BERT HOWE
  • Nationwide: (800) 482-1822    
    housing expert witness Chowan County North Carolina custom home expert witness Chowan County North Carolina office building expert witness Chowan County North Carolina structural steel construction expert witness Chowan County North Carolina Medical building expert witness Chowan County North Carolina multi family housing expert witness Chowan County North Carolina parking structure expert witness Chowan County North Carolina institutional building expert witness Chowan County North Carolina Subterranean parking expert witness Chowan County North Carolina concrete tilt-up expert witness Chowan County North Carolina industrial building expert witness Chowan County North Carolina condominiums expert witness Chowan County North Carolina landscaping construction expert witness Chowan County North Carolina custom homes expert witness Chowan County North Carolina townhome construction expert witness Chowan County North Carolina casino resort expert witness Chowan County North Carolina low-income housing expert witness Chowan County North Carolina mid-rise construction expert witness Chowan County North Carolina tract home expert witness Chowan County North Carolina high-rise construction expert witness Chowan County North Carolina condominium expert witness Chowan County North Carolina retail construction expert witness Chowan County North Carolina
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Chowan County, North Carolina

    North Carolina Builders Right To Repair Current Law Summary:

    Current Law Summary: Case law precedent


    Construction Expert Witness Contractors Licensing
    Guidelines Chowan County North Carolina

    A contractor's license is required for all jobs over $30,000.00. Separate boards license plumbing and electrical trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Wilkes Co Home Builders Association (NC)
    Local # 3453
    PO Box 902
    Wilkesboro, NC 28697
    http://www.wilkescountyhba.com

    Alamance Caswell Home Builders Association
    Local # 3410
    PO Box 1713
    Burlington, NC 27216
    http://www.alamancehba.org

    Roanoke Chowan Chapter
    Local # 3491
    941 Elm Grove Rd
    Colerain, NC 27924


    Greater Greensboro Builders Association
    Local # 3440
    PO Box 41135
    Greensboro, NC 27404
    http://www.greensborobuilders.org

    Home Builders Association of Winston-Salem
    Local # 3476
    220 Charlois Blvd
    Winston Salem, NC 27103
    http://www.hbaws.org

    Outer Banks Home Builders Association
    Local # 3489
    105 Airstrip Rd
    Kill Devil Hills, NC 27948
    http://www.obhomebuilders.org

    "Home Builders Association of Durham, Orange & Chatham Counties "
    Local # 3420
    20 W Colony Pl Ste 180
    Durham, NC 27705
    http://www.hbadoc.com


    Construction Expert Witness News and Information
    For Chowan County North Carolina

    A Game of Texas Hold’em: How Texas Stopped Wage Increases for Salaried Exempt Employees Nationwide

    Dave McLain included in the 2023 edition of The Best Lawyers in America

    When to Withhold Retention Payments on Private or Public Projects

    Homebuilders See Record Bearish Bets on Shaky Recovery

    Be Careful in Contracting and Business

    Business and Professions Code Section 7031, Demurrers, and Just How Much You Can Dance

    Four Steps to Effectively Manage Rising Risk of Construction Liability Claims

    What Every Project Participant Needs to Know About Delay Claims

    Business Risk Exclusions Bar Coverage for Construction Defect Claims

    The Construction Industry's Health Kick

    Contract Change #9: Owner’s Right to Carry Out the Work (law note)

    Affordable Harlem Housing Allegedly Riddled with Construction Defects

    Contractors and Owners Will Have an Easier Time Identifying Regulated Wetlands Following Recent U.S. Supreme Court Opinion

    Do Hurricane-Prone Coastal States Need to Update their Building Codes?

    SB800 Is Now Optional to the Homeowner?

    The Who/What/How of Sealing Plans for Architects and Engineers (Law Note)

    Unpunished Racist Taunts: A Pennsylvania Harassment Case With No True 'Winner'

    No Coverage Under Property Policy With Other Insurance and Loss Payment Provisions

    Florida Passes Tort Reform Bill

    Ensuring Efficient Arbitration of Construction Disputes Involving Mechanic’s Liens

    Pallonji Mistry, Indian Billionaire Caught in Tata Feud, Dies at 93

    ARUP, Rethinking Green Infrastructure

    Drawing the Line: In Tennessee, the Economic Loss Doctrine Does Not Apply to Contracts for Services

    Wildfires, Silica Exposures and ESG-Friendly Solutions

    Contractors Sued for Slip

    Court Holds That Trimming of Neighbor’s Trees is Not an Insured Accident or Occurrence

    Travelers’ 3rd Circ. Win Curbs Insurers’ Asbestos Exposure

    Contractor Sentenced to Seven Years for Embezzling $3 Million

    Newmeyer & Dillion Selected to 2017 OCBJ’s Best Places to Work List

    Georgia Supreme Court Rules Construction Defects Can Constitute an Occurrence in CGL Policies

    Congratulations to Partners Nicole Whyte, Keith Bremer, Vik Nagpal, and Devin Gifford, and Associates Shelly Mosallaei and Melissa Youngpeter on Their Inclusion in 2024 Best Lawyers in America!

    The Hidden Price of Outdated Damage Prevention Laws: Part I

    Employee or Independent Contractor? New Administrator’s Interpretation Issued by Department of Labor Provides Guidance

    Hurricane Harvey Victims Face New Hurdles In Pursuing Coverage

    Occurrence Definition Trends Analyzed

    Developer Transition - Maryland Condominiums

    Accident/Occurrence Requirement Does not Preclude Coverage for Vicarious Liability or Negligent Supervision

    Coffee Beans, Mars and the 50 States: Civil Code 1542 Waivers and Latent Defects

    Employer’s Liability Exclusion Bars Coverage

    The Architecture of Tomorrow Mimics Nature to Cool the Planet

    Construction Litigation Roundup: “D’Oh!”

    Protecting Your Business From Liability Claims Stemming From COVID-19 Exposure

    Court Resolves Disagreement on the Amount of the Deductible

    Court of Appeal Shines Light on Collusive Settlement Agreements

    Congratulations to Wilke Fleury’s 2023 Super Lawyers and Rising Stars!!

    Cost of Materials Holding Back Housing Industry

    Housing Starts in U.S. Surge to Seven-Year High as Weather Warms

    Engineer Pauses Fix of 'Sinking' Millennium Tower in San Francisco

    MBIA Seeks Data in $1 Billion Credit Suisse Mortgage Suit

    Court Finds Duty To Defend Environmental Claim, But Defense Limited to $100,000
    Corporate Profile

    CHOWAN COUNTY NORTH CAROLINA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    With over 4500 engineering, construction, and builders standard of care related expert designations, the Chowan County, North Carolina Construction Expert Directory provides a single point of reference for construction defect and claims related support to lawyers and construction practice groups concerned with construction defect and claims litigation. BHA provides construction claims investigation and expert services to the nation's most recognized builders, risk managers, legal professionals, owners, state and local government agencies. Utilizing in house resources which include construction cost and scheduling experts, registered design professionals, forensic engineers, certified professional estimators, the construction experts group brings specialized experience and local capabilities to Chowan County and the surrounding areas.

    Chowan County North Carolina construction expert witnessChowan County North Carolina construction scheduling and change order evaluation expert witnessChowan County North Carolina construction expertsChowan County North Carolina building code expert witnessChowan County North Carolina contractor expert witnessChowan County North Carolina expert witnesses fenestrationChowan County North Carolina eifs expert witness
    Construction Expert Witness News & Info
    Chowan County, North Carolina

    Construction Liens: Liening for Amounts Not Yet Technically Due Does Not Mean Lien Is Fraudulent

    August 11, 2026 —
    A 2024 bankruptcy ruling, In re Edgewater Construction Group, Inc., 657 B.R. 668 (S.D.Fla. 2024), touched upon an interesting issue when it comes to construction liens. Is a construction lien fraudulent simply because the lien includes amounts not yet due? Not necessarily. In this bankruptcy dispute, the subcontractor debtor (that filed for bankruptcy) recorded two construction liens on projects. The general contractor argued in the bankruptcy court that the subcontractor debtor’s liens were fraudulent. As to the first lien, the general contractor argued that the lien was fraudulent because it included amounts that the debtor knew the general contractor had already paid to the debtor’s subcontractors/suppliers. The bankruptcy court disagreed: “The Court finds that, although the Debtor had been told that [the general contractor] had paid these subcontractors, in light of the ongoing dispute between Debtor and [the general contractor], it was reasonable for the Debtor to demand proof. Debtor’s subsequent filing of a partial satisfaction of lien once the Debtor received the requested proof of payment from [the general contractor] counters any claim of willful exaggeration.” In re Edgewater Construction Group, supra, at 672-673. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Preventing Common and Costly Water Intrusion Events in Construction

    July 13, 2026 —
    Water leaking into a building is a leading cause of damage and loss in the construction industry. On one jobsite, heavy rains flooded a sub-basement, damaging a new electrical transformer—all because a roof drain was not property connected. On another jobsite, a drinking-fountain supply line broke in a multistory building that was undergoing renovation, causing water to run—undetected—for an entire weekend, resulting in water damage to all lower floors, where construction had been finished. Those loss scenarios could have been prevented with a comprehensive and effective water damage prevention plan (WDPP). This includes routine site inspections to identify uncontrolled water damage exposures and basic maintenance to make sure drains are clean of debris and divert them to a catch basin or low point away from the building. An effective WDPP plan also incorporates technology such as backflow preventers on sewer connections and water sensing technology to monitor the most vulnerable exposures. Reprinted courtesy of Andrew Swift, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Managing Rising Costs and Shifting Legal Risk for Florida High-Rise and Condominium Projects

    May 05, 2026 —
    Florida's construction defect landscape is experiencing a major shift. The convergence of material and labor cost volatility, regulatory tightening, and increasingly complex litigation strategies is forcing associations, developers, and their counsel to rethink how they approach risk management and dispute resolution. For those managing large-scale condo and high-rise projects, the stakes have never been higher. The Cost Volatility Trap Construction material prices rose at a "staggering" 12.6% annualized rate during the first two months of 2026, according to recent industry analysis. Tariff impacts are projected to lead to more increases of 5.4% to 6.8%, depending on property type. For associations facing construction defect claims, this volatility creates a cascading problem: repair scopes defined two years ago are now dramatically underpriced, and damage calculations that appeared reasonable at discovery are obsolete by the time of settlement. Courts and mediators are increasingly scrutinizing how cost estimates were developed and whether they account for existing market circumstances. Associations must now commission updated repair assessments more frequently, a practice that increases investigation costs but strengthens the credibility of damage claims. Conversely, defendants are weaponizing cost inflation as a defense, arguing that claimed damages are speculative or inflated. The practical result: repair sequencing and phasing strategies have become critical litigation tools. Associations that can demonstrate a rational, cost-effective repair plan tied to current market data are more favorably placed in settlement negotiations. Regulatory Pressure and Deliberate Timing Florida's 2026 condo compliance regime has significantly changed the defect claims landscape. Elevated transparency requirements, stricter reserve funding mandates, and tightened building safety inspection protocols mean that associations now face dual pressures: Comply with new regulations while simultaneously handling construction defect exposure. This regulatory environment is changing investigation and documentation strategy. Associations that delay defect investigation to avoid triggering reserve funding obligations or disclosure requirements are taking on considerable legal risk. Recent case law such as the Third District Court of Appeal's reaffirmation of Chapter 558's pre-suit mediation requirements, underscores Florida's intent to resolve disputes early. Associations that move deliberately and record carefully during the pre-suit phase gain leverage in mediation and reduce the risk of expensive litigation. Timing also intersects with repair sequencing. Associations must now balance the urgency of compliance inspections against the strategic advantage of phased repairs. Some associations are using compliance deadlines as a forcing mechanism to accelerate settlement discussions, while others are sequencing repairs to demonstrate good-faith remediation efforts before litigation commences. The Emerging Risk Transfer Challenge As construction defect claims grow more complex and costly, the traditional risk transfer systems, such as design-build warranties, contractor bonds, and insurance, are proving inadequate. Developers and general contractors are increasingly shifting risk to subcontractors and material suppliers, fragmenting liability and complicating recovery efforts for associations. Permitting and approval friction is also creating new litigation pressure points. Delays in municipal approvals, changes to building code interpretations, and disputes over remedial work compliance continue to spawn collateral claims that go beyond the original defect. Associations must now anticipate not only defect liability but also regulatory compliance disputes with municipalities, creating a dual-front legal challenge. For large communities, this means reconsidering the entire risk architecture. Insurance carriers are tightening coverage, and traditional indemnification chains are breaking down. Forward-thinking associations are engaging counsel earlier in the development process to negotiate clearer risk allocation provisions and more robust insurance requirements. Taking a Data-Driven Approach Managing rising costs and shifting legal risk in Florida's high-rise and condo market requires a more sophisticated, data-driven approach. Associations must commission frequent cost updates, move deliberately through pre-suit investigation and mediation, and challenge traditional assumptions about risk transfer. Developers and their counsel should view regulatory compliance not as a burden but as an opportunity to demonstrate good-faith risk management and strengthen settlement positioning. The firms and associations that succeed in 2026 will be those that treat cost volatility, regulatory change, and litigation strategy not as separate challenges but as linked elements of a coherent risk management framework. Stephen Hauptman is special counsel in Ball Janik LLP’s Fort Lauderdale office. He may be reached at shauptman@balljanik.com.

    Voluntary Dismissal of an Indemnity Claim Does Not Make the Subcontractor a “Prevailing Party,” Washington Court of Appeals Holds

    September 21, 2026 —
    In King County v. Walsh Construction Company II, LLC, No. 86503-0-I (Wash. Ct. App. Aug. 4, 2025), an unpublished decision from Division I of the Washington Court of Appeals, the Court affirmed the denial of a subcontractor’s request for prevailing-party attorney fees under an indemnity clause after the general contractor voluntarily dismissed its indemnity claims. Because the indemnity claim was no longer live and no determination of fault had occurred, the Court held that the trial court did not err in denying the request. ACS represented Walsh, the general contractor, in securing the denial of the fee request at the trial court that the Court of Appeals affirmed. A Pass-Through Indemnity Claim That Ended Before Fault Was Decided The dispute arose out of a public works contract under which King County hired Walsh Construction Company II, LLC (“Walsh”) to construct and install a conveyance pipeline. After the pipeline broke, King County sued Walsh for breach of contract and warranty, expressly identifying both Walsh and its subcontractor, Mears Group Inc., (“Mears”) as responsible. Walsh tendered defense and indemnity to Mears under the subcontract. Read the full story...
    Reprinted courtesy of Margarita Kutsin, Ahlers Cressman & Sleight PLLC
    Ms. Kutsin may be contacted at margarita.kutsin@acslawyers.com

    Contractor Dispute Resolution Framework and Prevention

    July 06, 2026 —
    WHAT DEFINES A CONTRACTOR DISPUTE RESOLUTION FRAMEWORK A contractor dispute resolution framework is a structured system of contractual terms, governance processes and escalation pathways designed to prevent, manage and resolve conflicts between contracting parties with minimal disruption to cost, schedule and performance. The framework operates as both a preventive control and a corrective mechanism. Preventive elements establish clarity in scope, expectations and accountability before work begins. Corrective elements define how disagreements are identified, documented, escalated and resolved once they arise. Reprinted courtesy of Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Seattle’s Residential Zoning Transformation: What Property Owners, Buyers, and Investors Should Understand

    May 14, 2026 —
    Seattle is in the midst of a significant transformation in residential land use policy. Longstanding neighborhood zoning patterns that historically favored detached single-family development are being reexamined in response to housing supply pressures, affordability concerns, and evolving state mandates. For homeowners, purchasers, investors, and builders, these changes may create substantial new opportunities. They also create a heightened need for careful legal and practical due diligence. While zoning reform can expand potential uses of property, it does not eliminate the many other constraints that may still govern what can actually be built. Read the full story...
    Reprinted courtesy of Lawrence S. Glosser, Ahlers Cressman & Sleight PLLC
    Mr. Glosser may be contacted at larry.glosser@acslawyers.com

    Travelers Injury Impact Report Highlights Longer Recovery Times Amid Declining Injury Rates

    May 05, 2026 —
    HARTFORD, Conn.--(BUSINESS WIRE)--The Travelers Companies, Inc. (NYSE: TRV) today released its 2026 Injury Impact Report, an analysis of more than 1.2 million workers compensation claims received by the company from 2021 through 2025. The report finds that even as workplace injury rates decline, the injuries that do occur are growing more complex and taking longer to heal – a trend driven by an aging workforce and the disproportionate vulnerability of first-year employees. “The decrease in workplace injuries is a positive story, yet injured workers are still missing an average of 80 workdays,” said Claude Howard, Vice President of Workers Compensation Claim at Travelers. “This report is a reminder that progress doesn’t mean the risk environment requires any less attention, and an employer’s commitment to safety must keep pace with an ever-evolving workforce and injury landscape.” Read the full story...
    Reprinted courtesy of The Travelers Companies, Inc.

    Congratulations to Reno Partner Karen Baytosh for Securing a Complete Dismissal via a Motion for Summary Judgment

    July 13, 2026 —
    BWB&O is proud to announce that Reno Partner Karen Baytosh received a significant victory on behalf of the firm’s Developer Client in a high-exposure personal injury matter. Plaintiff, a teenager, was struck by an intoxicated driver while walking her dog at night, sustaining catastrophic injuries requiring 24-hour critical care for the remainder of her life. Plaintiff’s Guardian brought suit against the drunk driver and her husband, the City, and BWB&O’s Developer Clients, alleging that the City and Developers failed to improve street lighting and install a sidewalk that would have prevented the accident. Read the full story...
    Reprinted courtesy of Bremer Whyte Brown & O'Meara LLP