BERT HOWE
  • Nationwide: (800) 482-1822    
    retail construction expert witness Pine Grove Mills Pennsylvania condominiums expert witness Pine Grove Mills Pennsylvania high-rise construction expert witness Pine Grove Mills Pennsylvania production housing expert witness Pine Grove Mills Pennsylvania Medical building expert witness Pine Grove Mills Pennsylvania casino resort expert witness Pine Grove Mills Pennsylvania townhome construction expert witness Pine Grove Mills Pennsylvania institutional building expert witness Pine Grove Mills Pennsylvania parking structure expert witness Pine Grove Mills Pennsylvania mid-rise construction expert witness Pine Grove Mills Pennsylvania Subterranean parking expert witness Pine Grove Mills Pennsylvania multi family housing expert witness Pine Grove Mills Pennsylvania landscaping construction expert witness Pine Grove Mills Pennsylvania custom home expert witness Pine Grove Mills Pennsylvania custom homes expert witness Pine Grove Mills Pennsylvania concrete tilt-up expert witness Pine Grove Mills Pennsylvania structural steel construction expert witness Pine Grove Mills Pennsylvania office building expert witness Pine Grove Mills Pennsylvania industrial building expert witness Pine Grove Mills Pennsylvania tract home expert witness Pine Grove Mills Pennsylvania condominium expert witness Pine Grove Mills Pennsylvania low-income housing expert witness Pine Grove Mills Pennsylvania
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Pine Grove Mills, Pennsylvania

    Pennsylvania Builders Right To Repair Current Law Summary:

    Current Law Summary: HB 1875 stipulates that “no later than 90 days before filing an action, serve written notice of claim on the contractor. Upon receipt of notice, builder has 15 days to forward the claim to any subcontractor/supplier and 30 days after service of notice to offer to compromise and settle the claim by monetary payment without inspection, propose to inspect the dwelling that is the subject of the claim; or reject the claim. Contractor has 14 days after inspection to provide written notice of intention.”


    Construction Expert Witness Contractors Licensing
    Guidelines Pine Grove Mills Pennsylvania

    No state license required. For public works projects, see General Services website.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Carbon Bldrs Association
    Local # 3922
    PO Box 218 490 Ore Street
    Bowmanstown, PA 18030
    http://www.carbonbuilders.com

    Builders Association of Central PA
    Local # 3952
    2038 Sandy Drive Ste 100
    State College, PA 16803
    http://centralpabuilders.com

    Indiana-Armstrong Builders Association
    Local # 3914
    1380 Route 286 Highway East Suite 502
    Indiana, PA 15701
    http://www.iabuilders.com

    Lehigh Valley Builders Association
    Local # 3904
    1524 W Linden St
    Allentown, PA 18102
    http://www.lvba.org

    Schuylkill Builders Assn
    Local # 3954
    1036 Schylkill Mountain Rd
    Schuylkill Haven, PA 17972
    http://www.schuylkillba.com

    Mifflin-Juniata Chapter
    Local # 3926
    5 Oak Drive
    Thompsontown, PA 17094
    http://www.mifflinjuniatabuilders.org

    Huntingdon Co Builders Association
    Local # 3917
    PO Box 399
    Huntingdon, PA 16652
    http://www.huntingdoncountybuilders.com


    Construction Expert Witness News and Information
    For Pine Grove Mills Pennsylvania

    Court of Appeals Discusses Implied Duty of Good Faith and Fair Dealing in Public Works Contracting

    Reminder: Know Your Contractor Licensing Rules

    Microsoft Urges the Construction Industry to Deliver Lifecycle Value

    Construction Law- Where Pragmatism and Law Collide

    Residential Construction: Shrinking Now, Growing Later?

    Living With a Millennial. Or Grandma.

    City Council Authorizes Settlement of Basement Flooding Cases

    Federal Court Denies Summary Judgment in Leaky Condo Conversion

    Concrete Worker Wins Lawsuit and Settles with Other Defendant

    Key Amendments to Insurance Claims-Handling Regulations in Puerto Rico

    Corps Issues Draft EIS for Controversial Alaskan Copper Mine

    OSHA Aims to Address the Long Summer Days

    Denial of Coverage for Bulge in Wall Upheld

    Toolbox Talk Series Recap - Undocumented Change Work

    Hawaii Supreme Court Reaffirms an "Accident" Includes Reckless Conduct, Finds Green House Gases are Pollutants

    Signed, Sealed and (Almost) Delivered: EU Council Authorizes Signing of U.S. – EU Bilateral Insurance Agreement

    Ahlers Cressman & Sleight named one of the Top 50 Construction Law Firms

    Invest In America Act Offers 494 Billion In Funding to U.S. Infrastructure and Millions of New Jobs

    Property Owner’s Defense Goes Up in Smoke in Careless Smoking Case

    ASCE Releases New Report on Benefits and Burdens of Infrastructure Investment in Disadvantaged Communities

    Housing Starts in U.S. Beat 1 Million Pace for Second Month

    Handshake Deals Gone Wrong

    Supreme Court Addresses Newly Amended Statute of Repose for Construction Claims

    Limitations on the Ability to Withdraw and De-Annex Property from a Common Interest Community

    The Sounds of Silence: Pennsylvania’s Sutton Rule

    No Trial Credit in NJ Appellate Decision for Non-Settling Successive Tortfeasors – Must Demonstrate Proof of Initial Tortfeasor Negligence and Proximate Cause

    Sweat the Small Stuff – Don’t Overlook These Three (3) Clauses When Negotiating Your Construction Contract

    Three Steps to a Safer Jobsite

    Another Colorado District Court Refuses to Apply HB 10-1394 Retroactively

    Terminator’s Trench Rehab Drives L.A. Land Prices Crazy

    Contractor Underpaid Workers, Pocketed the Difference

    Detect and Prevent Construction Fraud

    Additional Dismissals of COVID Business Interruption, Civil Authority Claims

    Drill Rig Accident Kills Engineering Manager, Injures Operator in Philadelphia

    Construction Defects Lead to “A Pretty Shocking Sight”

    Why Are Developers Still Pouring Billions Into Waterlogged Miami?

    (Don’t) Go Fish

    Negligence Per Se Claim Based Upon Failure to Pay Benefits Fails

    Decline in Home Construction Brings Down Homebuilder Stocks

    Living Not So Large: The sprawl of television shows about very small houses

    Want to Make Your Jobsite Safer? Look to the Skies.

    Clean Water Act Cases: Of Irrigation and Navigability

    In Construction Your Contract May Not Always Preclude a Negligence Claim

    Steel Makeover Under Way for Brooklyn's Squibb Footbridge

    John Paulson’s $1 Billion Caribbean Empire Faces Betrayal

    Safety Guidance for the Prevention of the Coronavirus on Construction Sites

    Almost Half of Homes in New York and D.C. Are Now Losing Value

    Contractors: Revisit your Force Majeure Provisions to Account for Hurricanes

    New Jersey Court Washes Away Insurer’s Waiver of Subrogation Arguments

    The Godfather of Solar Predicts Its Future
    Corporate Profile

    PINE GROVE MILLS PENNSYLVANIA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through over four thousand building and construction related expert designations, the Pine Grove Mills, Pennsylvania Construction Expert Directory provides a streamlined multi-disciplinary expert retention and support solution to lawyers and construction practice groups seeking effective resolution of construction defect and claims matters. BHA provides construction related litigation support and expert witness services to the nation's most recognized builders, risk managers, legal professionals, owners, state and local government agencies. Utilizing captive resources which comprise building envelope experts, forensic architects, professional engineers, credentialed construction standard of care consultants, the firm brings national experience and local capabilities to Pine Grove Mills and the surrounding areas.

    Pine Grove Mills Pennsylvania eifs expert witnessPine Grove Mills Pennsylvania construction safety expertPine Grove Mills Pennsylvania construction claims expert witnessPine Grove Mills Pennsylvania building code compliance expert witnessPine Grove Mills Pennsylvania forensic architectPine Grove Mills Pennsylvania expert witness commercial buildingsPine Grove Mills Pennsylvania civil engineer expert witness
    Construction Expert Witness News & Info
    Pine Grove Mills, Pennsylvania

    Conditional Payment Bond Consideration-Make Sure There Is Pay-If-Paid Provision

    June 29, 2026 —
    If a general contractor is going to have a conditional payment bond, it needs to ensure it subcontracts contain pay-if-paid or pay-when-paid provisions. This conditional payment language in subcontracts is the general contractor’s defense that it doesn’t have to pay a subcontractor UNTIL owner has paid the general contractor for the subcontractor’s work. The general contractor (and the surety) can look at the conditional payment bond with the s. 713.245 legend stamped on its face designating the conditional nature of the bond, and assume the conditional structure is locked in against the bond: no payment from the owner, no obligation to the subcontractors under the bond. But what happens when the subcontracts contain no express conditional payment language despite having a valid conditional payment bond? Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    2026 Top Business Risks for Construction and Engineering Companies

    May 26, 2026 —
    The 2026 Allianz Risk Barometer revealed some surprising findings for construction and engineering businesses. Now in its fifteenth year, this annual business risk ranking by corporate insurer Allianz Commercial incorporates the views of 3,338 global risk management professionals on the main perils on their radar for the year. Survey respondents included construction and engineering risk experts who identified the threats keeping them up at night. Here is how they ranked the top industry risks for 2026: Natural Catastrophes Natural catastrophe risk retains the top spot, with 38% of construction and engineering respondents citing this risk as their leading concern for 2026. From the insurance perspective, economic and insured losses remained high, albeit lower than the 10-year average. The evolving nature of natural catastrophes continues to pose significant challenges to businesses and the (re)insurance industry. Insured losses from natural catastrophes are set to reach $107 billion for 2025, according to Swiss Re—the sixth year in a row they have exceeded $100 billion, while economic losses are well in excess of $200 billion. Reprinted courtesy of Darren Tasker, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Dotted Line: How Construction Is Dealing with Cybersecurity in the Age of AI

    October 12, 2026 —
    Richard R. Volack, Partner in P&A’s New York office and Chair of the firm’s Cyber Security & Data Privacy practice, was recently quoted in “Dotted Line: How Construction Is Dealing with Cybersecurity in the Age of AI,” an article written by Construction Dive. The article examines how contractors’ increasing reliance on interconnected technologies and AI can make cyberattacks more sophisticated. It discusses the heightened risks for government contractors and smaller subcontractors, including the potential exposure of sensitive project information, personal data, and financial records. It also explores practical measures contractors can take to mitigate these risks, such as strengthening contractual protections, conducting penetration testing, obtaining appropriate cyber insurance, implementing multifactor authentication, and providing employees with regular cybersecurity training. Read the full story...
    Reprinted courtesy of Richard R. Volack, Peckar & Abramson, PC
    Mr. Volack may be contacted at rvolack@pecklaw.com

    Voluntary Dismissal of an Indemnity Claim Does Not Make the Subcontractor a “Prevailing Party,” Washington Court of Appeals Holds

    September 21, 2026 —
    In King County v. Walsh Construction Company II, LLC, No. 86503-0-I (Wash. Ct. App. Aug. 4, 2025), an unpublished decision from Division I of the Washington Court of Appeals, the Court affirmed the denial of a subcontractor’s request for prevailing-party attorney fees under an indemnity clause after the general contractor voluntarily dismissed its indemnity claims. Because the indemnity claim was no longer live and no determination of fault had occurred, the Court held that the trial court did not err in denying the request. ACS represented Walsh, the general contractor, in securing the denial of the fee request at the trial court that the Court of Appeals affirmed. A Pass-Through Indemnity Claim That Ended Before Fault Was Decided The dispute arose out of a public works contract under which King County hired Walsh Construction Company II, LLC (“Walsh”) to construct and install a conveyance pipeline. After the pipeline broke, King County sued Walsh for breach of contract and warranty, expressly identifying both Walsh and its subcontractor, Mears Group Inc., (“Mears”) as responsible. Walsh tendered defense and indemnity to Mears under the subcontract. Read the full story...
    Reprinted courtesy of Margarita Kutsin, Ahlers Cressman & Sleight PLLC
    Ms. Kutsin may be contacted at margarita.kutsin@acslawyers.com

    Urban Digital Twins: How Virtual Cities Could Help Build Smarter Cities

    August 11, 2026 —
    Traffic congestion, endless construction, flooded streets and power outages. For city leaders and residents alike, these disruptions are simply part of daily urban life. But an emerging tool, known as the urban digital twin, could help cities anticipate problems before they occur by allowing planners to simulate responses, stress-test infrastructure, and evaluate decisions before implementing them in the real world. What Is an Urban Digital Twin? An urban digital twin is a dynamic, data-driven virtual model of a real city. It uses AI analytics and combines 3D modeling with real-time data and information from sources such as IoT sensors, traffic cameras, satellite feeds, infrastructure databases, utility networks, and environmental data including weather systems and heat maps to create a continuously updated digital representation of the urban environment that mirrors infrastructure, movement and systems in real time. In other words, it is a living digital replica of a city. Read the full story...
    Reprinted courtesy of Pillsbury

    USDOT’s DBE Interim Final Rule: How It Affects Current and Out-to-Bid DOT and Airport Projects

    June 15, 2026 —
    In our April 16, 2026 post, we discussed the U.S. Department of Transportation’s Interim Final Rule (IFR) concerning Disadvantaged Business Enterprise (DBE) and Airport Concession Disadvantaged Business Enterprise (ACDBE) certification, specifically as it concerns transportation and airport projects in California. This post addresses a broader question: What does the IFR mean for current and out-to-bid DOT projects operating under pre-existing DBE goals? The answer is that the IFR did more than change who qualifies as a DBE. It also changed how federally funded transportation and airport projects must be handled during the re-evaluation period. This affects active contracts, pending procurements, airport projects, design-build teams, and anyone relying on old assumptions about DBE goals and counting of DBE and ACDBE credit. Read the full story...
    Reprinted courtesy of Zachary F. Jacobson, Seyfarth Shaw LLP
    Mr. Jacobson may be contacted at zjacobson@seyfarth.com

    Five Snell & Wilmer Partners Named to Utah Business’ 2026 Legal Elite

    September 29, 2026 —
    SALT LAKE CITY – Snell & Wilmer is pleased to announce that five partners have been named to Utah Business’ 2026 “Legal Elite.” The annual recognition honors leading Utah attorneys who are making a meaningful impact in their respective areas of practice. Honorees are peer-nominated and selected by a panel of experienced legal and law enforcement professionals based on their legal knowledge, commitment to ethical standards, and professional achievements. Wade R. Budge is a land use and real estate lawyer with significant experience advising developers and owners in all aspects of real estate development. He has negotiated entitlements for master planned communities, industrials projects, retail centers, office buildings, subdivisions, and mountain resorts throughout Utah. He also regularly represents clients in the use, acquisition, and disposition of real estate projects throughout the Western United States. Budge has advised developers in obtaining public incentives and using public finance tools, including tax increment financing, to facilitate new and redevelopment projects, and regularly advises clients with government relations matters involving state and local governments. Budge has negotiated public-private partnerships with dozens of local governments and with every one of the state’s development agencies, including the Point of the Mountain State Land Authority, the Military Installation Development Authority, and the Utah Fairpark Area Investment and Restoration District. Read the full story...
    Reprinted courtesy of Snell & Wilmer

    Insufficient Notice of Commencement and Construction Lien Rights

    August 03, 2026 —
    When a party is preserving their construction lien rights, the party will look to the recorded Notice of Commencement. This is the recorded document that provides the lienor with the information for purposes of preserving construction lien rights. A Notice to Owner company will typically rely on the Notice of Commencement to serve Notices to Owners from lower tiers not in contract with the owner. However, when it comes to preparing the lien, a lienor should look beyond just the Notice of Commencement and also look to the property appraiser’s website as a backstop. In a recent case, a window company had the homeowner sign the Notice of Commencement and then filled in the information. The company naturally did this for the convenience of the homeowner that probably was unfamiliar with the Notice of Commencement process. Regardless, information in the Notice of Commencement was inaccurate. It failed to include all the real property owners. Thus, when a payment dispute arose and a construction lien was prepared, it did not identify all of the real property owners. All of the real property owners were added later during the pendency of a lien foreclosure lawsuit. The trial court denied the lien because of the defective / insufficient Notice of Commencement — the lienor assumed the risk of error by filling out the information in the Notice of Commencement. The trial court further denied the lien holding that because the work did not commence within 90 days of the Notice of Commencement, the Notice of Commencement is void. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com