BERT HOWE
  • Nationwide: (800) 482-1822    
    custom homes expert witness Grantsboro North Carolina landscaping construction expert witness Grantsboro North Carolina high-rise construction expert witness Grantsboro North Carolina housing expert witness Grantsboro North Carolina low-income housing expert witness Grantsboro North Carolina concrete tilt-up expert witness Grantsboro North Carolina mid-rise construction expert witness Grantsboro North Carolina institutional building expert witness Grantsboro North Carolina multi family housing expert witness Grantsboro North Carolina tract home expert witness Grantsboro North Carolina parking structure expert witness Grantsboro North Carolina condominiums expert witness Grantsboro North Carolina production housing expert witness Grantsboro North Carolina industrial building expert witness Grantsboro North Carolina casino resort expert witness Grantsboro North Carolina office building expert witness Grantsboro North Carolina hospital construction expert witness Grantsboro North Carolina townhome construction expert witness Grantsboro North Carolina retail construction expert witness Grantsboro North Carolina condominium expert witness Grantsboro North Carolina custom home expert witness Grantsboro North Carolina Subterranean parking expert witness Grantsboro North Carolina
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Grantsboro, North Carolina

    North Carolina Builders Right To Repair Current Law Summary:

    Current Law Summary: Case law precedent


    Construction Expert Witness Contractors Licensing
    Guidelines Grantsboro North Carolina

    A contractor's license is required for all jobs over $30,000.00. Separate boards license plumbing and electrical trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Home Builders Association of Fayetteville
    Local # 3425
    2935 Breezewood Ave Suite 100
    Fayetteville, NC 28303
    http://www.fayhba.org

    Jackson County Home Builders Association
    Local # 3474
    PO Box 1073
    Cashiers, NC 28717
    http://www.jchba.org

    Home Builders Association of Craven and Pamlico Counties
    Local # 3418
    PO Box 14009
    New Bern, NC 28561


    Union County Home Builders Association
    Local # 3403
    2560 W Roosevelt Blvd Ste A
    Monroe, NC 28110
    http://UnionCountyHBA.net

    Moore County Home Builders Association
    Local # 3452
    10022 NC Highway 211 E
    Aberdeen, NC 28315
    http://www.mchba.com

    Appalachian Home Builders Association
    Local # 3404
    PO Box 1143
    Murphy, NC 28906
    http://www.wncahba.org

    Macon Co Home Builders Association
    Local # 3482
    PO Box 1144
    Franklin, NC 28744



    Construction Expert Witness News and Information
    For Grantsboro North Carolina

    What Happens When Dave Chappelle Buys Up Your Town

    Is Privity of Contract with the Owner a Requirement of a Valid Mechanic’s Lien? Not for GC’s

    Construction Industry Survey Says Optimism Hits All-Time High

    From Ashes to Action: LA Fire Recovery Enters New Phase

    Subrogation 101 (and Why Should I Care?)

    Fast-Moving Isaias Dishes Out Disruption in the Mid-Atlantic, Northeast

    New York Moves to Tighten Third-Party Practice: Key Changes to CPLR 1007

    Land Use Team Wins Appeal for Affordable Senior Housing Development in San Francisco

    Consumer Prices Rising as U.S. Housing Stabilizes: Economy

    CGL Policy Covering Attorney’s Fees in Property Damage Claims

    President Trump’s Infrastructure Plan Requires a Viable Statutory Framework (PPP Statutes)[i]

    Largest Per Unit Settlement Ever in California Construction Defect Case?

    New York Bars Developers from Selling Condos due to CD Fraud Case

    Examining Construction Defect as Occurrence in Recent Case Law and Litigation

    Lost Productivity or Inefficiency Claim Can Be Challenging to Prove

    Appellate Court Endorses Discretionary Test for Vicarious Disqualification of Law Firms Due To New Attorney’s Conflict

    A Court-Side Seat: Clean Air, Clean Water, Citizen Suits and the Summer of 2022

    Hawaiian Electric Finalizes $2 Billion Maui Fire Settlement

    Finding an "Occurrence," Appellate Court Rules Insurer Must Defend

    Four HHMR Attorneys Recognized in the 2027 Editions of Best Lawyers®

    Modern Building-Sundt $17M Claim Is Stranded by Hospital Bankruptcy

    Haight Proudly Supports JDC's 11th Annual Bike-A-Thon Benefitting Pro Bono Legal Services

    Watchdog Opens Cartel Probe Into Eight British Homebuilders

    How to Document Changes and Preserve Claims Without Starting a Fight

    Medical Center Builder Sues Contracting Agent, Citing Costly Delays

    Contractor Given a Wake-Up Call for Using a "Sham" RMO/RME

    Where Standing, Mechanic’s Liens, and Bankruptcy Collide

    Lawyer Claims HOA Scam Mastermind Bribed Politicians

    West Coast Casualty’s 25th Construction Defect Seminar Has Begun

    In Colorado, Repair Vendors Can Bring First-Party Bad Faith Actions For Amounts Owed From an Insurer

    The Best Lawyers in America© Peer Review Names Eight Newmeyer & Dillion Partners in Multiple Categories and Two Partners as Orange County’s Lawyers of the Year in Construction and Insurance Law

    Tenth Circuit Finds Appraisal Can Decide Causation of Loss Under Colorado Law

    UPDATE: ACS Obtains Additional $13.6 Million for General Contractor Client After $19.2 Million Jury Trial Victory

    Fraud, the VCPA and Construction Contracts

    Administration Seeks To Build New FBI HQ on Current D.C. Site

    LA’s Wildfire Recovery Shifts to Costly and Chaotic Rebuilding

    Super Lawyers Recognized Five Lawyers from Hunton’s Insurance Recovery Group

    Busting Major Alternative-Lending Myths

    Construction Defect Settlement in Seattle

    Taking the Stairs to Human Wellness and Greener Buildings

    ACI 318-25 Structural Concrete Code Update Adds Sustainability Guide, Performance-based Wind Design

    Insurer Incorrectly Relies Upon "Your Work" Exclusion to Deny Coverage

    Don’t Miss the 2015 West Coast Casualty Construction Defect Seminar

    New Proposed Regulations Expand CFIUS Jurisdiction Regarding Real Estate

    Mold Due to Construction Defects May Temporarily Close Fire Station

    Recent Sanctions Against a Plaintiff for Suspected Use of AI in Brief Writing a Stark Reminder of the Increasing Prevalence of AI

    Concurrent Causation Doctrine Applies Where Natural and Man-made Perils Combine to Create Loss

    Wisconsin Court of Appeals Re-affirms American Girl To Find Coverage for Damage Caused by Subcontractors

    Iowa Tornado Flattens Homes, Businesses and Wind Turbines

    Nevada Supreme Court Holds That Insureds Can Use Extrinsic Evidence to Prove Duty to Defend
    Corporate Profile

    GRANTSBORO NORTH CAROLINA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    With over four thousand engineering, construction, and builders standard of care related expert designations, the Grantsboro, North Carolina Construction Expert Directory provides a streamlined multi-disciplinary expert retention and support solution to legal professionals and construction practice groups concerned with the effective resolution of construction defect and claims litigation. BHA provides construction claims investigation and expert services to the nation's leading construction practice groups, Fortune 500 builders, general liability carriers, owners, as well as a variety of public entities. Utilizing in house assets which comprise testifying architects, design engineers, construction cost and standard of care experts, licensed general and specialty contractors, the firm brings national experience and local capabilities to Grantsboro and the surrounding areas.

    Grantsboro North Carolina construction expert witnessesGrantsboro North Carolina OSHA expert witness constructionGrantsboro North Carolina construction expert witness consultantGrantsboro North Carolina consulting architect expert witnessGrantsboro North Carolina architectural engineering expert witnessGrantsboro North Carolina construction scheduling and change order evaluation expert witnessGrantsboro North Carolina soil failure expert witness
    Construction Expert Witness News & Info
    Grantsboro, North Carolina

    Bridging the Gap at Alaska’s Juneau Creek

    September 21, 2026 —
    The largest single-span steel plate girder bridge launch in the nation wasn’t about setting records. Alaska’s Juneau Creek Bridge design was a matter of necessity. The fully erected steel plate girder bridge, featuring a 440-ft main span hovering 285 ft above the Juneau Creek, was part of the larger Sterling Highway project. It offered a logistical challenge but was chosen among over a dozen bridge types due to the unique constraints brought by the mountainous site. Read the full story...
    Reprinted courtesy of Tim Newcomb, Engineering News-Record
    ENR may be contacted at enr@enr.com

    Chambers USA 2026 Recognizes Multiple Snell & Wilmer Attorneys and Practices

    August 11, 2026 —
    PHOENIX – Snell & Wilmer is pleased to announce that its attorneys have received 57 individual recognitions in their respective fields, by Chambers USA: America’s Leading Lawyers for Business 2026. These prestigious rankings are driven by independent interviews with clients of the firm and members of the legal community. Read the full story...
    Reprinted courtesy of Snell & Wilmer

    Hidden Risks Behind Today’s Stadium Construction Boom

    July 20, 2026 —
    After a decade-plus lull, professional sports leagues, universities and municipalities are once again spending heavily on new stadiums and major renovations. In the NFL alone, multiple marquee projects are underway or planned, representing more than $10 billion in facilities and mixed-use entertainment districts, rivaling or exceeding the scale of development during the last stadium-build cycle of the early 2000s. Beneath the excitement of architectural ambition and civic pride lies a risk landscape that has fundamentally changed since the last wave of stadium construction. Teams, cities and contractors that rely on outdated assumptions may find themselves exposed to cost overruns, schedule delays and liabilities that are far more difficult to unwind once construction is underway. Reprinted courtesy of Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Voluntary Dismissal of an Indemnity Claim Does Not Make the Subcontractor a “Prevailing Party,” Washington Court of Appeals Holds

    September 21, 2026 —
    In King County v. Walsh Construction Company II, LLC, No. 86503-0-I (Wash. Ct. App. Aug. 4, 2025), an unpublished decision from Division I of the Washington Court of Appeals, the Court affirmed the denial of a subcontractor’s request for prevailing-party attorney fees under an indemnity clause after the general contractor voluntarily dismissed its indemnity claims. Because the indemnity claim was no longer live and no determination of fault had occurred, the Court held that the trial court did not err in denying the request. ACS represented Walsh, the general contractor, in securing the denial of the fee request at the trial court that the Court of Appeals affirmed. A Pass-Through Indemnity Claim That Ended Before Fault Was Decided The dispute arose out of a public works contract under which King County hired Walsh Construction Company II, LLC (“Walsh”) to construct and install a conveyance pipeline. After the pipeline broke, King County sued Walsh for breach of contract and warranty, expressly identifying both Walsh and its subcontractor, Mears Group Inc., (“Mears”) as responsible. Walsh tendered defense and indemnity to Mears under the subcontract. Read the full story...
    Reprinted courtesy of Margarita Kutsin, Ahlers Cressman & Sleight PLLC
    Ms. Kutsin may be contacted at margarita.kutsin@acslawyers.com

    The Delay You Did Not Draft For: Regulatory Risk in Data Center Construction Contracting

    November 24, 2026 —
    The delay risk on data center projects has escalated, and the contracts have not caught up. Everyone drafting these agreements in 2023 and 2024 was worried about supply chain and labor. Reasonable worries. But the delay most likely to stop data center construction in 2026 is not a late transformer. It is a county commission, a governor or three neighbors with a lawyer. New York recently passed legislation pausing state environmental permits for new hyperscale data centers drawing 50 megawatts or more—a move that could signal the direction of future data center legislation in other states. A Sudden Regulatory Roadblock On July 14, 2026, Governor Hochul signed Executive Order No. 62, pausing state environmental permits for new hyperscale data centers drawing 50 megawatts or more, for up to a year, while DPS develops a generic environmental impact statement and the state assembles a regulatory framework. The legislature passed the Responsible Data Center Development Act in June. The Governor did not sign it. She issued the order instead, which took effect immediately. Reprinted courtesy of Jason Kosek and Keith Lazere, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Alexander Hopkins Authors Law360 Article on Wisconsin Supreme Court Coverage Decision

    October 06, 2026 —
    Alexander Hopkins recently authored an Expert Analysis for Law360 examining a recent Wisconsin Supreme Court decision addressing coverage for water damage arising from alleged construction defects. In “Wis. Coverage Ruling Rejects Strict Ensuing Loss Test,” Alex explores the relationship between construction defect exclusions and ensuing loss provisions, and what the decision means for policyholders seeking coverage when an excluded condition contributes to subsequent damage. Read the full story...
    Reprinted courtesy of Alexander G. Hopkins, SDV Fenchurch
    Mr. Hopkins may be contacted at alexander.hopkins@sdvfenchurch.us

    Water Reuse Emerges as a Critical Strategy for Data Center Development

    June 22, 2026 —
    As demand for data centers continues to accelerate, water availability is emerging as a critical factor in project development and long-term operations. Although power supply and transmission access have historically dominated siting discussions, increasing water constraints in many regions are placing greater focus on the substantial volumes of water required to support data center cooling systems. As we covered previously, data centers are frequently located in areas already experiencing water stress and require substantial volumes of water to operate—roughly 228 billion gallons in 2023 in the United States alone—with water use projected to increase by up to 170% by 2030. Alternative cooling options, such as free-air cooling or mechanical chillers, can reduce direct water consumption but introduce their own tradeoffs. Free-air cooling is climate-dependent and often ineffective in hotter regions, while mechanical chillers increase energy demand, potentially shifting water consumption upstream through increased electricity generation. Reprinted courtesy of Ashleigh Myers, Pillsbury, Jillian Marullo, Pillsbury and Jason Drogin Atwood, Pillsbury Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com Read the full story...

    The Deadline to File Suit on a Public Works Payment Payment Bond is Triggered by a Claimant’s Work on a Project Not by a Claimant’s Work Under a Contract

    June 02, 2026 —
    California law requires that prime contractors furnish a payment bond – providing for payment to lower-tiered subcontractors and suppliers – on state and local public works projects with a value in excess of $25,000. There are three conditions that must be satisfied when a claimant makes a claim against a payment bond on a public works project in California:
    1. First, generally, the claimant must have served a preliminary notice, unless the claimant is a first-tier subcontractor or supplier;
    2. The claimant must have “ceased to provide work” on the project; and
    3. The claimant must file suit against the payment bond no later than six (6) months after the period in which a stop payment notice must be given or, in other words, the earlier of 270 days after completion of the public works project or 210 days after a notice of completion or cessation was recorded on a public works project.
    In Tarlton & Sons, Inc. v. Great American Insurance Company, 111 Cal.App.5th 376 (2025), the 2nd District Court of Appeal examined whether a subcontractor timely filed a claim against a payment bond when a prime contractor was terminated and replaced by another prime contractor who the subcontractor continued to perform work for. Read the full story...
    Reprinted courtesy of Garret D. Murai, Nomos LLP
    Mr. Murai may be contacted at gmurai@nomosllp.com