BERT HOWE
  • Nationwide: (800) 482-1822    
    hospital construction expert witness East Wakefield New Hampshire condominium expert witness East Wakefield New Hampshire housing expert witness East Wakefield New Hampshire Subterranean parking expert witness East Wakefield New Hampshire low-income housing expert witness East Wakefield New Hampshire multi family housing expert witness East Wakefield New Hampshire landscaping construction expert witness East Wakefield New Hampshire casino resort expert witness East Wakefield New Hampshire office building expert witness East Wakefield New Hampshire concrete tilt-up expert witness East Wakefield New Hampshire retail construction expert witness East Wakefield New Hampshire condominiums expert witness East Wakefield New Hampshire Medical building expert witness East Wakefield New Hampshire mid-rise construction expert witness East Wakefield New Hampshire industrial building expert witness East Wakefield New Hampshire custom homes expert witness East Wakefield New Hampshire structural steel construction expert witness East Wakefield New Hampshire institutional building expert witness East Wakefield New Hampshire townhome construction expert witness East Wakefield New Hampshire production housing expert witness East Wakefield New Hampshire high-rise construction expert witness East Wakefield New Hampshire tract home expert witness East Wakefield New Hampshire
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    East Wakefield, New Hampshire

    New Hampshire Builders Right To Repair Current Law Summary:

    Current Law Summary: Pursuant to HB 459; Title XXXI; Ch. 359-G, Sections 4 & 5 homeowners or their agents have 60 days to submit a complaint (in writing) regarding a construction defect. The builder receiving notice has 21 days to respond (in writing) to inspect, to settle or dispute the claim. The law restricts liability through "comparative negligence or failure to perform normal and reasonable maintenance," among others.


    Construction Expert Witness Contractors Licensing
    Guidelines East Wakefield New Hampshire

    Licensure is required for certain specialty trades: asbestos and lead abatement, electrical, and plumbing.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Lakes Region Bldrs & Remod Association
    Local # 3012
    355 Oakcrest Road
    Bristol, NH 03222


    Concord Area Builders Association
    Local # 3010
    48 Lesmerises Road
    Loudon, NH 03307


    White Mountain Home Builders & Remodelers
    Local # 3090
    PO Box 183
    North Conway, NH 03860


    Connecticut Valley Area Home Builders Association
    Local # 3005
    PO Box 903
    Charlestown, NH 03603
    http://www.ourhba.com

    Home Builders & Remodeling Association of NH
    Local # 3000
    119 Airport Rd
    Concord, NH 03301
    http://www.hbranh.com

    Home Builders Association of Seacoast Region
    Local # 3080
    PO Box 1453
    Portsmouth, NH 03802
    http://www.seacoasthba.com

    Home Builders Association of Manchester
    Local # 3060
    PO Box 5172
    Manchester, NH 03108
    http://www.gmhba.com


    Construction Expert Witness News and Information
    For East Wakefield New Hampshire

    Emergency Paid Sick Leave and FMLA Leave Updates in Response to COVID-19

    Reconstructing the Francis Scott Key Bridge Utilizing the Progressive Design-Build Method

    Is Your Business Insured for the Coronavirus?

    Real Estate & Construction News Roundup (05/23/23) – Distressed Prices, Carbon Removal and Climate Change

    Gehry-Designed Project Seen Bringing NYC Vibe to L.A.

    Is Settling a Bond Claim in the Face of a Seemingly Clear Statute of Limitations Defense Bad Faith?

    World's Longest Immersed Tunnel Passes Milestone, But Faces Delays

    Congratulations to Las Vegas Partner Madeline Arcellana on Securing a FULL DISMISSAL for BWB&O’s Clients!

    Pool Deck Failure Cited as Starting Point in Surfside Condo Collapse

    Colorado General Assembly Sets Forth Prerequisites for an Insurance Company to Use Failure to Cooperate as a Defense to a Claim for First Party Insurance Benefits

    In Florida, Component Parts of an Improvement to Real Property are Subject to the Statute of Repose for Products Liability Claims

    Updated Covid-19 Standards In The Workplace

    Location, Location, Location — But Which One? The Few Words in Your Construction Contract that Pick Where You Fight

    Rejection’s a Bear- Particularly in Construction

    Delaware Court Holds No Coverage for Faulty Workmanship

    The Cost of Overlooking Jury Fees

    Property Damage to Insured's Own Work is Not Covered

    Equitable Subrogation Part Deux: Mechanic’s Lien vs. Later Bank Deed of Trust

    Ten-Year Statute Of Repose To Sue For Latent Construction Defects

    Quick Note: Be Careful with Pay if Paid Clauses (Both Subcontractors and General Contractors)

    Unlicensed Contractors Caught in a Sting Operation

    Trump Administration Waives Border Wall Procurement Rules

    The Coronavirus, Zoom Meetings and Now a CCPA Class Action

    Court Finds California FAIR Plan Unlawful

    Construction Mezzanine Financing

    Traub Lieberman Partner Colleen Hastie and Associate Jeffrey George Successfully Oppose Plaintiff’s Motion to Vacate Dismissal

    Quick Note: Don’t Sue Your Arbitrator

    Boston Nonprofit Wants to Put Grown-Ups in Dorms

    Key Legal Considerations for Modular Construction Contracts

    Pollution Exclusion Prevents Coverage for Injury Caused by Insulation

    California Contractors Get a Much-Needed Break: SB 342 Softens the Harsh Consequences of Contractor License Lapses

    Don’t Get Caught Holding the Bag: Hold the State Liable When General Contractor Fails to Pay on a Public Project

    Managing Narrative, Capturing Context, and Building Together: Talking VR and AEC with David Weir-McCall

    Second Month of US Construction Spending Down

    Pennsylvania Civil Engineers Give the State's Infrastructure a "C-" Grade

    Need to Cover Yourself for “Crisis” Changes on a Job Site? Try These Tips (guest post)

    Release Of “Unknown” Claim Does Not Bar Release Of “Unaccrued” Claim: Fair Or Unfair?

    Sureties do not Issue Bonds Risk-Free to the Bond-Principal

    Gordon & Rees Ranked #4 of Top 50 Construction Law Firms in the Nation by Construction Executive Magazine

    …More on Delay Claims and the Burden of Proof Substantiating Delay

    Over 50 Lewis Brisbois Attorneys Recognized in 6th Edition of Best Lawyers: Ones to Watch in America

    NY Is Set To Sue US EPA Over ‘Completion’ of PCB Removal

    Product Liability Alert: Evidence of Apportionment of Fault Admissible in Strict Products Liability Action

    Payment Bond Claim Notice Requires More than Mailing

    TOP TAKE-AWAY SERIES: The 2023 Fall Meeting in Washington, D.C.

    Key Person Provisions in Construction Contracts: Because People, Not Companies, Build Projects

    Columbus, Ohio’s Tallest Building to be Inspected for Construction Defects

    Waiver of Consequential Damages: The Most Important Provision in a Construction Contract

    Colorado Supreme Court Weighs in on Timeliness of Claims Against Subcontractors in Construction Defect Actions

    U.S. Housing Starts Top Forecast on Single-Family Homes
    Corporate Profile

    EAST WAKEFIELD NEW HAMPSHIRE CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through over four thousand building and construction related expert designations, the East Wakefield, New Hampshire Construction Expert Directory delivers a wide range of trial support and consulting services to attorneys and construction practice groups concerned with construction defect and claims matters. BHA provides building related trial support and expert services to the nation's most recognized construction practice groups, Fortune 500 builders, CGL carriers, owners, as well as a variety of public entities. In connection with regional assets which comprise registered architects, professional engineers, licensed general and specialty contractors, the construction experts group brings national experience and local capabilities to East Wakefield and the surrounding areas.

    East Wakefield New Hampshire soil failure expert witnessEast Wakefield New Hampshire expert witness roofingEast Wakefield New Hampshire building envelope expert witnessEast Wakefield New Hampshire construction project management expert witnessEast Wakefield New Hampshire construction code expert witnessEast Wakefield New Hampshire eifs expert witnessEast Wakefield New Hampshire construction claims expert witness
    Construction Expert Witness News & Info
    East Wakefield, New Hampshire

    Differing Site Conditions Claim Requires a Misrepresentation

    May 14, 2026 —
    If you are entertaining a differing site conditions claim, consider this Third District Court of Appeals case from the mid-90s. In Hendry Corp. v. Metropolitan Dade County, 648 So.2d 140 (Fla. 3d DCA 1995), a contractor was hired by Dade County to demolish the old Rickenbacker Causeway in Miami. The original 1941 plans of the causeway were made available to contractors. The lowest bidding contractor that was awarded the project based its bid “on its conclusion that the pilings supporting the old bridge were made of concrete.” Hendry, supra at 141. The contractor based this conclusion on the original plans, its visual observation, and experience. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    GRSM Trial Team Holds Alameda County Asbestos Verdict to $900,000 Against $50 Million Demand

    July 27, 2026 —
    Gordon Rees Scully Mansukhani Partners John Katerndahl and Vincent Gunter recently obtained an outstanding trial result for a manufacturer of asbestos-containing electrical cable, holding a jury verdict to $900,000 against a $50 million demand following an eight-week trial in Alameda County Superior Court, which is among the most challenging asbestos venues in the country. The GRSM team also included Associate Brandon Sanchez, on-site trial Paralegal Laura Vitanova, and Paralegal Kerrie Lease. The plaintiffs, the surviving spouse and four children of a former painter who died of mesothelioma, alleged that the decedent was exposed to asbestos from the company’s electrical cable during construction of a California nuclear power facility. GRSM’s client was the sole remaining defendant at trial. The plaintiffs asked the jury for $50 million and called 15 witnesses across their case-in-chief and rebuttal. Read the full story...
    Reprinted courtesy of Gordon Rees Scully Mansukhani

    Insufficient Notice of Commencement and Construction Lien Rights

    August 03, 2026 —
    When a party is preserving their construction lien rights, the party will look to the recorded Notice of Commencement. This is the recorded document that provides the lienor with the information for purposes of preserving construction lien rights. A Notice to Owner company will typically rely on the Notice of Commencement to serve Notices to Owners from lower tiers not in contract with the owner. However, when it comes to preparing the lien, a lienor should look beyond just the Notice of Commencement and also look to the property appraiser’s website as a backstop. In a recent case, a window company had the homeowner sign the Notice of Commencement and then filled in the information. The company naturally did this for the convenience of the homeowner that probably was unfamiliar with the Notice of Commencement process. Regardless, information in the Notice of Commencement was inaccurate. It failed to include all the real property owners. Thus, when a payment dispute arose and a construction lien was prepared, it did not identify all of the real property owners. All of the real property owners were added later during the pendency of a lien foreclosure lawsuit. The trial court denied the lien because of the defective / insufficient Notice of Commencement — the lienor assumed the risk of error by filling out the information in the Notice of Commencement. The trial court further denied the lien holding that because the work did not commence within 90 days of the Notice of Commencement, the Notice of Commencement is void. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Hunton’s Jae Lynn Huckaba Selected to Miami-Dade Bar’s 2026 Circle of Excellence for Insurance Law

    October 26, 2026 —
    Congratulations to Hunton insurance coverage associate Jae Lynn (JL) Huckaba for being selected to the Miami-Dade Bar’s 2026 Circle of Excellence for Insurance Law. Now in its fifth year, the Miami-Dade Bar’s Circle of Excellence Awards recognize attorneys who exemplify the highest standards of skill, integrity, and professionalism across the county. Honorees are chosen by a panel of past Circle of Excellence recipients following a rigorous two-month review that incorporates input from the public, Bar members, and committee leadership. Read the full story...
    Reprinted courtesy of Hunton Andrews Kurth LLP

    ACEC Research Institute Report: Real Risk of AI Isn’t Technology. It’s the Org Chart.

    September 01, 2026 —
    WASHINGTON (August 19, 2026) – The ACEC Research Institute today released Leading Through AI Risk: The Enterprise Framework for Engineering Firm Leaders, a new study finding that the most significant risks artificial intelligence poses to engineering firms are organizational rather than technological, and that firms treating AI as an IT initiative are managing the wrong issue. The report, part of the Institute’s yearslong Firm of the Future initiative, combines an extensive literature review with in-depth interviews of 21 leaders drawn from engineering firms, public infrastructure owners, technology vendors, insurance and legal professionals, licensing and regulatory agencies, and AI consultants. The report groups AI risk into eight interconnected domains:
    • technical reliability and model risk
    • professional liability and standard of care risk
    • data governance, privacy, and intellectual property risk
    • organizational and workforce risk
    • ethical, regulatory, and reputational risk
    • operational and cybersecurity risk
    • financial and business model risk
    • strategic leadership and enterprise governance risk
    The last serves as the integrating domain through which firms coordinate responsible AI adoption enterprise wide. The report stresses that firms do not experience these risks one at a time. Weak oversight may create legal liability. Workforce gaps may affect quality assurance. “Understanding these interactions,” the study notes, “is often more important than understanding individual risks independently.” About the ACEC Research Institute The ACEC Research Institute is the independent research arm of the American Council of Engineering Companies (ACEC). Its mission is to fund and deliver research to equip the engineering industry with actionable intelligence on the issues critical to its success. Learn more at www.acecresearchinstitute.org.

    Federal Bid Protest Standard of Review and Disparate Treatment with Ratings

    August 16, 2026 —
    A recent decision out of the Federal Claims Court explains the post-award bid protest standard of review. In Massman Construction Co. v. U.S., 2026 WL 1971985 (Fed.Cl. 2026), a protestor brought a post-award bid protest after the Army Corps of Engineers awarded the contract to another contractor. The protestor argued that the Army Corps (government) acted irrational in its evaluation through disparate treatment. The Court of Federal Claims agreed and remanded for the Army Corps to “either justify this disparity or explain why [awardee’s] lower-priced, but technically inferior proposal provides the best value to the government.” Massman Construction, supra at *1. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Did You Know: Unique Legal Considerations for Animal Care Facilities

    August 24, 2026 —
    Animal care facilities are highly specialized environments that require expertise far beyond traditional commercial or even standard medical construction. Whether designing and building animal shelters, doggy daycares, veterinary clinics or full-service animal hospitals, these facilities operate under conditions that introduce unique challenges related to sanitation, durability, animal behavior and operational workflows. Because of these complexities, projects that fail to account for animal care requirements adequately often encounter costly issues—many of which result in litigation. Below are real-world examples drawn from expert witness work, followed by proactive best practices construction professionals should apply to future animal care projects. Reprinted courtesy of Hannah Skidmore, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    New York Climate Superfund Rulings Put Vermont Law in Focus

    October 20, 2026 —
    A second federal judge has struck down New York’s Climate Change Superfund Act and barred its enforcement. On September 23, 2026, Judge P. Kevin Castel of the U.S. District Court for the Southern District of New York issued a decision granting summary judgment to the United States and the U.S. Environmental Protection Agency (EPA), declaring the Act unconstitutional, and permanently enjoining New York officials from enforcing it in United States v. New York, No. 1:25-cv-03656 (S.D.N.Y. Sept. 23, 2026). Judge Castel’s decision closely tracks the Northern District of New York’s August 31 decision in West Virginia v. James, Case No. 1:25-cv-00168 (N.D.N.Y. Aug. 31, 2026). Both courts held that the Clean Air Act (CAA) preempts New York’s effort to impose strict liability through a climate attribution and cost recovery framework based on interstate greenhouse gas (GHG) emissions. Both also held that the foreign affairs doctrine preempts the Act as applied to fossil fuel activity outside the United States. On September 24, the Northern District entered Rule 54(b) judgment implementing its August 31 decision, enjoining Attorney General Letitia James and DEC Commissioner Amanda Lefton from implementing or enforcing the Act and permitting an immediate appeal of the preemption claims. Reprinted courtesy of Amanda G. Halter, Pillsbury, Ashleigh K. Myers, Pillsbury, Jillian Marullo, Pillsbury and Marcus Manca, Pillsbury Ms. Halter may be contacted at amanda.halter@pillsburylaw.com Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com Mr. Manca may be contacted at marcus.manca@pillsburylaw.com Read the full story...