Function Over Form: Eighth Circuit Narrows Application of Cosmetic Damage Exclusion
October 12, 2026 —
Ali Jamwal - SDV FenchurchIntroduction
In a significant decision for policyholders, the United States Court of Appeals for the Eighth Circuit adopted a narrow interpretation of an exclusion for cosmetic roof damage caused by wind or hail.
[1] The court held that for a cosmetic damage exclusion to apply, an insurer must prove that the roof’s ability to function as a barrier to the elements is not impaired as compared to its functionality prior to the loss or damage.
Background
In April 2022, a hailstorm struck the insured school buildings causing indentations in the buildings’ metal roofs. The hail did not puncture the roofs’ metal, and no leaks were reported. The insurer denied the claim based on the policy’s cosmetic damage exclusion, which precluded coverage for “cosmetic damage to roof surfacing caused by wind and/or hail.” Cosmetic damage was defined as “superficial damage that altered the appearance of the roof surfacing, but such damage does not prevent the roof from continuing to function as a barrier to entrance of the elements to the same extent as it did before.”
Read the full story...Reprinted courtesy of
Ali Jamwal, SDV FenchurchMr. Jamwal may be contacted at
ali.jamwal@sdvfenchurch.us
Suit Limitation Provision Eliminates Wind Loss Claim
July 27, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer’s motion for judgment on the pleadings was granted after the insured failed to file suit against the insurer within the policy’s two-year suit limitation provision. Interstate Investments, LLC v. Mt. Hawley Ins Co., 2026 U.S. Dist. LEXIS 98108 (S.D. N. Y. May 4, 2026).
On or before June 27, 2023, a wind, hail and rainstorm damaged Interstate’s property in Oklahoma. Interstate filed a claim under its policy with Mt. Hawley. The policy provided that New York law applied and contained a two- year suit limitation provision.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
At the Frontier of Change: How—or Where—to Rebuild as Alaska's Permafrost Disappears
September 28, 2026 —
Pam McFarland - Engineering News-RecordIn some areas of the tiny subsistence coastal village of Kwigillingok along the Bering Sea in western Alaska, pockets of ground feel squishy, almost gelatinous, rather than solid. It’s an odd sensation, as if there is only a thin layer of muddy soil preventing people from falling into the water beneath their feet.
Read the full story...Reprinted courtesy of
Pam McFarland, Engineering News-RecordMs. McFarland may be contacted at
mcfarlandp@enr.com
Best Lawyers Recognizes 33 White and Williams LLP Lawyers
August 24, 2026 —
White and Williams LLPWhite and Williams LLP is pleased to congratulate our attorneys recognized among the 2027 Best Lawyers in America® rankings.
Best Lawyers® has recognized Michael W. Horner, Chair of the Healthcare Group and Managing Partner of the Cherry Hill, NJ Office, as a 2027 "Lawyer of the Year” in the area of Litigation - Insurance for Cherry Hill. Michael Horner’s has extensive experience litigating, mediating and arbitrating complex catastrophic cases throughout multiple jurisdictions in the Northeast, with litigation and counseling experience that spans several decades in the areas of healthcare, catastrophic loss and employment matters in multiple state and federal jurisdictions.
Read the full story...Reprinted courtesy of
White and Williams LLP
Defend Now, Allocate Later? An Unresolved Tension in Colorado Construction Law
August 16, 2026 —
David McLain - Colorado Construction Litigation BlogFor decades, Colorado law has recognized an important distinction between the duty to defend and the duty to indemnify. The former ordinarily arises at the beginning of litigation; the latter generally cannot be determined until the underlying liability is known. That distinction makes intuitive sense. A defense that becomes due only after litigation concludes is not much of a defense.
But Colorado’s construction anti-indemnity statute, C.R.S. § 13-21-111.5(6), raises an interesting question about how that familiar rule operates in construction disputes. The statute expressly regulates contractual obligations not only to indemnify, but also to insure and defend, and it reflects a legislative policy that construction businesses should bear financial responsibility for their own negligence.
Those principles have developed along separate tracks. At some point, a Colorado appellate court may have to decide precisely how they fit together.
Read the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & Roswell, LLCMr. McLain may be contacted at
mclain@hhmrlaw.com
The Race to Reengineer Cybersecurity
October 06, 2026 —
Emell D. Adolphus - Engineering News-RecordIt took six days for Colonial Pipeline Co.'s 5,500-plus miles of connected refined petroleum supply infrastructure from Houston to New York City, to come back on line after a May 7, 2021 ransomware cyberattack forced the company to shut down operations and pay $4.4 million for restoration.
Read the full story...Reprinted courtesy of
Emell D. Adolphus, Engineering News-RecordMr. Adolphus may be contacted at
adolphuse@enr.com
Landlord Determined to Not Qualify as Additional Insured
September 08, 2026 —
Tred R. Eyerly - Insurance Law HawaiiIn a dispute between two insurers, the Second Circuit affirmed the district court’s determination that the landlord was not an additional insured under the tenant’s policy. Peleus Ins. Co. v. Am. European Ins. Co., 2026 U.S. App. LEXIS 17981 June 22, 2026).
Blossom Miller sued 57th Avenue and 21st Century in state court alleging that she was injured when she tripped on the sidewalk in front of the leased premises (the “Miller Action”). The premises was leased by 57th Avenue to 21st Century.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
"Resilient Rebuild Hub" Helps Wildfire-Impacted Homeowners Build Back Stronger
September 21, 2026 —
California Nevada Cement AssociationNEWPORT BEACH, Calif., Sept. 21, 2026 /PRNewswire/ -- When homeowners in a fire-ravaged Pacific Palisades neighborhood banded together last year to rebuild with fire-hardened materials rather than standard wood framing, they weren't just rebuilding houses: they were rewriting the playbook for how California communities can rebuild after wildfire. Today, the Building with Resilience effort is making that playbook available to every homeowner facing the same decision with the launch of its new Resilient Rebuild Hub for exploring fire resistant, non-combustible construction options.
The Resilient Rebuild Hub helps homeowners understand options for fire-resistant, concrete-based construction and connect with architects, engineers, and contractors who can build them. This includes six noncombustible building systems:
- Insulated Concrete Forms (ICF): stackable, high-density foam blocks filled with concrete which save 20-50% on monthly heating and cooling costs, reduce outside noise by up to 80%, offer exceptional earthquake performance and 4-hour fire resistance rating.
- Insulated Composite Concrete Forms (ICCF): similar formwork to ICF construction with composite materials that enhance strength, simplify installation, and improve long-term performance.
- Concrete Masonry: strong, durable wall systems used for decades across California and the U.S.
- Precast Insulated Sandwich Panels: a complete building enclosure system consisting of two layers of concrete separated by a continuous layer of rigid insulation.
- 3D Shotcrete: air-sprayed concrete for strong, fast, and versatile wall systems that enable a high degree of artistic freedom together with unparalleled fire resistance.
- 3D Concrete Printing: the cutting edge of residential construction, a large-scale robotic 3D printer "squeezes" a specialized concrete mixture layer by layer to allow for organic, curved designs that are often too expensive or impossible to build with traditional methods.
The Resilient Rebuild Hub is available now at buildingwithresilience.com/how-to-build. Each part is free to access and includes case studies, technical resources, and a directory of architects, engineers, and contractors experienced in each building method.
CNCA is a not-for-profit organization committed to developing sustainable and economical construction solutions for California and Nevada with an emphasis on the use of cement and concrete. For more information, visit www.cncement.org.
CalCIMA is a trade association for the construction and essential mineral industries in California, including aggregate, essential and rare earth minerals, ready mixed concrete, and asphalt producers. In all, there are about 70 producer member companies that include 500 production sites in every county of California. Our members also include more than 100 suppliers and service providers to the industry.
Founded in 1930, the National Ready Mixed Concrete Association (NRMCA) is the leading industry advocate with a mission to provide exceptional value for our members by responsibly representing and serving the entire ready mixed concrete industry through leadership, promotion, education and partnering to ensure ready mixed concrete is the building material of choice.