BERT HOWE
  • Nationwide: (800) 482-1822    
    landscaping construction expert witness Canyon City Oregon mid-rise construction expert witness Canyon City Oregon custom home expert witness Canyon City Oregon casino resort expert witness Canyon City Oregon industrial building expert witness Canyon City Oregon structural steel construction expert witness Canyon City Oregon production housing expert witness Canyon City Oregon tract home expert witness Canyon City Oregon institutional building expert witness Canyon City Oregon housing expert witness Canyon City Oregon high-rise construction expert witness Canyon City Oregon condominium expert witness Canyon City Oregon townhome construction expert witness Canyon City Oregon multi family housing expert witness Canyon City Oregon hospital construction expert witness Canyon City Oregon Medical building expert witness Canyon City Oregon retail construction expert witness Canyon City Oregon parking structure expert witness Canyon City Oregon low-income housing expert witness Canyon City Oregon office building expert witness Canyon City Oregon concrete tilt-up expert witness Canyon City Oregon condominiums expert witness Canyon City Oregon
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Canyon City, Oregon

    Oregon Builders Right To Repair Current Law Summary:

    Current Law Summary: (HB 2525 Chap. 701; HB2389) If an owner sends a builder a notice of defect within the time allowed for the owner to commence a court action against that contractor, the time for the owner to commence the action shall be extended, notwithstanding any statute of limitation or statute of ultimate repose, until the later of 120 days after written receipt of builders intention to repair, replace the defect, make monetary compensation or reject the claim. Upon receipt of notice, builder has 14 days to inspect the alleged defect. They then have no more than 90 days to communicate their intention The homebuyer must respond to the builder response within 30 days of receipt. The law requires builder notifies homebuyer of NOR before purchase.


    Construction Expert Witness Contractors Licensing
    Guidelines Canyon City Oregon

    Commercial and Residential Contractors License Required.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Lincoln County Home Builders Association
    Local # 3858
    PO Box 440
    Tangent, OR 97389
    http://www.lincolncountyhba.org

    Willamette Valley Home Builders Association
    Local # 3805
    PO Box 440 32054 Old Hwy 34
    Tangent, OR 97389
    http://www.wvhba.com

    Home Builders Association of Lane County
    Local # 3824
    1065 River Rd
    Eugene, OR 97404
    http://www.hbalanecounty.org

    Central Oregon Builders Association
    Local # 3810
    61396 S Hwy 97 Ste 203
    Bend, OR 97702
    http://www.coba.org

    Baker County Chapter
    Local # 3802
    3470 10th St
    Baker City, OR 97814


    Home Builders Association of Marion and Polk Counties
    Local # 3878
    385 Taylor St NE
    Salem, OR 97301
    http://www.homebuildersassociation.org

    Oregon Home Builders Association
    Local # 3800
    375 Taylor St NE
    Salem, OR 97301
    http://www.oregonhba.com


    Construction Expert Witness News and Information
    For Canyon City Oregon

    Court Holds That One-Year SOL Applies to Disgorgement Claims Under B&P Section 7031

    Newmeyer Dillion Secures Victory For Crown Castle In Years-Long Litigation With City Council Of Piedmont Over Small Cell Wireless Telecommunications Sites

    Using Ambient Sound as Construction Progress Indicator

    NY Supreme Court Rules City Not Liable for Defective Sidewalk

    Seven Key Issues for Construction Professionals to Consider When Dealing With COVID-19

    When is Forum Selection in a Construction Contract Enforceable?

    Real Estate & Construction News Round-Up 04/20/22

    Florida Contractor on Trial for Bribing School Official

    Drowning of Two Boys Constitutes One Occurrence

    Manufacturer of Asbestos-Free Product May Still Be Liable for Asbestos Related Injuries

    Bill Proposes First-Ever Federal Workforce Housing Tax Credit for Middle-Class Housing

    Manhattan to Get Tall, Skinny Tower

    Testing Your Nail Knowledge

    Subcontractor Strength Will Drive Industry’s Ability to Meet Demand, Overcome Challenges

    Angela Cooner Appointed Vice-Chair of Arizona’s Inaugural Board of Legal Specialization Construction Defect Law Advisory Commission

    Navigating Federal Government Contracts Under Newly Imposed Tariffs

    West Coast Casualty’s Construction Defect Seminar Returns to Anaheim May 15th & 16th

    Roof Mounted Solar Panels: Lower Your Risk of Fire

    Mortenson Subcontractor Fires Worker Over Meta Data Center Noose

    Candis Jones Named to Atlanta Magazine’s 2021 “Atlanta 500” List

    Construction Insurance Rates Up in the United States

    The Hunton Policyholder’s Guide to Artificial Intelligence: SEC’s Recent AI-Washing Claims Present D&O Risks, Potential Coverage Challenges

    Florida Courts Inundated by Wave of New Lawsuits as Sweeping Tort Reform Appears Imminent

    Stacking of Service Interruption and Contingent Business Interruption Coverages Permitted

    When Must a New York Insurer Turn Over a Copy of the Policy?

    New York Considering Legislation That Would Create Statute of Repose For Construction

    Connecticut Court Finds Anti-Concurrent Causation Clause Enforceable

    Demonstrating A Fraudulent Inducement Claim Or Defense

    General Commercial Liability Coverage Depends on Facts - Not Labels

    Be Proactive Now: Commercial Construction Quickly Joining List of Industries Vulnerable to Cyber Attacks

    Las Vegas, Back From the Bust, Revives Dead Projects

    Prison Time and Restitution for Construction Fraud

    Employee or Independent Contractor? New Administrator’s Interpretation Issued by Department of Labor Provides Guidance

    DRCOG’s Findings on the Impact of Construction Defect Litigation Have Been Released (And the Results Should Not Surprise You)

    Outcry Over Peru’s Vast Graft Probe Prompts Top Lawyer to Quit

    Illinois Court Determines Insurer Must Defend Property Damage Caused by Faulty Workmanship

    Word of the Day: “Contractor”

    America’s Infrastructure Gets a D+

    Hunton Offers Amicus Support in First Circuit Review of “Surface Water” Under Massachusetts Law

    Newark Trial Team Obtains Affirmance of Summary Judgment for General Contractor Client

    Reinsurer's Obligation to Provide Coverage Determined Under English Law

    Skilled Labor Shortage Implications for Construction Companies

    Constructive Suspension (Suspension Outside of an Express Order)

    Texas Legislature Puts a Spear in Doctrine Making Contractor Warrantor of Owner Furnished Plans and Specifications

    Priority of Liability Insurance Coverage and Horizontal and Vertical Exhaustion

    Environmental Update: Regulatory Notes – April 2025

    Time is Money. Unless You’re an Insurance Company

    Eliminating Waste in Construction – An Interview with Turner Burton

    Construction Litigation Roundup: “Ursinus is Cleared!”

    Do Municipal Gas Bans Slow the Clean Hydrogen Transition in Real Estate?
    Corporate Profile

    CANYON CITY OREGON CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    With over four thousand construction related expert witness designations, the Canyon City, Oregon Construction Expert Directory provides a wide range of trial support and construction consulting services to construction claims professionals concerned with construction defect, scheduling, and delay claims. BHA provides building related litigation support and expert witness services to the nation's leading construction practice groups, Fortune 500 builders, general liability carriers, owners, as well as a variety of public entities. Utilizing captive assets which comprise licensed architects, civil engineers, building envelope experts, general and specialty contractors focused on the evaluation of construction claims, the firm brings a wealth of experience and local capabilities to Canyon City and the surrounding areas.

    Canyon City Oregon multi family design expert witnessCanyon City Oregon eifs expert witnessCanyon City Oregon soil failure expert witnessCanyon City Oregon construction safety expertCanyon City Oregon building code compliance expert witnessCanyon City Oregon architectural engineering expert witnessCanyon City Oregon engineering consultant
    Construction Expert Witness News & Info
    Canyon City, Oregon

    PJM’s Reliability Backstop Procurement Proposal—Fast-Track Capacity to Meet Rising Large-Load Demand

    May 12, 2026 —
    In January, we discussed the Statement of Principles jointly signed by the National Energy Dominance Council and governors across the mid-Atlantic region—framing accelerating demand (especially from large-scale data centers) as an emergency reliability issue for PJM Interconnection, L.L.C. (PJM), the nation’s largest power grid operator. That policy signal is now becoming a near-term, accelerated procurement and contracting exercise. On April 8, 2026, PJM notified stakeholders of a critical issue fast path reliability backstop procurement process. PJM subsequently released a request for information (RFI) with respect to a proposed Reliability Backstop Procurement (RBP)—a one-time mechanism intended to attract significant new capacity to address projected reliability shortfalls driven by large-load growth. RBP compresses what is often a multiyear market and regulatory conversation into a fast-moving set of commercial choices. Developers, large loads, utilities and capital providers should be preparing now for (i) an accelerated bilateral contracting window and (ii) a standardized PJM-led backstop procurement if bilateral deals do not clear enough capacity. Reprinted courtesy of Stephen J. Humes, Pillsbury, Alicia M. McKnight, Pillsbury, Jason Drogin Atwood, Pillsbury and Andrew H. Jacobs, Pillsbury Mr. Humes may be contacted at stephen.humes@pillsburylaw.com Ms. McKnight may be contacted at alicia.mcknight@pillsburylaw.com Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com Mr. Jacobs may be contacted at andrew.jacobs@pillsburylaw.com Read the full story...

    Modular Construction’s Big Boom: New Risks Outpacing Standard Contracts in Industrial Projects

    March 24, 2026 —
    Modular construction is revolutionizing the construction industry, tackling labor shortages, sustainability goals and supply-chain challenges, with the global market for modular and prefabricated construction projected to reach over $200 billion by 2030. While residential builders have embraced modular’s speed and affordability, the greatest risks—and opportunities—are emerging in the industrial sector, where project scale and complexity demand new legal strategies. In 2023, Chad Theriot explored industrial and infrastructure applications of modular construction, addressing risks like offsite fabrication and integration complexities in his article, “The Rise of Modular Construction—Impacts for Consideration.” Since that time, modular construction has continued to experience significant advancements and has been increasingly adopted by contractors across a broad spectrum of industrial and commercial projects. As modular construction continues to reshape the industrial landscape, contractors and owners alike must be mindful of the legal implications associated with its use, specifically as it relates to liability and risk allocation, regulatory compliance, quality control and upstream factors such as transportation and intellectual property concerns. Reprinted courtesy of Chad Theriot and Jack Mayo, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Court Rules Cook County Misspent $243M in Transportation Funds

    March 10, 2026 —
    A Cook County Illinois Circuit Court judge has ruled that the county violated the state constitution by using $243 million in transportation tax revenue during fiscal 2023 for non-transportation purposes, handing a legal win to a statewide coalition of construction trade groups. Read the full story...
    Reprinted courtesy of Annemarie Mannion, Engineering News-Record
    Ms. Mannion may be contacted at manniona@enr.com

    My Current Love-Hate Relationship with AI

    June 08, 2026 —
    It’s early in the relationship, I know. But still, there are some things that bug me. Yet, I also know that it’s a relationship in which leaving is not an option, and even if I could, it’s not to the point where it’s so bad that I would do so. So, if you would, let me gripe a bit. While there’s been much discussion about AI and, at least in my neck of the woods, a fair amount of discussion about how lawyers can, should, and must use AI or risk becoming discarded into the dustbin of history, much less has been written about clients’ use of AI. Increasingly, I’ve gotten the sense that my clients are using AI. For example, I had a client ask for confirmation that if he disagreed with an administrative decision that he could file a writ of mandate, and if so, whether that deadline was 30, 60 or 90 days after the administrative decision. The answer to the first question was yes, and as to the second question, the answer was 90 days. This was from a client who, smart as he is, probably didn’t know this off the top of his head. Read the full story...
    Reprinted courtesy of Garret D. Murai, Nomos LLP
    Mr. Murai may be contacted at gmurai@nomosllp.com

    Executive Order Addresses Wildfire Rebuilding Delays Through Federal Preemption of State and Local Permitting

    February 10, 2026 —
    Quick Take On January 23, 2026, one year after the Los Angeles wildfires, the President issued Executive Order 14377 directing the Secretary of Homeland Security, acting through the Administrator of the Federal Emergency Management Agency (FEMA), and the Administrator of the Small Business Administration (SBA) to consider regulations that would preempt state and local permitting requirements for federally funded reconstruction projects in the Pacific Palisades and Eaton Canyon areas. The Order mandates expedited federal environmental and historic preservation reviews, directs the development of legislative proposals, and orders an audit of California’s use of Hazard Mitigation Grant Program (HGMP) funding. Key Provisions Federal Preemption of State and Local Permitting The Order directs FEMA and the SBA to consider promulgating regulations that would preempt state or local permitting processes found to have “unduly impeded” the timely use of federal emergency-relief funds by homeowners, businesses, or houses of worship seeking to rebuild. Under the proposed framework, preempted permitting regimes would be replaced with a self-certification requirement, whereby builders would certify to a federal designee that they have complied with all applicable substantive state and local health and safety standards. FEMA would retain authority to review all repairs and construction for compliance with applicable health and safety standards. Proposed regulations must be published within 30 days, with final regulations due within 90 days. Reprinted courtesy of Olivia LaCasto, Snell & Wilmer and Josh Schneiderman, Snell & Wilmer Ms. LaCasto may be contacted at olacasto@swlaw.com Mr. Schneiderman may be contacted at jschneiderman@swlaw.com Read the full story...

    Colorado Court of Appeals Confirms: Prevailing Parties Can Recover “Fees on Fees” — Reinforcing Why Builders Should Strike Attorneys’ Fee Clauses From Their Contracts

    December 30, 2025 —
    Colorado developers, builders, and contractors should take notice of a recently published Colorado Court of Appeals decision that increases the financial exposure created by prevailing party attorneys’ fee clauses. In 1046 Munras Properties, L.P. v. Kabod Coffee, 2025 COA 71, the Court held, for the first time in a published Colorado case, that a prevailing party may recover not only contractual attorneys’ fees, but also the attorney fees incurred to obtain those fees. In short: “fees on fees” are now recoverable when a contract contains a broad fee shifting clause. This development underscores the same warning sounded years ago in a prior HHMR blog post titled, Attorney Fee Clauses Are Engraved Invitations to Sue. If prevailing party fee provisions already encouraged litigation, the Munras decision supercharges that incentive. Read the full story...
    Reprinted courtesy of David McLain, Higgins, Hopkins, McLain & Roswell, LLC
    Mr. McLain may be contacted at mclain@hhmrlaw.com

    Reducing Rework on Construction Projects Benefits Budget, Schedule and Financial Loss

    February 10, 2026 —
    The costs of not building it right the first time is statistically staggering—some research suggests up to 20% of the total project costs. This article highlights the costs of re-work, provides a financial worksheet to track the costs of re-work, and a trusted tool to help reduce the impact of re-work. Typically, when discussing rework, one thinks of the labor and material costs, but there are other costs associated with rework that are less easily quantified:
    • Liquidated damages and related legal costs
    • Potential for increasing safety incidents associated with rework
    • Morale loss due to performing rework
    • Loss of previously trained workers due to delays caused by rework
    • Reputational loss and the inability to bid on future work
    • Challenges of future work to be performed due to schedule delays on a current project
    Reprinted courtesy of Brian Clarke, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Mr. Clarke may be contacted at brianclarke1121@aol.com Read the full story...

    HDR Agreed to $12M Settlement With Miami Bridge Design-Build Team

    May 12, 2026 —
    HDR last year agreed to pay $12 million to the design-build construction contractor Archer Western-de Moya Group to settle its claims that the engineer had incompletely designed and under-designed Miami's new Signature Bridge when the joint venture committed to a fixed price prior to construction in 2018. Read the full story...
    Reprinted courtesy of Richard Korman, Engineering News-Record
    Mr. Korman may be contacted at kormanr@enr.com