    custom homes Johnson County Tennessee condominiums Johnson County Tennessee high-rise construction Johnson County Tennessee institutional building Johnson County Tennessee hospital construction Johnson County Tennessee casino resort Johnson County Tennessee Subterranean parking Johnson County Tennessee low-income housing Johnson County Tennessee condominium Johnson County Tennessee office building Johnson County Tennessee mid-rise construction Johnson County Tennessee industrial building Johnson County Tennessee custom home Johnson County Tennessee tract home Johnson County Tennessee retail construction Johnson County Tennessee multi family housing Johnson County Tennessee townhome construction Johnson County Tennessee parking structure Johnson County Tennessee landscaping construction Johnson County Tennessee housing Johnson County Tennessee structural steel construction Johnson County Tennessee production housing Johnson County Tennessee
    Arrange No Cost Consultation
     
    Construction Expert Witness Builders Information
    Johnson County, Tennessee

    Tennessee Builders Right To Repair Current Law Summary:

    Current Law Summary: (HB 2787/SB2931 & HB 2771/SB 2201; Title 66, Chptr 36) Homeowners must serve written notice of a defect 15 days after its discovery; Contractors, upon receipt of the notice, have 10 business days to inspect the residence and inform any subcontractors it believes are reasonably responsible on the defect. Within 10 business days after notice of the claim, the subcontractor must serve a written response to contractor. Within 30 days after receipt of notice of a defect, the contractor must provide written notice of intention (repair, replace, monetarily compensate or reject) to the homeowner.


    Construction Expert Witness Contractors Licensing
    Guidelines Johnson County Tennessee

    Commercial and Residential Contractors License Required.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Johnson City Area Home Builders Association
    Local # 4494
    1001 N Roan St
    Johnson City, TN 37601
    http://www.jcahba.org

    Greene County Chapter of National Associated Home Builders
    Local # 4464
    70 Afton Road
    Afton, TN 37616


    Home Builders Association of Tennessee
    Local # 4400
    213 5th Ave N Ste 200
    Nashville, TN 37219
    http://www.hbat.org

    Home Builders Association of Upper Cumberland
    Local # 4491
    PO Box 243
    Cookeville, TN 38503
    http://www.uchba.com

    Home Builders Association of Gr Kingsport
    Local # 4445
    1200 E Sevier Ave
    Kingsport, TN 37664
    http://www.kingsporthomebuilders.com

    Clarksville-Montgomery Co Home Builders Association
    Local # 4406
    PO Box 1167
    Clarksville, TN 37041
    http://www.clarksvillehba.org

    Home Builders Association of Dyer Co
    Local # 4425
    1075 Cooper Dr
    Dyersburg, TN 38024



    Construction Expert Witness News and Information
    For Johnson County Tennessee

    Washington Court of Appeals Upholds Standard of Repose in Fruit Warehouse Case

    Homeowner may pursue negligence claim for construction defect, Oregon Supreme Court holds

    Contractors with Ties to Trustees Reaped Benefits from LA Community College Modernization Program

    A Call to Washington: Online Permitting Saves Money and the Environment

    Builder Cannot Receive Setoff in Construction Defect Case

    Insurer Able to Refuse Coverage for Failed Retaining Wall

    Was Jury Right in Negligent Construction Case?

    Vegas Hi-Rise Not Earthquake Safe

    Construction Defects in Home a Breach of Contract

    Ambitious Building Plans in Boston

    Partial Settlement in DeKalb Construction Management Case

    Insurance Company Prevails in “Chinese Drywall” Case

    Public Relations Battle over Harmon Tower

    Flooded Courtroom May be Due to Construction Defect

    Ohio Court of Appeals Affirms Judgment in Landis v. Fannin Builders

    Guilty Pleas Draw Renewed Interest In Nevada’s Construction Defect Laws

    Boston Tower Project to Create 450 Jobs

    Massachusetts Couple Seek to Recuse Judge in Construction Defect Case

    Lockton Expands Construction and Design Team

    No Coverage For Construction Defects When Complaint Alleges Contractual Damages

    Liability policy covers negligent construction: GA high court

    Water Damage Covered Under Efficient Proximate Cause Doctrine

    Legislatures Shouldn’t Try to Do the Courts’ Job

    Florida trigger

    Safer Schools Rendered Unsafe Due to Construction Defects

    Insurer Beware: Failure to Defend Ends with Hefty Verdict

    Know the Minnesota Statute of Limitations for Construction Defect Claims

    Lien Claimant’s Right to Execute against Bond Upheld in Court of Appeals

    Pipes May Be Defective, But Owners Lack Standing

    Nevada Court Adopts Efficient Proximate Cause Doctrine

    Coverage Exists Under Ensuing Loss Provision

    Window Manufacturer Weathers Recession by Diversifying

    Background Owner of Property Cannot Be Compelled to Arbitrate Construction Defects

    Denver Court Rules that Condo Owners Must Follow Arbitration Agreement

    Town Files Construction Lawsuit over Dust

    Contractor’s Home Not Covered for Construction Defects

    Differing Rulings On Construction Defect Claims Leave Unanswered Questions For Builders, and Construction Practice Groups. Impact to CGL Carriers, General Contractors, Builders Remains Unclear

    Construction Defect Litigation at San Diego’s Alicante Condominiums?

    California Supreme Court to Examine Arbitration Provisions in Several Upcoming Cases

    Harmon Tower Construction Defects Update: Who’s To Blame?

    Homeowners Sue Over Sinkholes, Use Cash for Other Things

    Appeals Court Reverses Summary Judgment over Defective Archway Construction

    A Downside of Associational Standing - HOA's Claims Against Subcontractors Barred by Statute of Limitations

    California Supreme Court Binds Homeowner Associations To Arbitration Provisions In CC&Rs

    Court Requires Adherence to “Good Faith and Fair Dealing” in Construction Defect Coverage

    Construction Defects Are Occurrences, Says Georgia Supreme Court

    Statute of Limitations Upheld in Construction Defect Case

    Foundation Arbitration Doesn’t Preclude Suing Over Cracks

    Statutes of Limitations May be the Colorado Contractors’ Friend

    Lower Court “Eminently Reasonable” but Wrong in Construction Defect Case

    Cogently Written Opinion Finds Coverage for Loss Caused By Defective Concrete

    High School Gym Closed by Construction Defects

    Contractor Convicted of Additional Fraud

    Water Drainage Case Lacks Standing

    Badly Constructed Masonry Walls Not an Occurrence in Arkansas Law

    Environment Decision May Expand Construction Defect Claims

    Defense for Additional Insured Not Barred By Sole Negligence Provision

    Homeowner Loses Suit against Architect and Contractor of Resold Home

    Late Filing Contractor Barred from Involving Subcontractors in Construction Defect Claim

    Increased Expenditure on Injuries for New York City School Construction

    Loose Bolts Led to Sagging Roof in Construction Defect Claim

    Ensuing Loss Provision Does Not Salvage Coverage

    New Safety Standards Issued by ASSE and ANSI

    Godfather Charged with Insurance Fraud

    Contractor Underpaid Workers, Pocketed the Difference

    Construction Defect Exception Does Not Lift Bar in Payment Dispute

    Bound by Group Builders, Federal District Court Finds No Occurrence

    Colorado Court of Appeals Finds Damages to Non-Defective Property Arising From Defective Construction Covered Under Commercial General Liability Policy

    Harmon Towers Duty to Defend Question Must Wait, Says Court

    Avoid Gaps in Construction Defect Coverage

    The Hidden Dangers of Construction Defect Litigation

    2011 Worst Year Ever for Home Sales

    Appeals Court Upholds Decision by Referee in Trial Court for Antagan v Shea Homes

    Contract Not So Clear in South Carolina Construction Defect Case

    Insurer Must Cover Construction Defects Claims under Actual Injury Rule

    After Katrina Came Homes that Could Withstand Isaac

    Supreme Court of Oregon Affirms Decision in Abraham v. T. Henry Construction, et al.

    Judge Okays Harmon Tower Demolition, Also Calls for More Testing

    Fifth Circuit Reverses Insurers’ Summary Judgment Award Based on "Your Work" Exclusion

    Contractual Liability Exclusion Bars Coverage

    Homeowners May Not Need to Pay Lien on Defective Log Cabin

    Kentucky Court Upholds Arbitration Award, Denies Appeal

    Homeowner’s Policy Excludes Coverage for Loss Caused by Chinese Drywall

    West Coast Casualty Promises Exciting Line Up at the Nineteenth Annual Conference

    Parking Garage Collapse May Be Due to Construction Defect

    Windows and Lawsuits Fly at W Hotel

    Contractor Burns Down Home, Insurer Refuses Coverage

    Allowing The Use Of a General Verdict Form in a Construction Defect Case Could Subject Your Client to Prejudgment Interest

    Preventing Costly Litigation Through Your Construction Contract

    Construction Defect Journal Seeks Article Submissions Regarding SB800 and Other Builders Right to Repair Laws
    Corporate Profile

    JOHNSON COUNTY TENNESSEE CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 5500 construction defect and claims related expert witness designations, the Johnson County, Tennessee Construction Expert Witness Group provides a wide range of trial support and consulting services to Johnson County's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.

    Construction Expert Witness News & Info
    Johnson County, Tennessee

    Bound by Group Builders, Federal District Court Finds No Occurrence

    August 11, 2011 — Tred Eyerly, Insurance Law Hawaii

    The homeowners sued their contractor, alleging the contractor had defectively constructed and failed to complete their home.  State Farm Fire and Casualty Co. v. Vogelgesang, 2011 U.S. Dist. LEXIS 72618 (D. Haw. July 6, 2011).  The homeowners' complaint pled, among other things, damage caused by breach of contract and negligence.  State Farm agreed to defend under a reservation of rights.

    State Farm filed suit in federal court for declaratory relief.  Judge Mollway granted State Farm's motion for summary judgment.  Relying on the Hawaii Intermediate Court of Appeal's decision in Group Builders, Inc. v. Admiral Ins. Co., 123 Haw. 142, 231 P.3d 67 (Haw. Ct. App. 2010), Judge Mollway determined that the claims asserted in the underlying litigation arose from the contractor's alleged breach of contract.  Group Builders held that breach of contract claims based on allegations of shoddy performance were not covered under CGL policies.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Toxic Drywall Not Covered Under Homeowner’s Policy

    March 28, 2012 — CDJ Staff

    The Duphuys of Baton Rouge Louisiana found themselves needing to argue both sides of an issue, according to the judge in Duphuy v. USAA Casualty Insurance Company. The Duphuys alleged that the drywall in their home “emits odorous gases that cause damage to air-condition and refrigerator coils, copper tubing, electrical wiring, computer wiring, and other household items.” Additionally, they reported damage to “their home’s insulation, trimwork, floors, cabinets, carpets, and other items” which they maintained were “covered under the ‘ensuing loss’ portion of their policy.”

    Their insurer declined coverage, stating that the damages were not a “direct, physical loss,” and even if they were “four different exclusions independently exclude coverage, even if such loss occurred.” The policy excludes defective building materials, latent defects, pollutants, and corrosion damage. The court noted that “ambiguities in policy exclusions are construed to afford coverage to the insured.”

    The court did determine that the Duphuys were not in “a situation where the plaintiffs caused the risk for which they now seek coverage.” The judge cited an earlier case, In re Chinese Drywall, “a case with substantially similar facts and construing the same policy” and in that case, “property damage” was determined to “include the loss of use of tangible property.” The court’s conclusion was that the Duphuys “suffered a direct, physical loss triggering coverage under their policy.”

    Unfortunately for the Duphuys, at this point the judge noted that while they had a “direct, physical loss,” the exclusions put them “in the tough predicament of claiming the drywall is neither defective nor its off-gassing corrosive or a pollutant, but nonetheless damage-causing.”

    In the earlier Chinese Drywall case, the judge found that “faulty and defective materials” “constitutes a physical thing tainted by imperfection or impairment.” The case “found the drywall served its intended purpose as a room divider and insulator but nonetheless qualified under the exclusion, analogizing the drywall to building components containing asbestos that courts have previously determined fit under the same exclusion.” In the current case, the judge concluded that the drywall was “outside the realm of coverage under the policy.”

    The court also found that it had to apply the corrosion exclusion, noting that the plaintiffs tried to evade this by stating, “simplistically and somewhat disingenuously, that the damage is not caused by corrosion but by the drywall itself.” The plaintiffs are, however, parties to another Chinese drywall case, Payton v. Knauf Gips KG, in which “they directly alleged that ‘sulfides and other noxious gases, such as those emitted from [Chinese] drywall, cause corrosion and damage to personal property.’” As the court pointed out, the Duphuys could not claim in one case that the corrosion was caused by gases emitted by the drywall and in another claim it was the drywall itself. “They hope their more ambiguous allegations will be resolved in their favor and unlock the doors to discovery.”

    The court quickly noted that “the remaining damage allegations are too vague and conclusory to construe” and permitted “exploration of the latent defect and pollution exclusions.”

    The judge concluded that the plaintiffs did not provide sufficient facts to establish coverage under the ensuing loss provision, stating that the “plaintiffs must allege, at the very least, how the drywall causes damage to the trimwork, carpet, etc., not simply that it does so.” Given the court’s determinations in the case, the plaintiffs’ motion was dismissed.

    Read the court’s decision…


    Orange County Home Builder Dead at 93

    April 25, 2012 — CDJ Staff

    Randall E. Presley was a homebuilder in Southern California for more than thirty years, acting as head of Presley Development Company from 1956 until selling the firm to Lyon Homes in 1987. The two companies merged in 1991 as the Presley Cos. Mr. Presley saw the need in the 1950s to provide people in Southern California with low- to medium-priced quality homes.

    His firm built more than 160 communities and was among the ten largest homebuilding firms in the country, expanding beyond California. Mr. Presley was 93 when he succumbed to pneumonia. He is survived by a wife, three children, seven grandchildren, and 11 great-grandchildren.

    Read the full story…


    There Is No Non-Delegable Duty on the Part of Residential Builders in Colorado

    August 16, 2012 — Brady Iandiorio, Higgins, Hopkins, McLain & Roswell, LLC

    Recently, in the Arapahoe District Court, the Honorable Michael Spear, issued an order holding that builders do not owe a non-delegable duty to homeowners. In Marx and Corken v. Alpert Custom Homes, Inc., et al., Judge Spear’s order came in response to plaintiffs’ motion for determination of question of law seeking a finding that the defendants owed a non-delegable duty to the plaintiffs and thus, to strike defendants’ designation of nonparties at fault. After being fully briefed, Judge Spear, found that such a non-delegable duty does not exist.

    The case arises from the construction of a single-family residence in Aurora, Colorado. Through the construction and interaction with Alpert Custom Homes, Inc. and Scott and Sally Alpert, the defendants, Paul Marx and Kay Corken, the plaintiffs claimed they suffered various damages and losses, and brought claims for breach of contract-warranty, breach of contract, violation of the Colorado Consumer Protection Act, breaches of the implied covenant of good faith, promissory estoppel, willful breach of contract, and quantum meruit. During litigation, the defendants filed a designation of nonparties at fault, which named several parties which were at fault for the alleged construction defects at issue in the case.

    Read the full story…

    Reprinted courtesy of Brady Iandiorio, Higgins, Hopkins, McLain & Roswell, LLC. Mr. Iandiorio can be contacted at iandiorio@hhmrlaw.com


    Pipes May Be Defective, But Owners Lack Standing

    September 13, 2012 — CDJ Staff

    The United States District Court in Minnesota has determined that Steven and Cecilia Thundander cannot make a class-action claim against Uponor, Inc. over the plumbing in their home, as they do not have Article III standing. In this situation, the alleged defect is that Uponor made fraudulent claims that the pipes met National Sanitation Foundation (NSF) standards for use in potable water systems. Uponor submitted samples of other pipes, and their substitution was discovered when the NSF made an inspection of the manufacturing facility. The court noted that “the Thunanders contend that Uponor failed to inform homeowners, plumbers and consumers that it had been selling pipe that failed to meet NSF toxicity requirements at the time of sale and installation.”

    The Court noted that the Thunanders have not tested their piping to determine if they “demonstrate toxicity or lack of compliance with the NSF 61 standards,” noting also that the Complaint seeks to require Uponor to instruct the plaintiffs on “how to test the piping and water to determine the level of risk.” Lacking testing, the Court could not find that the Thundanders have defective pipes. The Court found that the “Plaintiffs have failed to adequately plead an injury in fact sufficient to confer standing as to their product liability claims.”

    The Court also concluded that it could not determine if the Plaintiff’s warranty actions could not be applied, as they “have failed to allege a plausible defect.” Even in the presence of a defect, the Court noted that more than eight years had passed before the filing of the suit, when the warranties under both Indiana and Minnesota law have a four-year statute of limitations. The Court also rejected the Thunanders tort claims, once again because “Plaintiffs have not tested their pipes,” noting that “a tort requires the existence of an injury.”

    In conclusion, Judge Nelson rejected the entirety of the complaint, granting the motions to dismiss by the defendants. However, despite the problems with the Thunanders’ claims, she found that they were not “patently frivolous or groundless.” Therefore, she denied attorney fees requested by one of the defendants.

    Read the court’s decision…


    Lower Court “Eminently Reasonable” but Wrong in Construction Defect Case

    July 10, 2012 — CDJ Staff

    Noting that “circuit court’s orders are eminently reasonable, logical and just” the Supreme Court of Appeals of West Virginia has granted a writ to halt enforcement of these orders and to compel arbitration instead in the case of State v. Tucker. The initial case concerned claims that an HVAC system had been improperly designed, constructed, manufactured, or maintained, leading to serious problems. Glenmark Holding, the owner of the Suncrest Executive Plaza brought a lawsuit against seven defendants. Three of the defendants, Morgan Keller, Inc, York International Corporation, and Johnson Controls, Inc. argued that Glenmark was obligated to enter into arbitration.

    Glenmark and the other defendants argued that the motions for arbitration should be denied “so all the claims and cross-claims of the parties could be litigated in one forum, in one proceeding.” The circuit court noted that arbitration is preferred over litigation because of its supposed “expeditious, economic resolution of issues,” but that in this case, “the petitioners would expend additional, not fewer resources responding to the parties’ claims and cross-claims.” As “compulsory arbitration would be insufficient and inequitable” the court denied the request, finding the arbitration clauses “unconscionable and, therefore, unenforceable.”

    Morgan Keller, York, and Johson argued that “the interpretation of arbitration clauses is governed exclusively by the Federal Arbitration Act.” The appeals court found that “the circuit court was within its authority to consider Glenmark’s claim that the arbitration clauses were unenforceable.” However, the appeals court rejected the circuit court’s conclusion about the “piecemeal” resolution of the conflict, as it contradicts a Supreme Court ruling. The Supreme Court stated in 1983 that the FAA “requires piecemeal resolution when necessary to give effect to an arbitration agreement.” In a 1985 decision, the Court held that a court could “not substitute [its] own views of economy and efficiency.”

    Nor could the court find the arbitration clause to be unconscionable or unenforceable. The court noted that the contract was a standard AIA form, and was amended by the parties involved, whom the court characterized as “commercially sophisticated.” The court found that the agreement limited the rights of all parties and was not one-sided.

    As the arbitration clause was neither unconscionable nor unenforceable, and Supreme Court rulings preclude a court from substituting its own procedures, even when these are “eminently reasonable, logical and just,” the appeals court halted the order of the circuit court, sending the matter to arbitration.

    Read the court’s decision…


    Late Filing Contractor Barred from Involving Subcontractors in Construction Defect Claim

    March 1, 2012 — CDJ Staff

    The Colorado Court of Appeals looked at that state’s Construction Defect Action Reform Act in determining if a general contractor could add subcontractors as third-party defendants to a construction defect lawsuit. Shaw Construction, LLC was the general contraction of the Roslyn Court condominium complex, and was sued by the homeowners’ association in a construction defect case. United Builder Services was the drywall subcontractor on the project. MB Roofing had installed roofs, gutters, and downspouts. The certificate of occupancy for the last building was issued on March 10, 2004. The project architect certified completion of all known remaining architectural items in June, 2004.

    The HOA filed a claim against the developers of the property on January, 21, 2009. A week later, the HOA amended its complaint to add Shaw, the general contractor. Shaw did not file its answer and third-party complaint until March 29, 2010, sending its notice of claim under the CDARA on March 30.

    The subcontractors claimed that the six-year statute of limitations had ended twenty days prior. Shaw claimed that the statute of limitations ran until six years after the architect’s certification, or that the HOA’s suit had tolled all claims.

    The trial court granted summary judgment to the subcontractors, determining that “substantial completion occurs ‘when an improvement to real property achieves a degree of completion at which the owner can conveniently utilize the improvement of the purpose it was intended.’”

    The appeals court noted that “Shaw correctly points out that the CDARA does not define ‘substantial completion.’” The court argued that Shaw’s interpretation went against the history and intent of the measure. “Historically, a construction professional who received a complaint responded by ‘cross-nam[ing] or add[ing] everybody and anybody who had a part to play in the construction chain.’” The court concluded that the intent of the act was to prevent unnamed subcontractors from being tolled.

    The court further rejected Shaw’s reliance on the date of the architect’s certification as the time of “substantial completion,” instead agreeing with the trial court that “the architect’s letter on which Shaw relies certified total completion.”

    The appeals court upheld the trial court’s determination that the statute of limitation began to run no later than March 10, 2004 and that Shaw’s complaint of March 29, 2010 was therefore barred. The summary judgment was upheld.

    Read the court’s decision…


    Arizona Court of Appeals Decision in $8.475 Million Construction Defect Class Action Suit

    May 9, 2011 — May 9, 2011 Beverley BevenFlorez - Construction Defect Journal

    In the case of Leflet v. Fire (Ariz. App., 2011), which involved an $8.475 million settlement in a construction defect class action suit, the question put forth to the Appeals court was “whether an insured and an insurer can join in a Morris agreement that avoids the primary insurer’s obligation to pay policy limits and passes liability in excess of those limits on to other insurers.” The Appeals court provided several reasons for their decision to affirm the validity of the settlement agreement as to the Non-Participatory Insurers (NPIs) and to vacate and remand the attorney fee awards.

    First, the Appeals court stated, “The settlement agreement is not a compliant Morris agreement and provides no basis for claims against the NPIs.” They conclude, “Appellants attempt to avoid the doctrinal underpinnings of Morris by arguing that ‘the cooperation clause did not prohibit Hancock from assigning its rights to anyone, including Appellants.’ This narrow reading of the cooperation clause ignores the fact that Hancock did not merely assign its rights — it assigned its rights after stipulating to an $8.475 million judgment that neither it nor its Direct Insurers could ever be liable to pay. Neither Morris nor any other case defines such conduct as actual ‘cooperation’—rather, Morris simply defines limited circumstances in which an insured is relieved of its duty to cooperate. Because Morris agreements are fraught with risk of abuse, a settlement that mimics Morris in form but does not find support in the legal and economic realities that gave rise to that decision is both unenforceable and offensive to the policy’s cooperation clause.”

    The Appeals court further concluded that “even if the agreement had qualified under Morris, plaintiffs did not provide the required notice to the NPIs.” The court continued, “Because an insurer who defends under a reservation of rights is always aware of the possibility of a Morris agreement, the mere threat of Morris in the course of settlement negotiations does not constitute sufficient notice. Instead, the insurer must be made aware that it may waive its reservation of rights and provide an unqualified defense, or defend solely on coverage and reasonableness grounds against the judgment resulting from the Morris agreement. The NPIs were not given the protections of this choice before the agreement was entered, and therefore can face no liability for the resulting stipulated judgment.”

    Next, the Appeals court declared that “the trial court abused its discretion in awarding attorney’s fees under A.R.S § 12-341.” The Appeals court reasoned, “In this case, the NPIs prevailed in their attack on the settlement. But the litigation did not test the merits of their coverage defenses or the reasonableness of the settlement amount. And Plaintiffs never sued the NPIs, either in their own right or as the assignees of Hancock. Rather, the NPIs intervened to test the conceptual validity of the settlement agreement (to which they were not parties) before such an action could commence. In these circumstances, though it might be appropriate to offset a fee award against some future recovery by the Plaintiff Leflet v. Fire (Ariz. App., 2011) class, the purposes of A.R.S. § 12-341.01 would not be served by an award of fees against them jointly and severally. We therefore conclude that the trial court abused its discretion in awarding fees against Plaintiffs ‘jointly and severally.’”

    The Appeals court made the following conclusion: “we affirm the judgment of the trial court concerning the validity of the settlement agreement as to the NPIs. We vacate and remand the award of attorney’s fees. In our discretion, we decline to award the NPIs the attorney’s fees they have requested on appeal pursuant to A.R.S. § 12-341.01(A).”

    Read the court’s decision…


    Wine without Cheese? (Why a construction contract needs an order of precedence clause)(Law Note)

    August 11, 2011 — Melissa Brumback

    For today’s law note, I’m addressing a comment that came to me last week from Dave O’Hern of Miller O’Hern Construction.  Dave writes:

    I am a general contractor doing a fuel tank replacement project for our county. In the specifications there is a spec for a UL 142 tank, on the plans the spec references UL 2085 ? a much more expensive tank. My subcontractor bid the UL 142 tank. The specifications state that the specs and plans are on the same level of precedence.

    The county wants me to furnish the more expensive tank without compensation citing the clause that states the plans and specs are complementary and what is called for by one is binding as if called by all and the most stringent requirement will apply.

    Read the full story…

    Reprinted courtesy of Melissa Brumback of Ragsdale Liggett PLLC. Ms. Brumback can be contacted at mbrumback@rl-law.com.


    Court Will Not Compel Judge to Dismiss Construction Defect Case

    August 2, 2012 — CDJ Staff

    The Fourteenth Court of Appeals of Texas has denied a petition for a writ of mandamus. The parties involved, Bonner Ball, Thomas Zenner, and Rallin Welch, are lmited partners of Black Diamond Builders, LLP. Black Diamond is the recipient of a lawsuit from Grier and Camille Patton, for whom Black Diamond built a home. The Pattons are alleging construction defects.

    The Black Diamond partners argue that Judge Jeff Shadwick, presiding judge of the 55th District Court of Harris County, Texas should have granted their motion to dismiss. They sought to have the Fourteenth Court of Appeals compel that action.

    The Black Diamond Partners claims that “the homowners failed to satisfy statutory prerequisites before filing suit, and dismissal of the suit was automatic under the applicable statues in effect at the time the Pattons noticed alleged defects in their home.”

    The court noted that “a trial court will be held to have abused its discretion only if the party requesting mandamus relief establishes that the trial court could have reached but one decision.” The court did not concur with this and denied the petition for a writ of mandamus.

    Read the court's decision…


    Another Guilty Plea in Las Vegas HOA Scandal

    December 20, 2012 — CDJ Staff

    A twenty-eighth person has plead guilty in the ongoing Las Vegas HOA scandal. Dax Louderman, who had been a construction company manager had acknowledged that he stole more than $495,000 from his former employers, Alpha 1 Construction and the Stone Canyon Homeowners Association, and further that he did not report this improper income on his tax returns. He has agreed to work with prosecutors and to pay $134,860 to the IRS. His actual sentencing will happen on June 24.

    Read the full story…


    Home Sales Still Low, But Enough to Spur Homebuilders

    August 16, 2012 — CDJ Staff

    Although new home sales are still fifty percent below the average over the last forty years, the housing rebound has sent stock of homebuilders up 53 percent this year, during the same period, the S&P 500 rose only 12 percent. The San Francisco Chronicle reports that from 2005 through 2011, homebuilder stocks trailed the S&P 500.

    The growth isn’t limited to homebuilders alone. Building suppliers are also seeing a growth in sales, with profits for companies that make gypsum wallboard, cabinetry, plumbing products, and other items used in home building.

    Homebuilders have also been able to raise prices. Standard Pacific Corp of Irvine, California has raised prices and cut incentives. Nevertheless, the buyers still come. PulteGroup and D.R. Horton are also raising prices.

    Read the full story…


    Homeowner may pursue negligence claim for construction defect, Oregon Supreme Court holds

    March 1, 2011 — Original Story by Lori Bauman, Ater Wynne LLP, Northwest Business Litigation Blog

    In Abraham v. T. Henry, Oregon’s court of appeals held that a Oregon’s court of appeals holds that a homeowner may sue builder for common law negligence absent a contractual provision that forecloses such a claim. Plaintiff homeowners hired defendant contractors to build a house. When plaintiffs discovered defects in the construction years later, they sued for negligence.

    The Court of Appeals held that the parties’ contractual relationship did not prevent a negligence claim, and that plaintiffs were entitled to pursue a negligence per se claim based on a violation of the Oregon Building Code.

    The Supreme Court affirmed, but on a somewhat different basis. First, according to the Court, a construction defect claim concerns damage to property — and not mere economic losses — and thus is not barred by the economic loss doctrine. Second, the existence

    Read Full Story...


    Florida County Suspends Impact Fees to Spur Development

    November 18, 2011 — CDJ Staff

    Hernando County, just north of Tampa on Florida’s west coast, has suspended impact fees for a year, hoping to spur development. Hernando Today reports that the move drew applause from the audience at the county commissioners meeting. Many of those in attendance were builders or members of the Greater Hernando Chamber of Commerce.

    Not all were convinced. Frankie Burnett, the mayor of Brooksville, told the commissioners that his city council were not convinced that this would spur development. “Development should pay its fair share, even in slow economic times.” Burnett’s letter to the board warned that “if lowering impact fees succeeded in stimulating more residential overbuilding, it would only further depress the current real estate market.”

    Read the full story…


    Homeowners Sue Over Sinkholes, Use Cash for Other Things

    January 6, 2012 — CDJ Staff

    Quoting one homeowner as saying that his house “can fall in the ground for all I care, I made my money,” the Tampa Bay Times looks at the issue of sinkhole claims in Florida. Homeowners “have paid off mortgages, put in pools, replaced roofs, or otherwise used money from sinkhole claims to do something besides fix sinkhole damage.

    It’s been tough for insurance companies. Citizens Property Insurance took in $32 million in premiums for sinkhole coverage in 2010, but paid out $245 million in sinkhole claims. The Tampa Bay Times notes that some of those claims come from settling problems caused by their repairs, including one settlement of $350,000 for repairs to a house worth $39,000.

    One couple, after receiving $217,000 from Citizens, sold the house to a company that bought unrepaired sinkhole homes for $190,000. The home has been sold since and remains unrepaired.

    Sometimes the preferred solution by the insurance company isn’t the cheapest either. One couple was informed that Citizens was going to spend $150,000 to have the hole filled with grout. After they settled with the insurance company, they fixed the problem by installing steel piers, at a cost of about $45,000.

    Read the full story…


    Kentucky Court Upholds Arbitration Award, Denies Appeal

    June 15, 2011 — CDJ Staff

    The Kentucky Court of Appeals has ruled in Lake Cumberland Community Action Agency v. CMW, Inc. affirming the arbitration award. CMW, Inc. was responsible for the construction of a facility to be used for pre-school students and the housing of Alzheimer patients and senior citizens. An agreement was made that any disputes would be heard by an arbitrator selected by the construction industry.

    The plaintiff alleged that there were design and construction defects in the building trusses, violation of the Kentucky Building Code, and problems with the HVAC system. The arbitrator awarded $106,000 to the plaintiff which then sought to vacate the award. The circuit court upheld the arbitrator’s decision.

    The Court of Appeals found that there was no basis for rejecting the arbitrator’s decision, noting “there is nothing to show that there was any fraud or bias on the part of the arbitrator.” The appeals court, with all three judges concurring, upheld the arbitration award.

    Read the court’s decision


    Water Damage Covered Under Efficient Proximate Cause Doctrine

    August 2, 2012 — Tred Eyerly, Insurance Law Hawaii

    A U.S. District Court in Washington found coverage in what it described as a text book study of the efficient proximate cause rule. Hiller v. Allstate Pro. & Cas. Ins. Co., 2012 U.S. Dist. LEXIS 84862 (E.D. Wash. June 19, 2012).

    The Hillers purchased a newly constructed home in December 2006. They also purchased an all-risk homeowner's policy from Allstate.

    In July 2010, the Hillers discovered that the carpet in the basement of the residence was saturated with water. Allstate was immediately notified. Hiller began an investigation to attempt to determine the source of the water. He poured water into a downspout drain at the northwest corner of the residence. This caused water to leak into the northwest corner of the home's basement.

    An area was excavated around the northwest downspout drain. The end of the drain pipe was partially blocked by rocks and had been wrapped with fabric landscaping material. Further, a “T” pipe installed at the foot of the drain was directing water toward the house's concrete foundation. Hiller notified Allstate that the problems with the drain was due to construction defects and the system was designed to fail.

    Allstate denied the claim. Based upon Hiller's information, coverage was excluded under the policy's surface water, subsurface water, inherent vice, and latent defect exclusions.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Is There a Conflict of Interest When a CD Defense Attorney Becomes Coverage Counsel Post-Litigation?

    September 1, 2011 — Chad Johnson of Higgins, Hopkins, McLain & Roswell, LLC

    In Weitz Co., LLC v. Ohio Cas. Ins. Co., the U.S. District Court for the District of Colorado was asked to rule on a motion to disqualify counsel in an insurance coverage action. 11-CV-00694-REB-BNB, 2011 WL 2535040 (D. Colo. June 27, 2011). Motions to disqualify counsel are viewed with suspicion, as courts “must guard against the possibility that disqualification is sought to ‘secure a tactical advantage in the proceedings.’” Id. at *2 (citing Religious Technology Center v. F.A.C.T. Net, Inc., 945 F. Supp. 1470, 1473 (D. Colo. 1996).

    Weitz Company, LLC (“Weitz”) is a general contractor and defendant in an underlying construction defect suit which had concluded before the action bringing rise to this order. In the underlying action, Weitz made third-party claims against subcontractors, including NPW Contracting (“NPW”). Weitz was listed as an additional insured under NPW’s policies with both Ohio Casualty Insurance Company and Mountain States Mutual Casualty Company (collectively “the Carriers”). The Carriers accepted Weitz’s tender of defense under a reservation of rights. However, neither insurance carrier actually contributed to Weitz’s defense costs in the underlying action. At the conclusion of the construction defect action, the parties unsuccessfully attempted to apportion the attorney’s fees and costs. Eventually, Weitz brought suit against the recalcitrant carriers. The Lottner firm, which had previously represented Weitz in the underlying construction defect action, continued to represent Weitz in this coverage action. 

    Read the full story…

    Reprinted courtesy of Higgins, Hopkins, McLain & Roswell, LLC. Mr. Johnson can be contacted at johnson@hhmrlaw.com