BERT HOWE
  • Nationwide: (800) 482-1822    
    retail construction expert witness Bixby Oklahoma housing expert witness Bixby Oklahoma high-rise construction expert witness Bixby Oklahoma townhome construction expert witness Bixby Oklahoma industrial building expert witness Bixby Oklahoma office building expert witness Bixby Oklahoma structural steel construction expert witness Bixby Oklahoma institutional building expert witness Bixby Oklahoma Medical building expert witness Bixby Oklahoma custom homes expert witness Bixby Oklahoma concrete tilt-up expert witness Bixby Oklahoma landscaping construction expert witness Bixby Oklahoma parking structure expert witness Bixby Oklahoma Subterranean parking expert witness Bixby Oklahoma low-income housing expert witness Bixby Oklahoma condominium expert witness Bixby Oklahoma hospital construction expert witness Bixby Oklahoma custom home expert witness Bixby Oklahoma mid-rise construction expert witness Bixby Oklahoma tract home expert witness Bixby Oklahoma casino resort expert witness Bixby Oklahoma production housing expert witness Bixby Oklahoma
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Bixby, Oklahoma

    Oklahoma Builders Right To Repair Current Law Summary:

    Current Law Summary: Case law precedent


    Construction Expert Witness Contractors Licensing
    Guidelines Bixby Oklahoma

    Resident electrical, mechanical, and plumbing contractors must be licensed. There are special requirements for non-resident contractors. See website for details.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Home Builders Association of Greater Tulsa
    Local # 3784
    11545 E 43rd St
    Tulsa, OK 74146
    http://www.tulsahba.com

    Home Builders Association of Stillwater
    Local # 3770
    PO Box 1715
    Stillwater, OK 74076
    http://www.stillwaterhba.com

    Central Oklahoma Home Builders Association
    Local # 3749
    PO Box 14005
    Oklahoma City, OK 73114
    http://www.okchomebuilders.com

    Rogers County Builders Association - Oklahoma
    Local # 3766
    PO Box 892
    Claremore, OK 74018
    http://www.rcbaclaremore.com

    Greater Sequoyah County Chapter
    Local # 3787
    2031 Breckenridge
    Sallisaw, OK 74955


    Oklahoma State Home Builders Association
    Local # 3700
    917 NE 63rd St
    Oklahoma City, OK 73105
    http://www.oshba.org

    Enid Home Builders Association
    Local # 3721
    PO Box 10446
    Enid, OK 73706



    Construction Expert Witness News and Information
    For Bixby Oklahoma
    Corporate Profile

    BIXBY OKLAHOMA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through more than 4500 construction and design related expert witness designations, the Bixby, Oklahoma Construction Expert Directory delivers a superior construction and design expert support solution to construction claims professionals seeking effective resolution of construction defect and claims matters. BHA provides construction related litigation support and expert witness services to the nation's most recognized builders, risk managers, legal professionals, owners, state and local government agencies. Utilizing in house resources which include licensed architects, registered professional engineers, ASPE certified professional estimators, ICC Certified inspection and testing professionals, the firm brings national experience and local capabilities to Bixby region.

    Bixby Oklahoma expert witnesses fenestrationBixby Oklahoma construction expert witness consultantBixby Oklahoma construction claims expert witnessBixby Oklahoma roofing construction expertBixby Oklahoma consulting engineersBixby Oklahoma hospital construction expert witnessBixby Oklahoma forensic architect
    Construction Expert Witness News & Info
    Bixby, Oklahoma

    Colorado Supreme Court Reverses Course on Public Project Liens: Key Takeaways From Wadsworth v. Regional Rail Partners

    July 27, 2026 —
    On April 6, 2026, the Colorado Supreme Court issued a unanimous opinion in Ralph L. Wadsworth Construction Company, LLC v. Regional Rail Partners, 2026 CO 19, reversing the Colorado Court of Appeals and providing much-needed clarity regarding verified statements of claim (VSOCs) under the Colorado Public Works Act, C.R.S. §§ 38-26-101 et seq. The decision resolves two issues that have generated significant concern among construction industry professionals since the Court of Appeals issued its opinion on August 1, 2024. Under C.R.S. § 38-26-107(1), a subcontractor on a public works project may file a VSOC with the contracting public entity for amounts due and unpaid for “…furnished labor, materials, sustenance, or other supplies used or consumed by a contractor or his or her subcontractor in or about the performance of the work contracted to be done or that supplies laborers, rental machinery, tools, or equipment to the extent used in the prosecution of the work….” If a claimant files a VSOC for “an amount greater than the amount due” without a reasonable possibility that the amount is due and with knowledge that the claim is excessive, the claimant “shall forfeit all rights to the amount claimed” and becomes liable for the opposing party’s costs and attorneys’ fees. C.R.S. § 38-26-110. Read the full story...
    Reprinted courtesy of Amanda E. McKinlay, Snell & Wilmer
    Ms. McKinlay may be contacted at amckinlay@swlaw.com

    New York Orders Moratorium on Large Data Center Permits

    July 27, 2026 —
    Levi W. Barrett, Co-Managing Partner of Peckar & Abramson’s New Jersey office, Co-Chair of the firm’s Construction Contracts & Risk Management team, and Executive Committee Member, was recently quoted in “New York Orders Moratorium on Large Data Center Permits,” an article written by Engineering News-Record (ENR). The article examines New York Governor Kathy Hochul’s executive order temporarily halting state environmental permit reviews for certain large-scale data center projects while regulators develop a comprehensive framework to address the sector’s energy demands, water consumption, environmental impacts, and effects on local communities. It also explores the broader implications of the moratorium for developers, contractors, investors, and other stakeholders, as well as the ongoing debate between economic development, AI-driven infrastructure growth, and environmental and utility ratepayer concerns. Read the full story...
    Reprinted courtesy of Levi W. Barrett, Peckar & Abramson, P.C.
    Mr. Barrett may be contacted at lbarrett@pecklaw.com

    Delay Matters: Florida’s Fourth DCA Reverses Hurricane Irma Dismissal

    June 08, 2026 —
    The mantra “delay, deny, defend” is frequently referenced in discussions of insurance claims handling, though insurers will invariably disavow these tactics. While it would be facially improper for an insurer to delay a coverage decision to gain a tactical advantage, empirical examples nonetheless exist. This very dynamic was addressed by Florida’s Fourth District Court of Appeals when it handed policyholders a win in Hypoluxo Mariner’s Cay Condo. Assoc’n, Inc. v. Underwriters at Lloyd’s London, No. 4D2024‑2250 (Fla. 4th DCA Apr. 1, 2026), reversing a trial court order dismissing a condominium association’s Hurricane Irma coverage lawsuit against its property insurer. Delay to Run the Statute of Limitations Following Hurricane Irma, a condominium association suffered roof and exterior envelope damage, reported an insurance claim, and submitted a sworn proof of loss to its property insurer in compliance with Florida Statute § 627.70132 (2020). The statute establishes a timeframe within which a policyholder must submit a claim for hurricane damage. Reprinted courtesy of Andrea DeField, Hunton Andrews Kurth LLP, Machaella Reisman, Hunton Andrews Kurth LLP and Cary D. Steklof, Hunton Andrews Kurth LLP Ms. DeField may be contacted at adefield@hunton.com Ms. Reisman may be contacted at reismanm@hunton.com Mr. Steklof may be contacted at csteklof@hunton.com Read the full story...

    Partner Bryan Stofferahn and Our Walnut Creek Team Secure Summary Judgment in a $28 Million Premises Liability Case!

    September 15, 2026 —
    BWB&O is proud to announce that Partner Bryan Stofferahn and the Walnut Creek Team secured a Summary Judgment on behalf of the firm’s clients, resulting in a complete dismissal of a negligence and premises liability claim. Plaintiff, a teenager, was riding his bicycle on private commercial property when he was struck by a vehicle. Plaintiff was in a coma for 6 weeks and developed major neurocognitive dysfunction from a traumatic brain injury. BWB&O’s clients are a commercial property owner and property management company, who Plaintiff contended were liable for his injuries based on the design, condition, operation, and management of the premises. Plaintiff had demanded $28 million in settlement of the claims against all defendants. Read the full story...
    Reprinted courtesy of Bremer Whyte Brown & O'Meara, LLP

    That’s a Wrap! Pennsylvania Court Holds Arbitration Clause in Online Agreement Unenforceable

    May 14, 2026 —
    In Duffy v. Tatum, 2026 Pa. Super. LEXIS 112, 2026 PA Super 41, the Superior Court of Pennsylvania (Superior Court) considered whether an arbitration provision contained in the online Terms of Service on the defendant’s website were enforceable. The plaintiff, Daniel Duffy (Duffy), visited the website of defendant, Dolly, Inc. (Dolly), to purchase moving services. Duffy selected the number of movers, items to be moved and the type of vehicle needed. To complete the booking, the website required Duffy to checkmark a box labeled “By checking this box I accept the Dolly Terms of Service.” Duffy did not have to open the link or scroll to the bottom of the agreement before being able to click on the checkmark box. The Terms of Service included an arbitration provision requiring that any dispute related to the moving services to be resolved by arbitration in accordance with the American Arbitration Association. The Terms of Service did not include any statement that the user was waiving the right to a jury trial. The Superior Court found the internet Terms of Service unenforceable. During the moving process, an accident occurred and injured Duffy. In May 2024, Duffy and his wife sued Dolly and other related entities alleging negligence and loss of consortium. Dolly filed preliminary objections alleging that the parties agreed to alternative dispute resolution. The lower court overruled the preliminary objections, finding that Dolly’s website did not provide reasonably obvious notice of its Terms of Service to Duffy and, as such, Duffy never agreed to waive his constructional right to a jury trial. Dolly filed an appeal to the Superior Court. Read the full story...
    Reprinted courtesy of Gus Sara, White and Williams LLP
    Mr. Sara may be contacted at sarag@whiteandwilliams.com

    Surety Liability Is Coextensive with Its Bond Principal

    April 14, 2026 —
    A recent Miller act payment bond case, U.S. f/u/b/o Whitetail General Constructors v. Northcon, Inc., 2026 WL 46671 (D.Mont. 2026), contains a short noteworthy discussion as to a surety’s liability being coextensive with that of its bond principal. If you are bonded, or you are pursuing a bond, you need to appreciate this, which is why this is a noteworthy discussion:
    A “surety’s liability on a Miller Act bond must be at least coextensive with the obligations imposed by the Act if the bond is to have its intended effect.” “Therefore, ‘the liability of a surety and its principal on a Miller Act payment bond is coextensive with the contractual liability of the principal only to the extent that it is consistent with the rights and obligations created under the Miller Act.’” In other words, “[w]here a subcontract’s terms are consistent with the Miller Act’s provisions, the surety’s liability on the Miller Act bond is coextensive with the contractual liability of its princip[al].”
    “The liability of a surety under the Miller Act is controlled by federal law, rather than state contract law[.]” The court may, however, “look to state law when interpreting contractual provisions” in a Miller Act case.
    “[T]he measure of recovery under the Miller Act is generally determined by the terms of the subcontract [or underlying contract].”
    Northcon, supra, at *4-5 (internal citations omitted).
    Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    $27B Meta Data Center Pushes Louisiana Toward Massive Power Expansion

    April 27, 2026 —
    Meta Platforms has reached an agreement with Entergy Louisiana to fund new energy infrastructure to support its planned $27-billion data center in Richland Parish, a project the company says could ultimately scale to 5 GW, becoming its largest facility to date. CEO Mark Zuckerberg has described the site as large enough to cover a significant portion of Manhattan. Read the full story...
    Reprinted courtesy of Vince Kong, Engineering News-Record
    Mr. Kong may be contacted at kongv@enr.com

    Landlord Determined to Not Qualify as Additional Insured

    September 08, 2026 —
    In a dispute between two insurers, the Second Circuit affirmed the district court’s determination that the landlord was not an additional insured under the tenant’s policy. Peleus Ins. Co. v. Am. European Ins. Co., 2026 U.S. App. LEXIS 17981 June 22, 2026). Blossom Miller sued 57th Avenue and 21st Century in state court alleging that she was injured when she tripped on the sidewalk in front of the leased premises (the “Miller Action”). The premises was leased by 57th Avenue to 21st Century. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com