Sometimes a General Damages Assessment is Enough. . .
July 06, 2026 —
Christopher G. Hill - Construction Law MusingsIt has been a while since I last posted here at
Construction Law Musings. Life, law practice, and “blogger’s block” have taken their toll on the posting schedule. Hopefully this will be one of several upcoming posts now that the litigation schedule has lightened a bit over the summer.
Today’s post is about damages. Specifically damage to a homeowner’s roof and her legal damages therefor. That last is of course a sentence that only a
construction attorney (or other litigator) could possibly craft and have it make sense. Now, on with the case. . .In
Hardesty Construction, Inc. v. Weedon, the facts are as follows:
Ms. Weedon had hail damage to the roof of her home. She hired Hardesty Construction to repair and replace the roof. After the first roof was installed and failed inspection, a second roof was installed. The issue was that the first roof had a warranty and the second roof, installed similarly to the first (and allegedly with the same construction issues according to Ms. Weedon’s expert), was not provided with the promised warranty. As one may expect, Weedon sued Hardesty and Hardesty Construction for fraudulent inducement and breach of contract. At trial, Weedon testified, without objection, that her home was worth $40,000 less because of Hardesty Construction’s work, which was based partially on quotes Weedon received to fix the roof. The Circuit Court granted Hardesty Construction’s motion to strike Weedon’s fraudulent inducement claim, but not her other claims. A jury awarded Weedon $30,253.30 on her breach of contract claim. Hardesty Construction appealed, arguing the Circuit Court erred in (a) allowing the jury to consider Weedon’s valuation testimony because it was not based on her personal knowledge and (b) denying its motion to strike based on insufficient evidence as to damages. Weedon assigned cross-error in the Circuit Court’s decision to grant the motion to strike her fraudulent inducement claim against Samual Hardesty.
Read the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Real Estate & Construction News Roundup (6/24/26) – HUD to Fund AI Grants, Luxury Hotel Deal Investment Activity to Surge, ESPCs to Fund Energy and Infrastructure Improvements
July 06, 2026 —
Pillsbury's Construction & Real Estate Law Team - Gravel2Gavel Construction & Real Estate Law BlogIn our latest roundup, data centers are exposed to climate change, commercial tenant sues CoStar, cities see opportunities in emerging sports markets, and more!
- With deferred maintenance growing and capital dollars stretched thin, local governments are using ESPCs to fund energy and infrastructure improvements through future operational savings. (Vicky Uhland, Construction Dive)
- The U.S. Department of Housing and Urban Development is offering up to $3 million in grants for local governments to deploy automated permitting and building code systems. (Ryan Kushner, Construction Dive)
- Luxury hotel deals are set to see a surge in investment activity due to strong fundamentals and strengthening capital markets. (Noor Adatia, Hotel Dive)
Read the full story...Reprinted courtesy of
Pillsbury's Construction & Real Estate Law Team
New Report Outlines Roadmap for Construction Jobsites to Cut Carbon Emissions by 2040
April 20, 2026 —
PCL ConstructionDenver, Colo., April 16, 2026 (GLOBE NEWSWIRE) -- A new industry report outlines five practical steps that, when implemented together, could reduce construction jobsite emissions by up to 75% without compromising cost, schedule or performance. Grounded in real operational data from 617 construction projects across the U.S. and Canada, Growing and Greening Canadian Construction represents the most comprehensive sector-wide analysis of jobsite emissions conducted to date.
The report was developed through a collaboration among leading general contractors, including
PCL Construction, in partnership with the Transition Accelerator, an organization that drives projects, partnerships, and strategies to promote economic competitiveness in a carbon‑neutral world. The report focuses specifically on emissions from construction jobsite activities and reflects a shared commitment to advancing practical, scalable solutions for the industry.
About PCL Construction
PCL is a group of independent construction companies that operates throughout the United States, Canada, the Caribbean and Australia. As one of the largest contracting organizations in North America, PCL completes more than $9.9 billion USD in work annually, building projects that shape communities. The company’s 100% employee ownership model fuels a culture of commitment for clients in the buildings, civil infrastructure, heavy industrial and solar markets. With a strategic presence in more than 30 major centers, PCL’s leadership teams consistently drive innovation and set new benchmarks for excellence, bringing unparalleled skill to every project. Watch us build at PCL.com.
About the Transition Accelerator
The Transition Accelerator works with 300+ partner organizations across Canada to build out pathways to a prosperous low-carbon economy and avoid costly dead-ends along the way. We help governments and industry harness the global shift towards clean growth to secure permanent jobs, abundant energy, and strong regional economies across the country. By connecting systems-level thinking with real-world analysis, we’re enabling a more affordable, competitive, and resilient future.
Read the full story...
Science-Based Standards for Wildfire Recovery: What California Policyholders Need to Know About A.B. 1642
March 03, 2026 —
Geoffrey B. Fehling & Yosef Itkin - Hunton Insurance Recovery BlogWildfires continue to present serious risks for California property owners. Unfortunately, commercial property owners, corporate facilities, landlords, and homeowners need to overcome not only the flames themselves, but also remediating hazardous contamination against a backdrop of unpredictable and ambiguous environmental safety standards. In response to the destructive Los Angeles area fires in 2025, the California Legislature recently introduced Assembly Bill 1642 aimed at creating uniform science-based standards for evaluating, testing, and clearing wildfire-impacted properties.
While A.B. 1642 is in its early stages of consideration, it could materially influence claims handling, remediation costs, risk management practices, and broader liability exposures for California policyholders.
Reprinted courtesy of
Geoffrey B. Fehling, Hunton Andrews Kurth LLP and
Yosef Itkin, Hunton Andrews Kurth LLP
Mr. Fehling may be contacted at gfehling@hunton.com
Mr. Itkin may be contacted at yitkin@hunton.com
Read the full story...
Supreme Court Rules Tariffs Unconstitutional: Why the Construction Industry Shouldn’t Expect Calm Just Yet
March 31, 2026 —
Christopher Barnett - Construction ExecutiveThe U.S. Supreme Court’s 6–3 decision in Learning Resources, Inc. v. Trump did what many expected: It held that the International Emergency Economic Powers Act (IEEPA) does not authorize the President to impose tariffs. What few anticipated was the speed of what followed: Within hours of the ruling, the administration announced replacement tariffs under Section 122 of the Trade Act of 1974, imposed a 10% global surcharge effective February 24, and signaled forthcoming Section 301 investigations against most major trading partners.
For those in the construction industry hoping the Learning Resources ruling would restore market stability, the message was unambiguous. The constitutional question may be settled, but the market disruption is not.
Reprinted courtesy of
Christopher Barnett, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
Navigating Timelines and Technology: Patent Strategies for Space and Earth
June 01, 2026 —
Kate Nuehring Su & Vanessa Wang - Engineering News-RecordMore than half a century after the Apollo 11 landing
fulfilled President John F. Kennedy’s bold vision, the global race back to the Moon is no longer theoretical. With renewed attention on NASA’s Artemis program and a surge of commercial investment in space infrastructure, lunar exploration is again shaping technology priorities here on Earth.
Reprinted courtesy of
Kate Nuehring Su, Engineering News-Record and
Vanessa Wang, Engineering News-Record Read the full story...ENR may be contacted at
enr@enr.com
“The Superintendent Told Us to Do It:” Why Verbal Approval May Not Be Enough
June 02, 2026 —
Andrew Lintner - Colorado Construction Litigation BlogIn construction defect litigation, one scenario appears repeatedly: a subcontractor installs work in a manner that differs from the plans, specifications, manufacturer instructions, or industry standards after being verbally directed to do so by the general contractor, superintendent, architect, or owner’s representative.
At the time, the decision may seem minor. The project is moving quickly, the field team wants to maintain progress, and nobody wants to stop working over what appears to be a small issue. The subcontractor may trust the superintendent or project manager and assume the conversation will be remembered later if questions arise.
Years later, however, when the project experiences problems, the people involved may deny the conversation occurred, remember it differently, or simply no longer remember the project. Without written documentation, the subcontractor can find itself defending claims for defective work, even though it performed the installation exactly as directed.
Read the full story...Reprinted courtesy of
Andrew Lintner, Higgins, Hopkins, McLain & Roswell, LLCMr. Lintner may be contacted at
alintner@hhmrlaw.com
The GKN Aerospace Chemical Release and the Laws Designed to Address It
July 06, 2026 —
Sean M. Sherlock - Snell & WilmerOn May 21, 2026, a 34,000-gallon storage tank at the GKN Aerospace facility in Garden Grove, California began leaking methyl methacrylate (MMA), a volatile and highly flammable industrial chemical used to manufacture high-strength acrylic plastics. GKN Aerospace makes advanced military and commercial transparencies, such as aircraft canopies, windshields, cabin windows, bullet-resistant glass, and spacecraft windows.
In polymer chemistry lingo, MMA is known as a monomer. Monomers are like individual links to a chain. Under the right conditions they link up (react) with each other to form long-chained polymers, or plastics. MMA is an unstable monomer that requires controlled storage conditions to avoid setting off a polymerization (chain) reaction.
According to early reports, the MMA tank at GKN Aerospace overheated. The cause of the overheating is not yet clear, but the overheating may have created conditions enabling the MMA to initiate polymerization, which in turn generated heat, which in turn generated pressure, activating the tank’s pressure-relief system and releasing MMA vapor into the atmosphere. Concerns about a runaway reaction, massive release, and explosion led the Orange County Fire Authority to order evacuation of approximately 40,000 residents and closure of thirteen schools.
Read the full story...Reprinted courtesy of
Sean M. Sherlock, Snell & WilmerMr. Sherlock may be contacted at
ssherlock@swlaw.com