New York Team Secures Dismissal of Premises Liability Action Against Client
May 26, 2026 —
Lewis BrisboisNew York Associate Nicole Koch and Partner Jennine Gerrard recently secured a complete dismissal of a plaintiff’s claims for injuries following a fall in front of a client’s business at an outdoor mall.
The plaintiff alleged that she was walking on the sidewalk outside of the client's hair care supply store in the Bronx in May 2024 when she tripped and fell on a broken/defective portion of the sidewalk. As a result of the accident, the plaintiff suffered injuries to her spine, hip, wrist, and both knees. She proceeded to file suit in New York County Supreme Court against Lewis Brisbois’ client and the landlord for the property.
Read the full story...Reprinted courtesy of
Lewis Brisbois
Settlement Agreements and Contracts Require a Meeting of the Minds
July 20, 2026 —
David Adelstein - Florida Construction Legal UpdatesA settlement agreement does not need to be executed for it to be enforceable as long as there was a MEETING OF THE MINDS. The same rings true for any contract regardless of whether the contract is signed – THERE NEEDS TO BE A MEETING OF THE MINDS.
In a recent case dealing with the settlement agreement on a construction lien, the essential settlement terms (money and mutual release) were memorialized in an e-mail exchange between the parties (owner and subcontractor). The settlement required the owner to pay the principal amount plus some attorney’s fees and then a mutual general release would be prepared. In response to the confirmatory email, the owner sent a check, which the subcontractor deposited, but the owner refused to sign the release signed and sent by the subcontractor. The owner further claimed it doesn’t need to pay the attorney’s fees because the lien amount was paid in full. The subcontractor sued arguing the owner breached the terms of the settlement. The appellate court agreed.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Balancing the Right to Repair With Evidence Preservation in Construction Defect Litigation
April 20, 2026 —
Benton Wheatley & Anna Spicer - Construction ExecutiveEvery major construction project comes with risk, whether it’s a
warehouse build, a
multifamily development or a major renovation. Parties tend to be aligned when things are proceeding as planned. But when something goes wrong—cracked concrete, water intrusion, systems that don’t perform as expected—those interests can quickly diverge.
Property owners are often caught in the middle when construction defects surface. They’re expected to act quickly to limit damage and costs. But they also have legal obligations to preserve evidence and allow potentially responsible parties, such as contractors or designers, to observe testing, demolition and repairs. Additionally, owners often have duties to lenders and investors to fix problems promptly and pursue claims against those responsible. Meanwhile, contractors and other parties have obligations of their own—not to interfere with repairs and not to delay mitigation efforts while investigations are underway.
What follows will examine how those competing responsibilities play out in construction defect disputes.
Reprinted courtesy of
Benton Wheatley & Anna Spicer, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
Andrew Gendron Authors D.C., Maryland Damages Compendium Articles for Defense Counsel Journal’s “Damages Compendium – East of the Mississippi”
August 24, 2026 —
Lewis BrisboisBaltimore Partner Andrew Gendron recently penned the District of Columbia (D.C.) and Maryland damages compendium articles for the Defense Counsel Journal’s “Damages Compendium – East of the Mississippi,” which appears in the publication’s June 2026 issue. Mr. Gendron’s articles discuss evolving standards governing various types of damages in commercial litigation across jurisdictions in D.C. and Maryland.
In the compendium articles, Mr. Gendron describes the circumstances under which parties may recover various types of damages, citing to the relevant portions of the D.C. Code and Annotated Code of Maryland, as well as to applicable case law. Specifically, he discusses compensatory, consequential, incidental, punitive, liquidated, reliance, and unjust enrichment damages. In doing so, Mr. Gendron details the types of cases in which parties may recover these damages and under what circumstances.
Read the full story...Reprinted courtesy of
Lewis Brisbois
Preventing Common and Costly Water Intrusion Events in Construction
July 13, 2026 —
Andrew Swift - Construction ExecutiveWater leaking into a building is a leading cause of
damage and loss in the construction industry. On one jobsite, heavy rains flooded a sub-basement, damaging a new electrical transformer—all because a roof drain was not property connected. On another jobsite, a drinking-fountain supply line broke in a multistory building that was undergoing renovation, causing water to run—undetected—for an entire weekend, resulting in water damage to all lower floors, where construction had been finished.
Those loss scenarios could have been prevented with a comprehensive and effective water damage prevention plan (WDPP). This includes routine site inspections to identify uncontrolled water damage exposures and basic maintenance to make sure drains are clean of debris and divert them to a catch basin or low point away from the building. An effective WDPP plan also incorporates technology such as backflow preventers on sewer connections and water sensing technology to monitor the most vulnerable exposures.
Reprinted courtesy of
Andrew Swift, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
Federal Court Strikes Down New York’s Climate Superfund Act: What It Means for the “Polluter Pays” Movement
September 28, 2026 —
Amanda G. Halter, Ashleigh K. Myers & Jillian Marullo - Gravel2Gavel Construction & Real Estate Law BlogA federal judge in the Northern District of New York has struck down New York’s
Climate Change Superfund Act, ruling that the “polluter pays” climate law is preempted by federal law and “simply beyond the limits of state law.” The court concluded that the Clean Air Act (CAA) does not authorize New York’s compensation scheme, which calculates liability based on greenhouse gas (GHG) emissions attributable to worldwide fossil fuel extraction and refining. It separately held that any cost-recovery demand against a foreign producer would be preempted under the constitutional foreign affairs doctrine, which limits state intrusion into matters committed predominantly to the federal government. The court directed the parties to file a status report by September 14, leaving the form of further relief unresolved. In practical terms, the court has decided that the Act is preempted and cannot be enforced but has not yet determined the precise terms of its final order, including whether to formally enjoin its enforcement.
The
decision in West Virginia v. James, Case No. 1:25-cv-00168 (N.D.N.Y. Aug. 31, 2026), issued by Chief U.S. District Judge Brenda K. Sannes, who was appointed by President Obama, marks the first judicial invalidation of a state climate superfund statute and carries significant implications for the
climate superfund landscape and the three remaining
lawsuits challenging these laws.
Reprinted courtesy of
Amanda G. Halter, Pillsbury,
Ashleigh K. Myers, Pillsbury and
Jillian Marullo, Pillsbury
Ms. Halter may be contacted at amanda.halter@pillsburylaw.com
Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com
Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com
Read the full story...
Construction Contract Negotiation & Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You)
April 20, 2026 —
Michelle Cooper - Sheppard Construction and Infrastructure Law BlogConstruction contract negotiation is often treated as a “forms exercise,” especially when the parties start from familiar templates (e.g., AIA forms). In practice, though, the biggest problems tend to arise not from the existence of a form, but from (i) misalignment among the project’s governing documents and participants, (ii) ambiguity in pricing and payment mechanics, and (iii) state-specific statutory requirements that override negotiated terms.
This article includes a practical checklist intended to help owners, developers, and contractors streamline contract negotiations, reduce downstream disputes, and avoid unpleasant surprises during payment administration.
Read the full story...Reprinted courtesy of
Michelle Cooper, SheppardMs. Cooper may be contacted at
mcooper@sheppard.com
Conditional Payment Bond Consideration-Make Sure There Is Pay-If-Paid Provision
June 29, 2026 —
David Adelstein - Florida Construction Legal UpdatesIf a general contractor is going to have a conditional payment bond, it needs to ensure it subcontracts contain pay-if-paid or pay-when-paid provisions. This conditional payment language in subcontracts is the general contractor’s defense that it doesn’t have to pay a subcontractor UNTIL owner has paid the general contractor for the subcontractor’s work.
The general contractor (and the surety) can look at the conditional payment bond with the s. 713.245 legend stamped on its face designating the conditional nature of the bond, and assume the conditional structure is locked in against the bond: no payment from the owner, no obligation to the subcontractors under the bond. But what happens when the subcontracts contain no express conditional payment language despite having a valid conditional payment bond?
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com