BERT HOWE
  • Nationwide: (800) 482-1822    
    production housing Eckert Colorado custom homes Eckert Colorado condominium Eckert Colorado structural steel construction Eckert Colorado condominiums Eckert Colorado retail construction Eckert Colorado institutional building Eckert Colorado industrial building Eckert Colorado concrete tilt-up Eckert Colorado parking structure Eckert Colorado casino resort Eckert Colorado low-income housing Eckert Colorado Medical building Eckert Colorado high-rise construction Eckert Colorado office building Eckert Colorado hospital construction Eckert Colorado Subterranean parking Eckert Colorado multi family housing Eckert Colorado custom home Eckert Colorado townhome construction Eckert Colorado housing Eckert Colorado mid-rise construction Eckert Colorado
    Arrange No Cost Consultation
     
    Construction Expert Witness Builders Information
    Eckert, Colorado

    Colorado Builders Right To Repair Current Law Summary:

    Current Law Summary: HB 1161 has three significant components that effect construction defect litigation. The first is a right to remedy and notice provision (75 days written notice) The homeowner must give the builder a notice that describes the nature of the claimed construction defects, the location of the defects and a general description of the type of damages that are claimed. The second component is a limitation on the nature and type of damages that can be pursued and awarded in a construction defect case. The third is a limitation on the availability and amount of punitive damages ($250,000) under the provisions of the Colorado Consumer Protection Act


    Construction Expert Witness Contractors Licensing
    Guidelines Eckert Colorado

    State license required for electrical, asbestos removal, plumbers, and pesticides trade; no state license for general contracting. Licensing may be required on a city or county level.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Housing & Builders Association Of Colorado Springs
    Local # 0625
    4585 Hilton Pkwy Ste 100
    Colorado Springs, CO 80907
    http://www.cshba.com

    Home Builders Association of Teller Co
    Local # 0690
    PO Box 713
    Woodland Park, CO 80866
    http://www.hbatellercounty.com/

    Housing and Bldng Assn of Northwestern Colorado
    Local # 0664
    569 S Westgate Dr Ste 3
    Grand Junction, CO 81505
    http://www.hbanwco.com

    Mountain to Mesa Home Builders Association
    Local # 0670
    PO Box 2719
    Glenwood Springs, CO 81602
    http://www.memhba.org

    Summit County Builders Association
    Local # 0688
    PO Box 2245
    Frisco, CO 80443
    http://www.summitcountybuilders.org

    Eagle Valley Home Builders Association Inc
    Local # 0652
    PO Box 3550
    Eagle, CO 81631
    http://www.evhba.com

    Home Builders Association of Metropolitan Denver
    Local # 0650
    9033 E Easter Pl Ste 200
    Centennial, CO 80112
    http://www.hbadenver.com


    Construction Expert Witness News and Information
    For Eckert Colorado

    Brown Paint Doesn’t Cover Up Construction Defects

    Steps to Defending against Construction Defect Lawsuits

    Late Filing Contractor Barred from Involving Subcontractors in Construction Defect Claim

    Destruction of Construction Defect Evidence Leads to Sanctions against Plaintiff

    Condo Buyers Seek to Void Sale over Construction Defect Lawsuit

    After Katrina Came Homes that Could Withstand Isaac

    Broker Not Liable for Failure to Reveal Insurer's Insolvency After Policy Issued

    Battle of “Other Insurance” Clauses

    Is Construction Heading Off the Fiscal Cliff?

    Alaska Supreme Court Dismisses Claims of Uncooperative Pro Se Litigant in Defect Case

    After Construction Defect Case, Repairs to Austin Building

    Congress Addresses Homebuilding Credit Crunch

    No Choice between Homeowner Protection and Bankrupt Developers?

    Nevada Bill Aims to Reduce Legal Fees For Construction Defect Practitioners

    Damron Agreement Questioned in Colorado Casualty Insurance v Safety Control Company, et al.

    Follow Up on Continental Western v. Shay Construction

    The Year 2010 In Review: Design And Construction Defects Litigation

    Ohio Court of Appeals Affirms Judgment in Landis v. Fannin Builders

    Architect Not Responsible for Injuries to Guests

    District Court’s Ruling Affirmed in TCD v American Family Mutual Insurance Co.

    Application of Efficient Proximate Cause Doctrine Supports Coverage

    Safety Officials Investigating Death From Fall

    Bad Faith and a Partial Summary Judgment in Seattle Construction Defect Case

    In Oregon Construction Defect Claims, “Contract Is (Still) King”

    Colorado Senate Bill 12-181: 2012’s Version of a Prompt Pay Bill

    Construction Defect Lawsuit Stayed by SB800

    Housing Market on Way to Recovery

    Webinar on Insurance Disputes in Construction Defects

    Williams v. Athletic Field: Hugely Important Lien Case Argued Before Supreme Court

    Five Years of Great Legal Blogging at Insurance Law Hawaii

    Another Guilty Plea In Nevada Construction Defect Fraud Case

    Texas Construction Firm Files for Bankruptcy

    Florida trigger

    A Lien Might Just Save Your Small Construction Business

    Construction Employment Rises in Half of the States

    Town Files Construction Lawsuit over Dust

    Federal District Court Predicts Florida Will Adopt Injury In Fact Trigger

    After Breaching its Duty to Defend, Insurer Must Indemnify

    Lower Court “Eminently Reasonable” but Wrong in Construction Defect Case

    Irene May Benefit Construction Industry

    Driver’s Death May Be Due to Construction Defect

    Washington Supreme Court Sides with Lien Claimants in Williams v. Athletic Field

    New Buildings in California Soon Must Be Greener

    Boston Tower Project to Create 450 Jobs

    Summary Judgment in Construction Defect Case Cannot Be Overturned While Facts Are Still in Contention in Related Cases

    Ensuing Loss Provision Does Not Salvage Coverage

    Ghost Employees Steal Jobs from Legit Construction Firms

    Appeals Court Upholds Decision by Referee in Trial Court for Antagan v Shea Homes

    Court Clarifies Sequence in California’s SB800

    Florida Appeals Court Rules in Favor of Homeowners Unaware of Construction Defects and Lack of Permits

    Florida Law: Defects in Infrastructure Improvements Not Covered in Home Construction Warranties

    Architect Not Liable for Balcony’s Collapse

    A Call to Washington: Online Permitting Saves Money and the Environment

    Florida “get to” costs do not constitute damages because of “property damage”

    Crane Dangles and So Do Insurance Questions

    Renovation Contractors: Be Careful How You Disclose Your Projects

    Mortar Insufficient to Insure Summary Judgment in Construction Defect Case

    Condominium Exclusion Bars Coverage for Construction Defect

    BHA Expands Construction Experts Group

    Certificate of Merit to Sue Architects or Engineers Bill Proposed

    Recent Case Brings Clarity and Questions to Statute of Repose Application

    New Apartment Tower on the Rise in Seattle

    Important Information Regarding Colorado Mechanic’s Lien Rights.

    Tennessee Court: Window Openings Too Small, Judgment Too Large

    Construction Defects Are Occurrences, Says South Carolina High Court

    Construction Case Alert: Appellate Court Confirms Engineer’s Duty to Defend Developer Arises Upon Tender of Indemnity Claim

    Hospital Construction Firm Settles Defect Claim for $1.1 Million

    Faulty Workmanship may be an Occurrence in Indiana CGL Policies

    Construction Defects: 2010 in Review

    Insurance Company Prevails in “Chinese Drywall” Case

    Gut Feeling Does Not Disqualify Expert Opinion

    Insurance Firm Defends against $22 Million Claim

    Construction Delayed by Discovery of Bones

    One Colorado Court Allows Negligence Claim by General Contractor Against Subcontractor

    Time to Repair Nevada’s Construction Defect Laws?

    Illinois Court Determines Insurer Must Defend Negligent Misrepresentation Claim

    Homebuilders Go Green in Response to Homebuyer Demand

    Denver Court Rules that Condo Owners Must Follow Arbitration Agreement

    Quarter Four a Good One for Luxury Homebuilder

    West Coast Casualty Promises Exciting Line Up at the Nineteenth Annual Conference

    Continuous Trigger of Coverage Adopted for Loss Under First Party Policy

    Contract Not So Clear in South Carolina Construction Defect Case

    Home Builder Doesn’t See Long Impact from Hurricane

    State Audit Questions College Construction Spending in LA

    Preparing for Trial on a Cause of Action for Violation of Civil Code section 895, et seq.

    South Carolina Legislature Redefining Occurrences to Include Construction Defects in CGL Policies

    Colorado “property damage” caused by an “occurrence” and exclusions j(5) and j(6) “that particular part”

    Construction Defects and Contractor-Owners

    Contractor Underpaid Workers, Pocketed the Difference

    Texas contractual liability exclusion
    Corporate Profile

    ECKERT COLORADO CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Eckert, Colorado Construction Expert Witness Group is comprised from a number of credentialed construction professionals possessing extensive trial support experience relevant to construction defect and claims matters. Leveraging from this considerable body of experience, BHA provides construction related trial support and expert services to the nation's most recognized construction litigation practitioners, Fortune 500 builders, commercial general liability carriers, owners, construction practice groups, and a variety of state and local government agencies.

    Construction Expert Witness News & Info
    Eckert, Colorado

    Colorado “occurrence”

    January 6, 2012 — CDCoverage.com

    In Greystone Construction, Inc. v. National Fire & Marine Insurance Co., No. 09-1412 (10th Cir. November 1, 2011), general contractors Greystone and Branan were each sued by purchases of homes built by each alleging defective construction performed by subcontractors. CGL insurer American Family Mutual Insurance Company defended both Greystone and Brannon while co-insurer National Fire & Marine Insurance Company denied a defense. Greystone, Branan, and American Family sued National Fire for contribution towards defense costs. The federal district trial court entered summary judgment for National Fire.

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    Insurer’s Discovery Requests Ruled to be Overbroad in Construction Defect Suit

    October 28, 2011 — CDJ Staff

    The US District Court has ruled in the case of D.R. Horton Los Angeles Holding Co. Inc. v. American Safety Indemnity, Co. D.R. Horton was involved in a real estate development project. Its subcontractor, Ebensteiner Co., was insured by ASIC and named D.R. Horton as an additional insured and third-party beneficiary. D.R. Horton, in response to legal complaints and cross-complaints, filed for coverage from ASIC under the Ebensteiner policy. This was refused by ASIC. ASIC claimed that “there is no potential coverage for Ebensteiner as a Named Insurer and/or D.R. Horton as an Additional Insured.” They stated that “the requirements for coverage are not satisfied.”

    The case same to trial with the deadline for discovery set at March 1, 2011. ASIC stated they were seeking the developer’s “job file” for the Canyon Gate project. D.R. Horton claimed that ASIC’s discovery request was overbroad and that it would be “unduly burdensome for it to produce all documents responsive to the overbroad requests.”

    D.R. Horton did agree to produce several categories of documents, which included:

    “(1) final building inspection sign-offs for the homes that are the subject of the underlying litigation;(2) an updated homeowner matrix for the underlying actions; (3) the concrete subcontractor files; (4) the daily field logs for D.R. Horton’s on-site employee during Ebensteiner’s work; (5) documents relating to concrete work, including documents for concrete suppliers; (6) documents relating to compacting testing; (7) documents relating to grading; and (8) D.R. Horton’s request for proposal for grading”

    The court found that the requests from ASIC were overbroad, noting that the language of the ASIC Request for Production of Documents (RFP) 3-5 would include “subcontractor files for plumbing, electric, flooring, etc. - none of these being at issue in the case.” The court denied the ASIC’s motion to compel further documents.

    The court also found fault with ASIC’s RFPs 6 and 7. Here, D.R. Horton claimed the language was written so broadly it would require the production of sales information and, again, subcontractors not relevant to the case.

    Further, the court found that RFPs 8, 10, 11, and 13 were also overbroad. RFP 8 covered all subcontractors. D.R. Horton replied that they had earlier complied with the documents covered in RFPs 10 and 11. The court concurred. RFP 13 was denied as it went beyond the scope of admissible evidence, even including attorney-client communication.

    The court denied all of ASIC’s attempts to compel further discovery.

    Read the court’s decision…


    Going Green for Lower Permit Fees

    October 23, 2012 — CDJ Staff

    Clay County, Kansas is offering rebates on building permits for green homes. According to the Kansas City Star, building permits in the county are typically $2,500. The county will rebate anything from half to all of the permit fee, depending on how well the builder meets green standards. The county will monitor and inspect the process to make certain that builders adhere to their promises for green construction. The county hopes this will encourage green building by offsetting the cost.

    Read the full story…


    North Carolina Exclusion j(6) “That Particular Part”

    February 10, 2012 — CDCoverage.com

    In Alliance Mutual Insurance Co. v. Dove, 714 S.E.2d 782 (N.C. Ct. App. 2011), claimant Murphy-Brown hired insured Dove to repair a broken elevator belt in a grain elevator in Murphy-Brown’s feed mill. The elevator was inside a metal duct and, to access the broken belt, Dove had to cut out a section of the duct. After replacing the belt, Dove welded the metal section back to the duct. Immediately after Dove completed the welding, dust inside the duct ignited, causing an explosion in the elevator, resulting in property damage to the elevator and other property. Murphy-Brown sued Dove for negligence seeking damages for the repair and replacement of the elevator, repair and replacement of the other property, increased grain handling costs during the repairs, and loss of use.

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    Judge Rejects Extrapolation, Harmon Tower to Remain Standing

    November 7, 2012 — CDJ Staff

    CityCenter has filed an emergency motion asking the Nevada Supreme Court to intervene in Judge Elizabeth Gonzalez’ order that the building’s defects cannot be extrapolated from those tested. CityCenter’s structural engineering expert “evaluated 397 of the Harmon’s critical structural elements and found all but one defective,” according to the article on Vegas.Inc. Judge Gonzalez would not permit this to be extrapolated to the untested 1,072, as the locations tested were not random.

    Judge Gonzalez also ruled that if CityCenter does additional testing, they may not appeal her order that ruled the extrapolation inadmissible. CityCenter argued to the Nevada Supreme Court that “the notion that CityCenter should be forced to incur additional millions of dollars in testing costs and sanctions ?Äì on the condition that it waive its right to appeal this ruling ?Äì just to be permitted to present its own damages evidence, shocks the conscience.”

    Gonzalez gave the okay to CityCenter to demolish the building, but its demolition would make any further testing impossible. Under Gonzalez’ ruling, the untested structural elements cannot b assumed to be defective.

    Read the full story…


    Drug Company Provides Cure for Development Woes

    November 18, 2011 — CDJ Staff

    Vertex Pharmaceuticals is poised to become the holder of Boston’s biggest commercial lease, paying $72.5 million for 1.1 million square feet on Boston’s waterfront. Vertex’s new buildings are still under construction, but the plans have spurred other development in the Fan Pier area, according to the New York Times. The Times quotes Mary A. Burke, a senior economist at the Federal Reserve Bank of Boston that the Vertex project gives “a big push” to the “momentum for economic growth.”

    The Fallon Company is building Vertex’s new laboratory and office space. They are separately planning to build a high-rise with 150 luxury condominium units. According to Joseph Fallon, the chief executive and president of the Fallon Company, there is already a waiting list of 50 buyers for the condominiums.

    Across the street from the Vertex site, a group including Morgan Stanley and Boston Global Investors is planning a 23-block mixed use project that would include 1.2 million square feet of retail space. Additionally, the New England Development and the Hanover Group is building a 356-unit apartment building at the adjacent Pier 4.

    Read the full story…


    School District Settles Construction Lawsuit

    November 7, 2012 — CDJ Staff

    The Franklin County, Pennsylvania Public Opinion reports that an area school is coming to an end with its construction lawsuit. The school district was sued by its contractors for a combined $1.4 million, which the school district withheld when the project was not completed on schedule. Lobar Inc. claimed that the district additionally owed interest and should pay attorney fees. The school claimed that only $1.15 million was due under the contract. Under the settlement, they will be paying $1.136 million.

    Read the full story…


    Australian Group Seeks Stronger Codes to Combat Dangerous Defects

    October 23, 2012 — CDJ Staff

    The Owners Corporation Network, a group that represents condominium owners in Australia, has raised concerns about building defects in high-rise building that can lead to safety problems. The group prepared a statement which would strengthen the rights of owners, but the government official, Fair Trading Minister Anthony Roberts, declined to sign it. A spokesperson for the group cited a fatal fire at a Sydney high rise, noting that “there had been issues of certification which has been a concern of the Owners Corporation Network.” The Australian Broadcasting Network reports that the government will be reviewing the laws concerning high-rise apartment buildings.

    Read the full story…


    Pipes May Be Defective, But Owners Lack Standing

    September 13, 2012 — CDJ Staff

    The United States District Court in Minnesota has determined that Steven and Cecilia Thundander cannot make a class-action claim against Uponor, Inc. over the plumbing in their home, as they do not have Article III standing. In this situation, the alleged defect is that Uponor made fraudulent claims that the pipes met National Sanitation Foundation (NSF) standards for use in potable water systems. Uponor submitted samples of other pipes, and their substitution was discovered when the NSF made an inspection of the manufacturing facility. The court noted that “the Thunanders contend that Uponor failed to inform homeowners, plumbers and consumers that it had been selling pipe that failed to meet NSF toxicity requirements at the time of sale and installation.”

    The Court noted that the Thunanders have not tested their piping to determine if they “demonstrate toxicity or lack of compliance with the NSF 61 standards,” noting also that the Complaint seeks to require Uponor to instruct the plaintiffs on “how to test the piping and water to determine the level of risk.” Lacking testing, the Court could not find that the Thundanders have defective pipes. The Court found that the “Plaintiffs have failed to adequately plead an injury in fact sufficient to confer standing as to their product liability claims.”

    The Court also concluded that it could not determine if the Plaintiff’s warranty actions could not be applied, as they “have failed to allege a plausible defect.” Even in the presence of a defect, the Court noted that more than eight years had passed before the filing of the suit, when the warranties under both Indiana and Minnesota law have a four-year statute of limitations. The Court also rejected the Thunanders tort claims, once again because “Plaintiffs have not tested their pipes,” noting that “a tort requires the existence of an injury.”

    In conclusion, Judge Nelson rejected the entirety of the complaint, granting the motions to dismiss by the defendants. However, despite the problems with the Thunanders’ claims, she found that they were not “patently frivolous or groundless.” Therefore, she denied attorney fees requested by one of the defendants.

    Read the court’s decision…


    Pennsylvania Court Extends Construction Defect Protections to Subsequent Buyers

    December 20, 2012 — CDJ Staff

    The Pennsylvania courts have long held that there is an implied warranty of habitability for the initial purchaser of a home. Now, as some defects may not immediately show up, the court has extended that implied warranty to second and subsequent purchasers. As Marc D. Brookman, David I. Haas, and Christopher Bender of Duane Morris note, “this judicially created doctrine shifts the risk of a latent defect in the construction of a new home from the purchaser to the builder-vendor.”

    The Pennsylvania Supreme Court concluded that a contractual relationship is not needed for an implied warranty of habitability. The court’s concern was inequalities would result when a home was sold while other homes were protected by being within the statute of repose.

    Read the full story…


    Supreme Court of New York Denies Motion in all but One Cause of Action in Kikirov v. 355 Realty Assoc., et al.

    April 28, 2011 — April 28, 2011 Beverley BevenFlorez - Construction Defect Journal

    In the construction defect suit Kikirov v. 355 Realty Associates, LLC, et al., the Supreme Court of the State of New York granted a dismissal of the plaintiff’s fourth cause of action, but denied the defendants’ motion in all other respects. The plaintiff alleged breach of contract, among other claims. “355 Realty was the sponsor of 355 Kings Highway Condominium, a condominium project located at 355 Kings Highway, in Brooklyn, New York. The condominium units were allegedly marketed as ‘ultra luxury condos,’ and a ‘Manhattan style condominium building,’ which would be the ‘epitome of luxury and quality.’ The construction of the six-story 28 unit residential condominium building began in approximately November 2003. […] Plaintiff entered into a purchase agreement, dated December 21, 2005, with 355 Realty (which was executed on behalf of 355 Realty by Michael Marino, as its member) for the purchase of Unit 2G in the building.”

    The plaintiff alleged that construction defects emerged soon after moving into the unit: “After taking occupancy of his condominium unit, plaintiff allegedly experienced serious leakage and moisture problems in his unit, which caused a dangerous mold condition to develop, in addition to causing actual damage to the structural elements of his unit. According to plaintiff, the walls, moldings, and wood floors of his unit are constantly wet and moist, and there is severe buckling of the wood floors. Plaintiff claims that these problems have caused his unit to be uninhabitable. Plaintiff alleges that he has been forced to remove all of his personal belongings from his unit and has been unable to occupy his unit.”

    According to the plaintiff, Foremost attempted to repair the defects, but only made the situation worse: “Specifically, plaintiff asserts that Foremost’s contractors opened his walls to remove the stained drywall, but never corrected the cause of the leaks, destroyed the walls, and never properly taped and painted the sheet rock. Plaintiff alleges that Foremost repaired the openings in a defective manner. Plaintiff also claims that his floor was repaired at that time by a subcontractor hired by Foremost, but the basic structural problem was never resolved and the leaks continued, compromising the beams and causing the mold conditions, in addition to all of the physical damage present in the unit. On or about July 16, 2009, plaintiff allegedly sent a notice of the defects to 355 Realty and to the managing agent designated by the condominium board, by certified mail, return receipt requested. Plaintiff asserts that defendants have failed and refused to repair and remedy the defective condition, and that the damage is extensive and requires major structural repairs.”

    The plaintiff filed suit on May 4, 2010, and the original complaint asserted eight causes of action. “By decision and order dated September 13, 2010, the court granted a motion by defendants to dismiss plaintiff’s second cause of action for breach of implied covenants of good faith and fair dealing, his third cause of action for breach of implied warranties, his fifth cause of action for negligence as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his seventh cause of action for negligence as against Vision, Foremost, and MMJ, and his eighth cause of action for violations of General Business Law § 349 and § 350, and granted plaintiff leave to replead his first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his fourth cause of action for breach of statutory warranties, and his sixth cause of action for breach of contract as against Vision, Foremost, and MMJ.”

    The plaintiff amended their complaint on October 18, 2010, and “has repleaded these three causes of action by asserting a first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, a second cause of action for breach of statutory warranties, and a third cause of action for breach of contract as against Vision, Foremost, and MMJ. In addition, plaintiff, in his amended complaint, has added a fourth cause of action for fraud.”

    The defendants, on the other hand, “argue that each of the four causes of action alleged by plaintiff in his amended complaint fail to state a claim upon which relief may be granted, and that plaintiff’s amended complaint must be dismissed pursuant to CPLR 3211 (a) (7). Defendants also cite to CPLR 3211 (a) (1), and (5), asserting that dismissal is also required based upon documentary evidence and the Statute of Limitations contained in the limited warranty.” The defendants’ motion to dismiss the first cause of action, breach of contract against 355 Realty, was denied: “While defendants dispute that the alleged defects are actually structural in nature, plaintiff’s allegations as to their structural nature are sufficient, at this juncture, to withstand defendants’ motion to dismiss. Thus, dismissal of plaintiff’s first cause of action must be denied.”

    Next, the court reviewed the second cause of action, which was breach of statutory warranties: “Defendants’ motion also seeks dismissal of plaintiff’s second cause of action for breach of statutory warranties, which alleges that, under applicable law, including General Business Law § 777-a, et seq., the sponsor warranted to purchasers of units that the units would be constructed in a skillful, careful, and workmanlike manner, consistent with proper design, engineering, and construction standards and practices, and free of material latent, design, and structural defects. Defendants argue that General Business Law § 777-a, known as the housing merchant implied warranty, is inapplicable to this case because it is limited to the construction of a ‘new home,’ defined in General Business Law § 777 (5) as ‘any single family house or for-sale unit in a multi-unit residential structure of five stories or less.’ As noted above, the building in which plaintiff’s condominium unit is located is a six-story building.”

    The motion to dismiss the second cause of action is denied. The court provided this reasoning: “the full text of the offering plan has not been provided, the court is unable to examine the entire written agreement so as to determine the purpose of the inclusion of the text of General Business Law § 777.”

    In the third cause of action, the plaintiff alleges “a breach of contract claim as against Vision, Foremost, and MMJ based upon their contract with 355 Realty, pursuant to which they agreed to be the general contractors/construction managers for the condominium, to undertake oversight responsibility for the design and construction of the condominium, to prepare and/or review drawings, plans, and specifications for the condominium, and to otherwise manage and oversee the project. Plaintiff alleges that Vision, Foremost, and MMJ breached their contractual obligations in that the condominium units were improperly and inadequately designed and constructed, and completed in an incompetent and unworkmanlike manner, with material design and construction defects.”

    The motion to dismiss the third cause of action was denied as well: “Plaintiff alleges, in his amended complaint, that Vision, Foremost, and MMJ have acknowledged notice of the defects and have not denied that they are responsible for providing a warranty to plaintiff. Plaintiff also refers to this warranty, in his amended complaint, by noting that paragraph 16 of the purchase agreement stated that the ‘[s]eller shall not be liable to . . . the [p]urchaser for any matter as to which an assignable warranty . . . has been assigned . . . to [p]urchaser and in such case the sole recourse of such . . . [p]urchaser . . . shall be against the warrantor . . . except that in the event a contractor or subcontractor is financially unable or refuses to perform its warranty . . . [s]eller shall not be excused from its obligations enumerated in the [offering p]lan under Rights and Obligations of Sponsor.’ Consequently, the court finds that dismissal of plaintiff’s third cause of action as against Foremost and MMJ must also be denied.”

    In the fourth cause of action, the plaintiff alleges “that defendants made false statements and representations orally, in advertisements, and in the purchase agreement, that the condominium was properly and adequately designed and constructed and completed in a competent and workmanlike manner, in accordance with the condominium plans and specifications and proper design, engineering, and construction standards and practices consistent with applicable standards for a first class, luxury condominium in Brooklyn.”

    The court dismissed the fourth cause of action stating, “it must be dismissed because it is duplicative of his first cause of action for breach of contract.” Therefore, “defendants’ motion to dismiss plaintiff’s amended complaint is granted to the extent that it seeks dismissal of plaintiff’s fourth cause of action, and it is denied in all other respects.”

    Read the court’s decision…

    Hawaii Building Codes to Stay in State Control

    March 1, 2012 — CDJ Staff

    The Hawaii State Senate voted down Senate Bill 2692. Had it been passed, the State Building Code Council would have been abolished and building codes would have become the responsibility of county governments. The bill was opposed by the Insurance Institute for Business and Home Safety. Their director of code development, Wanda Edwards said that the bill “would have undermined key components that are essential to an effective state building code regime.”

    Read the full story…


    Summary Judgment in Construction Defect Case Cannot Be Overturned While Facts Are Still in Contention in Related Cases

    September 9, 2011 — CDJ Staff

    The Alabama Court of Civil Appeals has dismissed an appeal of a summary judgment in the case Bella Investments, Inc. v. Multi Family Services, Inc. MFS was hired by Bella to be the general contractor for a hotel in Gardendale, Alabama. MFS hired various subcontractors, including the architect for the project. After completion of the hotel in April, 2006, Bella made requests for MFS to repair cracked floor tiles.

    In August, 2008, Bella sued MFS, the architect, and various fictitiously named defendants. Subsequently, Bella amended its complaint, naming some of the fictitiously named defendants.

    MFS in turn claimed that Bella’s claims were void under the statute of limitations and that Bella was in beach of contact by failing to pay MFS the full amount owed. MFS moved for summary judgment under the statute of limitations, which was granted by the court.

    Bella requested that the court “alter, amend, or vacate its summary judgment order.” When this was denied, Bella appealed to the Alabama Supreme Court, which transferred the appeal to the Court of Civil Appeals. The Court of Appeals refused to vacate the summary judgment as claims that form part of the case against MFS are also part of Bella’s claims against the other defendants. For this reason, the court upheld the summary judgment.

    Read the court’s decision…


    Construction Case Alert: Appellate Court Confirms Engineer’s Duty to Defend Developer Arises Upon Tender of Indemnity Claim

    January 27, 2010 — By Steven M. Cvitanovic, Haight Brown & Bonesteel, LLP, January 27, 2010

    In the recent case of UDC-Universal Development, L.P. v. CH2M Hill, 2010 Cal.App.LEXIS 47 (filed January 15, 2010), the Sixth District Court of Appeal provided a stunning illustration of the far-reaching effects of the California Supreme Court’s holding in Crawford v. Weather Shield Manufacturing Inc. (2008) 44 Cal.4th 541. In Crawford, the Court held the duty to defend under an indemnity agreement arose upon the mere tender of defense of a claim covered by the indemnity.

    In the UDC case, CH2M Hill provided engineering and environmental planning services to developer UDC on a project that ultimately wound up in a construction defect lawsuit by the homeowners association ( HOA ). UDC tendered its defense to CH2M Hill, the tender was rejected, and UDC filed a cross-complaint for negligence, breach of contract and indemnity against CH2M Hill and others. After the HOA’s construction defect claims were settled, UDC proceeded to trial against CH2M Hill. The jury found in favor of CH2M Hill on the claims for negligence and breach of contract. At the request of the parties prior to trial, the trial court ruled on the application of the indemnity agreement in light of Crawford and, in so doing, found that the defense obligation arose upon the tender and that CH2M Hill breached that duty despite the jury finding in favor of CH2M Hill.

    The Court of Appeal affirmed, noting that the defense obligation arose as soon as the defense was tendered and did not depend on the outcome of the litigation, and that the HOA’s general description of the defects along with an allegation that Doe engineers were negligent triggered the duty to defend.

    Although this case did not expand the crushing impact of Crawford’s holding, it is

    Read the full story...


    Hawaii State Senate Requires CGL Carriers to Submit Premium Information To State Legislature

    March 20, 2011 — March 20, 2011 Construction Defect Journal Staff

    In light of the decision in Hawaii’s Intermediate Court of Appeals in Group Builders, Inc.,v. Admiral Insurance Company, 231 P.3d 67(2010), Hawaii’s state senate is requesting that "every domestic and foreign insurance company that has ever issued commercial general liability policies in the State is requested to submit information to the Legislature on the total premiums received for their commercial general liability policies during the past ten years"

    Read Full Text of Hawaii State Senate Resolution


    Avoid Gaps in Construction Defect Coverage

    July 10, 2012 — CDJ Staff

    The language may be standardized, but the way different states’ courts interpret it is not. That’s the problem discussed by William F. Knowles and Brendan Winslow-Nason in an article in Business Insurance. One of the major issue through the country is whether a construction defect claim and the resultant damage are an occurrence. Additionally, there are questions whether certain exclusions apply, such as “your work” or “your product” exclusions. They note that many courts “ agree that they are intended to exclude defective construction itself, while providing coverage for unintended consequences.” They further note that these are not the only insurance issues, “making it difficult for construction companies operating across state lines to ensure adequate coverage.”

    Their recommendations to contractors are that they pay careful attention to where they’ve done business and “if the states have issued decisions or if there is legislation in place address the scope of coverage under additional insured endorsements.” Additionally, they suggest determining whether a contractor can negotiate a choice of law provision in their policy. The conclude that “construction companies can take proactive steps to protect themselves by identifying the applicable states’ laws, determining whether insurance is adequate under those laws, and then taking steps to resolve any gaps in their coverage.”

    Read the full story…


    After Construction Defect Case, Repairs to Austin Building

    August 2, 2012 — CDJ Staff

    The Austin Business Journal reports that remediation is about to begin on Met Center 10, a building that was “at the center of a complex structural defect case.” Claims were made that Grubb & Ellis failed to disclose known structural defects to a group of investors who purchased the building. The brokerage was ordered to pay $6.75 million. Repairs will take an estimated six months at a cost of $3.7 million.

    Read the full story…


    Retaining Wall Contractor Not Responsible for Building Damage

    July 20, 2011 — CDJ Staff

    The Court of Appeals of Indiana ruled on July 8 in the case of Rollander Enterprises, Inc. v. H.C. Nutting Co. Judge Baily wrote the opinion affirming the decision of the trial court.

    The case involved an unfinished condominium complex, the Slopes of Greendale, in Greendale, Indiana. Rollander is a real estate development company incorporated in Ohio. One of the issues in the case was whether the case should be settled in the Indiana courts or be tried in Ohio. The project was owned by a special purpose entity limited liability corporation incorporated in Indiana.

    Rollander hired Nutting to determine the geological composition of the site. Nutting’s report described the site as “a medium plastic clay containing pieces of shale and limestone.” The court summarized this as corresponding with “slope instability and landslides.” Rollander then hired Nutting to design the retaining walls, which were constructed by Scherziner Drilling.

    After cracking was discovered on State Route 1, the walls were discovered to be inadequate. More dirt was brought in and a system of tie-backs was designed to anchor the walls. Not only were the tie-backs unsightly, local officials would not approve the complex for occupancy. Further, the failure of the wall below one building lead to damage of that building.

    The court concluded that since almost all events occurred in Indiana, they rejected Rollander’s contention that the case should be tried in Ohio. Further, the court notes “the last event making Nutting potentially liable on both claims was an injury that occurred in Indiana and consequently, under the lex loci delicti analysis, Indiana law applies.”

    Nor did the court find that Nutting was responsible for the damage to the rest of the project, citing an Indiana Supreme Court ruling, that “there is no liability in tort to the owner of a major construction project for pure economic loss caused unintentionally by contractors, subcontractors, engineers, design professionals, or others engaged in the project with whom the project owner, whether or not technically in privity of contract, is connected through a network or chain of contracts.”

    The court concluded:

    Because Rollander was in contractual privity with Nutting, and Indy was connected to Nutting through a chain of contracts and no exception applies, the economic loss rule precludes their recovery in tort. Damage to Building B was not damage to "other property," and the negligent misrepresentation exception to the economic loss rule is inapplicable on these facts. The trial court therefore did not abuse its discretion by entering judgment on the evidence in favor of Nutting on the Appellants' negligence and negligent misrepresentation claims.

    Read the court’s decision…