bear Lake Michigan concrete tilt-up expert witness Bear Lake Michigan mid-rise construction expert witness Bear Lake Michigan custom home expert witness Bear Lake Michigan housing expert witness Bear Lake Michigan
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Bear Lake, Michigan

    Michigan Builders Right To Repair Current Law Summary:

    Current Law Summary: Article 24 of the Occupational Code dictates that a complaint against a builder must be filed with the Department of Consumer and Industry Service within 18 months of the completion, occupancy or purchase of a residence. If building official determines complaint has merit, "Notice to Respondent: sent to provide builder with opportunity to repair; additional administrative procedures follow to conclusion; Individual townships have local rules regarding properties; Example: Bloomfield has mandated that structures must meet ongoing minimum maintenance standards.


    Construction Expert Witness Contractors Licensing
    Guidelines Bear Lake Michigan

    Residential contractors need to be licensed. License required for plumbing and electrical trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Mid-Northern Michigan Home Builders Association
    Local # 2369
    PO Box 128
    Oscoda, MI 48750


    Tri-Lakes Home Builders Association
    Local # 2363
    1210 Rough Ct
    Roscommon, MI 48653
    http://www.tl-hba.org

    Home Builders Association of Grand Traverse Area
    Local # 2338
    3040 Sunset Lane
    Traverse City, MI 49684
    http://www.hbagta.com

    Mid-Eastern Michigan Home Builders Association
    Local # 2365
    3823 W Wheeler Rd
    Standish, MI 48658


    Northeastern Michigan Home Builders Association
    Local # 2373
    102 South Third
    Alpena, MI 49707
    http://www.nemhba.com

    Builder & Remodelers of Greater Northwest Michigan
    Local # 2357
    PO Box 1062
    Big Rapids, MI 49307
    http://www.hbamc.com/

    Home Builders Association of Central Michigan
    Local # 2364
    2026 Independence Dr
    Mount Pleasant, MI 48858
    http://www.hbacm.com


    Construction Expert Witness News and Information
    For Bear Lake Michigan

    First-Time Homebuyers Make Biggest Share of Deals in 17 Years

    Subcontract Requiring Arbitration Outside of Florida

    Supreme Court Declines to Address CDC Eviction Moratorium

    Home Numbers Remain Small While Homes Get Bigger

    Contract And IP Implications Of Design Professionals Monetizing Non-Fungible Tokens Comprising Digital Construction Designs

    Construction Demand Unsteady, Gains in Some Regions

    Homebuyers Aren't Sweating the Fed

    “Pay When Paid” Provisions May Not Be Dead, at Least Not Yet

    Administration Launches 'Buy Clean' Construction Materials Push

    Executing Documents with Powers of Attorney and Confessions of Judgment in PA Just Got Easier

    Home Construction Thriving in Lubbock

    Oracle's $16B Michigan Data Center Secures Financing as Power Contracts Face Appeals

    Building 47 Bridges in Two Years

    Construction Litigation Roundup: “Too Soon?”

    Science-Based Standards for Wildfire Recovery: What California Policyholders Need to Know About A.B. 1642

    Traub Lieberman Attorneys Named 2019 Super Lawyers

    Modification: Exceptions to Privette Doctrine Do Not Apply Where There is No Evidence a General Contractor Affirmatively Contributed to the Injuries of an Independent Contractor’s Employee

    Why Insurers and Their Attorneys Need to Pay Close Attention to Their Discovery Burden in Washington

    Alabama Court Upholds Late Notice Disclaimer

    DRCOG’s Findings on the Impact of Construction Defect Litigation Have Been Released (And the Results Should Not Surprise You)

    Avoiding Lender Liability for Credit-Related Actions in California

    Enhanced Geothermal Energy Could Be the Next Zero-Carbon Hero

    Looking for a Way Out

    New York’s Lawsky Proposes Changes to Reduce Home Foreclosures

    Ben L. Aderholt Joins Coats Rose Construction Litigation Group

    Why A.I. Isn’t Going to Replace Lawyers Anytime Soon

    Why Travelers Fought a Fire Claim for Invisible Smoke Damage

    Can a Receiver Prime and Strip Liens Against Real Property?

    Real Estate & Construction News Roundup (04/26/23) – The Energy Transition and a Bit of Brick-and-Mortar Blues

    Year and a Half Old Las Vegas VA Emergency Room Gets Rebuilt

    The Court of Appeals Holds That Indifference to Safety Satisfies the Standard for a Willful Violation Under WISHA

    A Property Boom Is Coming to China's Smaller Cities

    Close Enough Only Counts in Horseshoes and Hand Grenades

    “Other Insurance” and Indemnity Provisions Determine Which Insurer Must Cover

    Steven L. Heisdorffer Joins Higgins, Hopkins, McLain & Roswell

    Business Interruption, Food Spoilage Claims Resulting from Off Premise Power Failure Denied

    Winning Construction Disputes: Strategic Negotiation for Better Outcomes

    Construction Firms Complain of Missed Payments on Redevelopment Project

    No Coverage Based Upon Your Prior Work Exclusion

    Graham & Who May Trigger The Need To Protest

    The Louvre Abu Dhabi’s Mega-Structure Domed Roof Completed

    Rescission of Policy for Misrepresentation in Application Reversed

    Five Steps Employers Should Take In the Second Year Of the COVID-19 Pandemic

    Sales of Existing Homes in U.S. Fall to Lowest Since 2012

    Georgia Court of Appeals Upholds Denial of Coverage Because Insurance Broker Lacked Agency to Accept Premium Payment

    Party Loses Additional Insured Argument by Improper Pleading

    Collaborating or Competing with Construction Tech Startups

    “Positive Limiting Barriers” Are An Open and Obvious Condition, Relieving Owner of Duty to Warn

    Congratulations to Partner Madeline Arcellana on Her Selection as a Top Rank Attorney in Nevada!

    From ‘Cuckoo’s Egg’ to Today’s Cyber Threat Landscape
    Corporate Profile

    BEAR LAKE MICHIGAN CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 4500 construction and design related expert witness designations, the Bear Lake, Michigan Construction Expert Directory delivers a streamlined multi-disciplinary expert retention and support solution to legal professionals and construction practice groups seeking effective resolution of construction defect and claims litigation. BHA provides building related trial support and expert services to the construction industry's most recognized companies, legal professionals, Fortune 500 builders, CGL carriers, owners, as well as a variety of state and local government agencies. In connection with regional assets which comprise testifying architects, design engineers, construction cost and standard of care experts, licensed general and specialty contractors, the firm brings a wealth of experience and local capabilities to Bear Lake and the surrounding areas.

    Bear Lake Michigan delay claim expert witnessBear Lake Michigan building consultant expertBear Lake Michigan architectural expert witnessBear Lake Michigan construction defect expert witnessBear Lake Michigan building envelope expert witnessBear Lake Michigan building expertBear Lake Michigan structural engineering expert witnesses
    Construction Expert Witness News & Info
    Bear Lake, Michigan

    Owner Taking Assignment of General Contractor’s Claims Against a Subcontractor(s)

    September 21, 2026 —
    Here’s a scenario that occurs in construction defect cases. An owner sues a general contractor and subs for construction defects. The owner settles with a number of parties and takes an assignment of the general contractor’s claims against some or all of the subs and pursues the remaining parties for indemnity based on the assignment of the general contractor’s claims. This was the scenario in Craftsman Plastering and Lath, Inc. v. Rath Mor, LLC, 2026 WL 2328032 (Fla. 4th DCA 2026). The owner settled with the general contractor and all subs except one. The owner took an assignment of the general contractor’s claim against the sub, and really the indemnity claim. The owner was then substituted as the real party in interest as it relates to the general contractor’s claims against the sub. The owner sought roughly $780,000 in attorney’s fees and costs in connection with the dispute claiming the sub was liable for such fees. The jury didn’t buy the argument and awarded the owner about $55,000. Basically, the jury seemingly prorated the fees by the number of parties, at least, that’s how the math worked out. The owner didn’t like that and moved for an additur to increase the jury’s verdict which the trial court granted. This was reversed on appeal despite the fact that a trial court has broad discretion to grant a motion for additur. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Sausage-Making Often Relies on the Good Sense of the Chef Rather than the Recipe

    June 23, 2026 —
    Even for lawyers, the rules governing litigation can get complex and convoluted. Does something need to be filed? What needs to be filed? When is the deadline for filing? Simple questions with not always with straightforward answers. This was the case in R & J Sheet Metal, Inc. v. W.E. O’Neil Construction Co. of California, 111 Cal.App.5th 878 (2025), which involved sheet metal panels lost when they fell into the Port of Long Beach harbor. Read the full story...
    Reprinted courtesy of Garret D. Murai, Nomos LLP
    Mr. Murai may be contacted at gmurai@nomosllp.com

    At the Frontier of Change: How—or Where—to Rebuild as Alaska's Permafrost Disappears

    September 28, 2026 —
    In some areas of the tiny subsistence coastal village of Kwigillingok along the Bering Sea in western Alaska, pockets of ground feel squishy, almost gelatinous, rather than solid. It’s an odd sensation, as if there is only a thin layer of muddy soil preventing people from falling into the water beneath their feet. Read the full story...
    Reprinted courtesy of Pam McFarland, Engineering News-Record
    Ms. McFarland may be contacted at mcfarlandp@enr.com

    Wisconsin Supreme Court Finds Coverage Under Ensuing Loss Provisions

    September 29, 2026 —
    Reversing the trial court’s grant of summary judgment to the insurer, the Wisconsin Supreme Court determined that genuine issues of material fact existed on whether ensuing losses as defined in the policy were covered. Cincinnati Ins. Co. v. Ropicky, 2026 Wisc. LEXIS 302 (Wis. July 7, 2026). The insured suffered damage during a storm on May 11, 2018, when rainwater poured into the home. The insureds gave notice to their insurer, Cincinnati. Upon inspection, Cincinnati determined that water intrusion resulted from multiple construction defects in the home. In the front of the home, water entered through a gap in the stone veneer. The inspector also concluded that the damage from rainwater was not just from the May 11, 2018, storm, but damage had occurred from prior storm events. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Ball Janik LLP Strengthens Miami Construction Defect Team with Litigator Nicolas Aixala

    October 26, 2026 —
    MIAMI, FL, October 22, 2026 — Ball Janik LLP has added Nicolas Aixala to its Construction Defect Practice Group as an associate in the firm's Miami office. Aixala brings experience in construction and civil litigation, along with a perspective many litigators don't have: a view from the public side of development, gained researching land use and zoning matters for the City of Miami. "Construction disputes in South Florida rarely stay inside the four walls of a building. Zoning, permitting, and local regulation are often part of the story," said James C. Prichard, Managing Partner of Ball Janik LLP. "Nicolas has seen that landscape from the city's side of the table, and he pairs it with solid litigation training. That combination helps us quickly size up the development and regulatory issues our clients face. We're glad to have him on our Miami team." Before joining Ball Janik, Aixala clerked at Miami-area law firms, supporting attorneys in construction litigation and a range of civil matters through legal research, motion practice, discovery, deposition preparation, and trial preparation. He also interned with the City of Miami, assisting with legal research and opinions on land use and zoning matters, including the City of Miami Zoning Code, known as Miami 21. That work gave him a close look at how local policy shapes development, and how it affects the neighborhoods and property owners who live with the results. "A building is one of the biggest investments a property owner will ever make, and when construction goes wrong, they need advocates who understand both the courtroom and the local landscape," said Aixala. "Ball Janik handles complex construction litigation with a practical, client-focused approach. I'm excited to bring my litigation experience and local knowledge to this team and to the property owners it serves across South Florida." Aixala earned his J.D. from the University of Miami School of Law, where he was a member of the Yvette Ostolaza Mock Trial Team and the Cuban American Bar Association. He received his B.S. in Business Administration from the University of Central Florida, with a minor in Legal Studies and a certificate in Entrepreneurship. About Ball Janik LLP Ball Janik LLP is a Florida-based law firm offering construction defect, construction law, insurance recovery, and commercial litigation counsel, to its local and national clients. The firm was founded in 1982 and has expanded its capabilities, professionals, and geographic footprint. What started as a small firm focused on real property, land use, and litigation (known then as Ball Janik & Novack) has grown to a team of 70-plus attorneys and paralegals in five offices in Florida, with centuries of combined experience and capabilities. The firm has been recognized by Chambers USA, including for its construction law capabilities in Florida, U.S. News & World Report and Best Lawyers®, The Best Lawyers in America©, Super Lawyers, and Corporate International. Read more at www.balljanik.com.

    Court Finds Potential Conflicts In Denying Insurer’s Motion to Dismiss Claim for Independent Counsel

    October 12, 2026 —
    The District Court denied the insurer’s motion to dismiss the additional insured’s claim that the appointment of independent counsel was required. S. Cal. Edison Co. v. Travelers Prop. Cas. Co of Am., 2025 U.S. DIst. LEXIS 148495 (C.D Calif. July 15, 2025). Southern California Edison Company (SCE) entered a Master Services Agreement with its contractor, SASCO whereby SASCO agreed to provide services concerning electrical pole repair and replacement. SASCO was required to obtain primary and excess general liability policies and to name SCE as an additional insured. SASCO obtained such policies from Travelers, naming SCE as an additional insured. The policies limited coverage for SCE to covered damages arising from SASCO’s work. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Building the Research and Healthcare Facilities of Tomorrow Without Impacting the Progress of Today

    August 16, 2026 —
    Research labs run experiments that can’t be paused. Hospitals treat patients around the clock. Yet these same facilities constantly need upgrades—new infrastructure, modernized systems, renovated spaces—to meet the demands of twenty-first century science and medicine. The challenge for construction teams isn’t just building. It’s building without ever turning the lights off. This unique dynamic creates an environment where construction activities are happening adjacent to sensitive testing and treatment, a complex setting where disruptions can have serious consequences. Skanska continues to successfully navigate these challenges across multiple sectors, including from occupied lab space at the North Carolina Department of Environmental Quality’s (NCDEQ) Reedy Creek Laboratory in Raleigh to hospital corridors alongside staff and patients in various hospital locations across the country. Reprinted courtesy of Jason Tobias, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    One Year In: A Look at the Initial Impacts of LEED v5 on the Built Environment

    October 20, 2026 —
    As federal climate policies shift, the built environment has entered a period of uncertainty where developers, designers and owners need to find pragmatic, forward-looking approaches to sustainability. A year after its launch on April 28, 2025, LEED v5 is helping lead that charge by pushing the industry toward a stronger long-term focus on carbon reduction, climate resilience and building performance. The framework of this certification provides a snapshot of the current state of the industry and an indication of where it may be headed in the future. LEED v5’s introduction has helped to begin reframing and informing the approaches of both mission-driven and cost-conscious clients, providing a framework to align their decisions more closely with sustainable priorities by emphasizing carbon reduction, energy efficiency and electrification. These standards can help teams make investments strategically by phasing in upgrades, planning for future technologies and demonstrating how the rating system is influencing long-term decision-making across projects. Reprinted courtesy of Eric Haggstrom, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...