Kahana Feld Obtains Favorable Result in High-Exposure NY Premises Liability Case
June 15, 2026 —
Leigh Katz - Kahana FeldKahana Feld partner Leigh Katz obtained a significant victory in a recent matter involving a videotaped alleged trip and fall on the sidewalk in front of the client’s commercial residence. The plaintiff claimed he suffered a knee injury that necessitated surgery, along with other assorted injuries that prevented him from continuing high-level athletic activities. Leigh was able to demonstrate that the fall was staged and received a voluntary discontinuance with prejudice.
At mediation, Leigh emphasized that KF’s expert witness challenged the plaintiff’s claim that the fall was caused by a sidewalk height differential after reviewing the videotape footage and determining the plaintiff’s fall began before his feet made contact with the alleged defect. Based on this analysis, the expert concluded the reported height differential did not initiate the fall, which supported KF’s position that the incident depicted in the video was unrealistic and appeared staged.
Read the full story...Reprinted courtesy of
Leigh Katz, Kahana FeldMs. Katz may be contacted at
lkatz@kahanafeld.com
“He Chose…Poorly: How Bad DSC Clauses Lead to Project Doom in the Last Crusade of Construction Risk”
March 10, 2026 —
Curt Martin & Lee Banta - ConsensusDocs“We do not follow maps to buried treasure, and X never, ever marks the spot.” That’s the advice that Indiana Jones offered in the Last Crusade film. But what’s beneath the surface isn’t just important to adventure archaeologists. It has real-world application to our industry, where success depends on the stability of materials below the surface.
The study of geology and soils has ancient roots. Egyptians relied on soil stability for the pyramids; Rome built a continent-wide roadway system utilizing subgrade preparation techniques; Medieval builders implemented a rudimentary foundation pier system; Henri Gautier studied what is now called the “angle of repose” for French retaining walls in the early 18th Century.
Through the 19th Century, contractors bore the risk of the stability of their work, and the attendant peril of unforeseen site conditions. But in the early 20th Century, design trades continued to develop increased understanding of soil and underground conditions. In the 1920’s US federal contracts began employing “differing site conditions” clauses, which provided for cost/time adjustments if subsurface conditions differed from expectations. Industry forms followed the federal policy, and these clauses became almost universally accepted.
Reprinted courtesy of
Curt Martin, Peckar & Abramson, P.C. and
Lee Banta, Peckar & Abramson, P.C.
Mr. Martin may be contacted at cmartin@pecklaw.com
Mr. Banta may be contacted at lbanta@pecklaw.com
Read the full story...
Turnover Traps for Community Associations: Investigate First, Release Claims Later
April 14, 2026 —
Nicholas B. Vargo - Ball Janik LLPTurnover of a community association from developer control to owner control is a uniquely vulnerable moment. Developers are increasingly presenting Florida condominium and homeowners’ associations with “standard” settlement or release agreements at turnover, often being framed as routine steps to finalize the transition of control. In reality, these agreements can have sweeping consequences, including the release of construction-defect claims before the association has conducted any meaningful independent evaluation.
The developer has years of project knowledge and access to plans, subcontractors, and internal records. The newly elected board is just beginning to organize, obtain documents, and understand the property’s condition. Many defects, especially those involving roofing, waterproofing, windows, or structural components, are latent and not yet visible. Signing a release at this stage means the association is making a binding decision under conditions of uncertainty, without full information, to release all future potential claims.
Over the last few years, there has been a rise in reports of developers offering a packaged deal: they agree to complete certain repairs, often minor punch-list or cosmetic items, and to “forgive” an alleged financial deficit (often around $50,000) supposedly owed by the association from the developer-control period. In exchange, the association is asked to sign a broad release covering all claims, including known and unknown construction defects. To a new HOA board that received their community with limited operating and reserve funds, they are left with a difficult decision to either accept the developer’s offer or assess their owners to pay this alleged debt.
These agreements are occasionally presented through community management companies, which may describe them as “standard” or "routine.” Whether due to misunderstanding or influence from the developer, management companies can unintentionally reinforce the idea that signing is expected. Any recommendation provided to HOAs about whether to sign these releases could open community management to liability down the road. The best practice for both associations and community managers is to refer any agreements to be reviewed by general counsel for the association.
The following two case studies illustrate the real-world consequences:
Case Study One: A newly transitioned board relies on its management company to negotiate with the developer-builder to resolve irrigation issues, pond concerns, and signage deficiencies, along with forgiving an asserted financial shortfall. In exchange, the board signs a broad release covering all claims, including latent defects.
Within a year, several punch-list items remain incomplete, and more serious issues arise. When the association demands completion, the developer delays, prompting the association to seek advice on how to enforce the settlement agreement. The association hires counsel to hold the developer responsible for both the previously agreed-upon items and newly identified construction defects. However, when the association brings claims against the developer, the developer points to the release of all potential construction defects in the community. Thus, the only remaining remedy is limited to enforcement of the specific punch-list terms. The community, still relatively new, has no viable claims against the developer-builder for the construction defects. With warranties expired and the release, the association must fund repairs through special assessments, despite defects that would otherwise have been actionable.
Case Study Two: A community is presented with a similar agreement as above. The management company encourages execution, suggesting it is standard and even telling the board to “name your price.” The developer also pressures the newly elected board to sign.
Instead of signing, the board consults with their attorney. Counsel advises the board not to sign the release and recommends further investigation. Engineers are retained and identify early indicators of broader issues, including stucco cracking, water intrusion, and irrigation deficiencies. Based on this information, the association declines to sign the release. Subsequent evaluation reveals potentially significant construction-defect claims, allowing the community to pursue recovery that would have been lost under the proposed agreement.
These scenarios underscore a fundamental point: signing a release at turnover is not an administrative formality—it is a major legal decision. Board members act in a fiduciary capacity on behalf of their community, and their decisions can bind all current and future owners. At turnover, an association’s right is to investigate and pursue claims. Preserving that right until a full and independent evaluation is completed is not adversarial—it is responsible governance.
Accordingly, associations should retain independent evaluations of the property and consult qualified legal counsel before signing any “standard” agreements, especially ones involving a release of future claims.
Nicholas B. Vargo is a partner in Ball Janik LLP’s Construction Practice Group. He may be reached at nvargo@balljanik.com.
White and Williams LLP Secures Trio of Cyber Coverage Wins
May 12, 2026 —
Gabriel Darwick & Sean Elman - White and Williams LLPThree weeks, three jurisdictions, three cyber wins.
White and Williams picked up the first victory on March 9, 2026, in the United States District Court for the Western District of Texas, where the court granted summary judgment to their client enforcing a Cyber Crime Loss sublimit. See Perry & Perry Builders, Inc. v. Cowbell Cyber and Obsidian Specialty Ins. Co., 2026 U.S. Dist. LEXIS 49409 (E.D. Tex. Mar. 9, 2026). In Perry, the insured was deceived into transferring money intended for a vendor to an unintended third party. The insurer acknowledged that the loss was covered and paid the insured the policy’s Cyber Crime Loss sublimit. Discontent with a single sublimit, the insured argued that because it wired the money to the fraudster in separate transfers, it was entitled to a second Cyber Crime Loss sublimit.
Reprinted courtesy of
Gabriel Darwick, White and Williams LLP and
Sean Elman, White and Williams LLP
Mr. Darwick may be contacted at darwickg@whiteandwilliams.com
Mr. Elman may be contacted at elmans@whiteandwilliams.com
Read the full story...
Don’t Ignore Prejudgment Interest
February 02, 2026 —
David Adelstein - Florida Construction Legal UpdatesWhen it comes to contracts, there may be a clause that provides that untimely payments shall bear interest at a particular rate. Or it may be the statutory rate. That clause will come into play when determining prejudgment interest. In ANY dispute, prejudgment interest can be an important damages component that accrues from the date of the loss. Don’t ignore prejudgment interest.
The Fourth District of Florida, in a construction dispute, maintained:
“[I]f a plaintiff establishes that he sustained out-of-pocket loss, prejudgment interest must be awarded from the date of the loss. The trial court has no discretion regarding awarding prejudgment interest and must do so applying the statutory rate of interest in effect at the time the interest accrues.”
Bensusan v. Design Engineering Group, LLC, 2025 WL 3466367 (Fla. 4th DCA 2025) (citation omitted).
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
From Dark Data to Building Intelligence
July 13, 2026 —
Aarni Heiskanen - AEC BusinessIn this episode, I talk with Mark Sorsa-Leslie, founder and CEO of
Auttaa AI, whose team just won first place in Luotea’s inaugural hackathon in Helsinki for turning property maintenance from reactive firefighting into proactive forecasting with AI. Mark is a chartered surveyor with 30 years of real estate data experience, previously the founder of the UK sensor company Beringar.
We discuss why so much building data stays dark and siloed, from outdated networking technology to the shortage of people who understand both engineering and property. Mark explains how Auttaa bridges real-time building data with large language models, using what he calls an “influence graph” to surface correlations and causation across previously disconnected systems, such as linking occupancy patterns to CO2 readings to diagnose ventilation problems in minutes rather than days.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Insureds’ Altering Dates for Hailstorm Damage Justifies Denial of Claim
June 02, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe Firth Circuit affirmed the district court’s grant of summary judgment to the insurer due to the insureds’ failure to establish the date of loss after a hailstorm. Cutchall v. Chubb Lloyds Ins. Co. of Texas, 2026 WL 625633 (5th Cir. March 5, 2026).
In September 2021, the Cutchalls made a claim on their policy for interior water damage due to a hailstorm that breached their roof. Chubb retained two engineers to inspect the home, but neither found evidence that a hailstorm caused the damage. Instead, the engineers concluded a variety of other causes, such as poor ventilation and as-built defects, caused the damage. Because Chubb concluded that some of these other causes were covered by the policy, it paid only for the covered portions.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Insured General Contractor Prevails on Motion for Summary Judgment to Establish Builder’s Risk Coverage
July 06, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe general contractor’s motion for partial summary judgment successfully established that damage to footings in place before the policy period was covered after the collapse of a building. Big D Builders, Inc. v. Am Zurich Ins. Co., 2026 U.S. Dist. LEXIS 72012 (D. Idaho March 31, 2026).
Big D was the general contractor for building a new airplane hangar by erecting a 38,000 square foot structure. Before Big D began construction, the site of the hangar did not contain any pre-existing structures or buildings. Before completion of the hangar, it collapsed and caused extensive property damage.
The builder’s risk policy issued by Zurich covered certain aspects of the construction project for the policy period December 28, 2023, to December 28, 2024. Zurich accepted coverage for most of the damage but not for damage to footings and columns installed prior to the start date of the policy.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com