BERT HOWE
  • Nationwide: (800) 482-1822    
    condominium expert witness Guilford Missouri custom home expert witness Guilford Missouri housing expert witness Guilford Missouri tract home expert witness Guilford Missouri multi family housing expert witness Guilford Missouri institutional building expert witness Guilford Missouri casino resort expert witness Guilford Missouri custom homes expert witness Guilford Missouri industrial building expert witness Guilford Missouri Medical building expert witness Guilford Missouri condominiums expert witness Guilford Missouri townhome construction expert witness Guilford Missouri high-rise construction expert witness Guilford Missouri retail construction expert witness Guilford Missouri office building expert witness Guilford Missouri hospital construction expert witness Guilford Missouri production housing expert witness Guilford Missouri structural steel construction expert witness Guilford Missouri parking structure expert witness Guilford Missouri low-income housing expert witness Guilford Missouri landscaping construction expert witness Guilford Missouri concrete tilt-up expert witness Guilford Missouri
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Guilford, Missouri

    Missouri Builders Right To Repair Current Law Summary:

    Current Law Summary: (SB168/HB573) Missouri’s NOR law requires homeowners to provide notice of an alleged construction defect before filing a lawsuit. The contractor has the option to offer to inspect the defect, repair the defect, offer a settlement or dispute the claim. The law places deadlines on the contractor to serve notice on each subcontractor (14 days) and provide a written response to the claimant (14 days). HB1166 is a similar law that addresses Notice of Repair for Homeowner Associations.


    Construction Expert Witness Contractors Licensing
    Guidelines Guilford Missouri

    Licensing is done at the city level. Contractors must register to do business with the Secretary of State.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Midland Empire Home Builders Association
    Local # 2629
    PO Box 8278
    Saint Joseph, MO 64508
    http://www.mehba.org

    Home Builders Association of Greater Kansas City
    Local # 2636
    600 E 103rd St
    Kansas City, MO 64131
    http://www.kchba.org

    Home Builders Association of Columbia
    Local # 2618
    204 Peach Way Suite B
    Columbia, MO 65203
    http://www.columbiahba.com

    Home Builders Association of St. Louis and Eastern Missouri
    Local # 2690
    10104 Old Olive Street Rd
    Saint Louis, MO 63141
    http://www.stlhba.com

    Home Builders Association of Central Missouri
    Local # 2605
    1420 Creek Trail Dr
    Jefferson City, MO 65109
    http://www.hbacentralmo.com

    SE Missouri Home Builders Association
    Local # 2691
    3667 County Road 222
    Cape Girardeau, MO 63701


    Home Builders Association of Greater Springfield
    Local # 2654
    636 W Republic Rd Ste D 108
    Springfield, MO 65807
    http://www.springfieldhba.com


    Construction Expert Witness News and Information
    For Guilford Missouri

    The Need for Situational Awareness in Construction

    Arbitration Provision Must Be Incorporated into a Bond for Surety to Elect Arbitration

    The Preservation Maze

    Congratulations Devin Brunson on His Promotion to Partner!

    Builders Can’t Rely on SB800

    Court of Appeals Finds Additional Insured Coverage Despite “Care, Custody or Control” Exclusion

    Traub Lieberman Partners Dana Rice and Jason Taylor Obtain Summary Judgment For Insurance Carrier Client in Missouri Federal Court Coverage Action

    TOP TAKE-AWAY SERIES: The 2023 Annual Meeting in Vancouver

    Nomos LLP Partner Garret Murai Recognized by Best Lawyers®

    Gain in Home Building Points to Sustained U.S. Growth

    Quick Note: Aim to Avoid a Stay to your Miller Act Payment Bond Claim

    California Subcontractor Gets a Kick in the Rear (or Perhaps the Front) for Prematurely Recorded Mechanics Lien

    Which Cities have the Most Affordable Homes?

    Hunton Insurance Partner Syed Ahmad Serves as Chair of the ABA Minority Trial Lawyer Committee’s Programming Subcommittee

    Homeowner Loses Suit against Architect and Contractor of Resold Home

    Allen, TX Board of Trustees Expected to Approve Stadium Repair Plans

    Connecticut Supreme Court Rules Matching of Materials Decided by Appraisers

    Occurrence Found, Business Risk Exclusions Do Not Bar Coverage for Construction Defects

    Public Law Center Honors Snell & Wilmer Partner Sean M. Sherlock As Volunteers For Justice Attorney Of The Year

    A Tuesday With Lisa Colon

    More Regulations for Federal Contractors

    Homebuilders Opposed to Potential Change to Interest on Construction Defect Expenses

    Lack of Credibility Can Destroy a Claim

    Massachusetts Court Holds Statute of Repose Bars Certain Asbestos-Related Construction Claims

    Mortgage Firms Face Foreclosure Ban Until 2022 Under CFPB Plan

    PFAS, HFCs and Related Chemicals in the Data Center Industry

    South Carolina Clarifies the Accrual Date for Its Statute of Repose

    A Relatively Small Exception to Fraud and Contract Don’t Mix

    Blue-Sky Floods Take a Rising Toll for Businesses

    Insurance Coverage for COVID-19? Two N.J. Courts Allow Litigation to Proceed

    Voluntary Payments Affirmative Defense Does Not Apply in Contract Cases

    SB800 Not the Only Remedy for Construction Defects

    Ahlers Cressman & Sleight Nationally Ranked as a 2020 “Best Law Firm” by U.S. News – Best Lawyers®

    Contractor to Repair Defective Stucco, Plans on Suing Subcontractor

    Bankruptcy on a Construction Project: Coronavirus Edition

    Contract Not So Clear in South Carolina Construction Defect Case

    ASCE Statement on National Dam Safety Awareness Day - May 31

    Cincinnati Team Secures Summary Judgment for Paving Company in Trip-and-Fall Case

    EPC Contractors Procuring from Foreign Companies need to Reconsider their Contracts

    Real Estate & Construction News Roundup (06/28/23) – Combating Homelessness, U.S. Public Transportation Costs and the Future of Commercial Real Estate

    Happenings in and around the 2016 West Coast Casualty Seminar

    Congratulations to BWB&O’s 2023 Super Lawyers Rising Stars!

    White House Plan Would Break Up Corps Civil-Works Functions

    Choose the Right Option: How Facilitative and Evaluative Approaches Can Both Have a Role in Mediation

    2019 California Construction Law Update

    Fall 2024 Legislative Update:

    If I Released My California Mechanics Lien, Can I File a New Mechanics Lien on the Same Project? Will the New Mechanics Lien be Enforceable?

    5 Impressive Construction Projects in North Carolina

    Back Posting with Thoughts on Lien Waivers

    S&P Suspended and Fined $80 Million in SEC, State Mortgage Bond Cases
    Corporate Profile

    GUILFORD MISSOURI CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through more than 4500 construction and design related expert witness designations, the Guilford, Missouri Construction Expert Directory provides a single point of reference for construction defect and claims related support to legal professionals and construction practice groups concerned with the effective resolution of construction defect and claims litigation. BHA provides building related litigation support and expert witness services to the nation's leading construction practice groups, Fortune 500 builders, general liability carriers, owners, as well as a variety of public entities. Utilizing captive assets which comprise testifying architects, design engineers, construction cost and standard of care experts, the firm brings national experience and local capabilities to Guilford and the surrounding areas.

    Guilford Missouri structural engineering expert witnessesGuilford Missouri structural concrete expertGuilford Missouri concrete expert witnessGuilford Missouri construction project management expert witnessGuilford Missouri expert witness commercial buildingsGuilford Missouri defective construction expertGuilford Missouri construction safety expert
    Construction Expert Witness News & Info
    Guilford, Missouri

    Cuomo Bridge Lawsuit Adversaries Weigh Mediated Settlement

    July 06, 2026 —
    Rival legal teams have reached a critical juncture as they consider a mediated settlement in one of two major payment lawsuits pending between a design-build contracting team and the New York State Thruway Authority over construction of the more than $3-billion Mario M. Cuomo Bridge north of New York City. Read the full story...
    Reprinted courtesy of Richard Korman, Engineering News-Record
    Mr. Korman may be contacted at kormanr@enr.com

    Congratulations to Las Vegas Partner Jeffrey Saab and Senior Associate Shanna Carter on Winning Another Motion for Summary Judgment!

    March 17, 2026 —
    Partner Jeffrey Saab and Senior Associate Shanna Carter’s client owned a condo, which he rented out. The tenant allegedly assaulted Plaintiff across the street from the condo, resulting in personal injury, including nerve damage. Shanna did the research and writing, and Jeff argued the Motion for Summary Judgment. The Court ruled, in pertinent part, that the subject assault off property was not foreseeable, resulting in a complete dismissal of the lawsuit with prejudice. Read the full story...
    Reprinted courtesy of Dolores Montoya, Bremer Whyte Brown & O'Meara LLP

    PJM’s Reliability Backstop Procurement Proposal—Fast-Track Capacity to Meet Rising Large-Load Demand

    May 12, 2026 —
    In January, we discussed the Statement of Principles jointly signed by the National Energy Dominance Council and governors across the mid-Atlantic region—framing accelerating demand (especially from large-scale data centers) as an emergency reliability issue for PJM Interconnection, L.L.C. (PJM), the nation’s largest power grid operator. That policy signal is now becoming a near-term, accelerated procurement and contracting exercise. On April 8, 2026, PJM notified stakeholders of a critical issue fast path reliability backstop procurement process. PJM subsequently released a request for information (RFI) with respect to a proposed Reliability Backstop Procurement (RBP)—a one-time mechanism intended to attract significant new capacity to address projected reliability shortfalls driven by large-load growth. RBP compresses what is often a multiyear market and regulatory conversation into a fast-moving set of commercial choices. Developers, large loads, utilities and capital providers should be preparing now for (i) an accelerated bilateral contracting window and (ii) a standardized PJM-led backstop procurement if bilateral deals do not clear enough capacity. Reprinted courtesy of Stephen J. Humes, Pillsbury, Alicia M. McKnight, Pillsbury, Jason Drogin Atwood, Pillsbury and Andrew H. Jacobs, Pillsbury Mr. Humes may be contacted at stephen.humes@pillsburylaw.com Ms. McKnight may be contacted at alicia.mcknight@pillsburylaw.com Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com Mr. Jacobs may be contacted at andrew.jacobs@pillsburylaw.com Read the full story...

    Prefatory Contract Language Cannot Be Used to Create an Ambiguity with Operative Provisions

    May 12, 2026 —
    Contract drafting and interpretation matters. A case dealt with the potential conflict with prefatory language in an agreement compared with operative provisions in the agreement. The trial court held that the operative provisions control. I discussed this case here where the appellate court reversed based on the prefatory language. But, through a motion for rehearing, the appellate court reconsidered its position and affirmed the trial court based on the operative provisions, mainly that the prefatory language cannot be used to create an ambiguity with operative provisions. Consider this explanation in affirming the trial court:
    Because the trial court correctly found that the initial language in the contract was prefatory and could not be used to create an ambiguity in the remainder of the contract, we affirm the final judgment.
    Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Managing Tariff Volatility in Cross‑Border U.S. Construction Projects: Practical Contract‑Drafting and Procurement Strategies

    March 10, 2026 —
    Volatile U.S. tariff announcements continue to affect international supply chains for U.S. construction projects. Although recent litigation has centered on the scope of presidential tariff authority rather than construction‑specific disputes, these decisions carry important implications for how parties structure risk in their contracts. In May 2025, the U.S. Court of International Trade (CIT) struck down certain “Liberation Day” tariffs as exceeding presidential authority under IEEPA. A federal district court in Washington, D.C. likewise issued a preliminary injunction suspending related tariffs—though it later stayed its own order pending appeal. And the Supreme Court has agreed to review cases addressing the legal limits of IEEPA‑based tariffs. While none of these developments arises from construction disputes, the themes they highlight—timing, statutory authority, and documentation—mirror the issues encountered when tariff conditions disrupt international procurement. The following strategies reflect practical steps U.S. project owners, contractors, and foreign suppliers can take to mitigate risk, drawing on drafting approaches now widely used across major construction forms, including—but not limited to—modified AIA agreements. Reprinted courtesy of Sara Beiro Farabow, Seyfarth Shaw LLP and Michael Wagner, Seyfarth Shaw LLP Ms. Farabow may be contacted at sfarabow@seyfarth.com Mr. Wagner may be contacted at mewagner@seyfarth.com Read the full story...

    Tampa Team Obtains Highly Favorable Verdict for Property Owner Client in Lawsuit over Traffic Accident

    March 24, 2026 —
    Tampa Managing Partner John Rine and Partner Nick Dareneau obtained a very favorable verdict for their property owner client in a Sarasota County trial in a lawsuit arising from a traffic accident. At the end of closing arguments, plaintiff’s counsel requested appropriately $18 million from the jury. The jury returned a net verdict of just over a thousand dollars. The plaintiff was on a scooter and was involved in an accident with an SUV in a parking lot intersection. Our firm represented the property owner. The plaintiffs argued that the landscape vegetation was too tall and violated the sight lines of the two drivers, and that the height of the shrubbery violated the owner’s landscaping contract and a local sight line ordinance. They also argued that the intersection lacked a stop sign in contrast to the other six parking lot entrances, which had stop signs. Read the full story...
    Reprinted courtesy of Lewis Brisbois

    Kahana Feld Announces Key Partner Additions Coast to Coast

    June 22, 2026 —
    IRVINE, CA – June 10, 2026 – Kahana Feld is pleased to announce Yvette Davis, Evan Kalooky, Beth Obra-White, Sean Paden, Michael Parme, Jeffrey Schmid, and Julieanne Yanez have joined the firm as partners. Four of these partners are joining the San Diego office, which further strengthens the firm’s General Liability and Construction Litigation practices and enhances Kahana Feld’s ability to serve clients across a broad range of complex matters in the region. Read the full story...
    Reprinted courtesy of Kahana Feld

    Every High-Tech Building Has Many Lifespans

    August 16, 2026 —
    When I worked as an architect, our team designed a laboratory for fuel research. The facility included a large research hall where various boilers and other devices were tested and analyzed. The setup required extensive floor channeling under the thick concrete floor. We suggested building a modular system that would allow flexibility in the future, when requirements would certainly change. They did not want that because of budget constraints. The high-tech construction trend is spreading. Data centers, semiconductor fabs, battery plants, and life science facilities share one property that sets them apart from ordinary buildings. The technology inside turns over faster than the structure around it. Server generations change every three to five years. Rack densities have risen from 10 or 20 kW to 130 kW and beyond in just a few years. A high-tech facility is really several buildings with different lifespans inside one envelope, and we keep designing them as if they were one. The failure is not that things become obsolete. It is that we never say when each layer is expected to. Read the full story...
    Reprinted courtesy of Aarni Heiskanen, AEC Business
    Mr. Heiskanen may be contacted at aec-business@aepartners.fi