Federal Bid Protest Standard of Review and Disparate Treatment with Ratings
August 16, 2026 —
David Adelstein - Florida Construction Legal UpdatesA recent decision out of the Federal Claims Court explains the post-award bid protest standard of review.
In Massman Construction Co. v. U.S., 2026 WL 1971985 (Fed.Cl. 2026), a protestor brought a post-award bid protest after the Army Corps of Engineers awarded the contract to another contractor. The protestor argued that the Army Corps (government) acted irrational in its evaluation through disparate treatment. The Court of Federal Claims agreed and remanded for the Army Corps to “either justify this disparity or explain why [awardee’s] lower-priced, but technically inferior proposal provides the best value to the government.” Massman Construction, supra at *1.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Landlord Determined to Not Qualify as Additional Insured
September 08, 2026 —
Tred R. Eyerly - Insurance Law HawaiiIn a dispute between two insurers, the Second Circuit affirmed the district court’s determination that the landlord was not an additional insured under the tenant’s policy. Peleus Ins. Co. v. Am. European Ins. Co., 2026 U.S. App. LEXIS 17981 June 22, 2026).
Blossom Miller sued 57th Avenue and 21st Century in state court alleging that she was injured when she tripped on the sidewalk in front of the leased premises (the “Miller Action”). The premises was leased by 57th Avenue to 21st Century.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Every High-Tech Building Has Many Lifespans
August 16, 2026 —
Aarni Heiskanen - AEC BusinessWhen I worked as an architect, our team designed a laboratory for fuel research. The facility included a large research hall where various boilers and other devices were tested and analyzed. The setup required extensive floor channeling under the thick concrete floor. We suggested building a modular system that would allow flexibility in the future, when requirements would certainly change. They did not want that because of budget constraints.
The high-tech construction trend is spreading. Data centers, semiconductor fabs, battery plants, and life science facilities share one property that sets them apart from ordinary buildings. The technology inside turns over faster than the structure around it. Server generations change every three to five years. Rack densities have risen from 10 or 20 kW to 130 kW and beyond in just a few years.
A high-tech facility is really several buildings with different lifespans inside one envelope, and we keep designing them as if they were one. The failure is not that things become obsolete. It is that we never say when each layer is expected to.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
One Industry, One Goal: Construction Safety Week 2026
May 05, 2026 —
Maggie Murphy - Construction ExecutiveConstruction safety has long been a top priority across the industry. Yet fatality rates have remained stubbornly flat for more than a decade. Steven Carter, global health and safety director at
Gilbane chair company for
Construction Safety Week 2026—believes the industry has reached a pivotal moment. This year’s theme—”
All In Together: Recognize. Respond. Respect.”—is a unified call to action for owners, designers, contractors and craft professionals around a shared, risk-based approach to preventing serious injuries and fatalities.
In a recent interview with Construction Executive, Carter discusses why the industry must move beyond incremental improvements, how technology and AI can support better planning and what it will take to create a true culture of psychological safety on jobsites.
Reprinted courtesy of
Maggie Murphy, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
New Report Outlines Roadmap for Construction Jobsites to Cut Carbon Emissions by 2040
April 20, 2026 —
PCL ConstructionDenver, Colo., April 16, 2026 (GLOBE NEWSWIRE) -- A new industry report outlines five practical steps that, when implemented together, could reduce construction jobsite emissions by up to 75% without compromising cost, schedule or performance. Grounded in real operational data from 617 construction projects across the U.S. and Canada, Growing and Greening Canadian Construction represents the most comprehensive sector-wide analysis of jobsite emissions conducted to date.
The report was developed through a collaboration among leading general contractors, including
PCL Construction, in partnership with the Transition Accelerator, an organization that drives projects, partnerships, and strategies to promote economic competitiveness in a carbon‑neutral world. The report focuses specifically on emissions from construction jobsite activities and reflects a shared commitment to advancing practical, scalable solutions for the industry.
About PCL Construction
PCL is a group of independent construction companies that operates throughout the United States, Canada, the Caribbean and Australia. As one of the largest contracting organizations in North America, PCL completes more than $9.9 billion USD in work annually, building projects that shape communities. The company’s 100% employee ownership model fuels a culture of commitment for clients in the buildings, civil infrastructure, heavy industrial and solar markets. With a strategic presence in more than 30 major centers, PCL’s leadership teams consistently drive innovation and set new benchmarks for excellence, bringing unparalleled skill to every project. Watch us build at PCL.com.
About the Transition Accelerator
The Transition Accelerator works with 300+ partner organizations across Canada to build out pathways to a prosperous low-carbon economy and avoid costly dead-ends along the way. We help governments and industry harness the global shift towards clean growth to secure permanent jobs, abundant energy, and strong regional economies across the country. By connecting systems-level thinking with real-world analysis, we’re enabling a more affordable, competitive, and resilient future.
Read the full story...
Louisiana Legislature Enacts Act 932 – Significant Changes to Insurer Bad-Faith Exposure for Failure to Settle
July 13, 2026 —
Tabitha R. Durbin & Jennifer E. Michel - Lewis BrisboisThe Louisiana Legislature has enacted Act 932 (formerly House Bill 1162), which became law this week without the Governor's signature pursuant to the Louisiana Constitution, after expiration of the applicable constitutional review period. Act 932 makes several important amendments to Louisiana's insurer bad-faith statute and appears intended, at least in part, to address issues arising from the Louisiana Supreme Court's decision in Kelly v. State Farm Fire & Casualty Co., 169 So.3d 328 (La. 2015). The Act also makes changes regarding claim payments involving licensed contractors. The Act takes effect on August 1, 2026.
Key Takeaways
Act 932:
- Limits certain bad-faith causes of action (bad faith failure to settle) involving personal injury and bodily injury claims where good-faith disputes exist or where an insurer has not been afforded sufficient opportunity to respond to a settlement demand.
- Requires insurers and adjusters to verify a contractor's Louisiana license status before issuing claim payments when a contractor is named as a payee on a check for repair or restoration of immovable property.
- Creates a statutory safe harbor protecting insurers from bad-faith penalties and attorney fees when payment delays result from an inability to verify a contractor's license, provided specified documentation and notice requirements are met.
Reprinted courtesy of
Tabitha R. Durbin, Lewis Brisbois and
Jennifer E. Michel, Lewis Brisbois
Ms. Durbin may be contacted at Tabitha.Durbin@lewisbrisbois.com
Ms. Michel may be contacted at Jenny.Michel@lewisbrisbois.com
Read the full story...
U.S. Supreme Court Decision Alters Course of $745M Louisiana Coastal Damage Judgment
June 15, 2026 —
Jennifer Kretschmann & Jennifer E. Michel - Lewis BrisboisThe U.S. Supreme Court has issued a unanimous decision allowing oil and gas companies to move Louisiana coastal erosion lawsuits from state court to federal court under the federal officer removal statute. While the ruling is procedural, it carries significant implications for environmental- and energy-related risks. The case,
Chevron U.S.A. Inc. v. Plaquemines Parish, Louisiana, Slip Op. 24-813 (April 17, 2026), addressed a threshold jurisdictional question but has broader significance for environmental and climate related litigation. State courts are often viewed as more favorable forums for plaintiffs asserting environmental damage claims, particularly those brought by governmental entities.
The opinion issued on April 17, 2026 is the latest development in long-running Louisiana coastal litigation that began more than a decade ago. Starting in 2013, Louisiana parishes filed 42 lawsuits against oil and gas companies alleging environmental damage related to historic oil field operations. The parishes alleged that oil and gas companies violated state coastal management laws by failing to properly restore impacted areas. Chevron sought to remove the cases from state court under 28 U.S.C. § 1442(a)(1), known as federal officer removal, which provides federal jurisdiction over “any person acting under [an] officer” of the United States "for or relating to any act under color of such office." The Fifth Circuit rejected the argument and remanded the case, and others like it, to state court. Trial began in March 2025 in Point à la Hache, Louisiana. On April 4, 2025, the jury awarded a total of $745 million to compensate for land loss, contamination and abandoned equipment. On June 16, 2025, the U.S. Supreme Court agreed to review the question of whether a federal contractor can remove to federal court when sued for oil-production activities undertaken to fulfill a federal oil-refinement contract.
Reprinted courtesy of
Jennifer Kretschmann, Lewis Brisbois and
Jennifer E. Michel, Lewis Brisbois
Ms. Kretschmann may be contacted at Jennifer.Kretschmann@lewisbrisbois.com
Ms. Michel may be contacted at Jenny.Michel@lewisbrisbois.com
Read the full story...
“The Superintendent Told Us to Do It:” Why Verbal Approval May Not Be Enough
June 02, 2026 —
Andrew Lintner - Colorado Construction Litigation BlogIn construction defect litigation, one scenario appears repeatedly: a subcontractor installs work in a manner that differs from the plans, specifications, manufacturer instructions, or industry standards after being verbally directed to do so by the general contractor, superintendent, architect, or owner’s representative.
At the time, the decision may seem minor. The project is moving quickly, the field team wants to maintain progress, and nobody wants to stop working over what appears to be a small issue. The subcontractor may trust the superintendent or project manager and assume the conversation will be remembered later if questions arise.
Years later, however, when the project experiences problems, the people involved may deny the conversation occurred, remember it differently, or simply no longer remember the project. Without written documentation, the subcontractor can find itself defending claims for defective work, even though it performed the installation exactly as directed.
Read the full story...Reprinted courtesy of
Andrew Lintner, Higgins, Hopkins, McLain & Roswell, LLCMr. Lintner may be contacted at
alintner@hhmrlaw.com