GRSM Attorneys Recognized in The Best Lawyers in America® 2027
August 24, 2026 —
Gordon Rees Scully MansukhaniGordon Rees Scully Mansukhani is pleased to announce that 183 of its attorneys were listed in The Best Lawyers in America© 2027 Edition, six of whom received “Lawyer of the Year” recognitions. Additionally, 49 GRSM attorneys were recognized in Best Lawyers: Ones to Watch 2027.
Best Lawyers lists are compiled based on peer-review evaluations. For the 2027 edition of The Best Lawyers in America®, results were determined using millions of confidential attorney evaluations. Ones to Watch adopts the same peer-review methodology.
Read the full story...Reprinted courtesy of
Gordon Rees Scully Mansukhani
Beyond the Storm: How Non-Hurricane Catastrophes Expose Florida’s Construction Defect Blind Spot
August 11, 2026 —
Franchesco “Frank” Soto & Amanda L. Gonzalez - Ball JanikOn June 8, 2026, a magnitude 6.1 earthquake struck the Gulf near the coast of Cuba, the largest instrumentally recorded earthquake in the Gulf since seismic monitoring began in 1950. Buildings swayed, offices were evacuated, and many residents along the east coast of Florida, from Miami-Dade to Jacksonville, felt the ground shake. Although no tsunami followed and reported structural damage was limited, this event exposed a blind spot that Florida property owners, developers, and their counsel cannot afford to ignore: catastrophic stress on Florida buildings does not always come in the form of a named storm.
Florida property owners have grown accustomed to preparing for wind, storm surge, floods, and torrential rain. Far less attention is paid to earthquakes, sinkholes, tornadoes, hail, and non-tropical flooding, each of which can place unexpected stress on buildings not designed with those forces top of mind and can trigger deficiencies in buildings that were not otherwise known, expose design failures, and create an urgency for both insurance claims and subsequent litigation.
Non-Hurricane Triggers of Latent Defects
Seismic activity is the clearest example. Florida’s building code accounts for wind loads, not seismic forces, meaning even a moderate earthquake can reveal weaknesses in curtain wall systems, structural connections, or foundations that were already marginal. Sinkholes, driven by Florida’s karst limestone geology, remain a persistent threat, particularly in Central Florida, where subsurface voids can undermine foundations without warning. Non-tropical flooding, like the record rainfall that flooded South Florida in June 2024, can intrude through building envelopes and waterproofing systems that were never stress-tested for such volumes of water. Tornadoes and hail, while more localized, can cause roofing and envelope failures that mimic, mask, or trigger latent construction defects.
The Litigation and Coverage Disputes That Follow
When one of these events strikes a building already carrying undisclosed or unresolved construction defects, the resulting disputes become considerably more complex. Property owners and associations must move quickly to document existing conditions and distinguish damage caused by the event from pre-existing defective construction, the same causation issue that arises in the hurricane context under Chapter 558, but often without the benefit of established precedent or adjuster experience with these less common events.
Insurance coverage disputes frequently follow close behind. Carriers may dispute whether an earthquake, flood, or other peril is covered at all, particularly where policies contain earthquake or flood exclusions requiring separate endorsements, or anti-concurrent causation language that can bar coverage entirely when a covered peril combines with an uncovered one, such as pre-existing defective construction, to cause a loss. Sinkhole claims carry their own statutory framework under Florida law, requiring specific testing protocols and reporting before a claim is compensable. Developers and contractors, in turn, may find themselves defending Chapter 558 claims while simultaneously litigating with their own carriers over defense and indemnity obligations.
Practical Risk Mitigation Strategies
Property owners, associations, and developers can take several concrete steps to reduce their exposure. First, maintain thorough documentation, including engineering reports, maintenance logs, and photographs, well before any event occurs. This documentation is often the deciding factor in causation disputes. Second, engage structural engineers and consultants immediately following any seismic event, unusual flooding, or storm damage, regardless of whether a hurricane is involved. Prompt inspection preserves evidence and can help prevent inadvertent waiver of construction defect claims. Third, review insurance policies regularly with counsel or a broker to confirm earthquake, flood, and sinkhole coverage matches the property’s actual risk profile, rather than assuming a standard property policy responds to every peril. Fourth, avoid rushing to remediate before conditions are documented and/or before consulting counsel. Well-intentioned repairs can inadvertently compromise evidence needed to prove a defect claim.
The June earthquake was a reminder that Florida’s catastrophic risk profile extends beyond hurricane season. Property owners, associations, and developers who build readiness plans around all forms of catastrophic stress, not just named storms, will be far better positioned when the next unexpected event occurs.
Franchesco “Frank” Soto is a partner in
Ball Janik’s Construction Defect Practice Group in Miami. He may be reached at fsoto@balljanik.com.
Amanda L. Gonzalez is a litigation attorney in
Ball Janik’s Construction Defect Practice Group in Miami. She may be reached at agonzalez@balljanik.com.
Humanoid Robots in Construction: The Reality Right Now
October 12, 2026 —
Aarni Heiskanen - AEC BusinessHumanoid robots are getting a lot of media attention. Videos of robots doing backflips and kung fu moves suggest that a general-purpose machine worker is just around the corner. A recent visit by the Finnish technology magazine
Tekniikka&Talous to crane manufacturer
Konecranes offers a more sober picture. I think it is a useful reality check for anyone in the AEC industry wondering what humanoids can actually do today.
What a Humanoid Can Do in a Controlled Environment
Konecranes bought a
Unitree G1 EDU humanoid in autumn 2025, likely as the first Finnish industrial company to do so. With separately purchased five-finger hands and other extras, the price came close to €100,000.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Course of Construction Exclusions and the CGL Policy
July 20, 2026 —
Anna M. Perry, Rachel S. Kindseth & Nina Catanzaro - Saxe Doernberger & Vita, P.C.I. Course of Construction Exclusions
Course of Construction (“COC”) exclusions are found on General Liability and excess liability policies, typically a wrap-up or project specific policy, and generally exclude “all property damage occurring during the course of construction.” Insurers claim COC exclusions are not problematic because they are intended to prevent an overlap in coverage between the general liability policy and first-party property Builder’s Risk policy. However, because General Liability policies and Builder’s Risk policies provide coverage for different risks, COC exclusions can create a gap in coverage for owners and contractors. Therefore, any exclusion on a wrap-up or project specific policy that limits coverage for property damage liability should be scrutinized, and amendments sought when warranted and commercially achievable, for owners, developers and contractors because General Liability policies do not cover the same risk as that of a Builder’s Risk policy.
General liability policies provide defense and indemnity to the insured(s) for claims made by a third-party against the insured. Broad COC exclusions serve to preclude coverage for all property damage, not just property damage to the insured project. This includes property damage to property other than the insured project, e.g. an adjacent property. On the other hand, Builder’s Risk policies provide first-party property coverage for direct physical loss to the project during the course of construction. The Builder’s Risk policy will not provide coverage for property other than the project itself (e.g., adjacent property) and it will not provide a defense or indemnity in the event the owner of the damaged property brings a claim against a potentially at-fault party.
Reprinted courtesy of
Anna M. Perry, Saxe Doernberger & Vita, P.C.,
Rachel S. Kindseth, Saxe Doernberger & Vita, P.C. and
Nina Catanzaro, Saxe Doernberger & Vita, P.C.
Ms. Perry may be contacted at APerry@sdvlaw.com
Ms. Kindseth may be contacted at rkindseth@sdvlaw.com
Ms. Catanzaro may be contacted at NCatanzaro@sdvlaw.com
Read the full story...
SB 342 Eliminates the “All-or-Nothing” Rule Under Dreaded Business and Professions Code Section 7031
November 02, 2026 —
Garret D. Murai - California Construction Law BlogMost California contractors are aware of dreaded Business and Professions Code section 7031 which has been described even by courts – who typically veer away from ascribing judgment to legislation – as being “harsh[ ],” “draconian” and “unjust.”
For those less familiar with Section 7031, the statute provides two remedies, described as a shield and a sword, against unlicensed contractors who perform work requiring a license. The first, the “shield” also referred to as the “claim preclusion” provision, precludes unlicensed contractors from suing for payment when performing work requiring a license. The second, the “sword” also referred to as the “disgorgement” provision, allows a property owner to sue an unlicensed contractor for disgorgement of all money paid to the unlicensed contractor.
Read the full story...Reprinted courtesy of
Garret D. Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Federal Court Highlights the Strategic Value of Additional Insured Coverage
June 22, 2026 —
Michael S. Levine - Hunton Insurance Recovery BlogA recent decision from the District of Maryland underscores a recurring—but often underutilized—opportunity for policyholders: securing and enforcing additional insured coverage under another party’s liability policy. In Charter Oak Fire Insurance Co. v. Builders Premier Insurance Co., the court held that an equipment lessor qualified as an additional insured under the lessee’s policy and was entitled to a primary defense.
The decision is a useful reminder that additional insured coverage can fundamentally shift defense obligations and materially reduce a policyholder’s exposure. We build on the decision to highlight the practical steps policyholders should take to ensure that all potentially available insurance is identified and pursued.
Read the full story...Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth LLPMr. Levine may be contacted at
mlevine@hunton.com
New York Construction: New Rules for Reporting and Cancellation Pay
October 12, 2026 —
Meghan Douris & Howard Wexler - The Construction SeytEffective December 8, 2026, covered New York construction employers generally must provide up to four hours of reporting pay when an employee reports for a scheduled shift but receives no work, and two hours of pay when a scheduled shift is canceled with less than 12 hours’ notice. Separate requirements apply to certain prevailing-wage construction projects. Before the law takes effect, contractors should identify which projects and employees are covered and make sure their scheduling, payroll, labor, and contract practices are ready.
What the New Law Requires
New York’s Construction Reporting Pay Act introduces two principal compensation requirements for covered construction employees:
- Reporting pay: An employee who reports for a scheduled shift but is not provided work generally must receive up to four hours of pay.
- Shift-cancellation pay: An employee generally must receive two hours of pay when a scheduled shift is canceled with less than 12 hours’ notice.
Reprinted courtesy of
Meghan Douris, Seyfarth and
Howard Wexler, Seyfarth
Ms. Douris may be contacted at mdouris@seyfarth.com
Mr. Wexler may be contacted at hwexler@seyfarth.com
Read the full story...
ACEC Supports BUILD America 250 Act as Important First Step on Surface Reauthorization
May 26, 2026 —
The American Council of Engineering CompaniesWASHINGTON -- The American Council of Engineering Companies (ACEC), the business voice of America’s engineering and design services industry released the following statement on the BUILD America 250 Act:
"Chairman Graves and Ranking Member Larsen have taken an important bipartisan step toward reauthorizing the federal surface transportation programs that are critical to economic growth in every state. The BUILD America 250 Act provides five years of stability in funding road and transit projects, raises new revenues to address the solvency of the Highway Trust Fund, and includes meaningful provisions to strengthen project delivery, advance digital infrastructure, and improve the contracting framework that engineering firms rely on every day. ACEC will continue to advocate for investment levels that keep pace with the country's growing infrastructure needs, and we urge the Committee to keep this process moving forward."
The American Council of Engineering Companies (ACEC) is the business association of America’s engineering industry, representing more than 5,500 independent engineering firms and more than 650,000 professionals throughout the United States engaged in the development of America’s transportation, water, and energy infrastructure, along with environmental, industrial, and other public and private facilities. Founded in 1906 and headquartered in Washington, D.C., ACEC is a national federation of 51 state and regional organizations.