BERT HOWE
  • Nationwide: (800) 482-1822    
    townhome construction expert witness Killdeer North Dakota housing expert witness Killdeer North Dakota institutional building expert witness Killdeer North Dakota production housing expert witness Killdeer North Dakota custom homes expert witness Killdeer North Dakota low-income housing expert witness Killdeer North Dakota multi family housing expert witness Killdeer North Dakota office building expert witness Killdeer North Dakota Medical building expert witness Killdeer North Dakota tract home expert witness Killdeer North Dakota hospital construction expert witness Killdeer North Dakota industrial building expert witness Killdeer North Dakota casino resort expert witness Killdeer North Dakota parking structure expert witness Killdeer North Dakota structural steel construction expert witness Killdeer North Dakota custom home expert witness Killdeer North Dakota mid-rise construction expert witness Killdeer North Dakota retail construction expert witness Killdeer North Dakota concrete tilt-up expert witness Killdeer North Dakota condominium expert witness Killdeer North Dakota condominiums expert witness Killdeer North Dakota high-rise construction expert witness Killdeer North Dakota
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Killdeer, North Dakota

    North Dakota Builders Right To Repair Current Law Summary:

    Current Law Summary: (HB1437) Notice required six months prior to undertaking any repair other than emergency repair, or instituting action for breach of warranty of one or two-family dwelling; response time 30 days.


    Construction Expert Witness Contractors Licensing
    Guidelines Killdeer North Dakota

    A contractor's license is required for all jobs over $2,000.00. Separate boards license plumbing and electrical trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Forx Builders Association
    Local # 3515
    519 DeMers Ave
    Grand Forks, ND 58201
    http://www.forxbuilders.com

    North Dakota AB
    Local # 3500
    1720 Burnt Boat Dr Ste 207
    Bismarck, ND 58503
    http://www.ndbuild.com

    Bismarck-Mandan Home Builders Association
    Local # 3510
    2600 Gateway Ave Ste 1
    Bismarck, ND 58503
    http://www.bmhba.com

    Dickinson Area Home Builders Association
    Local # 3512
    PO Box 1697
    Dickinson, ND 58602


    Williston Area Builders Association
    Local # 3520
    PO Box 1825
    Williston, ND 58802


    Home Builders Association of Fargo-Moorhead
    Local # 3545
    1802 32nd Ave S
    Fargo, ND 58103
    http://www.hbafm.com

    Minot Association of Bldrs
    Local # 3565
    PO Box 1851
    Minot, ND 58702
    http://www.minotab.com


    Construction Expert Witness News and Information
    For Killdeer North Dakota

    Massachusetts Federal Court Holds No Coverage for Mold and Water Damage Claim

    Snell & Wilmer Receives Multiple National and Regional Top Tier Rankings in 2026 “Best Law Firms® Rankings” by Best Lawyers®

    “Based On”… What Exactly? NJ Appellate Division Examines Phrase and Estops Insurer From Disclaiming Coverage for 20-Month Delay

    New Jersey’s Proposed Construction Defect Law May Not Cover Everything

    Extreme Flooding Overwhelms New York Roadways, Killing 1 Person

    William Doerler Recognized by JD Supra 2022 Readers’ Choice Awards

    Maryland Contractor Documents its Illegal Deal and Pays $2.15 Million to Settle Fraud Claims

    Orange County Team Obtains Unanimous Defense Verdict in Case Involving Failed Real Estate Transaction

    Colorado Temporarily Requires Employers to Provide Sick Leave While Awaiting COVID-19 Testing

    U.S. Home Prices Rose More Than Estimated in February

    Chattanooga Bridge Collapse Likely Resulted From Impact

    New York State Trial Court: Non-Cumulation Provision in Excess Policies Mandates “All Sums” Allocation

    No Bad Faith Despite Insurer’s Appraisal Award Exceeding Initial Payment

    John Palmeri and Peter Siachos Named to 2026 Lawdragon 500 Leading Lawyers in America

    U.S., Canada, Mexico Set New Joint Clean-Energy Goal

    Performing Work with a Suspended CSLB License Costs Big: Subcontractor Faces $18,000,000 Disgorgement

    Courts Favor Arbitration in Two Recent Construction Dispute Cases

    When Is an Arbitration Clause Unconscionable? Not Often

    Plan Ahead for the Inevitable Murphy’s Law Related Accident

    New York Court Enforces Construction Management Exclusion

    Real Estate & Construction News Roundup (2/19/25) – An Embrace of AI, A Squeeze on Construction and a Jump in Mortgage Refinance Demand

    Separation of Insureds Provision in CGL Policies

    Fluor Agrees to $14.5M Fixed-Price Project Cost Pact with SEC

    How Are You Dealing with Material Delays / Supply Chain Impacts?

    William Lyon Homes Unites with Polygon Northwest Company

    OSHA Finalizes Rule on Crane Operator Qualification and Certification

    Acquisition, Development, and Construction Lending Conditions Ease

    LA Home Destroyed in Palisades Fire Draws More Than 60 Offers

    Back Posting with Thoughts on Lien Waivers

    Ninth Circuit Clears the Way for Review of Oregon District Court’s Rulings in Controversial Climate Change Case

    Assessments Underway After Hurricane Milton Rips Off Stadium Roof, Snaps Crane Boom in Florida

    As Fracture Questions Remain, Team Raced to Save Mississippi River Bridge

    U.S. Codes for Deck Attachment

    Anatomy of a Construction Dispute- A Wrap Up

    Gilbane Project Exec Completes His Mission Against the Odds

    Forget Backyard Pools, Build a Swimming Pond Instead

    Courthouse Reporter Series - How to Avoid Having Your COVID-19 Expert Stricken

    When an Insurer Proceeds as Subrogee, Defendants Cannot Assert Contribution Claims Against the Insured

    Contractor Definition Central to Coverage Dispute

    Consult with Counsel when Preparing Construction Liens

    Georgia Supreme Court Rules Construction Defects Can Constitute an Occurrence in CGL Policies

    Roni Most, Esq., Reappointed as a City of Houston Associate Judge

    Albert Reichmann, Builder of NY, London Finance Hubs, Dies at 93

    California Courts Call a “Time Out” During COVID-19 –New Emergency Court Rules on Civil Litigation

    Construction Insurance Rates Up in the United States

    San Diego: Compromise Reached in Fee Increases for Affordable Housing

    The Right to Repair Act Isn’t Out for the Count, Yet. Homebuilders Fight Back

    Mediation in the Zero Sum World of Construction

    The Impact of Nuclear Verdicts on Construction Businesses

    EPA Steps Back, Arizona Moves Forward
    Corporate Profile

    KILLDEER NORTH DAKOTA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from approximately five thousand construction and design related expert designations, the Killdeer, North Dakota Construction Expert Directory delivers a superior construction and design expert support solution to builders and construction claims professionals concerned with construction defect, scheduling, and delay matters. BHA provides building claims investigation and expert services to the construction industry's most recognized companies, legal professionals, Fortune 500 builders, CGL carriers, owners, as well as a variety of state and local government agencies. In connection with in house personnel which comprise credentialed construction consultants, NCARB certified architects, forensic engineers, building envelope and design experts, the organization brings national experience and local capabilities to Killdeer and the surrounding areas.

    Killdeer North Dakota building expertKilldeer North Dakota soil failure expert witnessKilldeer North Dakota architectural engineering expert witnessKilldeer North Dakota construction project management expert witnessKilldeer North Dakota OSHA expert witness constructionKilldeer North Dakota building consultant expertKilldeer North Dakota forensic architect
    Construction Expert Witness News & Info
    Killdeer, North Dakota

    $356 Million Judgement Against Developer for Defective Construction of DC Condominium

    August 16, 2026 —
    On July 31, 2026, the Superior Court of the District of Columbia entered a $356,085,513.00 judgment against developers JBG Smith for defective construction and renovation of the Wardman Tower Residential Condominium in Washington, D.C. The case is Wardman Tower Residential Condominium Unit Owners Association v. JBG Smith Properties, et al., No. 2020 CA 004807 B (D.C. Super. Ct.). In a 148-page Trial Order, the D.C. Superior Court awarded $118,695,171.00 in damages in favor of the condominium association and against the condominium developers, including JBG Smith. The Court trebled those damages pursuant to the District of Columbia Consumer Protection Procedures Act (“CPPA”) to reach an ultimate judgment of $356,085,513.00. See Cowie Law Group: DC Condominium Construction Defects: Recovering Attorney’s Fees, Litigation Expenses & Treble Damages Under the Consumer Protection Procedures Act. Cowie Law Group, P.C. filed the lawsuit on behalf of the Association in 2020. The firm represented the Association throughout years of pretrial discovery and ultimately served as trial counsel with Williams & Connolly LLP during a lengthy bench trial before the Honorable Yvonne Williams. The Cowie Law Group team included attorneys, George A. Bealefeld, III, Albert G. McCarraher, Stanford L. Kimmel, III and Nicholas D. Cowie. Read the full story...
    Reprinted courtesy of Nicholas D. Cowie, Cowie Law Group
    Mr. Cowie may be contacted at ndc@cowielawgroup.com

    Wadsworth v. Regional Rail Partners — Verified Statements of Claim Under the Colorado Public Works Act

    August 25, 2026 —
    Editor’s Note: Wadsworth Revisited In August 2024, following the Colorado Court of Appeals’ decision in Ralph L. Wadsworth Construction Company, LLC v. Regional Rail Partners, we published Colorado Court of Appeals’ Ruling Highlights Dangers of Excessive Public Works Claims. At the time, the decision warranted a significant warning to contractors and subcontractors performing public work in Colorado. The Court of Appeals concluded that Wadsworth’s verified statement of claim improperly included unliquidated delay damages and that, because the claim was excessive, Wadsworth forfeited its right to recover the amounts included in the claim. We cautioned contractors to carefully scrutinize verified statements of claim and to avoid including unliquidated damages or amounts that were not yet due and payable. The Colorado Supreme Court has now reversed that decision. Read the full story...
    Reprinted courtesy of Olivia Barden, Higgins, Hopkins, McLain & Roswell, LLC

    Insurer Granted Summary Judgment on Claim for Roof Damage Caused by Windstorm

    May 26, 2026 —
    The insurer successfully moved for summary judgment, eliminating the insured’s claim for roof damage due to windstorm. Mulas v. Westchester Surplus Lines Ins. Co., 2026 U.S. Dist. LEXIS 20537 (Jan. 30, 2026). The insureds’ commercial property sustained windstorm damage during Hurricane Ian. Westchester denied the claim. The insureds believed Westchester wrongfully denied coverage for roof damage and various interior damage to property. The insureds also argued that Westchester’s actual cash value (ACV) payment did not reflect the fully insured loss. The insureds sued and Westchester moved for summary judgment. Westchester argued the roof damage was not covered because Hurricane Ian did not cause the damage. Westchester hired an engineer who determined the roof damage was not caused by wind from Hurricane Ian. Westchester pointed out that the insureds’ expert also found no wind damage on the roof. The insureds offered no other evidence suggesting the hurricane caused roof damage. Therefore, the insureds could not show that Westchester breached the policy by denying coverage. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Texas Adopts New Procedural Rules for Summary Judgment Motions: What You Need To Know

    July 13, 2026 —
    On March 1, 2026, sweeping amendments to Texas Rule of Civil Procedure 166a took effect, fundamentally changing how Texas courts handle summary judgment motions — from filing and briefing through disposition. Whether representing a plaintiff or defendant, Texas litigants and attorneys must understand these new rules and their impact on case strategy and timelines. These procedural changes carry particular significance for construction litigants. Background: The Prior Rule Texas summary judgment practice has long diverged from the federal model. The Texas Rules of Civil Procedure recognize two types of summary judgment motions: (1) the traditional motion for summary judgment, and (2) the “no-evidence” motion for summary judgment. The no-evidence motion — unique to Texas — may be filed only after adequate time for discovery has passed. No bright-line rule governs that determination; it depends on the unique circumstances of each case. Reprinted courtesy of Conor G. Bateman, Snell & Wilmer and Marsha Cotton, Snell & Wilmer Mr. Bateman may be contacted at cbateman@swlaw.com Ms. Cotton may be contacted at mcotton@swlaw.com Read the full story...

    Brandy Price, Dean Pillarella Named to Lawdragon's "Next Generation" List

    June 22, 2026 —
    Charlotte/North Charleston Partner Brandy G. Price and New York Partner Dean Pillarella have been selected to "The 2026 Lawdragon 500 X – The Next Generation," which recognizes emerging leaders in law. Lawdragon's annual Next Generation listing highlights up-and-coming attorneys with fewer than 15 years in practice. The legal media company selected these honorees through a combination of peer nominations, extensive journalistic research by Lawdragon editors, and independent vetting. Read the full story...
    Reprinted courtesy of Lewis Brisbois

    World's Longest Immersed Tunnel Passes Milestone, But Faces Delays

    August 03, 2026 —
    Work on the $8-billion Fehmarnbelt Tunnel, which is planned to link Germany and Denmark as the world’s longest immersed tunnel, is progressing as crews achieved a milestone last month with the successful immersion of its first precast concrete element. But Danish state-owned project owner Femern A/S says the plan is now running at least two years behind schedule and the tunnel’s road and rail portions will open in two separate stages. Read the full story...
    Reprinted courtesy of James Leggate, Engineering News-Record
    Mr. Leggate may be contacted at leggatej@enr.com

    Travelers Injury Impact Report Highlights Longer Recovery Times Amid Declining Injury Rates

    May 05, 2026 —
    HARTFORD, Conn.--(BUSINESS WIRE)--The Travelers Companies, Inc. (NYSE: TRV) today released its 2026 Injury Impact Report, an analysis of more than 1.2 million workers compensation claims received by the company from 2021 through 2025. The report finds that even as workplace injury rates decline, the injuries that do occur are growing more complex and taking longer to heal – a trend driven by an aging workforce and the disproportionate vulnerability of first-year employees. “The decrease in workplace injuries is a positive story, yet injured workers are still missing an average of 80 workdays,” said Claude Howard, Vice President of Workers Compensation Claim at Travelers. “This report is a reminder that progress doesn’t mean the risk environment requires any less attention, and an employer’s commitment to safety must keep pace with an ever-evolving workforce and injury landscape.” Read the full story...
    Reprinted courtesy of The Travelers Companies, Inc.

    The GKN Aerospace Chemical Release and the Laws Designed to Address It

    July 06, 2026 —
    On May 21, 2026, a 34,000-gallon storage tank at the GKN Aerospace facility in Garden Grove, California began leaking methyl methacrylate (MMA), a volatile and highly flammable industrial chemical used to manufacture high-strength acrylic plastics. GKN Aerospace makes advanced military and commercial transparencies, such as aircraft canopies, windshields, cabin windows, bullet-resistant glass, and spacecraft windows. In polymer chemistry lingo, MMA is known as a monomer. Monomers are like individual links to a chain. Under the right conditions they link up (react) with each other to form long-chained polymers, or plastics. MMA is an unstable monomer that requires controlled storage conditions to avoid setting off a polymerization (chain) reaction. According to early reports, the MMA tank at GKN Aerospace overheated. The cause of the overheating is not yet clear, but the overheating may have created conditions enabling the MMA to initiate polymerization, which in turn generated heat, which in turn generated pressure, activating the tank’s pressure-relief system and releasing MMA vapor into the atmosphere. Concerns about a runaway reaction, massive release, and explosion led the Orange County Fire Authority to order evacuation of approximately 40,000 residents and closure of thirteen schools. Read the full story...
    Reprinted courtesy of Sean M. Sherlock, Snell & Wilmer
    Mr. Sherlock may be contacted at ssherlock@swlaw.com