BERT HOWE
  • Nationwide: (800) 482-1822    
    mid-rise construction expert witness Dodgeville Wisconsin office building expert witness Dodgeville Wisconsin condominiums expert witness Dodgeville Wisconsin structural steel construction expert witness Dodgeville Wisconsin casino resort expert witness Dodgeville Wisconsin concrete tilt-up expert witness Dodgeville Wisconsin parking structure expert witness Dodgeville Wisconsin Subterranean parking expert witness Dodgeville Wisconsin custom home expert witness Dodgeville Wisconsin hospital construction expert witness Dodgeville Wisconsin landscaping construction expert witness Dodgeville Wisconsin high-rise construction expert witness Dodgeville Wisconsin institutional building expert witness Dodgeville Wisconsin housing expert witness Dodgeville Wisconsin Medical building expert witness Dodgeville Wisconsin townhome construction expert witness Dodgeville Wisconsin custom homes expert witness Dodgeville Wisconsin low-income housing expert witness Dodgeville Wisconsin production housing expert witness Dodgeville Wisconsin tract home expert witness Dodgeville Wisconsin condominium expert witness Dodgeville Wisconsin industrial building expert witness Dodgeville Wisconsin
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Dodgeville, Wisconsin

    Wisconsin Builders Right To Repair Current Law Summary:

    Current Law Summary: SB448 specifies 90 day notice with details and evidence prior to commencing legal action. It provides for a 15 day written response from contractor or 25 days if cross-claims against subcontractors; The law states “The claimant and contractor or supplier are bound by any contractor or supplier warranty terms pertaining to products or services supplied for the dwelling.”


    Construction Expert Witness Contractors Licensing
    Guidelines Dodgeville Wisconsin

    Contractors are required to have the correct credentials for their trade. Not all classifications require credentialing. For a list of credentials, see the website.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Madison Area Builders Association
    Local # 5132
    5936 Seminole Centre Ct
    Madison, WI 53711
    http://www.maba.org

    Metro Builders Association of Gr Milwaukee
    Local # 5148
    N16 W23321 Stoneridge Dr
    Waukesha, WI 53188
    http://www.mbaonline.org

    Wisconsin Builders Association (State)
    Local # 5100
    4868 High Crossing Blvd
    Madison, WI 53704
    http://www.wisbuild.org

    Lakeland Builders Association
    Local # 5128
    1560 N Country Club Pkwy
    Elkhorn, WI 53121
    http://www.lakelandba.com

    Racine-Kenosha Builders Association
    Local # 5156
    PO Box 706
    Sturtevant, WI 53177
    http://www.rkbabuilders.com

    South Central Wisconsin Builders Association
    Local # 5140
    PO Box 563
    Janesville, WI 53547
    http://www.scwbaonline.com

    South West Wisconsin Home Builders Association
    Local # 5142
    703 19th St PO Box 521
    Monroe, WI 53566



    Construction Expert Witness News and Information
    For Dodgeville Wisconsin

    Cross-Office Team Secures Summary Judgment Win in Negligence Action with $2M Demand

    Constructive Changes – A Primer

    The EEOC Is Actively Targeting the Construction Industry

    Traub Lieberman Attorneys Recognized as 2024 New York – Metro Super Lawyers®

    Newmeyer Dillion Attorneys Named to 2022 Southern California Rising Stars List

    Maybe California Actually Does Have Enough Water

    Contractors Should be Aware of Homeowner Duties When Invited to Perform Residential Work

    Insureds' Claim for Flood Damage is Time-Barred

    Contractor Walks Off Job. What are the Owner’s Damages?

    Coverage for Construction Defects Barred By Exclusion j (5)

    Best Lawyers Honors Hundreds of Lewis Brisbois Attorneys, Names Four Partners ‘Lawyers of the Year’

    Biden's Next 100 Days: Major Impacts Expected for the Construction Industry

    NYC Luxury-Condo Buyers Await New Towers as Sales Slow

    25 Days After Explosion, Another Utility Shuts Off Gas in Boston Area

    In Contracts, One Word Makes All the Difference

    Noteworthy Construction Defect Cases for 1st Qtr 2014

    Catch 22: “If You’re Moving Dirt, You Need to Control Your Dust” (But Don’t Use Potable Water!)

    Traub Lieberman Partner Lisa M. Rolle Obtains Summary Judgment in Favor of Defendant

    L.A. Mixes Grit With Glitz in Downtown Revamp: Cities

    Ambiguity in Pennsylvania’s Statute of Repose Finally Cleared up by Superior Court

    Presidential Executive Order 14008: The Climate Crisis Order

    Business Solutions Alert: Homeowners' Complaint for Breach of Loan Modification Agreement Can Proceed Past Pleading Stage

    Montana Federal District Court Finds for Insurer in Pollution Coverage Dispute

    Illinois Supreme Court Rules Labor Costs Not Depreciated to Determine Actual Cash Value

    Application of Ordinance and Law Coverage in Property Insurance Policy and Twenty-Five Percent Rule

    Hawaii Bill Preserves Insurance Coverage in Lava Zones

    Miller Wagers Gundlach’s Bearish Housing Position Loses

    'Right to Repair' and Fixing Equipment in a Digital Age

    Illinois Court Addresses Level of Evidence Necessary to Prevent Summary Judgment in Hail Damage Claim

    Do Hurricane-Prone Coastal States Need to Update their Building Codes?

    Insured's Jury Verdict Reversed After Improper Trial Tactics

    Billionaire Behind Victoria’s Secret Built His Version of the American Heartland

    Additional Dismissals of COVID Business Interruption, Civil Authority Claims

    Brazil's Detained Industry Captain Says No Plea Deals Coming

    Helsinki is Building a Digital Twin of the City

    Construction Defect Scam Tied to Organized Crime?

    Insurers Subrogating in Arkansas Must Expend Energy to Prove That Their Insureds Have Been Made Whole

    Firm Pays $8.4M to Settle Hurricane Restoration Contract Case

    City Council Authorizes Settlement of Basement Flooding Cases

    Introducing the Updated 2026 Pillsbury Guide to Data Centers

    Differing Site Conditions: What to Expect from the Court When You Encounter the Unexpected

    Sixth Circuit Rejects Claim for Reverse Bad Faith

    Insured Cannot Sue to Challenge Binding Appraisal Decision

    Locating Construction Equipment with IoT and Mobile Technology

    Thanks for My 6th Year Running as a Construction Litigation Super Lawyer

    California Contractor License Bonds to Increase in 2016

    Designing the Process to Deliver Zero-Carbon Construction – Computational Design in Practice

    Home Building on the Upswing in Bakersfield

    Natural Hydrogen May Seem New in Town, but It’s Been Here All Along

    What You Say...
    Corporate Profile

    DODGEVILLE WISCONSIN CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through over 4500 construction and design related expert designations, the Dodgeville, Wisconsin Construction Expert Directory provides a wide range of trial support and construction consulting services to builders and construction claims professionals concerned with construction defect, scheduling, and delay matters. BHA provides construction claims investigation and expert services to the industry's leading construction practice groups, Fortune 500 builders, insurers, owners, as well as a variety of public entities. Utilizing in house assets which include testifying architects, design engineers, construction cost and standard of care experts, the firm brings national experience and local capabilities to Dodgeville region.

    Dodgeville Wisconsin construction claims expert witnessDodgeville Wisconsin construction scheduling expert witnessDodgeville Wisconsin construction scheduling and change order evaluation expert witnessDodgeville Wisconsin architecture expert witnessDodgeville Wisconsin architectural engineering expert witnessDodgeville Wisconsin eifs expert witnessDodgeville Wisconsin slope failure expert witness
    Construction Expert Witness News & Info
    Dodgeville, Wisconsin

    Engineering Seals Versus Contracts ‘Under Seal’ (Two Very Different Things)

    May 05, 2026 —
    Recently, I was asked by a reader to explain the difference between a document that is ‘sealed’ by an engineer (or architect) and one that is signed ‘under seal’. This question prompted this post, as others may also be wondering about the distinction. [Hi Ed! Thanks for your question] Professionals have ‘seals’ that show that they are registered (Engineers) or licensed (Architects). As most of you likely know, your professional seal is something that is hard won and which is used when—and only when—your plans were made by you or someone under your direct supervisory control. Your signature represents that you were in responsible control over the documents, and that they have met the required professional standard of care. (21 NC Admin Code 2-0206 (a)(11)). Read the full story...
    Reprinted courtesy of Melissa Dewey Brumback, Ragsdale Liggett PLLC
    Ms. Brumback may be contacted at mbrumback@rl-law.com

    Michael C. Zisa and Phillip Boldt Co-Author D.C. Chapter of “50-State Guide to Electronic Execution of the General Agreement of Indemnity”

    October 06, 2026 —
    Michael C. Zisa, Co-Managing Partner of P&A’s Washington, D.C. office, Chair of the Surety and Construction Related Insurance Defense practice, and Co-Chair of the Crisis Management team, and Phillip Boldt, an Associate in P&A’s Washington, D.C. office, have co-authored the District of Columbia chapter of the American Bar Association (ABA) Fidelity and Surety Law Committee and The Surety & Fidelity Association of America’s (SFAA), “50-State Guide to Electronic Execution of the General Agreement of Indemnity.” Reprinted courtesy of Michael C. Zisa, Peckar & Abramson, P.C. and Phillip Boldt, Peckar & Abramson, P.C. Mr. Zisa may be contacted at mzisa@pecklaw.com Mr. Boldt may be contacted at pboldt@pecklaw.com Read the full story...

    Federal Court Strikes Down New York’s Climate Superfund Act: What It Means for the “Polluter Pays” Movement

    September 28, 2026 —
    A federal judge in the Northern District of New York has struck down New York’s Climate Change Superfund Act, ruling that the “polluter pays” climate law is preempted by federal law and “simply beyond the limits of state law.” The court concluded that the Clean Air Act (CAA) does not authorize New York’s compensation scheme, which calculates liability based on greenhouse gas (GHG) emissions attributable to worldwide fossil fuel extraction and refining. It separately held that any cost-recovery demand against a foreign producer would be preempted under the constitutional foreign affairs doctrine, which limits state intrusion into matters committed predominantly to the federal government. The court directed the parties to file a status report by September 14, leaving the form of further relief unresolved. In practical terms, the court has decided that the Act is preempted and cannot be enforced but has not yet determined the precise terms of its final order, including whether to formally enjoin its enforcement. The decision in West Virginia v. James, Case No. 1:25-cv-00168 (N.D.N.Y. Aug. 31, 2026), issued by Chief U.S. District Judge Brenda K. Sannes, who was appointed by President Obama, marks the first judicial invalidation of a state climate superfund statute and carries significant implications for the climate superfund landscape and the three remaining lawsuits challenging these laws. Reprinted courtesy of Amanda G. Halter, Pillsbury, Ashleigh K. Myers, Pillsbury and Jillian Marullo, Pillsbury Ms. Halter may be contacted at amanda.halter@pillsburylaw.com Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com Read the full story...

    Late Notice Bars Insured’s Claim for Water Leak Damage

    August 11, 2026 —
    The federal district court granted the insurer’s motion for summary judgment dismissing the insured’s claim due to late notice. Global Approach, Inc. v. Scottsdale Ins. Co., 2026 U.S. Dist. LEXIS 120183 (S. D. Fla. June 1, 2026). Global suffered water damage on September 3, 2021, which originated in the bathroom of one of its rental properties. Global reported the claim to its insurer, Scottsdale, on October 19, 2021. Prior to reporting the claim, Global hired a handyman to inspect the property and then demolished the damaged area and repaired the bathroom. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Court Rules Insurer AIG Can't Claw Back $50M Storm Payout From Turner

    October 20, 2026 —
    A Delaware court judge ruled earlier this month that insurer AIG cannot claw back $50 million from Turner Construction for two insurance claim payouts it has made to New York University's Langone Medical Center. The dispute relates to the 2012 flooding of the university's Manhattan hospital center during Superstorm Sandy in October 2012. Read the full story...
    Reprinted courtesy of Richard Korman, Engineering News-Record
    Mr. Korman may be contacted at kormanr@enr.com

    Anomaly in Adding a Third-Party Claimant to a Liability Insurance Coverage Dispute

    May 05, 2026 —
    In an insurance coverage lawsuit seeking declaratory relief, an insurer sued the third-party claimant. The insurer was seeking a declaration that there was no coverage, which naturally would impact the third-party claimant. The insured did not respond to the lawsuit and the insurer moved for a default judgment which was objected to by the third-party claimant. The trial court granted a final judgment in favor of the insurer, which prompted an appeal from the third-party claimant because the final judgment impacts its rights to coverage if it obtains a judgment against the insured. The appellate court reversed but please take a look at this Court’s discussion on the issue of an insurer adding a third-party claimant to a coverage lawsuit when then the third-party cannot pursue a direct claim against the insurer until it obtains a settlement or judgment against the insured. It presents an interesting argument and counter-point for a third-party claimant that is added to the coverage lawsuit which has implications if it obtains a judgment against the insured: This case involves an apparent anomaly in Florida law. It is well-established that third-party claimants injured by an insured’s negligence have a right as third-party beneficiaries to payment from the insured’s insurance proceeds. It is equally well-established that the third-party claimants’ rights in this regard do not accrue unless and until they obtain a verdict or settlement against the insured. A quick review of this law is helpful at this point. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Endorsement is Void Where Compliance is Impossible

    September 21, 2026 —
    The Sixth Circuit found that the insured’s loss of property due to fire was covered despite noncompliance with an endorsement requiring encompassing the property. 3371 Reading, LLC v. Liberty Mut Group, Inc., et al., 2026 U.S. App. LEXIS 19156 (6th Cir. June 29, 2026). The insured, 3371 Reading, owned a building undergoing renovation. After the structure burned down, 3371 Reading made a claim under its policy with Ohio Casualty Insurance Company. Ohio Casualty relied on an endorsement requiring fencing round the jobsite. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Project Labor Agreements: A New Bid Protest Forum Split

    May 14, 2026 —
    Advertisements often include a disclaimer: “individual results may vary.” Similarly, lawyers are notorious for saying “it depends.” The mandatory Project Labor Agreement (“PLA”) regulations have recently placed into context this adage as it applies to federal contract bid protests, with very different results depending on which forum – the Court of Federal Claims (“COFC”) versus the Government Accountability Office (“GAO”) – different contractors have selected to bring PLA bid protests. Over the last two years, over 30 protesters have successfully achieved removal of mandatory PLAs from large-scale federal construction contracts based on two landmark bid protest decisions issued by the COFC. Similar challenges to PLAs at the GAO, however, have not been successful in removing PLAs, highlighting an emerging trend that the COFC is often a more effective relief forum than GAO for government construction contractors. Reprinted courtesy of Dirk D. Haire, Burr & Forman LLP, David P.J. Timm, Burr & Forman LLP and Michael J. Brewer, Burr & Forman LLP Mr. Haire may be contacted at dhaire@burr.com Mr. Timm may be contacted at dtimm@burr.com Mr. Brewer may be contacted at mbrewer@burr.com Read the full story...