Pulling the Plug, Preserving the Product: Protecting Rights to a Modular Subcontractor’s Work Post-Termination
June 08, 2026 —
Paul Williamson - ConsensusDocsVolumetric Modular Construction (VMC) is a building method where a structure is divided into large components or modules, fabricated in an offsite factory and then transported to a construction site for assembly.[
1] Proponents of VMC hail it as a cost-efficient alternative to traditional building methods that leads to more consistent quality and shorter construction duration.[
2] Due to a growing labor shortage, high demand for compressed project schedules, and stagnant construction productivity rates, the construction industry is embracing VMC.[
3] A recent report on the market size of prefabricated construction estimates that from 2026 to 2031, VMC will grow at a compound annual growth rate of 7.16% and become a 413.11-billion-dollar industry.[
4]
As VMC becomes more prevalent, owners, general contractors, and subcontractors must consider how to effectively contract for modular construction. One important consideration, which this article focuses on, is navigating termination of a modular subcontractor.
Read the full story...Reprinted courtesy of
Paul Williamson, Peckar & Abramson, P.C.Mr. Williamson may be contacted at
pwilliamson@pecklaw.com
Achieving Sustainability Through Design-Build Delivery: Part I – An Overview
September 21, 2026 —
Joshua M. Pruett, Jennifer L. Harris & Tiffany A. Harrod - Peckar & Abramson, P.C.This article was written for the AGC’s Law in Brief and first appeared here.
Sustainability is no longer optional. What was once a matter of public policy or corporate preference has become a regulatory mandate and is reshaping how construction projects are designed, built, and operated. This mandate is not solely figurative. Rather, states have started to follow Europe’s lead by beginning to codify sustainability requirements into regulations and law. California led the charge by adding mandatory embodied-carbon emissions regulations into CALGreen, and other states, such as New York, have introduced bills to implement similar requirements. Owners, designers, and builders must now treat sustainability not as aspirational, but as a clearly defined contract issue from the outset, particularly where the project is expected to achieve a third-party rating, meet energy or resiliency targets, qualify for incentives, or comply with evolving green building codes.
In the federal public sector, construction contracts include a layered compliance framework—executive order-inspired policy, FAR-mandated clauses, and enduring statutory requirements—requiring contractors to integrate sustainability into design, material selection, and lifecycle management. Staying ahead means aligning with regulatory standards, conducting life-cycle cost analyses, and embedding sustainability into every procurement and construction decision.
Reprinted courtesy of
Joshua M. Pruett, Peckar & Abramson, P.C.,
Jennifer L. Harris, Peckar & Abramson, P.C. and
Tiffany A. Harrod, Peckar & Abramson, P.C.
Mr. Pruett may be contacted at jpruett@pecklaw.com
Ms. Harris may be contacted at jharris@pecklaw.com
Ms. Harrod may be contacted at tharrod@pecklaw.com
Read the full story...
Turning Expert Services into Products
July 20, 2026 —
Aarni Heiskanen - AEC BusinessA Finnish engineering, architecture, and project consulting company, AINS Group, recently opened an online store to purchase fixed-price services. The store presents specialist work in a product-like format, with fixed service names, defined scopes, and visible prices, such as a building history report, a zoning plan cost analysis, and a technical preliminary survey for a property transaction.
Is this productization a smart move or a sign that expert services are being commoditized?
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Properly Taking Judicial Notice of Florida’s Building Code
October 12, 2026 —
David Adelstein - Florida Construction Legal UpdatesMany construction defects cases involve Florida’s Building Code. A recent non-construction case, BSREP II PBG Resort, LLC v Ginsburg, 2026 WL 265226 (Fla. 4th DCA 2026), discussed a court taking judicial notice of a provision in the Florida Building Code. This case was a premise liability case where the plaintiff tripped in an asphalt parking lot. The plaintiff, without complying with proper procedural notice protocol, asked the court to take judicial notice of a section of Florida’s Building Code, i.e., admitting this section as relevant evidence in the case. The trial court granted the request for judicial notice and the plaintiff used this as the basis of her cross-examination, the jury instructions, and closing argument that the violation of this section of Florida’s Building Code was evidence of negligence. This was in error.
First, Florida’s Building Code is NOT a statute but an administrative rule. Ginsburg, supra. As an administrative rule, a court “may” but is not obligated to take judicial notice of the rule – it is a permissive judicial notice request per Florida Statute s. 90.203 and 90.202(9). This is important because the trial court viewed Florida’s Building Code as a statute it mandatorily had to take judicial notice of per Florida Statute s. 90.201, which was in error. Because it was permissive, the plaintiff needed to comply with statutory procedural notice protocols, which the plaintiff failed to do.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
GRSM Ranked Among Top 5 Construction Law Firms by Construction Executive
September 21, 2026 —
Gordon Rees Scully MansukhaniGordon Rees Scully Mansukhani has been ranked the No. 5 construction law firm in the nation by Construction Executive in the magazine’s 2026 ranking of The Top 50 Construction Law Firms™.
“Being named in the top five underscores the talent, experience, and nationwide capabilities of our construction team,” said Allen Estes III and Angela Richie, Chairs of GRSM’s Construction practice. “We are honored to serve as trusted counsel to clients across the construction industry and remain committed to delivering strategic solutions that help them achieve their business and project objectives.”
In addition to this ranking, GRSM Construction practice group Co-Chairs Allen Estes and Angela Richie were featured in “Executive Insights 2026: Leaders in Construction Law,” where they shared insights on key risks to consider before signing construction contracts and discussed strategies for managing material cost volatility, supply-chain disruptions, and project delays.
Read the full story...Reprinted courtesy of
Gordon Rees Scully Mansukhani
Insufficient Notice of Commencement and Construction Lien Rights
August 03, 2026 —
David Adelstein - Florida Construction Legal UpdatesWhen a party is preserving their construction lien rights, the party will look to the recorded Notice of Commencement. This is the recorded document that provides the lienor with the information for purposes of preserving construction lien rights. A Notice to Owner company will typically rely on the Notice of Commencement to serve Notices to Owners from lower tiers not in contract with the owner. However, when it comes to preparing the lien, a lienor should look beyond just the Notice of Commencement and also look to the property appraiser’s website as a backstop.
In a recent case, a window company had the homeowner sign the Notice of Commencement and then filled in the information. The company naturally did this for the convenience of the homeowner that probably was unfamiliar with the Notice of Commencement process. Regardless, information in the Notice of Commencement was inaccurate. It failed to include all the real property owners. Thus, when a payment dispute arose and a construction lien was prepared, it did not identify all of the real property owners. All of the real property owners were added later during the pendency of a lien foreclosure lawsuit. The trial court denied the lien because of the defective / insufficient Notice of Commencement — the lienor assumed the risk of error by filling out the information in the Notice of Commencement. The trial court further denied the lien holding that because the work did not commence within 90 days of the Notice of Commencement, the Notice of Commencement is void.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
The ROI of Estimating Accuracy in Preconstruction
September 15, 2026 —
Aaron Kivett - Construction ExecutivePrecision is the foundation of profitability in construction. Even minor quantity or pricing mistakes can swing bids anywhere from 5-15%, leading to project delays, unprofitable jobs or margin erosion through change orders. And worse, these losses can damage client trust and jeopardize long-term relationships that drive repeat business and future bids. Consistently
estimating accurately builds confidence, speeds up bidding and positions your company to win more profitable projects.
Estimating accuracy is where profit is either protected or lost. In construction, you make your biggest financial decisions before a project ever starts. Once a bid is won, most of the project’s cost structure is locked in. If the estimate is wrong, no amount of execution can fully fix those mistakes. That makes estimating accuracy a business issue, not just an operations issue.
Reprinted courtesy of
Aaron Kivett, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
Insured General Contractor Prevails on Motion for Summary Judgment to Establish Builder’s Risk Coverage
July 06, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe general contractor’s motion for partial summary judgment successfully established that damage to footings in place before the policy period was covered after the collapse of a building. Big D Builders, Inc. v. Am Zurich Ins. Co., 2026 U.S. Dist. LEXIS 72012 (D. Idaho March 31, 2026).
Big D was the general contractor for building a new airplane hangar by erecting a 38,000 square foot structure. Before Big D began construction, the site of the hangar did not contain any pre-existing structures or buildings. Before completion of the hangar, it collapsed and caused extensive property damage.
The builder’s risk policy issued by Zurich covered certain aspects of the construction project for the policy period December 28, 2023, to December 28, 2024. Zurich accepted coverage for most of the damage but not for damage to footings and columns installed prior to the start date of the policy.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at