BERT HOWE
  • Nationwide: (800) 482-1822    
    townhome construction expert witness Pell Lake Wisconsin office building expert witness Pell Lake Wisconsin landscaping construction expert witness Pell Lake Wisconsin casino resort expert witness Pell Lake Wisconsin hospital construction expert witness Pell Lake Wisconsin tract home expert witness Pell Lake Wisconsin parking structure expert witness Pell Lake Wisconsin multi family housing expert witness Pell Lake Wisconsin custom homes expert witness Pell Lake Wisconsin Subterranean parking expert witness Pell Lake Wisconsin Medical building expert witness Pell Lake Wisconsin condominium expert witness Pell Lake Wisconsin institutional building expert witness Pell Lake Wisconsin condominiums expert witness Pell Lake Wisconsin industrial building expert witness Pell Lake Wisconsin low-income housing expert witness Pell Lake Wisconsin concrete tilt-up expert witness Pell Lake Wisconsin high-rise construction expert witness Pell Lake Wisconsin structural steel construction expert witness Pell Lake Wisconsin production housing expert witness Pell Lake Wisconsin mid-rise construction expert witness Pell Lake Wisconsin housing expert witness Pell Lake Wisconsin
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Pell Lake, Wisconsin

    Wisconsin Builders Right To Repair Current Law Summary:

    Current Law Summary: SB448 specifies 90 day notice with details and evidence prior to commencing legal action. It provides for a 15 day written response from contractor or 25 days if cross-claims against subcontractors; The law states “The claimant and contractor or supplier are bound by any contractor or supplier warranty terms pertaining to products or services supplied for the dwelling.”


    Construction Expert Witness Contractors Licensing
    Guidelines Pell Lake Wisconsin

    Contractors are required to have the correct credentials for their trade. Not all classifications require credentialing. For a list of credentials, see the website.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    South West Wisconsin Home Builders Association
    Local # 5142
    703 19th St PO Box 521
    Monroe, WI 53566


    South Central Wisconsin Builders Association
    Local # 5140
    PO Box 563
    Janesville, WI 53547
    http://www.scwbaonline.com

    Racine-Kenosha Builders Association
    Local # 5156
    PO Box 706
    Sturtevant, WI 53177
    http://www.rkbabuilders.com

    Lakeland Builders Association
    Local # 5128
    1560 N Country Club Pkwy
    Elkhorn, WI 53121
    http://www.lakelandba.com

    Madison Area Builders Association
    Local # 5132
    5936 Seminole Centre Ct
    Madison, WI 53711
    http://www.maba.org

    Metro Builders Association of Gr Milwaukee
    Local # 5148
    N16 W23321 Stoneridge Dr
    Waukesha, WI 53188
    http://www.mbaonline.org

    Wisconsin Builders Association (State)
    Local # 5100
    4868 High Crossing Blvd
    Madison, WI 53704
    http://www.wisbuild.org


    Construction Expert Witness News and Information
    For Pell Lake Wisconsin

    A Sample Itinerary to get the Most out of West Coast Casualty’s Construction Defect Seminar

    The Latest News on Fannie Mae and Freddie Mac

    Trends in Project Delivery Methods in Construction

    Antitrust Walker Process Claims Not Covered Under Personal Injury Coverage for Malicious Prosecution

    Remodel Leaves Guitarist’s Home Leaky and Moldy

    Construction Defect or Just Punch List?

    School Board Sues Multiple Firms over Site Excavation Problem

    Dispute Over Amount Insured Owes Public Adjuster Resolved

    Behavioral Science Meets Construction: Insights from Whistle Rewards

    One Industry, One Goal: Construction Safety Week 2026

    Eleventh Circuit Reverses Attorneys’ Fee Award to Performance Bond Sureties in Dispute with Contractor arising from Claim against Subcontractor Performance Bond

    Traub Lieberman Partner Ryan Parker and Associates Robert Biferie and Matthew Groteke Win Final Summary Judgment on Behalf of Homeowner’s Insurance Company

    Kahana Feld Partner Dominic Donato Receives a Pre-Answer Motion to Dismiss

    Administrative and Environmental Law Cases Decided During the U.S. Supreme Court’s 2017-2018 Term

    Three Attorneys Elevated to Partner at Newmeyer & Dillion, LLP

    Micromobility in Smart Cities: Keeping the Wheels in Motion

    Chinese Millionaire Roils Brokers Over Shrinking Mansion

    The Privacy Shield Is Gone: How Do I Now Move Data from the EU to the US

    Understand and Define Key Substantive Contract Provisions

    Honoring Veterans Under Our Roof & Across the World

    Judgment Stemming from a Section 998 Offer Without a Written Acceptance Provision Is Void

    Coverage Exists for Landlord as Additional Insured

    Shutdowns? What A Covid-19-Safe Construction Site Looks Like

    Should I Stay or Should I Go? The Supreme Court Says “Stay”

    New York Court Permits Asbestos Claimants to Proceed Against Insurers with Buyout Agreements

    Senior Living Facility Makes Construction Defect Claims

    For Whom Additional Insured Coverage Applies in New York

    The Ups and Downs of Elevator Maintenance Contractor's Policy Limits

    Construction Litigation Roundup: “Sudden Death”

    Florida Governor Signs Construction Defect Amendments into Law

    Arctic Roads and Runways Face the Prospect of Rapid Decline

    COVID-19 Pandemic Preference Amendments to Bankruptcy Code Benefiting Vendors, Customers, Commercial Landlords and Tenants

    Travelers v. Larimer County and the Concept of Covered Cause of Loss

    Less Than Perfectly Drafted Endorsement Bars Flood Coverage

    Norfolk Southern Agrees to $310M Settlement With Feds Over 2023 Ohio Derailment

    Mortgage Interest Rates Increase on Newly Built Homes

    The Best Laid Plans: Contingency in a Construction Contract

    Team Temporarily Stabilizes Delaware River Bridge Crack

    Alabama Supreme Court Finds No Coverage for Construction Defect to Contractor's own Product

    California Insurance Commissioner Lacks Authority to Regulate Formula for Estimating Replacement Cost Value

    ‘Like a War Zone’: Malibu Fire Ravages Multimillion-Dollar Homes

    Why A Jury Found That Contractor 'Retaliated' Against Undocumented Craft Worker

    Want to Build Affordable Housing in the Heart of Paris? Make It Chic.

    “We Are Here for One Reason”: Newark Trial Team Achieves Another Favorable Settlement for Client After Jury Selection

    Eleven WSHB Lawyers Honored on List of 2016 Rising Stars

    Gary Bague Elected Chairman of ALFA International’s Board of Directors

    Snell & Wilmer’s Los Angeles Office Recognized as One of the “Best Places to Work” by the Los Angeles Business Journal

    Axa Buys London Pinnacle Site for Redesigned Skyscraper

    White and Williams LLP Attorneys Recognized as PA and DE Super Lawyers

    Professional Liability and Attorney-Client Privilege Bulletin: Intra-Law Firm Communications
    Corporate Profile

    PELL LAKE WISCONSIN CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from approximately 5000 construction and design related expert witness designations, the Pell Lake, Wisconsin Construction Expert Directory delivers a superior construction and design expert support solution to builders and construction claims professionals concerned with construction defect, scheduling, and delay matters. BHA provides building related trial support and expert services to widely recognized construction practice groups, Fortune 500 builders, CGL carriers, owners, as well as a variety of public entities. In connection with in house assets which include registered architects, professional engineers, licensed general and specialty contractors, the firm brings regional experience and flexible capabilities to the Pell Lake construction industry.

    Pell Lake Wisconsin contractor expert witnessPell Lake Wisconsin delay claim expert witnessPell Lake Wisconsin architecture expert witnessPell Lake Wisconsin building code compliance expert witnessPell Lake Wisconsin expert witness concrete failurePell Lake Wisconsin consulting engineersPell Lake Wisconsin building expert
    Construction Expert Witness News & Info
    Pell Lake, Wisconsin

    Federal Court Finds that Master Agreement Bestows Additional Insured Coverage

    November 09, 2026 —
    In the recent case Triborough Scaffolding & Hoisting Servs. v. Sw. Marine & Gen. Ins. Co., 2026 U.S. Dist. LEXIS 226876, Judge P. Kevin Castel, who was also operating as finder of fact, held that a subcontractor master agreement covered a subcontractor’s work at a specific project, such that an obligation to name the prime contractor Triborough as well as the undefined Owner, bestowed additional insured coverage to Triborough and the Owner under policies issued to the subcontractor. The agreement at issue was dated December 15-16, 2017 and the accident at issue occurred in 2018. The trial evidence includes testimony from both Triborough and the subcontractor that the agreement was intended to apply annually, and the subcontractor could not recall the parties ever signing a project-specific agreement. Further, Triborough assigned work to the subcontractor by telephone call or texts on several projects, and without a project-specific contract. Moreover, no other operative indemnity or insurance agreement between Triborough and the subcontractor, other than a backdated agreement that was not applicable. Finally, the court did not find plausible that the subcontractor would enter into an agreement meant only to cover the final two weeks of 2017, such that the agreement extended into work occurring in 2018. Read the full story...
    Reprinted courtesy of Craig Rokuson, Traub Lieberman
    Mr. Rokuson may be contacted at crokuson@tlsslaw.com

    Location, Location, Location — But Which One? The Few Words in Your Construction Contract that Pick Where You Fight

    June 29, 2026 —
    Most professionals know the old real estate line: location, location, location. It turns out to be just as true for construction contracts as it is for property. Consider a recent case involving a project owner that hired two design firms for a project. When issues arose during construction, the owner sued the design firms in state court in Brazoria County, Texas, pursuant to the forum selection clause in the parties’ contracts. The defendants then removed the case to the federal district court in Galveston, a courthouse in a different county. But the owner wanted the case back in Brazoria County state court. Whether it got its wish came down to two words in the contract: “situated in.” This article is about words like those. A construction contract’s forum selection clause names the place for the fight nobody plans to have, and where that fight happens can shape how it goes. This article explains why the wording in your forum selection clause deserves careful reading before you sign a construction contract. It is not a deep dive into the mechanics of federal removal jurisdiction, and it is not an academic comparison of the terms “forum” and “venue.” Instead, it is a practical look at how courts actually read these clauses, so the location of a future fight is the one you intended. Read the full story...
    Reprinted courtesy of Brad Sands, Jones Walker, LLP
    Mr. Sands may be contacted at bsands@joneswalker.com

    Insured is Third Party Beneficiary of Forced-Place Policy

    October 26, 2026 —
    The court denied the insurer’s motion to dismiss the insured’s fire damage claims under a forced-place policy because the insured was a third-party beneficiary of the policy. Fredericks v. Assurant Specialty, et al., 2026 U.S. Dist. LEXIS 179779 (E.D. Pa. Aug. 12, 2026). The insureds’ home burned down on the same day their homeowner’s policy expired. The expiration automatically triggered a forced-placed policy issued by American Security Insurance Company (ASIC) to the insureds’ mortgage company, Rocket Mortgage Company, LLC. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    D.C. Circuit Upholds EPA’s CERCLA Hazardous-Substance Designations for PFAS as State-Law Settlements Highlight Expanding Liability Landscape

    September 15, 2026 —
    On August 18, 2026, a unanimous panel of the U.S. Court of Appeals for the D.C. Circuit upheld the 2024 designation by the U.S. Environmental Protection Agency (EPA) of perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS) as hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or Superfund). (See Chamber of Commerce of the United States of America, et al. v. EPA, No. 24-1193 (D.C. Cir. Aug. 18, 2026).) The decision leaves EPA’s PFOA and PFOS hazardous substance designations in place and provides guidance on the scope of EPA’s authority to make future hazardous substances designations under CERCLA Section 102(a). The decision also likely resolves a challenge to the rule that has spanned two presidential administrations. After taking office, the Trump administration had obtained an abeyance of the litigation challenging the Biden-era rule while EPA reconsidered its position. In September 2025, EPA informed the court that it had decided to retain the designations, while signaling that it would work with Congress and industry to address CERCLA liability concerns for “passive receivers.” The litigation then resumed, with the current Administration defending the rule. Reprinted courtesy of Ashleigh K. Myers, Pillsbury, Amanda G. Halter, Pillsbury, Jillian Marullo, Pillsbury and Anthony B. Cavender, Pillsbury Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com Ms. Halter may be contacted at amanda.halter@pillsburylaw.com Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com Mr. Cavender may be contacted at anthony.cavender@pillsburylaw.com Read the full story...

    Insurer Granted Summary Judgment on Claim for Roof Damage Caused by Windstorm

    May 26, 2026 —
    The insurer successfully moved for summary judgment, eliminating the insured’s claim for roof damage due to windstorm. Mulas v. Westchester Surplus Lines Ins. Co., 2026 U.S. Dist. LEXIS 20537 (Jan. 30, 2026). The insureds’ commercial property sustained windstorm damage during Hurricane Ian. Westchester denied the claim. The insureds believed Westchester wrongfully denied coverage for roof damage and various interior damage to property. The insureds also argued that Westchester’s actual cash value (ACV) payment did not reflect the fully insured loss. The insureds sued and Westchester moved for summary judgment. Westchester argued the roof damage was not covered because Hurricane Ian did not cause the damage. Westchester hired an engineer who determined the roof damage was not caused by wind from Hurricane Ian. Westchester pointed out that the insureds’ expert also found no wind damage on the roof. The insureds offered no other evidence suggesting the hurricane caused roof damage. Therefore, the insureds could not show that Westchester breached the policy by denying coverage. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Builders Risk/Construction All Risks and Delay in Start-Up Coverage for Large Energy Projects: Protecting Revenue Before Operations Begin

    September 21, 2026 —
    The Most Significant Loss May Be the Delay, Not the Damage Power and energy projects are uniquely vulnerable to losses during construction. Whether the project involves a utility-scale solar facility, battery storage installation, a wind farm, transmission project, LNG terminal, or conventional generation facility, loss events in this sector often have consequences far more impactful than the actual cost of repairing damaged property. Any number of construction losses can delay commercial operation of the facility by months, triggering lost revenues, financing impacts, contractual penalties, and investor concerns. In many cases, those delay-related losses significantly exceed the underlying repair costs. Construction All Risk (“CAR”) insurance and Delay in Start-Up (“DSU”) coverage are designed to respond to these exposures. However, recovering delay-related losses is far more complicated than many insureds anticipate, particularly when projects involve international stakeholders, global supply chains, and London market insurance placements. Read the full story...
    Reprinted courtesy of Will Bennett, SDV Fenchurch
    Mr. Bennett may be contacted at will.bennett@sdvfenchurch.us

    FERC Issues Show-Cause Orders: Impacts on California and Other Regional Power Markets

    July 13, 2026 —
    At an open meeting on June 18, 2026, the Federal Energy Regulatory Commission (FERC) issued show-cause orders under Section 206 of the Federal Power Act to the six FERC-jurisdictional RTOs/ISOs—PJM Interconnection, ISO New England, Midcontinent Independent System Operator, Southwest Power Pool, New York Independent System Operator and California Independent System Operator—along with their transmission owners (TOs), directing each region and the TOs to justify or revise tariff provisions governing how data centers and other large loads connect to and receive transmission service from the grid. These show-cause orders will impact several power markets across the country, including California. Reprinted courtesy of Stephen J. Humes, Pillsbury, Alicia M. McKnight, Pillsbury and Jason Drogin Atwood, Pillsbury Mr. Humes may be contacted at stephen.humes@pillsburylaw.com Ms. McKnight may be contacted at alicia.mcknight@pillsburylaw.com Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com Read the full story...

    AI Data Centers Become City-Scale Infrastructure, Prompting New Industry Playbook

    August 11, 2026 —
    AI data centers are no longer just buildings. They are increasingly reaching power-demand levels more commonly associated with municipalities, prompting industry groups to launch a new framework they say is needed to keep pace with rapidly changing power, cooling and reliability requirements. Read the full story...
    Reprinted courtesy of Bryan Gottlieb, Engineering News-Record
    Mr. Gottlieb may be contacted at gottliebb@enr.com