BERT HOWE
  • Nationwide: (800) 482-1822    
    Medical building expert witness Strathcona Minnesota hospital construction expert witness Strathcona Minnesota Subterranean parking expert witness Strathcona Minnesota townhome construction expert witness Strathcona Minnesota low-income housing expert witness Strathcona Minnesota structural steel construction expert witness Strathcona Minnesota housing expert witness Strathcona Minnesota retail construction expert witness Strathcona Minnesota production housing expert witness Strathcona Minnesota custom home expert witness Strathcona Minnesota mid-rise construction expert witness Strathcona Minnesota multi family housing expert witness Strathcona Minnesota custom homes expert witness Strathcona Minnesota institutional building expert witness Strathcona Minnesota industrial building expert witness Strathcona Minnesota condominium expert witness Strathcona Minnesota tract home expert witness Strathcona Minnesota casino resort expert witness Strathcona Minnesota parking structure expert witness Strathcona Minnesota concrete tilt-up expert witness Strathcona Minnesota office building expert witness Strathcona Minnesota landscaping construction expert witness Strathcona Minnesota
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Strathcona, Minnesota

    Minnesota Builders Right To Repair Current Law Summary:

    Current Law Summary: Statutory warranties for one-year, two-year and ten-year periods limits types of construction defects actionable under warranty law; This statute (Chapter 327A) limits liability and excludes normal wear and tear, normal shrinkage caused by drying of the dwelling, loss due to insufficient ventilation, loss or damage from negligence, improper maintenance, or alteration to dwelling, loss or damage from failure to maintain or failure to mitigate


    Construction Expert Witness Contractors Licensing
    Guidelines Strathcona Minnesota

    Residential contractors need to be licensed. If you work in two or more trades, certain trades will require a license. Call the state for details.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Headwaters Builders Association
    Local # 2480
    PO Box 402
    Bemidji, MN 56619
    http://www.headwatersbuilders.org

    Northern MN Builders Association
    Local # 2417
    802 S Pokegama Ave Ste A
    Grand Rapids, MN 55744
    http://www.nmbuilders.com

    Lake Region Builders Association
    Local # 2470
    1114 Hwy. 59 South Ste 2
    Detroit Lakes, MN 56501
    http://www.lakeregionbuilders.com

    Arrowhead Builders Association
    Local # 2415
    5255 Maple Grove Road
    HERMANTOWN, MN 55811
    http://www.abamn.org

    Home Builders Association of Mid-Minnesota
    Local # 2450
    17068 Commercial Park Road
    Brainerd, MN 56401
    http://www.midmnba.org

    Vikingland Builders Assoc
    Local # 2495
    509 22ND AVE E Ste 200
    Alexandria, MN 56308
    http://www.vikinglandbuilders.com

    Central Minnesota Builders Association
    Local # 2410
    1124 W Saint Germain St
    Saint Cloud, MN 56301
    http://www.cmbaonline.org


    Construction Expert Witness News and Information
    For Strathcona Minnesota

    Building Inspector Jailed for Taking Bribes

    AGC’s 2024 Construction Outlook. Infrastructure is Bright but Office-Geddon is Not

    The Need to Be Specific and Precise in Drafting Settling Agreements

    New Nafta Could Settle Canada-U.S. Lumber War, Resolute CEO Says

    A Matter Judged: Subrogating Insurers Should Beware of Prior Suits Involving the Insured

    New Jersey Federal Court Examines And Applies The “j.(5)” Ongoing Operations Exclusion

    2023 Construction Law Update

    Getting U.S to Zero Carbon Will Take a $2.5 Trillion Investment by 2030

    Texas Legislature Puts a Spear in Doctrine Making Contractor Warrantor of Owner Furnished Plans and Specifications

    Jersey City, New Jersey, to Get 95-Story Condo Tower

    Revisiting Statutory Offers to Compromise

    Ackman Group Pays $91.5 Million for Condo at NYC’s One57

    Washington Court of Appeals Upholds Standard of Repose in Fruit Warehouse Case

    Toll Brothers Report End of Year Results

    Remodel Gets Pricey for Town

    How AI Turns Construction Documents Into Procurement Intelligence

    Designing the Process to Deliver Zero-Carbon Construction – Computational Design in Practice

    Just Because You Caused it, Doesn’t Mean You Own It: The Hooker Exception to the Privette Doctrine

    Art Dao, Executive Director of the Alameda County Transportation Commission, Speaks at Wendel Rosen’s Infrastructure Forum

    Courthouse Reporter Series: The Travails of Statutory Construction...Defining “Labor” under the Miller Act

    The National Building Museum’s A-Mazing Showpiece

    As of July 1, 2024, California Will Require Most Employers to Have a Written Workplace Violence Prevention Program (WVPP) and Training. Is Your Company Compliant?

    Termination of Construction Contracts

    Construction in the Time of Coronavirus

    Feds Move To Indict NY Contractor Execs, Developer, Ex-Cuomo Aide

    Louisiana 13th in List of Defective Bridges

    Quick Note: Subcontractor Payment Bond = Common Law Payment Bond

    Weyerhaeuser Leaving Home Building Business

    Delay In Noticing Insurer of Loss is Not Prejudicial

    CEO/Founding Principal Nicole Whyte is recognized as one of the most Influential Leaders in Orange County by the OC Business Journal!

    Bad Faith Claim Survives Summary Judgment

    Replacement of Defective Gym Construction Exceeds Original Cost

    Jarred Reed Named to the National Black Lawyers’ “Top 40 Under 40” List for Second Consecutive Year

    Brian Newberry Accepted into ABOTA

    A License to Sue: Appellate Court Upholds Condition of Statute that a Contracting Party Must Hold a Valid Contractor’s License to Pursue Action for Recovery of Payment for Contracting Services

    Builders Beware: Smart Homes Under Attack by “Hide ‘N Seek” Botnet

    Brookfield Wins Disputed Bid to Manage Manhattan Marina

    Crews Tested By Rocky Ground, Utility Challenges

    Newark Trial Team Defends “No Cause” With Appellate Affirmance Of 2023 Jury Verdict

    Stormy Seas Ahead: 5th Circuit to Review Whether Maritime Law Applies to Offshore Service Contract

    New Jersey Appellate Court Reinstates Asbestos Action

    New Utah & Colorado Homebuilder Announced: Jack Fisher Homes

    Toll Brothers Faces Construction Defect Lawsuit in New Jersey

    Court Conditionally Grants Mandamus Relief to Compel Appraisal

    Project Labor Agreements: A New Bid Protest Forum Split

    Time to Reform Construction Defect Law in Nevada

    Negligent Failure to Respond to Settlement Offer Is Not Bad Faith

    When Are General Conditions and General Requirements Covered by Builder's Risk

    New York Climate Mobilization Act Update: Reducing Carbon Emissions and Funding Solutions

    Does the Implied Warranty of Habitability Extend to Subsequent Purchasers? Depends on the State
    Corporate Profile

    STRATHCONA MINNESOTA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    With over 4500 construction and design related expert designations, the Strathcona, Minnesota Construction Expert Directory delivers a comprehensive construction and design expert support solution to legal professionals and construction practice groups seeking meaningful resolution of construction defect and claims matters. BHA provides building claims investigation and expert services to the industry's leading construction attorneys, Fortune 500 builders, insurers, owners, as well as a variety of public entities. In connection with in house assets which include credentialed construction consultants, NCARB certified architects, forensic engineers, building envelope and design experts, the firm brings a wealth of experience and local capabilities to Strathcona and the surrounding areas.

    Strathcona Minnesota engineering expert witnessStrathcona Minnesota construction expert witness consultantStrathcona Minnesota stucco expert witnessStrathcona Minnesota testifying construction expert witnessStrathcona Minnesota multi family design expert witnessStrathcona Minnesota expert witnesses fenestrationStrathcona Minnesota construction expert witness
    Construction Expert Witness News & Info
    Strathcona, Minnesota

    Construction Liens and the “Substantial Performance” Doctrine

    April 08, 2026 —
    In a recent case dealing with a construction lien, the driving issue was whether the air conditioning contractor “substantially performed” before recording its construction lien against residential property. The importance here pertains to the substantial performance doctrine with respect to construction liens. The Third District Court of Appeal explained, with relevant citations, this doctrine as follows: Under Florida law, a contractor is entitled to a mechanic’s lien if he complies with all provisions of Chapter 713, governing construction liens, and “has substantially performed the contract.” Grant v. Wester, 679 So. 2d 1301, 1307 (Fla. 1st DCA 1996) (quotation omitted); Langley v. Knowles, 958 So. 2d 1149, 1151 (Fla. 5th DCA 2007) (“The substantial performance doctrine recognizes that a contactor who complies with all of the provisions of the contactor’s lien statute is entitled to enforce a lien if he has substantially, but not completely, performed his contractual obligations.”). Substantial performance is performance “so nearly equivalent to what was bargained for that it would be unreasonable to deny the promisee the full contract price subject to the promisor’s right to recover whatever damages may have been occasioned him by the promisee’s failure to render full performance.” Ocean Ridge Dev. Corp. v. Quality Plastering, Inc., 247 So. 2d 72, 75 (Fla. 4th DCA 1971). Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Project Labor Agreements: A New Bid Protest Forum Split

    May 14, 2026 —
    Advertisements often include a disclaimer: “individual results may vary.” Similarly, lawyers are notorious for saying “it depends.” The mandatory Project Labor Agreement (“PLA”) regulations have recently placed into context this adage as it applies to federal contract bid protests, with very different results depending on which forum – the Court of Federal Claims (“COFC”) versus the Government Accountability Office (“GAO”) – different contractors have selected to bring PLA bid protests. Over the last two years, over 30 protesters have successfully achieved removal of mandatory PLAs from large-scale federal construction contracts based on two landmark bid protest decisions issued by the COFC. Similar challenges to PLAs at the GAO, however, have not been successful in removing PLAs, highlighting an emerging trend that the COFC is often a more effective relief forum than GAO for government construction contractors. Reprinted courtesy of Dirk D. Haire, Burr & Forman LLP, David P.J. Timm, Burr & Forman LLP and Michael J. Brewer, Burr & Forman LLP Mr. Haire may be contacted at dhaire@burr.com Mr. Timm may be contacted at dtimm@burr.com Mr. Brewer may be contacted at mbrewer@burr.com Read the full story...

    Newark Team Obtains Appellate Ruling Affirming Summary Judgment for Lawyer and Firm in Professional Negligence Lawsuit

    April 14, 2026 —
    Newark Partner Meredith Kaplan Stoma and Associate Anthony Doss recently secured a decision from the New Jersey Superior Court, Appellate Division, affirming summary judgment for their clients, a lawyer and her firm, in a lawsuit alleging professional negligence in connection with the administration of a commercial loan. The circumstances giving rise to the lawsuit date back to September 2020, when the plaintiff was approached by members of a real estate investment company regarding a short-term loan opportunity whereby he would loan the company $200,000. The company provided the plaintiff with a “bridge loan package,” which stated that the requested funds would be held in the escrow account of their counsel and her firm (Lewis Brisbois’ clients), and returned to him with interest within six months once the company was “capitalized” by a senior lender. The company subsequently prepared two notes, each for $100,000, in connection with the agreement. Read the full story...
    Reprinted courtesy of Lewis Brisbois

    Insufficient Notice of Commencement and Construction Lien Rights

    August 03, 2026 —
    When a party is preserving their construction lien rights, the party will look to the recorded Notice of Commencement. This is the recorded document that provides the lienor with the information for purposes of preserving construction lien rights. A Notice to Owner company will typically rely on the Notice of Commencement to serve Notices to Owners from lower tiers not in contract with the owner. However, when it comes to preparing the lien, a lienor should look beyond just the Notice of Commencement and also look to the property appraiser’s website as a backstop. In a recent case, a window company had the homeowner sign the Notice of Commencement and then filled in the information. The company naturally did this for the convenience of the homeowner that probably was unfamiliar with the Notice of Commencement process. Regardless, information in the Notice of Commencement was inaccurate. It failed to include all the real property owners. Thus, when a payment dispute arose and a construction lien was prepared, it did not identify all of the real property owners. All of the real property owners were added later during the pendency of a lien foreclosure lawsuit. The trial court denied the lien because of the defective / insufficient Notice of Commencement — the lienor assumed the risk of error by filling out the information in the Notice of Commencement. The trial court further denied the lien holding that because the work did not commence within 90 days of the Notice of Commencement, the Notice of Commencement is void. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Chambers USA Recognizes Hunton’s Insurance Coverage Practice in 2026 Guide

    June 29, 2026 —
    Hunton is pleased to announce that its insurance coverage practice was recognized nationally for Insurance: Dispute Resolution – Policyholder in the recently released 2026 Chambers USA guide. The team also received state rankings in Florida (Insurance: Dispute Resolution), Georgia (Insurance), the District of Columbia (Insurance: Policyholder), and Massachusetts (Insurance). In addition to the insurance team’s group recognition across multiple states, the 2026 guide included individual rankings for Lorelie “Lorie” S. Masters (USA Nationwide and District of Columbia), Latosha M. Ellis (District of Columbia), Michael S. Levine (District of Columbia), Koorosh “KT” Talieh (District of Columbia), Walter J. Andrews (Florida), Andrea DeField (Florida), Cary D. Steklof (Florida), Lawrence J. Bracken II (Georgia), and Geoffrey B. Fehling (Massachusetts). Read the full story...
    Reprinted courtesy of Hunton Andrews Kurth LLP

    Flatiron Said Disputed Concrete Mix Cost Millions on Large Caltrans Project

    June 22, 2026 —
    For awhile in 2023, part of the California Dept. of Transportation's (Caltrans) Fix 50 HOV lane and resurfacing project in Sacramento itself needed to be fixed. Reprinted courtesy of Elaine Silver, Engineering News-Record and Richard Korman, Engineering News-Record Mr. Korman may be contacted at kormanr@enr.com Read the full story...

    The Grenfell & Champlain Towers: Risk Management Considerations in the Wake of Catastrophic Loss — A UK/US Comparison

    June 02, 2026 —
    1. Introduction As part of the multinational collaborative relationship between Saxe Doernberger & Vita, P.C. and Fenchurch Law, we continually find ourselves in conversations about the sometimes subtle but sometimes drastic differences between risk management and coverage considerations from one country to the next. These differences are often highlighted by the fallout from large catastrophic losses that are widely publicized and illuminate sometimes widespread risks and perils that many others may be facing in the coming years. The response of governments and their subdivisions to the needs of victims and/or commercial parties, and insurance markets’ evaluation of and reactions to catastrophic losses vary widely from country to country and jurisdiction. In this article, we discuss these responses and reactions in the cases of the Grenfell Tower Fire in London, England, and the Champlain Tower collapse in Surfside, Florida, within the United States. These two widely publicized losses involved different risk management and insurance considerations based on where they occurred. They also saw substantially different government responses and raised varied questions about what the next steps are for their respective commercial and insurance markets. Read the full story...
    Reprinted courtesy of Eric M. Clarkson, Saxe Doernberger & Vita, P.C.
    Mr. Clarkson may be contacted at EClarkson@sdvlaw.com

    Can Anything Supersede Excel in AEC?

    April 27, 2026 —
    If there’s one piece of software that dominates the business world across industries, it’s Microsoft Excel. Can AI finally dethrone the mighty spreadsheet? Memorable Spreadsheet Moments Everyone has memorable spreadsheet moments. I have a few. For example, my then-architecture firm was involved in more than a dozen housing developments abroad. I developed an Excel workbook that took the required number of households as input and automatically generated a breakdown of buildings and their apartment types for AutoCAD. This was urban planning and architectural design done with a spreadsheet. I also developed business software using Excel for project portfolio management. The prototype was later scaled into a commercial SaaS that is now used globally. Another memorable moment was when a property owner told me their Excel file grew so large that it ran out of rows and columns. That must have been before 2007, when the maximum number of columns on a sheet was still just 256 and the maximum number of rows was 65,536. The current limits are 1,048,576 rows and 16,384 columns, which I hope no one will exceed. Read the full story...
    Reprinted courtesy of Aarni Heiskanen, AEC Business
    Mr. Heiskanen may be contacted at aec-business@aepartners.fi