Insured’s Failure to Determine Depreciation When Presenting Claim for Replacement Cost Value
August 16, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe Third Circuit affirmed the district court’s granting of summary judgment to the insurer when the insured submitted replacement cost value of the loss but did not include a determination of depreciation. Kimmel v. Massachusetts Bay Ins. Co., 2026 U.S. App. LEXIS 16569 (3d Cir. June 9, 2026).
A lightning strike downed a tree on the insured’s property, causing extensive damage to the home. The insured had a homeowner’s policy with Massachusetts Bay Insurance Company (MBIC). MBIC denied the claim, determining that much of the claimed damage already existed and that several policy exclusions otherwise barred coverage. The insured filed suit for breach of contract and bad faith.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Wisconsin Supreme Court Finds Coverage Under Ensuing Loss Provisions
September 29, 2026 —
Tred R. Eyerly - Insurance Law HawaiiReversing the trial court’s grant of summary judgment to the insurer, the Wisconsin Supreme Court determined that genuine issues of material fact existed on whether ensuing losses as defined in the policy were covered. Cincinnati Ins. Co. v. Ropicky, 2026 Wisc. LEXIS 302 (Wis. July 7, 2026).
The insured suffered damage during a storm on May 11, 2018, when rainwater poured into the home. The insureds gave notice to their insurer, Cincinnati. Upon inspection, Cincinnati determined that water intrusion resulted from multiple construction defects in the home. In the front of the home, water entered through a gap in the stone veneer. The inspector also concluded that the damage from rainwater was not just from the May 11, 2018, storm, but damage had occurred from prior storm events.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Pulling the Plug, Preserving the Product: Protecting Rights to a Modular Subcontractor’s Work Post-Termination
June 08, 2026 —
Paul Williamson - ConsensusDocsVolumetric Modular Construction (VMC) is a building method where a structure is divided into large components or modules, fabricated in an offsite factory and then transported to a construction site for assembly.[
1] Proponents of VMC hail it as a cost-efficient alternative to traditional building methods that leads to more consistent quality and shorter construction duration.[
2] Due to a growing labor shortage, high demand for compressed project schedules, and stagnant construction productivity rates, the construction industry is embracing VMC.[
3] A recent report on the market size of prefabricated construction estimates that from 2026 to 2031, VMC will grow at a compound annual growth rate of 7.16% and become a 413.11-billion-dollar industry.[
4]
As VMC becomes more prevalent, owners, general contractors, and subcontractors must consider how to effectively contract for modular construction. One important consideration, which this article focuses on, is navigating termination of a modular subcontractor.
Read the full story...Reprinted courtesy of
Paul Williamson, Peckar & Abramson, P.C.Mr. Williamson may be contacted at
pwilliamson@pecklaw.com
What Is the Independent Tort Doctrine? New Case Explains…
August 24, 2026 —
David Adelstein - Florida Construction Legal UpdatesFlorida’s Sixth District Court of Appeals in Atout v. HHM Land Trust Dated October 29, 2013, 51 Fla.L.Weekly D1569a (Fla. 6th DCA 2026) recently included an extensive discussion on Florida’s independent tort doctrine. The independent tort doctrine is an important legal doctrine, particularly when parties are in contractual privity. This doctrine stands for the proposition that tort claims must be independent of any breach of contract. See Atout, supra. The Sixth District’s extensive discussion analyzed the indicators to determine this “independence,” which may arise from the source of the duty, the asserted conduct, the damages sought, or even public policy:
Unlike claims that rely on contractual relationships, an “independent” tort is often characterized by a duty imposed by law rather than by agreement. As to this consideration, United States District Court Judge Steven Merryday has explained that the independent tort doctrine honors the same divide as the economic loss rule, but rather than looking at the nature of the loss, it focuses on the source of the duty allegedly breached. “If a contract imposes a duty, and the defendant breaches that duty, the plaintiff must sue for breach of contract. If society imposes the duty, the plaintiff must sue in tort.” Following this reasoning, courts should consider whether the alleged breach of a duty in tort coincides or overlaps with a duty imposed by a contract. If the duty at issue is within the scope of a contract, and the relationship of the parties that led to the creation of that duty stems from a contract, then that duty’s source is from contract and any alleged tort claims based on a breach of those duties may not be “independent.”
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
From Dark Data to Building Intelligence
July 13, 2026 —
Aarni Heiskanen - AEC BusinessIn this episode, I talk with Mark Sorsa-Leslie, founder and CEO of
Auttaa AI, whose team just won first place in Luotea’s inaugural hackathon in Helsinki for turning property maintenance from reactive firefighting into proactive forecasting with AI. Mark is a chartered surveyor with 30 years of real estate data experience, previously the founder of the UK sensor company Beringar.
We discuss why so much building data stays dark and siloed, from outdated networking technology to the shortage of people who understand both engineering and property. Mark explains how Auttaa bridges real-time building data with large language models, using what he calls an “influence graph” to surface correlations and causation across previously disconnected systems, such as linking occupancy patterns to CO2 readings to diagnose ventilation problems in minutes rather than days.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
PJM’s Reliability Backstop Procurement Proposal—Fast-Track Capacity to Meet Rising Large-Load Demand
May 12, 2026 —
Stephen J. Humes, Alicia M. McKnight, Jason Drogin Atwood & Andrew H. Jacobs - Gravel2GavelIn January, we discussed the Statement of Principles jointly signed by the National Energy Dominance Council and governors across the mid-Atlantic region—framing accelerating demand (especially from large-scale data centers) as an emergency reliability issue for PJM Interconnection, L.L.C. (PJM), the nation’s largest power grid operator. That policy signal is now becoming a near-term, accelerated procurement and contracting exercise. On April 8, 2026, PJM notified stakeholders of a critical issue fast path reliability backstop procurement process. PJM subsequently released a request for information (RFI) with respect to a proposed Reliability Backstop Procurement (RBP)—a one-time mechanism intended to attract significant new capacity to address projected reliability shortfalls driven by large-load growth.
RBP compresses what is often a multiyear market and regulatory conversation into a fast-moving set of commercial choices. Developers, large loads, utilities and capital providers should be preparing now for (i) an accelerated bilateral contracting window and (ii) a standardized PJM-led backstop procurement if bilateral deals do not clear enough capacity.
Reprinted courtesy of
Stephen J. Humes, Pillsbury,
Alicia M. McKnight, Pillsbury,
Jason Drogin Atwood, Pillsbury and
Andrew H. Jacobs, Pillsbury
Mr. Humes may be contacted at stephen.humes@pillsburylaw.com
Ms. McKnight may be contacted at alicia.mcknight@pillsburylaw.com
Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com
Mr. Jacobs may be contacted at andrew.jacobs@pillsburylaw.com
Read the full story...
GRSM Secures Illinois Appellate Victory for Architectural Firm in Implied Warranty Dispute
May 14, 2026 —
Gordon Rees Scully MansukhaniGordon Rees Scully Mansukhani Partner Jonathan Federman, Partner Thomas Cronin, and Senior Counsel Garrett Lee recently secured a victory in the Illinois Appellate Court, Fifth District, on behalf of the firm’s client, an architectural firm, in a liability dispute.
The case arose following an entity’s purchase of a 111-unit building for use as an investment or rental property. The plaintiff made claims against the architect of the building, alleging that there were design defects that breached an implied warranty, as well as a negligence claim.
GRSM argued that an architect could not be liable for implied warranties, particularly for an implied warranty which no Illinois court has ever recognized. GRSM further argued that Illinois law bars an architect from liability for negligence arising from a duty pursuant to contract under the economic loss doctrine.
Read the full story...Reprinted courtesy of
Gordon Rees Scully Mansukhani
Federal Bid Protest Standard of Review and Disparate Treatment with Ratings
August 16, 2026 —
David Adelstein - Florida Construction Legal UpdatesA recent decision out of the Federal Claims Court explains the post-award bid protest standard of review.
In Massman Construction Co. v. U.S., 2026 WL 1971985 (Fed.Cl. 2026), a protestor brought a post-award bid protest after the Army Corps of Engineers awarded the contract to another contractor. The protestor argued that the Army Corps (government) acted irrational in its evaluation through disparate treatment. The Court of Federal Claims agreed and remanded for the Army Corps to “either justify this disparity or explain why [awardee’s] lower-priced, but technically inferior proposal provides the best value to the government.” Massman Construction, supra at *1.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com