    condominium Plainfield Indiana casino resort Plainfield Indiana landscaping construction Plainfield Indiana custom homes Plainfield Indiana office building Plainfield Indiana tract home Plainfield Indiana custom home Plainfield Indiana townhome construction Plainfield Indiana industrial building Plainfield Indiana institutional building Plainfield Indiana hospital construction Plainfield Indiana multi family housing Plainfield Indiana concrete tilt-up Plainfield Indiana housing Plainfield Indiana production housing Plainfield Indiana retail construction Plainfield Indiana condominiums Plainfield Indiana low-income housing Plainfield Indiana high-rise construction Plainfield Indiana parking structure Plainfield Indiana Medical building Plainfield Indiana Subterranean parking Plainfield Indiana
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Plainfield, Indiana

    Indiana Builders Right To Repair Current Law Summary:

    Current Law Summary: According to SB45160, §IC 32-27-3-1&2 a claimant must provide written notice 60 days before filing an action. Within 21 days after service of the notice, the construction professional must serve a written response. Claimant must file list of known construction defects, description, and the construction professional responsible for each alleged defect (to the extent known).


    Construction Expert Witness Contractors Licensing
    Guidelines Plainfield Indiana

    License required for plumbing. All other licensing is done at the local county level.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Madison County Chapter
    Local # 1504
    853 E. Southern Avenue
    Indianapolis, IN 46203


    Builders Association of Greater Indianapolis
    Local # 1544
    PO Box 44670
    Indianapolis, IN 46244
    http://www.bagi.com

    Indiana Builders Association
    Local # 1500
    101 W Ohio St Ste 1111
    Indianapolis, IN 46204
    http://www.buildindiana.org

    Wayne County Builders Association
    Local # 1570
    PO Box 1591
    Richmond, IN 47375
    http://www.wcbaonline.com

    Henry County Chapter
    Local # 1598
    PO Box 925
    New Castle, IN 47362


    Home Builders Association of Gtr Terre Haute
    Local # 1582
    2747 Sidenbender Rd
    Terre Haute, IN 47802
    http://www.hbaterrehaute.com

    Southeastern Indiana chapter
    Local # 1536
    394 W County Road 400 N
    Greensburg, IN 47240



    Construction Expert Witness News and Information
    For Plainfield Indiana

    Legislatures Shouldn’t Try to Do the Courts’ Job

    Summary Judgment in Construction Defect Case Cannot Be Overturned While Facts Are Still in Contention in Related Cases

    Senate Committee Approves Military Construction Funds

    Badly Constructed Masonry Walls Not an Occurrence in Arkansas Law

    Official Tried to Influence Judge against Shortchanged Subcontractor

    Contractor Burns Down Home, Insurer Refuses Coverage

    Exact Dates Not Needed for Construction Defect Insurance Claim

    Hovnanian Sees Second-Quarter Profit, Points to Recovery

    Yellow Brass Fittings Play a Crucial Role in Baker v Castle & Cooke Homes

    Construction Defects: 2010 in Review

    Save a Legal Fee: Prevent Costly Lawsuits With Claim Limitation Clauses

    Builder Cannot Receive Setoff in Construction Defect Case

    Pennsylvania Court Extends Construction Defect Protections to Subsequent Buyers

    Florida Law: Defects in Infrastructure Improvements Not Covered in Home Construction Warranties

    Virginia Chinese Drywall and pollution exclusion

    Amerisure Case to be Heard by Texas Supreme Court

    Colorado “occurrence”

    Lien Claimant’s Right to Execute against Bond Upheld in Court of Appeals

    Granting Stay, Federal Court Reviews Construction Defect Coverage in Hawaii

    Allowing the Use of a General Verdict Form in a Construction Defect Case Could Subject Your Client to Prejudgment Interest

    The Hidden Dangers of Construction Defect Litigation

    There is No Non-Delegable Duty on the Part of Residential Builders in Colorado

    Judge Rejects Extrapolation, Harmon Tower to Remain Standing

    South Carolina “occurrence” and allocation

    Ohio Court of Appeals Affirms Judgment in Landis v. Fannin Builders

    Washington Supreme Court Sides with Lien Claimants in Williams v. Athletic Field

    Florida Property Bill Passes Economic Affairs Committee with Amendments

    Don MacGregor To Speak at 2011 West Coast Casualty Construction Defect Seminar

    Mandatory Arbitration Provision Upheld in Construction Defect Case

    Firm Sued For Construction Defects in Parking Garage

    Insurer Unable to Declare its Coverage Excess In Construction Defect Case

    Hovnanian Increases Construction Defect Reserves for 2012

    California insured’s duty to cooperate and insurer’s right to select defense counsel

    No Coverage Under Ensuing Loss Provision

    Record-Setting Construction in Fargo

    Builder Waits too Long to Dispute Contract in Construction Defect Claim

    Homeowner may pursue negligence claim for construction defect, Oregon Supreme Court holds

    Oregon agreement to procure insurance, anti-indemnity statute, and self-insured retention

    Gut Feeling Does Not Disqualify Expert Opinion

    Insurer Has Duty to Defend Despite Construction Defects

    Builder to Appeal Razing of Harmon Tower

    Insurer Must Defend Claims for Diminution in Value of Damaged Property

    Cogently Written Opinion Finds Coverage for Loss Caused By Defective Concrete

    Renovation Contractors: Be Careful How You Disclose Your Projects

    The Complete and Accepted Work Doctrine and Construction Defects

    Preparing for Trial on a Cause of Action for Violation of Civil Code section 895, et seq.

    Battle of “Other Insurance” Clauses

    Texas Construction Firm Files for Bankruptcy

    Colorado statutory “property damage” caused by an “occurrence”

    Toxic Drywall Not Covered Under Homeowner’s Policy

    Construction Case Alert: Appellate Court Confirms Engineer’s Duty to Defend Developer Arises Upon Tender of Indemnity Claim

    Water Damage Covered Under Efficient Proximate Cause Doctrine

    Colorado Senate Bill 12-181: 2012’s Version of a Prompt Pay Bill

    The Ever-Growing Thicket Of California Civil Code Section 2782

    Can We Compel Insurers To Cover Construction Defect in General Liability Policies?

    Seven Former North San Diego County Landfills are Leaking Contaminants

    Park District Sues over Leaky Roof

    Follow Up on Continental Western v. Shay Construction

    West Coast Casualty Promises Exciting Line Up at the Nineteenth Annual Conference

    Condo Board May Be Negligent for not Filing Construction Defect Suit in a Timely Fashion

    Colorado Statutes of Limitations and Repose, A First Step in Construction Defect Litigation

    School District Marks End of Construction Project by Hiring Lawyers

    Conspirators Bilked Homeowners in Nevada Construction Defect Claims

    Statute of Repose Dependant on When Subcontractors Finished

    Former Zurich Executive to Head Willis North America Construction Insurance Group

    Housing Market on Way to Recovery

    Steps to Defending against Construction Defect Lawsuits

    Surveyors Statute Trumps Construction Defect Claim in Tennessee

    Increased Expenditure on Injuries for New York City School Construction

    New OSHA Fall Rules to Start Early in Minnesota

    Nevada District Court Dismisses Case in Construction Defect Coverage Suit

    Underpowered AC Not a Construction Defect

    Georgia Law: “An Occurrence Can Arise Where Faulty Workmanship Causes Unforeseen or Unexpected Damage to Other Property”

    More Charges in Las Vegas HOA Construction Defect Scam

    Coverage Rejected Under Owned Property and Alienated Property Exclusions

    Homebuilders Go Green in Response to Homebuyer Demand

    Georgia Supreme Court Rules Construction Defects Can Constitute an Occurrence in CGL Policies

    Ambitious Building Plans in Boston

    Who Is To Blame For Defective — And Still LEED Certified — Courthouse Square?

    Florida Contractor on Trial for Bribing School Official

    Condominium Exclusion Bars Coverage for Construction Defect

    Las Vegas Home Builder Still in Bankruptcy

    No Coverage For Damage Caused by Chinese Drywall

    Couple Sues Attorney over Construction Defect Case, Loses

    Arizona Court of Appeals Rules Issues Were Not Covered in Construction Defect Suit

    Counterpoint: Washington Supreme Court to Rule on Resulting Losses in Insurance Disputes

    Background Owner of Property Cannot Be Compelled to Arbitrate Construction Defects

    Homeowners Must Comply with Arbitration over Construction Defects

    Nevada Assembly Sends Construction Defect Bill to Senate

    Nevada Construction Defect Lawyers Dead in Possible Suicides
    Corporate Profile

    PLAINFIELD INDIANA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Plainfield, Indiana Construction Expert Witness Group at BHA, leverages from the experience gained through more than 5,500 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Plainfield's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Construction Expert Witness News & Info
    Plainfield, Indiana

    Nebraska Man Sentenced for Insurance Fraud in Construction Projects

    July 10, 2012 — CDJ Staff

    Thomas Herink has been ordered to repay more than $5 million to his victims and will be serving three years of probation after 18 months in jail for defrauding banks and insurance companies, according to a report in the Insurance Journal. Herink falsified financial statements to lenders and insurers so that his company, Golf Services Group Inc. could participate in construction projects.

    Read the full story…


    Death of Construction Defect Lawyer Ruled a Suicide

    June 19, 2012 — CDJ Staff

    The Clark County Coroner’s Office has concluded that Nancy Quon, the construction defect attorney implicated in the wide-ranging HOA scandal, died by her own hand. The cause of death was a combination of anti-anxiety and insomnia medication mixed with alcohol. Quon survived an earlier incident in which she took GHB and her apartment was set on fire. Quon denied that it was a suicide attempt.

    Read the full story…


    Local Government Waives Construction Fees to Spur Jobs

    June 19, 2012 — CDJ Staff

    Warren Township in New Jersey has waived building and electrical permit fees, up to $5,000, for businesses that create at least five new jobs. The fee reductions are available for construction in areas zones under various designations. Buildings that have received a zoning variance are not eligible. The Echoes-Sentinel notes that other towns in Somerset County, New Jersey have adopted similar ordinances.

    Read the full story…


    Who Is To Blame For Defective — And Still LEED Certified — Courthouse Square?

    September 1, 2011 — Douglas Reiser, Builders Counsel

    Remember Courthouse Square? I sure do. We have talked about the closed and evacuated LEED certified building a couple of times here on Builders Counsel. Well, it’s back in the news. This time building professionals are pointing fingers — but there is some talk about a fix. Still, its LEED certification remains.

    If you read my past articles about Courthouse Square, you can get caught up on this mess. The short of it is that Salem, Oregon had the five-story government building and bus mall completed in 2000 for $34 Million. It was awarded LEED certification during the USGBC’s infancy. Last year, it became public that the building had significantly defective concrete and design. The Salem-Keizer Transit District worked with the City of Salem to shut the building down, and it has not been occupied since.

    Last fall, Courthouse Square failed thorough forensic testing leading to a lengthy bout with a number of insurers.  The contractors and designers had been hauled into court, but the Transit District was able to settle with the architect and contractors. The only remaining party involved in the lawsuit appears to be the engineering firm, Century West Engineering. Most expert reports have pinned the responsibility for the poor design and materials on Century West’s shoulders.

    Read the full story…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com


    Homeowner Loses Suit against Architect and Contractor of Resold Home

    June 14, 2011 — CDJ Staff

    The California Court of Appeals in the case of Kizor v. Architects ruled that Mr. Kizor could not make construction defect claims against the architect and contractor of his home, as the defects had caused significant damage to the former owners, and it was they, not Kizor, who could have asserted those claims.

    The background of the case was that John and Miranda Redig hired BRU Architects to design a home. During construction in 2000, they wrote to the roofing supplier complaining about leaks. The leaks were caulked, but the roof continued leaking during rains. The Redigs sold their house to Kizor in 2002, with an addendum to the sale contract protecting themselves from liability for further problems with the roof. “Seller has no responsibility for the condition of the roof and stucco and buyer absolves seller of any liability in connection therewith.”

    In 2006, Kizor sued the architects, contractor, and subcontractor. The defendants moved for summary judgment which was granted. Kizor appealed, and in this current court case, appeal was denied.

    Read the court’s decision


    South Carolina “occurrence” and allocation

    September 1, 2011 — CDCoverage.com

    In Crossman Communities of North Carolina, Inc. v. Harleysville Mutual Insurance Co., No. 26909 (S.C. Aug. 22, 2011), insured Crossman was the developer and general contractor of several condominium projects constructed by Crossman’s subcontractors over multiple years. After completion, Crossman was sued by homeowners alleging negligent construction of exterior components resulting in moisture penetration property damage to non-defective components occurring during multiple years.  Crossman settled the underlying lawsuit and then filed suit against its CGL insurers to recover the settlement amount.  Crossman settled with all of the insurers except for Harleysville.  Crossman and Harleysville stipulated that the only coverage issue was whether there was an “occurrence.”  The trial court subsequently entered judgment in favor of Crossman, determining that there was an “occurrence.” The trial court also ruled that Harleysville was liable for the entire settlement amount without offset for the amounts paid by the other insurers.  

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    History of Defects Leads to Punitive Damages for Bankrupt Developer

    March 1, 2012 — CDJ Staff

    The South Carolina Court of Appeals has ruled that evidence of construction defects at a developer’s other projects were admissible in a construction defect lawsuit. They issued their ruling on Magnolia North Property Owners’ Association v. Heritage Communities, Inc. on February 15, 2012.

    Magnolia North is a condominium complex in South Carolina. The initial builder, Heritage Communities, had not completed construction when they filed for bankruptcy protection under Chapter 11. The remaining four buildings were completed by another contractor. The Property Owners’ Association subsequently sued Heritage Communities, Inc. (HCI) alleging defects. The POA also sued Heritage Magnolia North, and the general contractor, BuildStar.

    The trial court ruled that all three entities were in fact one. On appeal, the defendants claimed that the trial court improperly amalgamated the defendants. The appeals court noted, however, that “all these corporations share officers, directors, office space, and a phone number with HCI.” Until Heritage Communities turned over control of the POA to the actual homeowners, all of the POA’s officers were officers of HCI. The appeals court concluded that “the trial court’s ruling that Appellants’ entities were amalgamated is supported by the law and the evidence.”

    Heritage also claimed that the trial court should not have allowed the plaintiffs to produce evidence of construction defects at other Heritage properties. Heritage argued that the evidence was a violation of the South Carolina Rules of Evidence. The court cited a South Carolina Supreme Court case which made an exception for “facts showing the other acts were substantially similar to the event at issue.” The court noted that the defects introduced by the plaintiffs were “virtually identical across all developments.” This included identical use of the same products from project to project. Further, these were used to demonstrate that “HCI was aware of water issues in the other projects as early as 1998, before construction on Magnolia North had begun.”

    The trial case ended with a directed verdict. Heritage charged that the jury should have determined whether the alleged defects existed. The appeals court noted that there was “overwhelming evidence” that Heritage failed “to meet the industry standard of care.” Heritage did not dispute the existence of the damages during the trial, they “merely contested the extent.”

    Further, Heritage claimed in its appeal that the case should have been rejected due to the three-year statute of limitations. They note that the first meeting of the POA was on March 8, 2000, yet the suit was not filed until May 28, 2003, just over three years. The court noted that here the statute of limitation must be tolled, as Heritage controlled the POA until September 9, 2002. The owner-controlled POA filed suit “approximately eight months after assuming control.”

    The court also applied equitable estoppel to the statute of limitations. During the time in which Heritage controlled the board, Heritage “assured the unit owners the construction defects would be repaired, and, as a result, the owners were justified in relying on those assurances.” Since “a reasonable owner could have believed that it would be counter-productive to file suit,” the court found that also prevented Heritage from invoking the statute of limitations. In the end, the appeals court concluded that the even apart from equitable tolling and equitable estoppel, the statute of limitations could not have started until the unit owners took control of the board in September, 2002.

    Heritage also contested the jury’s awarding of damages, asserting that “the POA failed to establish its damages as to any of its claims.” Noting that damages are determined “with reasonable certainty or accuracy,” and that “proof with mathematical certainty of the amount of loss or damage is not required,” the appeals court found a “sufficiently reasonable basis of computation of damages to support the trial court’s submission of damages to the jury.” Heritage also claimed that the POA did not show that the damage existed at the time of the transfer of control. The court rejected this claim as well.

    Finally, Heritage argued that punitive damages were improperly applied for two reasons: that “the award of punitive damages has no deterrent effect because Appellants went out of business prior to the commencement of the litigation” and that Heritages has “no ability to pay punitive damages.” The punitive damages were upheld, as the relevant earlier decision includes “defendant’s degree of culpability,” “defendants awareness or concealment,” “existence of similar past conduct,” and “likelihood of deterring the defendant or others from similar conduct.”

    The appeals court rejected all of the claims made by Heritage, fully upholding the decision of the trial court.

    Read the court’s decision…


    Partial Settlement in DeKalb Construction Management Case

    July 10, 2012 — CDJ Staff

    The DeKalb County School District has made a partial settlement in a lawsuit over their claims of mismanagement of construction projects. The Atlanta Journal-Constitution reports that the school board settled with E. R. Mitchell & Co., the smaller of two firms that they have sued. As part of the settlement, Mitchell will be testifying against their former partner. Claims from the other side of the lawsuit are that the school board improperly fired the Heery/Mitchell partnership. The superintendant who fired the company, Crawford Lewis, and his chief operations office, Pat Reid, have since been charged with criminal conspiracy to defraud the construction program. A lawyer for Heery said that “we believe that when presented to a jury, Heery will be vindicated.”

    Read the full story…


    Tennessee Court: Window Openings Too Small, Judgment Too Large

    November 18, 2011 — CDJ Staff

    The Tennessee Court of Appeals has issued a ruling in the case of Dayton v. Ackerman, upholding the decision of the lower court, even as they found that the award was incorrectly computed. The Daytons purchased a house that had been designed and built by the Ackermans, who operated a construction business. The court noted that the warranty with the house promised that “for a period of 60 days, the following items will be free of defects in materials or workmanship: doors (including hardware); windows; electric switches; receptacles; and fixtures; caulking around exterior openings; pluming fixtures; and cabinet work.”

    Soon, the Daytons began to experience problems with the house. Many were addressed by the Ackermans, but the Daytons continued to have problems with the windows. Neither side could specify a firm date when the Ackermans were contacted by the Daytons about the window problems. The Ackermans maintained that more than two years passed before the Daytons complained about the windows. The lower court found the Daytons more credible in this.

    Initially, the Daytons included the window manufacturer in their suit, but after preliminary investigations, the Daytons dropped Martin Doors from their suit. Martin Doors concluded that the windows were improperly installed, many of them “jammed into openings that were too small for them.”

    After the Daytons dismissed Martin Doors, the Ackermans sought to file a third party complaint against them. This was denied by the court, as too much time had elapsed. The Ackermans also noted that not all of the window installations were defective, however, the courts found that the Daytons ought not to have mismatched windows.

    Unfortunately for the Daytons, the window repair was done incorrectly and the windows were now too small for the openings. The firm that did the repair discounted the windows and Daytons concealed the problem with plantation shutters, totalling $400 less than the original lowest estimate. However, the appeals court noted that it was here that the trial court made their computation error. Correcting this, the appeals court assessed the Ackermans $12,016.20 instead of $13,016.20.

    Finally, the Ackerman’s expert was excluded as he had changed his testimony between deposition and trial. The trial reviewed the expert’s testimony and had it been admissible, it would not have changed the ruling.

    Read the court’s decision…


    Mark Van Wonterghem To Serve as Senior Forensic Consultant in the Sacramento Offices of Bert L. Howe & Associates, Inc.

    March 1, 2012 — CDJ Staff

    Sacramento, CA — Bert L. Howe and Associates, Inc., is pleased to announce that Mark Van Wonterghem - General Contractor, has joined the firm as Senior Forensic Consultant. Mark will be responsible for leading the firm’s expansion in the newly formed Sacramento headquarters.

    His focus will continue to be working with construction practice groups and claims professionals in the Sacramento and Bay Area markets. He will utilize the resources of the Construction Experts Group at Bert L. Howe & Associates in furthering the litigation support needs attendant to the firm’s Northern California clientele.

    Mr. Van Wonterghem possesses extensive consulting and testimony experience. Through 32 years of experience in the construction industry he leverages extensive practical experience with multiple trades including concrete foundations, walls and flatwork, structural wood and steel framing, finish carpentry, drywall, lath & plaster/stucco, window & door installations, deck coating systems, metal and membrane flashings and above/below grade waterproofing. This trade experience encompasses both the commercial and residential construction sectors and has been vital in his ability to provide concise explanation of construction industry standards, as well as trade-specific standards of care.

    Mr. Van Wonterghem has broad experience with all types of building construction ranging from concrete and steel commercial construction to high-end custom residential construction.

    In connection with the Construction Experts Group at BHA, Mr. Van Wonterghem provides construction consulting and litigation support services to a wide variety of recognized construction claims professionals, owners, and publicly traded builders.

    The firm’s Sacramento offices are located at the Gateway Oaks III office complex, 2520 Venture Oaks Way, Suite 435, Sacramento, CA 95833. Mr. Van Wonterghem can be reached via e mail at mvanwonterghem@berthowe.com or at (800) 783-1822.


    Hilton Grand Vacations Defect Trial Delayed

    October 23, 2012 — CDJ Staff

    A settlement agreement between Conti Electric and Westgate Resorts has lead to a delay in starting the trial over construction defect claims and billing disputes over Hilton Grand Vacations a time share tower in Las Vegas. According to the Las Vegas Review-Journal, the dispute includes claims of $23.3 million owed to the general contractor against which the developer has placed $30 million in construction defect claims.

    Read the full story…


    Negligent Misrepresentation in Sale of Building Altered without Permits

    September 30, 2011 — CDJ Staff

    The Supreme Court of New Hampshire has ruled in the case Wyle v. Lees. The Leeses owned a two-unit apartment building in North Conway, New Hampshire. They hired a contractor to add a third, larger apartment, including a two-car garage. The Leeses and their contractor submitted a building permit application. They were informed that site plan review was required. After receiving approval on the site plan, construction started. At no point did they obtain a building permit and the construction was never inspected. The Leeses subsequently added more space to the unit, reducing parking spaces below the minimum required. Again, they did not obtain a building permit.

    In 2007, three years after all these changes were complete, the Leeses sold their building to Mr. Wyle. To the question “are you aware of any modifications or repairs made without the necessary permits?” they answered “no.” About six weeks after closing, Wyle “received a letter from the town code enforcement officer regarding the legality of the removal of a garage door from the new unit.” A subsequent inspection revealed “numerous building and life safety code violations.”

    Mr. Wyle brought a claim against the Leeses for negligent misrepresentation. The defendants filed a motion “seeking to preclude economic loss damages.” At a two-day bench trial, Mr. Wyle won. The Leeses appealed.

    The appeals court found that “the defendants negligently misrepresented that the premises were licensed for immediate occupancy and that the defendants had obtained all necessary permits,” and thus upheld the lower court’s finding of negligent misrepresentation. The appeals court also rejected the Leeses’ argument that damages must be apportioned on all parties, including “the plaintiff himself, the plaintiff’s building inspector, and the defendant’s contractor,” finding a lack of “adequate evidence.”

    The Leeses further argued that they were unaware that modifications and repairs were accomplished without the required permits. The appeals court noted that “the trial court found that both the conditional approval and final approval for the site plan stated that a building permit and a certificate of occupancy were required prior to any use.” The court concluded that the Leeses “knew or should have known of the falsity of their representation.”

    The appeals affirmed the findings of the trial court.

    Read the court’s decision…


    Nevada Construction Defect Lawyers Dead in Possible Suicides

    March 28, 2012 — CDJ Staff

    A number of news sources have reported on the recent death of Nevada construction defect attorney, Nancy Quon. Ms. Quon was implicated in a recent scandal in which a group conspired to control homeowner associations in order to divert construction defect lawsuits to the members of the conspiracy.

    Ms. Quon was found dead in her bathtub. The details are still under investigations. She and her boyfriend were accused of a failed arson/suicide scheme in 2010. Ms. Quon survived an attempt to burn down her home. Subsequently, her boyfriend obtained some gamma-hydroxybutyric acid (GBH) for her, as part of another failed suicide attempt.

    Subsequent to Ms. Quon’s death, David Amesbury was found in California dead by hanging. Mr. Amesbury took a plea deal in the case, and he had admitted his role in providing legal and construction contracts to firms in the conspiracy. He was accused of fixing HOA elections.

    Read the full story…

    Read the full story…

    Read the full story…

    Read the full story…


    Pennsylvania Court Extends Construction Defect Protections to Subsequent Buyers

    December 20, 2012 — CDJ Staff

    The Pennsylvania courts have long held that there is an implied warranty of habitability for the initial purchaser of a home. Now, as some defects may not immediately show up, the court has extended that implied warranty to second and subsequent purchasers. As Marc D. Brookman, David I. Haas, and Christopher Bender of Duane Morris note, “this judicially created doctrine shifts the risk of a latent defect in the construction of a new home from the purchaser to the builder-vendor.”

    The Pennsylvania Supreme Court concluded that a contractual relationship is not needed for an implied warranty of habitability. The court’s concern was inequalities would result when a home was sold while other homes were protected by being within the statute of repose.

    Read the full story…


    Senate Committee Approves Military Construction Funds

    June 29, 2011 — CDJ Staff

    With a decrease in funding, as compared to the House bill, the Military Construction and Veteran’s Affairs subcommittee of the Senate moved on a $72 billion construction bill. The House version had approved an additional half billion dollars in funding. Senator Tim Johnson, Democrat of South Carolina, said that he expected easy reconciliation with the House version. The Senate bill will move to the full Senate Appropriations Committee on June 30.

    The bill, S 1255, includes funding for construction and remodeling of military housing, as well as construction and remodeling of base facilities.

    Read the full story…

    Read S1255


    Surveyors Statute Trumps Construction Defect Claim in Tennessee

    June 19, 2012 — CDJ Staff

    The Tennessee Court of Appeals has issued an opinion in the case of Dale v. B&J Enters. (Tenn. App., 2012), affirming the ruling of the Chancery Court for Knox County. The homeowners purchased properties in Knoxville, Tennessee in 2007 and 2008. Subsequently, according to the complaint, they found “significant sink holes and depressions throughout the subdivision.” The plaintiffs determined that a previous developer in 2004 had been aware of the sink holes. The Knox County Metropolitan Planning Commission, upon giving approval, made requirements that included that sink holes, even if they were filled, had to be designated on the site plans. The developer did not indicate these locations on the final plans. The plaintiffs made claims of “failure to disclose, misrepresentation, misrepresentation by concealment, and violation of the Tennessee Consumer Protection Act.” They filed their suit in June 2009.

    The defendants in the initial case, argued that they did not create the final plat, the site plan indicating the features and lot lines. This had been the work of the previous developer. In September, 2009, the plaintiffs amended their complaint to include the previous developer and its engineering firm. The engineering firm disavowed any responsibility. The developer noted that the surveyor, Benchmark Associates, had “failed to properly include the sink holes and/or depressions on the final plat.” In June, 2010, the plaintiffs added Benchmark.

    Benchmark argued that the plaintiffs’ claims should be dismissed, as Tennessee has a four-year statute of limitations on claims against surveyors. The final plat was recorded on May 19, 2006, and the plaintiff filed their claims against Benchmark on June 16, 2010, slightly less than a month over four years. The plaintiffs argued that “the real issue [was] the tortious misrepresentation by Benchmark.” The Chancery Court found for Benchmark.

    On appeal, the plaintiffs raised three issues. They argued that the trial court applied the wrong section of the law, and should have applied the section applying to construction and not surveyors. They also argued that the timeliness of the claim should be based on when the defects were discovered. The also raised the question of whether the laws concerning surveyors bar claims for misrepresentation. The appeals court upheld the decision of the Chancery Court.

    For the plaintiff’s first claim, although the statute addressing deficiencies in construction mentions surveying, an earlier court ruling found that the legislature had removed a reference to surveyors in one part of the statute, but failed to do so in the second part. The earlier court had concluded that the “obvious intent of the legislature was to place all limits on actions against surveyors into the new statute.” As the applicable statute states that “any such action not instituted within this four (4) year period shall be forever barred,” the court held that the plaintiffs’ claims must be time barred. Further, as the intent of the legislature was determined to “place all limits on actions against surveyors into one statute,” the court felt that it could not apply the Consumer Protection Act.

    Read the court’s decision…


    Official Tried to Influence Judge against Shortchanged Subcontractor

    February 10, 2012 — CDJ Staff

    A contractor testified in the trial of former Cuyahoga County Commissioner Jimmy Dimora. According to Fox 8 in Cleveland, Ohio, Sean Newman, the president of Letter Perfect testified that his company was a subcontractor on the reconstruction of the locker rooms at the Cleveland Browns Stadium. Newman said his company was paid only $400,000 of their $650,000 bid. When Letter Perfect sued the contractor, D.A.S. Construction, Dimora called the judge to influence her to rule in favor of D.A.S.

    The judge in the earlier case, Bridgett McCafferty, has been found guilty of lying to the FBI during their investigation and is serving a 14-month prison sentence.

    Read the full story…


    Supreme Court of New York Denies Motion in all but One Cause of Action in Kikirov v. 355 Realty Assoc., et al.

    April 28, 2011 — April 28, 2011 Beverley BevenFlorez - Construction Defect Journal

    In the construction defect suit Kikirov v. 355 Realty Associates, LLC, et al., the Supreme Court of the State of New York granted a dismissal of the plaintiff’s fourth cause of action, but denied the defendants’ motion in all other respects. The plaintiff alleged breach of contract, among other claims. “355 Realty was the sponsor of 355 Kings Highway Condominium, a condominium project located at 355 Kings Highway, in Brooklyn, New York. The condominium units were allegedly marketed as ‘ultra luxury condos,’ and a ‘Manhattan style condominium building,’ which would be the ‘epitome of luxury and quality.’ The construction of the six-story 28 unit residential condominium building began in approximately November 2003. […] Plaintiff entered into a purchase agreement, dated December 21, 2005, with 355 Realty (which was executed on behalf of 355 Realty by Michael Marino, as its member) for the purchase of Unit 2G in the building.”

    The plaintiff alleged that construction defects emerged soon after moving into the unit: “After taking occupancy of his condominium unit, plaintiff allegedly experienced serious leakage and moisture problems in his unit, which caused a dangerous mold condition to develop, in addition to causing actual damage to the structural elements of his unit. According to plaintiff, the walls, moldings, and wood floors of his unit are constantly wet and moist, and there is severe buckling of the wood floors. Plaintiff claims that these problems have caused his unit to be uninhabitable. Plaintiff alleges that he has been forced to remove all of his personal belongings from his unit and has been unable to occupy his unit.”

    According to the plaintiff, Foremost attempted to repair the defects, but only made the situation worse: “Specifically, plaintiff asserts that Foremost’s contractors opened his walls to remove the stained drywall, but never corrected the cause of the leaks, destroyed the walls, and never properly taped and painted the sheet rock. Plaintiff alleges that Foremost repaired the openings in a defective manner. Plaintiff also claims that his floor was repaired at that time by a subcontractor hired by Foremost, but the basic structural problem was never resolved and the leaks continued, compromising the beams and causing the mold conditions, in addition to all of the physical damage present in the unit. On or about July 16, 2009, plaintiff allegedly sent a notice of the defects to 355 Realty and to the managing agent designated by the condominium board, by certified mail, return receipt requested. Plaintiff asserts that defendants have failed and refused to repair and remedy the defective condition, and that the damage is extensive and requires major structural repairs.”

    The plaintiff filed suit on May 4, 2010, and the original complaint asserted eight causes of action. “By decision and order dated September 13, 2010, the court granted a motion by defendants to dismiss plaintiff’s second cause of action for breach of implied covenants of good faith and fair dealing, his third cause of action for breach of implied warranties, his fifth cause of action for negligence as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his seventh cause of action for negligence as against Vision, Foremost, and MMJ, and his eighth cause of action for violations of General Business Law § 349 and § 350, and granted plaintiff leave to replead his first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his fourth cause of action for breach of statutory warranties, and his sixth cause of action for breach of contract as against Vision, Foremost, and MMJ.”

    The plaintiff amended their complaint on October 18, 2010, and “has repleaded these three causes of action by asserting a first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, a second cause of action for breach of statutory warranties, and a third cause of action for breach of contract as against Vision, Foremost, and MMJ. In addition, plaintiff, in his amended complaint, has added a fourth cause of action for fraud.”

    The defendants, on the other hand, “argue that each of the four causes of action alleged by plaintiff in his amended complaint fail to state a claim upon which relief may be granted, and that plaintiff’s amended complaint must be dismissed pursuant to CPLR 3211 (a) (7). Defendants also cite to CPLR 3211 (a) (1), and (5), asserting that dismissal is also required based upon documentary evidence and the Statute of Limitations contained in the limited warranty.” The defendants’ motion to dismiss the first cause of action, breach of contract against 355 Realty, was denied: “While defendants dispute that the alleged defects are actually structural in nature, plaintiff’s allegations as to their structural nature are sufficient, at this juncture, to withstand defendants’ motion to dismiss. Thus, dismissal of plaintiff’s first cause of action must be denied.”

    Next, the court reviewed the second cause of action, which was breach of statutory warranties: “Defendants’ motion also seeks dismissal of plaintiff’s second cause of action for breach of statutory warranties, which alleges that, under applicable law, including General Business Law § 777-a, et seq., the sponsor warranted to purchasers of units that the units would be constructed in a skillful, careful, and workmanlike manner, consistent with proper design, engineering, and construction standards and practices, and free of material latent, design, and structural defects. Defendants argue that General Business Law § 777-a, known as the housing merchant implied warranty, is inapplicable to this case because it is limited to the construction of a ‘new home,’ defined in General Business Law § 777 (5) as ‘any single family house or for-sale unit in a multi-unit residential structure of five stories or less.’ As noted above, the building in which plaintiff’s condominium unit is located is a six-story building.”

    The motion to dismiss the second cause of action is denied. The court provided this reasoning: “the full text of the offering plan has not been provided, the court is unable to examine the entire written agreement so as to determine the purpose of the inclusion of the text of General Business Law § 777.”

    In the third cause of action, the plaintiff alleges “a breach of contract claim as against Vision, Foremost, and MMJ based upon their contract with 355 Realty, pursuant to which they agreed to be the general contractors/construction managers for the condominium, to undertake oversight responsibility for the design and construction of the condominium, to prepare and/or review drawings, plans, and specifications for the condominium, and to otherwise manage and oversee the project. Plaintiff alleges that Vision, Foremost, and MMJ breached their contractual obligations in that the condominium units were improperly and inadequately designed and constructed, and completed in an incompetent and unworkmanlike manner, with material design and construction defects.”

    The motion to dismiss the third cause of action was denied as well: “Plaintiff alleges, in his amended complaint, that Vision, Foremost, and MMJ have acknowledged notice of the defects and have not denied that they are responsible for providing a warranty to plaintiff. Plaintiff also refers to this warranty, in his amended complaint, by noting that paragraph 16 of the purchase agreement stated that the ‘[s]eller shall not be liable to . . . the [p]urchaser for any matter as to which an assignable warranty . . . has been assigned . . . to [p]urchaser and in such case the sole recourse of such . . . [p]urchaser . . . shall be against the warrantor . . . except that in the event a contractor or subcontractor is financially unable or refuses to perform its warranty . . . [s]eller shall not be excused from its obligations enumerated in the [offering p]lan under Rights and Obligations of Sponsor.’ Consequently, the court finds that dismissal of plaintiff’s third cause of action as against Foremost and MMJ must also be denied.”

    In the fourth cause of action, the plaintiff alleges “that defendants made false statements and representations orally, in advertisements, and in the purchase agreement, that the condominium was properly and adequately designed and constructed and completed in a competent and workmanlike manner, in accordance with the condominium plans and specifications and proper design, engineering, and construction standards and practices consistent with applicable standards for a first class, luxury condominium in Brooklyn.”

    The court dismissed the fourth cause of action stating, “it must be dismissed because it is duplicative of his first cause of action for breach of contract.” Therefore, “defendants’ motion to dismiss plaintiff’s amended complaint is granted to the extent that it seeks dismissal of plaintiff’s fourth cause of action, and it is denied in all other respects.”

    Read the court’s decision…