BERT HOWE
  • Nationwide: (800) 482-1822    
    concrete tilt-up expert witness Durand Wisconsin mid-rise construction expert witness Durand Wisconsin office building expert witness Durand Wisconsin structural steel construction expert witness Durand Wisconsin casino resort expert witness Durand Wisconsin institutional building expert witness Durand Wisconsin custom home expert witness Durand Wisconsin townhome construction expert witness Durand Wisconsin industrial building expert witness Durand Wisconsin retail construction expert witness Durand Wisconsin Subterranean parking expert witness Durand Wisconsin custom homes expert witness Durand Wisconsin tract home expert witness Durand Wisconsin condominium expert witness Durand Wisconsin hospital construction expert witness Durand Wisconsin production housing expert witness Durand Wisconsin landscaping construction expert witness Durand Wisconsin high-rise construction expert witness Durand Wisconsin condominiums expert witness Durand Wisconsin housing expert witness Durand Wisconsin low-income housing expert witness Durand Wisconsin multi family housing expert witness Durand Wisconsin
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Durand, Wisconsin

    Wisconsin Builders Right To Repair Current Law Summary:

    Current Law Summary: SB448 specifies 90 day notice with details and evidence prior to commencing legal action. It provides for a 15 day written response from contractor or 25 days if cross-claims against subcontractors; The law states “The claimant and contractor or supplier are bound by any contractor or supplier warranty terms pertaining to products or services supplied for the dwelling.”


    Construction Expert Witness Contractors Licensing
    Guidelines Durand Wisconsin

    Contractors are required to have the correct credentials for their trade. Not all classifications require credentialing. For a list of credentials, see the website.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Brown County Home Builders Association
    Local # 5124
    PO Box 13194 811 Packerland Drive
    Green Bay, WI 54307
    http://www.bchba.org

    Wolf River Builders Association
    Local # 5193
    PO Box 595
    Shawano, WI 54166


    Golden Sands Home Builders Association
    Local # 5118
    1001 Theater Dr
    Plover, WI 54467
    http://gshba.org

    Chippewa Valley Home Builders Association
    Local # 5104
    4319 Jeffers Rd Ste 200
    Eau Claire, WI 54703
    http://www.cvhomebuilders.com

    Door County Home Builders Association
    Local # 5103
    PO Box 112 4087
    Sturgeon Bay, WI 54235
    http://www.dchba.org

    St Croix Valley Home Builders Association
    Local # 5182
    1632 ROLLING HILLS LN
    River Falls, WI 54022
    http://www.scvhba.com

    Central Wisc Home Builders Association
    Local # 5180
    2135 8th Street S
    Wisconsin Rapids, WI 54494
    http://www.cwhba.com


    Construction Expert Witness News and Information
    For Durand Wisconsin

    Issues of Fact Prevent Insurer's Summary Judgment Motion in Collapse Case

    Denver Parking Garage Roof Collapses Crushing Vehicles

    Leaky Wells Spur Call for Stricter Rules on Gas Drilling

    Include Materials Price Escalation Clauses in Construction Clauses

    The Devil is in the Details: The Texas Construction Trust Fund Pitfalls Residential Remodelers (and General Contractors) Should Avoid

    A Couple of Mechanic’s Lien Bills in VA [UPDATED]

    GRSM Secures Illinois Appellate Victory for Architectural Firm in Implied Warranty Dispute

    Insurer Must Defend General Contractor

    Bridges Need More Attention

    High-Rise Design and Construction: Then, Now, and Next

    Hurricane Laura: Implications for Insurers in Louisiana

    Federal Court Reiterates Broad Duty to Defend in Additional Insured Cases

    Insurance Companies Score Win at Supreme Court

    2023 Executive Insights From Leaders in Construction Law

    A Court-Side Seat: Clean Air, Clean Water, Citizen Suits and the Summer of 2022

    Construction Up in Northern Ohio

    Ball Janik LLP Elevates Construction Litigation Attorneys Keegan A. Berry and Nicholas B. Vargo to Partner

    The One New Year’s Resolution You’ll Want to Keep if You’re Involved in Public Works Projects

    Gordon & Rees Ranks #5 in Top 50 Construction Law Firms in the Nation

    Failure to Allege Property Damage Within Policy Period Defeats Insured's Claim

    Home Numbers Remain Small While Homes Get Bigger

    Can an Owner Preemptively Avoid a Mechanics Lien?

    Construction Defect Claims are on the Rise Due to Pandemic-Related Issues

    A Court-Side Seat – Case Law Update (February 2022)

    Massachusetts Couple Seek to Recuse Judge in Construction Defect Case

    The National Labor Relations Board Joint Employer Standard is Vacated by the Eastern District of Texas

    Texas Enacts Landmark Restrictions on Foreign Land Ownership Under SB 17

    Buyer's Demolishing of Insured's Home Not Barred by Faulty Construction Exclusion

    Nancy Conrad Recognized in Lehigh Valley Business 2024 Power in Law List

    A Year After Fatal Genoa Viaduct Collapse, Replacement Takes Shape

    Exact Dates Not Needed for Construction Defect Insurance Claim

    Replacing Coal Plants with Renewables Is Cheaper 80% of the Time

    Port Authority Revises Plans for $10B Midtown NYC Bus Terminal Replacement

    How Berlin’s Futuristic Airport Became a $6 Billion Embarrassment

    South Dakota Supreme Court Holds That Faulty Workmanship Constitutes an “Occurrence”

    Will COVID-19 Permanently Shift the Balance between Work from Home and the Workplace?

    Quick Note: Insurer Must Comply with Florida’s Claims Administration Act

    Meet Daniel Hall, Assistant Professor at TU Delft

    Another Guilty Plea in Las Vegas HOA Scandal

    Carbon Monoxide Injuries Caused by One Occurrence

    City of Birmingham Countersues Contractor for Incomplete Work

    Engineer at Flint Negligence Trial Details Government Water Errors

    Top Developments March 2024

    Designing the Process to Deliver Zero-Carbon Construction – Computational Design in Practice

    Is Settling a Bond Claim in the Face of a Seemingly Clear Statute of Limitations Defense Bad Faith?

    New Law Limits Withheld Retention on Qualified Private Works Projects to 5% Effective 2026

    Fraud, the VCPA and Construction Contracts

    Colorado Temporarily Requires Employers to Provide Sick Leave While Awaiting COVID-19 Testing

    GRSM New York Founding Partner Mercedes Colwin Honored with 2025 Excellence in Diversity Award by PLUS Foundation

    Court Rejects Anti-SLAPP Motion in Construction Defect Suit
    Corporate Profile

    DURAND WISCONSIN CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Through over four thousand construction defect and claims related expert designations, the Durand, Wisconsin Construction Expert Directory provides a wide range of trial support and construction consulting services to legal professionals and construction practice groups concerned with the effective resolution of construction defect and claims litigation. BHA provides construction claims investigation and expert services to the nation's most recognized builders, risk managers, legal professionals, owners, state and local government agencies. Employing in house resources which comprise building envelope experts, forensic architects, professional engineers, credentialed construction standard of care consultants, the construction experts group brings national experience and local capabilities to Durand and the surrounding areas.

    Durand Wisconsin expert witnesses fenestrationDurand Wisconsin engineering consultantDurand Wisconsin roofing construction expertDurand Wisconsin stucco expert witnessDurand Wisconsin construction code expert witnessDurand Wisconsin contractor expert witnessDurand Wisconsin reconstruction expert witness
    Construction Expert Witness News & Info
    Durand, Wisconsin

    Managing Rising Costs and Shifting Legal Risk for Florida High-Rise and Condominium Projects

    May 05, 2026 —
    Florida's construction defect landscape is experiencing a major shift. The convergence of material and labor cost volatility, regulatory tightening, and increasingly complex litigation strategies is forcing associations, developers, and their counsel to rethink how they approach risk management and dispute resolution. For those managing large-scale condo and high-rise projects, the stakes have never been higher. The Cost Volatility Trap Construction material prices rose at a "staggering" 12.6% annualized rate during the first two months of 2026, according to recent industry analysis. Tariff impacts are projected to lead to more increases of 5.4% to 6.8%, depending on property type. For associations facing construction defect claims, this volatility creates a cascading problem: repair scopes defined two years ago are now dramatically underpriced, and damage calculations that appeared reasonable at discovery are obsolete by the time of settlement. Courts and mediators are increasingly scrutinizing how cost estimates were developed and whether they account for existing market circumstances. Associations must now commission updated repair assessments more frequently, a practice that increases investigation costs but strengthens the credibility of damage claims. Conversely, defendants are weaponizing cost inflation as a defense, arguing that claimed damages are speculative or inflated. The practical result: repair sequencing and phasing strategies have become critical litigation tools. Associations that can demonstrate a rational, cost-effective repair plan tied to current market data are more favorably placed in settlement negotiations. Regulatory Pressure and Deliberate Timing Florida's 2026 condo compliance regime has significantly changed the defect claims landscape. Elevated transparency requirements, stricter reserve funding mandates, and tightened building safety inspection protocols mean that associations now face dual pressures: Comply with new regulations while simultaneously handling construction defect exposure. This regulatory environment is changing investigation and documentation strategy. Associations that delay defect investigation to avoid triggering reserve funding obligations or disclosure requirements are taking on considerable legal risk. Recent case law such as the Third District Court of Appeal's reaffirmation of Chapter 558's pre-suit mediation requirements, underscores Florida's intent to resolve disputes early. Associations that move deliberately and record carefully during the pre-suit phase gain leverage in mediation and reduce the risk of expensive litigation. Timing also intersects with repair sequencing. Associations must now balance the urgency of compliance inspections against the strategic advantage of phased repairs. Some associations are using compliance deadlines as a forcing mechanism to accelerate settlement discussions, while others are sequencing repairs to demonstrate good-faith remediation efforts before litigation commences. The Emerging Risk Transfer Challenge As construction defect claims grow more complex and costly, the traditional risk transfer systems, such as design-build warranties, contractor bonds, and insurance, are proving inadequate. Developers and general contractors are increasingly shifting risk to subcontractors and material suppliers, fragmenting liability and complicating recovery efforts for associations. Permitting and approval friction is also creating new litigation pressure points. Delays in municipal approvals, changes to building code interpretations, and disputes over remedial work compliance continue to spawn collateral claims that go beyond the original defect. Associations must now anticipate not only defect liability but also regulatory compliance disputes with municipalities, creating a dual-front legal challenge. For large communities, this means reconsidering the entire risk architecture. Insurance carriers are tightening coverage, and traditional indemnification chains are breaking down. Forward-thinking associations are engaging counsel earlier in the development process to negotiate clearer risk allocation provisions and more robust insurance requirements. Taking a Data-Driven Approach Managing rising costs and shifting legal risk in Florida's high-rise and condo market requires a more sophisticated, data-driven approach. Associations must commission frequent cost updates, move deliberately through pre-suit investigation and mediation, and challenge traditional assumptions about risk transfer. Developers and their counsel should view regulatory compliance not as a burden but as an opportunity to demonstrate good-faith risk management and strengthen settlement positioning. The firms and associations that succeed in 2026 will be those that treat cost volatility, regulatory change, and litigation strategy not as separate challenges but as linked elements of a coherent risk management framework. Stephen Hauptman is special counsel in Ball Janik LLP’s Fort Lauderdale office. He may be reached at shauptman@balljanik.com.

    Federal Bid Protest Standard of Review and Disparate Treatment with Ratings

    August 16, 2026 —
    A recent decision out of the Federal Claims Court explains the post-award bid protest standard of review. In Massman Construction Co. v. U.S., 2026 WL 1971985 (Fed.Cl. 2026), a protestor brought a post-award bid protest after the Army Corps of Engineers awarded the contract to another contractor. The protestor argued that the Army Corps (government) acted irrational in its evaluation through disparate treatment. The Court of Federal Claims agreed and remanded for the Army Corps to “either justify this disparity or explain why [awardee’s] lower-priced, but technically inferior proposal provides the best value to the government.” Massman Construction, supra at *1. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Introducing the Updated 2026 Pillsbury Guide to Data Centers

    June 08, 2026 —
    Since the initial publication of the Pillsbury Guide to Data Centers in 2025, the market has continued to evolve—most notably with respect to power availability, energy strategy, tax and incentives planning, and investment activity across the sector. While many of the legal, commercial and regulatory frameworks addressed in the original Guide remain durable and relevant, recent developments warranted targeted updates and additions. The 2026 edition expands and updates our energy-focused content to reflect the increasingly central role of power procurement, interconnection and long-term energy strategy in data center development. We have incorporated new materials addressing power purchase and interconnection agreements, solar and other renewable energy solutions, advanced reactor designs, and nuclear-powered data centers projects, including an updated project tracker. We have also added new analysis covering state and local tax considerations and incentive structures relevant to data center development and operations, as well as current M&A and private equity trends shaping investment in the sector. Read the full story...
    Reprinted courtesy of Gravel2Gavel Team

    The Grenfell & Champlain Towers: Risk Management Considerations in the Wake of Catastrophic Loss — A UK/US Comparison

    June 02, 2026 —
    1. Introduction As part of the multinational collaborative relationship between Saxe Doernberger & Vita, P.C. and Fenchurch Law, we continually find ourselves in conversations about the sometimes subtle but sometimes drastic differences between risk management and coverage considerations from one country to the next. These differences are often highlighted by the fallout from large catastrophic losses that are widely publicized and illuminate sometimes widespread risks and perils that many others may be facing in the coming years. The response of governments and their subdivisions to the needs of victims and/or commercial parties, and insurance markets’ evaluation of and reactions to catastrophic losses vary widely from country to country and jurisdiction. In this article, we discuss these responses and reactions in the cases of the Grenfell Tower Fire in London, England, and the Champlain Tower collapse in Surfside, Florida, within the United States. These two widely publicized losses involved different risk management and insurance considerations based on where they occurred. They also saw substantially different government responses and raised varied questions about what the next steps are for their respective commercial and insurance markets. Read the full story...
    Reprinted courtesy of Eric M. Clarkson, Saxe Doernberger & Vita, P.C.
    Mr. Clarkson may be contacted at EClarkson@sdvlaw.com

    California Contractors Get a Much-Needed Break: SB 342 Softens the Harsh Consequences of Contractor License Lapses

    October 20, 2026 —
    Imagine completing a multimillion-dollar project, performing quality work, paying your subcontractors, and satisfying the owner, only to discover that a temporary contractor license lapse could prevent you from recovering payment for that work or pursuing claims for extra work. For decades, that was the reality under California Business and Professions Code section 7031. A contractor that allowed its license to lapse, even briefly, could face catastrophic consequences completely disconnected from the quality of its work. In some cases, a contractor that performed otherwise flawless work could be barred from recovering payment and even be ordered to disgorge compensation already received – even if the owner knew the contractor had a lapse in its licensing and allowed it to continue construction. That reality is about to change. Read the full story...
    Reprinted courtesy of Heather Frisch, Seyfarth
    Ms. Frisch may be contacted at hfrisch@seyfarth.com

    Jurisdiction Over Foreign Manufacturers in Construction Litigation

    May 14, 2026 —
    A recent decision from the Washington Court of Appeals provides important guidance on personal jurisdiction over foreign product manufacturers in construction and infrastructure litigation. In King County v. Aquatherm GmbH, No. 85572-7-I (Wash.Ct. App.Div.I)(unpublished), the court addressed whether a German manufacturer could be sued in Washington for alleged defects in piping used in major public infrastructure projects. The ruling offers a detailed, fact-driven roadmap for how Washington courts evaluate jurisdiction over foreign manufacturers operating through layered distribution networks. It also reflects a broader trend toward focusing on real-world commercial conduct rather than formal corporate structure. Background of the Case King County sued after widespread failures in polypropylene piping installed at the King County Correctional Facility. The pipe, manufactured by Aquatherm GmbH in Germany, was marketed, distributed, and installed through a network of U.S.-based entities. Following a six-week trial, the jury returned a verdict exceeding $18 million on claims under the Washington Product Liability Act and Consumer Protection Act. Aquatherm challenged, among other things, the trial court's exercise of personal jurisdiction. Reprinted courtesy of Timothy J. Repass, Wood Smith Henning Berman and Miki J. Saito, Wood Smith Henning Berman Mr. Repass may be contacted at trepass@wshblaw.com Ms. Saito may be contacted at msaito@wshblaw.com Read the full story...

    Flatiron Said Disputed Concrete Mix Cost Millions on Large Caltrans Project

    June 22, 2026 —
    For awhile in 2023, part of the California Dept. of Transportation's (Caltrans) Fix 50 HOV lane and resurfacing project in Sacramento itself needed to be fixed. Reprinted courtesy of Elaine Silver, Engineering News-Record and Richard Korman, Engineering News-Record Mr. Korman may be contacted at kormanr@enr.com Read the full story...

    Late Notice Bars Insured’s Claim for Wind Damage

    June 29, 2026 —
    The court found that a six-month delay in reporting damage from wind did not comply with the policy’s notice requirements. Touchmark Hotel Group, LLC v. Mt. Hawley Ins. Co., 2026 U.S. Dist. LEXIS 61910 (S.D. N. Y. March 24, 2026). A storm caused damage to Touchstone’s hotel on January 4, 2023. Touchstone’s corporate representative, Rohit Patel, testified that he was not at the property on the day of the storm. In a telephone call the next day, the manager of the property reported to Patel that he observed detached shingles from the roof the hotel in the parking lot. Patel testified that he did not file a claim at that time because Touchmark’s employees did not detect any water leakage in the building and because he did not believe that the cost of the damage from the storm would exceed the policy’s deductible. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com