Insurer Granted Summary Judgment on Claim for Roof Damage Caused by Windstorm
May 26, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer successfully moved for summary judgment, eliminating the insured’s claim for roof damage due to windstorm. Mulas v. Westchester Surplus Lines Ins. Co., 2026 U.S. Dist. LEXIS 20537 (Jan. 30, 2026).
The insureds’ commercial property sustained windstorm damage during Hurricane Ian. Westchester denied the claim. The insureds believed Westchester wrongfully denied coverage for roof damage and various interior damage to property. The insureds also argued that Westchester’s actual cash value (ACV) payment did not reflect the fully insured loss.
The insureds sued and Westchester moved for summary judgment. Westchester argued the roof damage was not covered because Hurricane Ian did not cause the damage. Westchester hired an engineer who determined the roof damage was not caused by wind from Hurricane Ian. Westchester pointed out that the insureds’ expert also found no wind damage on the roof. The insureds offered no other evidence suggesting the hurricane caused roof damage. Therefore, the insureds could not show that Westchester breached the policy by denying coverage.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Insurer Cannot Dispose of Water Leak or Bad Faith Claims on Motion for Summary Judgment
July 20, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer’s motion for summary judgment seeking to eliminate the insured’s claims for damage from a water leak, bad faith and punitive damages failed. Nargizyan v, State Farm General Ins. Co., 2026 Cal App. LEXIS 302 (Cal. Ct. App. April 15, 2026).
The insured noticed tiles on his kitchen floor were warmer than usual. He found water dripping from the top of the crawl space under the house. He noticed water was “dripping in different places” but not pouring like a faucet. “There were too many places to count where water was dripping and there was water all over the place.”
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Insurer Dispenses with Bad Faith Claim on Summary Judgment
June 22, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe court granted the insurer’s motion for partial summary judgment because the insured failed to present evidence that the insurer failed to conduct a reasonable investigation. PSY Burger, LLC v. State Farm General Insurance Company, 2026 U.S. Dist. LEXIS 66991(C.D. Cal. March 20, 2026).
The insured’s commercial property suffered heavy damage from tropical storm Hilary. State Farm denied coverage to repair the damage. The insured sued State Farm alleging breach of contract and bad faith due to an inadequate investigation. Apparently, the insured did not retain an expert to opine on claims handling.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
It’s More Than a Feeling: Proving Construction Damages and When You Should Hire an Expert to Help Do It
July 27, 2026 —
Bradley E. Sands & Katie McCracken - ConsensusDocsWhen you win a bid, you might be singing that everything is going your way. Then something goes wrong. The owner hands you defective plans, sits on RFI responses or other critical information, or otherwise upends the work. The costs pile up through no fault of your own. You feel wronged, and you want to be made whole. But a feeling that you got burned is not enough. To recover, that feeling has to become something the law recognizes as damages. So, what are damages, and how do you prove them?
At bottom, contract damages are the money that puts the non-breaching party (i.e., the party that doesn’t breach the contract) in the position it would have occupied had the contract been performed.
Reprinted courtesy of
Bradley E. Sands, Jones Walker LLP and Katie McCracken, Summer Associate, University of Georgia School of Law
Read the full story...Mr. Sands may be contacted at
bsands@joneswalker.com
Project Labor Agreements: A New Bid Protest Forum Split
May 14, 2026 —
Dirk D. Haire, David P.J. Timm and Michael J. Brewer - ConsensusDocsAdvertisements often include a disclaimer: “individual results may vary.” Similarly, lawyers are notorious for saying “it depends.” The mandatory Project Labor Agreement (“PLA”) regulations have recently placed into context this adage as it applies to federal contract bid protests, with very different results depending on which forum – the Court of Federal Claims (“COFC”) versus the Government Accountability Office (“GAO”) – different contractors have selected to bring PLA bid protests.
Over the last two years, over 30 protesters have successfully achieved removal of mandatory PLAs from large-scale federal construction contracts based on two landmark bid protest decisions issued by the COFC. Similar challenges to PLAs at the GAO, however, have not been successful in removing PLAs, highlighting an emerging trend that the COFC is often a more effective relief forum than GAO for government construction contractors.
Reprinted courtesy of
Dirk D. Haire, Burr & Forman LLP,
David P.J. Timm, Burr & Forman LLP and
Michael J. Brewer, Burr & Forman LLP
Mr. Haire may be contacted at dhaire@burr.com
Mr. Timm may be contacted at dtimm@burr.com
Mr. Brewer may be contacted at mbrewer@burr.com
Read the full story...
Why Construction Tendering Needs Specialized Intelligence
March 31, 2026 —
Aarni Heiskanen - AEC BusinessThe construction industry has never lacked data; it lacks usable intelligence at the moments that matter most. In the high-stakes phases of tendering and pre-construction, the industry still relies on manual “Control-F” searches through thousands of pages of unstructured documents.
I recently spoke with
Herman Smith, a civil engineer and former Chief Digital Officer at Multiconsult, who left the corporate world to solve this specific bottleneck. His startup,
Volve, isn’t just another AI wrapper; it is a specialized “drill” designed to penetrate the complexity of construction documentation.
The Paradox of Digitalization without a Productivity Boost
For years, the AEC industry has faced a frustrating paradox: we have more digital tools than ever, yet productivity has not improved. Herman observed this from the inside, managing hundreds of unique software licenses while seeing companies struggle to adapt to new workflows.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
The GKN Aerospace Chemical Release and the Laws Designed to Address It
July 06, 2026 —
Sean M. Sherlock - Snell & WilmerOn May 21, 2026, a 34,000-gallon storage tank at the GKN Aerospace facility in Garden Grove, California began leaking methyl methacrylate (MMA), a volatile and highly flammable industrial chemical used to manufacture high-strength acrylic plastics. GKN Aerospace makes advanced military and commercial transparencies, such as aircraft canopies, windshields, cabin windows, bullet-resistant glass, and spacecraft windows.
In polymer chemistry lingo, MMA is known as a monomer. Monomers are like individual links to a chain. Under the right conditions they link up (react) with each other to form long-chained polymers, or plastics. MMA is an unstable monomer that requires controlled storage conditions to avoid setting off a polymerization (chain) reaction.
According to early reports, the MMA tank at GKN Aerospace overheated. The cause of the overheating is not yet clear, but the overheating may have created conditions enabling the MMA to initiate polymerization, which in turn generated heat, which in turn generated pressure, activating the tank’s pressure-relief system and releasing MMA vapor into the atmosphere. Concerns about a runaway reaction, massive release, and explosion led the Orange County Fire Authority to order evacuation of approximately 40,000 residents and closure of thirteen schools.
Read the full story...Reprinted courtesy of
Sean M. Sherlock, Snell & WilmerMr. Sherlock may be contacted at
ssherlock@swlaw.com
A Permitting Base Checklist for Data Centers and Power Plants
June 02, 2026 —
Michael S. McDonough, Stephen J. Humes & Stacey C. Wright - Gravel2Gavel Construction & Real Estate Law BlogThere is a lot of talk these days about “license to operate” for data centers, meaning management of the relationships with stakeholders and broader communities concerning both the benefits and adverse consequences of locating a facility in a particular locale. Here, we are speaking of “license to operate” more literally—namely, the legal and regulatory permitting and approval requirements for a privately owned data center whether by itself or colocated with a power generating plant.
Our Base Checklist includes generally and potentially applicable permitting requirements for development and operation, using California as an example. (Taking legal authority Frank Sinatra out of context, “If you can make it there, you can make it anywhere.”) The actual requirements for a given facility would depend, in part, on local law, including planning and zoning laws and plans, and the environment of the site. Just as examples, additional permitting and mitigation requirements might apply if sensitive receptors are located nearby (e.g., noise mitigation for residential dwellings), if sensitive and protected biological resources (e.g., jurisdictional waters and/or protected species) would be impacted, or if the present or former land uses require additional measures (e.g., hazardous materials remediation, mitigation for conversion of prime farmland, or protection of cultural resources). The scope of permit requirements would ultimately be determined by the applicable regulatory agencies and by the lead and responsible agencies under the applicable state environmental land use regime—in our reference case here, the California Environmental Quality Act (CEQA).
Reprinted courtesy of
Michael S. McDonough, Pillsbury,
Stephen J. Humes, Pillsbury and
Stacey C. Wright, Pillsbury
Mr. McDonough may be contacted at michael.mcdonough@pillsburylaw.com
Mr. Humes may be contacted at stephen.humes@pillsburylaw.com
Ms. Wright may be contacted at stephen.humes@pillsburylaw.com
Read the full story...