    housing Lacoochee Florida landscaping construction Lacoochee Florida townhome construction Lacoochee Florida retail construction Lacoochee Florida casino resort Lacoochee Florida multi family housing Lacoochee Florida Subterranean parking Lacoochee Florida tract home Lacoochee Florida custom homes Lacoochee Florida hospital construction Lacoochee Florida condominiums Lacoochee Florida low-income housing Lacoochee Florida institutional building Lacoochee Florida mid-rise construction Lacoochee Florida condominium Lacoochee Florida high-rise construction Lacoochee Florida production housing Lacoochee Florida concrete tilt-up Lacoochee Florida office building Lacoochee Florida structural steel construction Lacoochee Florida custom home Lacoochee Florida Medical building Lacoochee Florida
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Lacoochee, Florida

    Florida Builders Right To Repair Current Law Summary:

    Current Law Summary: In Title XXXIII Chapter 558, the Florida Legislature establishes a requirement that homeowners who allege construction defects must first notify the construction professional responsible for the defect and allow them an opportunity to repair the defect before the homeowner canbring suit against the construction professional. The statute, which allows homeowners and associations to file claims against certain types of contractors and others, defines the type of defects that fall under the authority of the legislation and the types of housing covered in thelegislation. Florida sets strict procedures that homeowners must follow in notifying construction professionals of alleged defects. The law also establishes strict timeframes for builders to respond to homeowner claims. Once a builder has inspected the unit, the law allows the builder to offer to repair or settle by paying the owner a sum to cover the cost of repairing the defect. The homeowner has the option of accepting the offer or rejecting the offer and filing suit. Under the statute the courts must abate any homeowner legal action until the homeowner has undertaken the claims process. The law also requires contractors, subcontractors and other covered under the law to notify homeowners of the right to cure process.


    Construction Expert Witness Contractors Licensing
    Guidelines Lacoochee Florida

    Commercial and Residential Contractors License Required.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Hernando Bldrs Assoc
    Local # 1010
    7391 Sunshine Grove Rd
    Brooksville, FL 34613
    http://www.hernandobuilders.com

    Home Builders Association of Metro Orlando
    Local # 1040
    544 Mayo Ave
    Maitland, FL 32751
    http://www.hbaofmetroorlando.com

    Home Builders Association of Lake County
    Local # 1026
    1100 N Joanna Ave
    Tavares, FL 32778
    http://www.lakehba.com

    Home Builders & CA of Brevard
    Local # 1012
    1500 W Eau Gallie Blvd Ste A
    Melbourne, FL 32935
    http://www.hbca-brevard.org

    Citrus Cty Bldr Assn
    Local # 1006
    1196 S Lecanto Hwy
    Lecanto, FL 34461
    http://www.citrusbuilders.com

    Polk County Builders Association
    Local # 1028
    2232 Heritage Dr
    Lakeland, FL 33801
    http://www.pcba.com

    Tampa Bay Builders Association
    Local # 1036
    11242 Winthrop Main St
    Riverview, FL 33578
    http://www.tbba.net


    Construction Expert Witness News and Information
    For Lacoochee Florida

    Cogently Written Opinion Finds Coverage for Loss Caused By Defective Concrete

    Court Rejects Anti-SLAPP Motion in Construction Defect Suit

    Ohio Court Finds No Coverage for Construction Defect Claims

    LEED Certified Courthouse Square Negotiating With Insurers, Mulling Over Demolition

    Court Clarifies Sequence in California’s SB800

    Contractor Sues Supplier over Defective Products

    Product Exclusion: The Big Reason Behind The Delay of LEED 2012

    Construction Defects Are Occurrences, Says Georgia Supreme Court

    Policyholder Fails to Build Adequate Record to Support Bad Faith Claim

    Federal Court Denies Summary Judgment in Leaky Condo Conversion

    Construction Defect Case Not Over, Despite Summary Judgment

    Houses Can Still Make Cents: Illinois’ Implied Warranty of Habitability

    Appropriation Bill Cuts Military Construction Spending

    Save a Legal Fee: Prevent Costly Lawsuits With Claim Limitation Clauses

    Negligent Construction an Occurrence Says Ninth Circuit

    History of Defects Leads to Punitive Damages for Bankrupt Developer

    Washington Court of Appeals Upholds Standard of Repose in Fruit Warehouse Case

    Policing Those Subcontractors: It Might Take Extra Effort To Be An Additional Insured

    OSHA Extends Delay of Residential Construction Fall Protection Requirements

    Preparing for Trial on a Cause of Action for Violation of Civil Code section 895, et seq.

    Alabama “occurrence” and subcontractor work exception to the “your completed work” exclusion

    Ohio Court Finds No Coverage for Construction Defect Claims

    When is a Construction Project truly “Complete”? That depends. (law note)

    Contractors Admit Involvement in Kickbacks

    Construction Law Alert: A Specialty License May Not Be Required If Work Covered By Another License

    Contractor Liable for Soils Settlement in Construction Defect Suit

    One Colorado Court Allows Negligence Claim by General Contractor Against Subcontractor

    Insurer Has Duty to Defend Despite Construction Defects

    Florida Construction Defect Case Settled for $3 Million

    Florida Contractor on Trial for Bribing School Official

    Limiting Plaintiffs’ Claims to a Cause of Action for Violation of SB-800

    CC&Rs Not the Place for Arbitration Agreement, Court Rules

    New OSHA Fall Rules to Start Early in Minnesota

    Restitution Unlikely in Las Vegas Construction Defect Scam

    Insurer Settles on Construction Defect Claim

    Safety Officials Investigating Death From Fall

    School Sues over Botched Pool

    Godfather Charged with Insurance Fraud

    Contractor Burns Down Home, Insurer Refuses Coverage

    A Performance-Based Energy Code in Seattle: Will It Save Existing Buildings?

    Counterpoint: Washington Supreme Court to Rule on Resulting Losses in Insurance Disputes

    Public Relations Battle over Harmon Tower

    Businesspeople to Nevada: Revoke the Construction Defect Laws

    Lien Claimant’s Right to Execute against Bond Upheld in Court of Appeals

    The Montrose Language Interpreted: How Many Policies Are Implicated By A Construction Defect That Later Causes a Flood?

    Injured Construction Worker Settles for Five Hundred Thousand

    New Washington Law Nixes Unfair Indemnification in Construction Contracts

    OSHA Cites Construction Firm for Safety Violations

    New Construction Laws, New Forms in California

    Boston Tower Project to Create 450 Jobs

    After Breaching its Duty to Defend, Insurer Must Indemnify

    Driver’s Death May Be Due to Construction Defect

    Application of Efficient Proximate Cause Doctrine Supports Coverage

    Guilty Pleas Draw Renewed Interest In Nevada’s Construction Defect Laws

    Colorado Statutes of Limitations and Repose, A First Step in Construction Defect Litigation

    Texas Windstorm Insurance Agency Under Scrutiny

    Condominium Exclusion Bars Coverage for Construction Defect

    In Colorado, Repair Vendors Can Bring First-Party Bad Faith Actions For Amounts Owed From an Insurer

    Judge Rejects Extrapolation, Harmon Tower to Remain Standing

    Pennsylvania Court Extends Construction Defect Protections to Subsequent Buyers

    Virginia Chinese Drywall and pollution exclusion

    Housing Prices Up through Most of Country

    Largest Per Unit Settlement Ever in California Construction Defect Case?

    Reference to "Man Made" Movement of Earth Corrects Ambiguity

    Landmark San Diego Hotel Settles Defects Suit for $6.4 Million

    Court Sends Construction Defect Case from Kansas to Missouri

    Couple Sues Attorney over Construction Defect Case, Loses

    Can We Compel Insurers To Cover Construction Defect in General Liability Policies?

    Contractor’s Home Not Covered for Construction Defects

    Williams v. Athletic Field: Hugely Important Lien Case Argued Before Supreme Court

    Construction Defect Lawsuits? There’s an App for That

    Boyfriend Pleads Guilty in Las Vegas Construction Defect Scam Suicide

    Court Voids Settlement Agreement in Construction Defect Case

    Ensuing Loss Provision Does Not Salvage Coverage

    Conspirators Bilked Homeowners in Nevada Construction Defect Claims

    No Choice between Homeowner Protection and Bankrupt Developers?

    Pictorial Construction Terminology Dictionary — A Quick and Helpful Reference

    Defense for Additional Insured Not Barred By Sole Negligence Provision

    Construction Workers Unearth Bones

    Partial Settlement in DeKalb Construction Management Case

    Condominium Communities Must Complete Construction Defect Repairs, Says FHA

    Good Signs for Housing Market in 2013

    Plans Go High Tech

    Windows and Lawsuits Fly at W Hotel

    Five Years of Great Legal Blogging at Insurance Law Hawaii

    Another Guilty Plea In Nevada Construction Defect Fraud Case

    Supreme Court of Oregon Affirms Decision in Abraham v. T. Henry Construction, et al.

    No Resulting Loss From Deck Collapsing Due to Rot

    Virginia Homebuilding Slumps After Last Year’s Gain

    Insurance Company Prevails in “Chinese Drywall” Case
    Corporate Profile

    LACOOCHEE FLORIDA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Lacoochee, Florida Construction Expert Witness Group at BHA, leverages from the experience gained through more than 5,500 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Lacoochee's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Lacoochee Florida forensic architect building consultant expertLacoochee Florida forensic architect civil engineer expert witnessLacoochee Florida forensic architect construction project management expert witnessLacoochee Florida forensic architect expert witness commercial buildingsLacoochee Florida forensic architect structural engineering expert witnessesLacoochee Florida forensic architect construction expert witnessLacoochee Florida forensic architect defective construction expert
    Construction Expert Witness News & Info
    Lacoochee, Florida

    Supreme Court of New York Denies Motion in all but One Cause of Action in Kikirov v. 355 Realty Assoc., et al.

    April 28, 2011 — April 28, 2011 Beverley BevenFlorez - Construction Defect Journal

    In the construction defect suit Kikirov v. 355 Realty Associates, LLC, et al., the Supreme Court of the State of New York granted a dismissal of the plaintiff’s fourth cause of action, but denied the defendants’ motion in all other respects. The plaintiff alleged breach of contract, among other claims. “355 Realty was the sponsor of 355 Kings Highway Condominium, a condominium project located at 355 Kings Highway, in Brooklyn, New York. The condominium units were allegedly marketed as ‘ultra luxury condos,’ and a ‘Manhattan style condominium building,’ which would be the ‘epitome of luxury and quality.’ The construction of the six-story 28 unit residential condominium building began in approximately November 2003. […] Plaintiff entered into a purchase agreement, dated December 21, 2005, with 355 Realty (which was executed on behalf of 355 Realty by Michael Marino, as its member) for the purchase of Unit 2G in the building.”

    The plaintiff alleged that construction defects emerged soon after moving into the unit: “After taking occupancy of his condominium unit, plaintiff allegedly experienced serious leakage and moisture problems in his unit, which caused a dangerous mold condition to develop, in addition to causing actual damage to the structural elements of his unit. According to plaintiff, the walls, moldings, and wood floors of his unit are constantly wet and moist, and there is severe buckling of the wood floors. Plaintiff claims that these problems have caused his unit to be uninhabitable. Plaintiff alleges that he has been forced to remove all of his personal belongings from his unit and has been unable to occupy his unit.”

    According to the plaintiff, Foremost attempted to repair the defects, but only made the situation worse: “Specifically, plaintiff asserts that Foremost’s contractors opened his walls to remove the stained drywall, but never corrected the cause of the leaks, destroyed the walls, and never properly taped and painted the sheet rock. Plaintiff alleges that Foremost repaired the openings in a defective manner. Plaintiff also claims that his floor was repaired at that time by a subcontractor hired by Foremost, but the basic structural problem was never resolved and the leaks continued, compromising the beams and causing the mold conditions, in addition to all of the physical damage present in the unit. On or about July 16, 2009, plaintiff allegedly sent a notice of the defects to 355 Realty and to the managing agent designated by the condominium board, by certified mail, return receipt requested. Plaintiff asserts that defendants have failed and refused to repair and remedy the defective condition, and that the damage is extensive and requires major structural repairs.”

    The plaintiff filed suit on May 4, 2010, and the original complaint asserted eight causes of action. “By decision and order dated September 13, 2010, the court granted a motion by defendants to dismiss plaintiff’s second cause of action for breach of implied covenants of good faith and fair dealing, his third cause of action for breach of implied warranties, his fifth cause of action for negligence as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his seventh cause of action for negligence as against Vision, Foremost, and MMJ, and his eighth cause of action for violations of General Business Law § 349 and § 350, and granted plaintiff leave to replead his first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his fourth cause of action for breach of statutory warranties, and his sixth cause of action for breach of contract as against Vision, Foremost, and MMJ.”

    The plaintiff amended their complaint on October 18, 2010, and “has repleaded these three causes of action by asserting a first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, a second cause of action for breach of statutory warranties, and a third cause of action for breach of contract as against Vision, Foremost, and MMJ. In addition, plaintiff, in his amended complaint, has added a fourth cause of action for fraud.”

    The defendants, on the other hand, “argue that each of the four causes of action alleged by plaintiff in his amended complaint fail to state a claim upon which relief may be granted, and that plaintiff’s amended complaint must be dismissed pursuant to CPLR 3211 (a) (7). Defendants also cite to CPLR 3211 (a) (1), and (5), asserting that dismissal is also required based upon documentary evidence and the Statute of Limitations contained in the limited warranty.” The defendants’ motion to dismiss the first cause of action, breach of contract against 355 Realty, was denied: “While defendants dispute that the alleged defects are actually structural in nature, plaintiff’s allegations as to their structural nature are sufficient, at this juncture, to withstand defendants’ motion to dismiss. Thus, dismissal of plaintiff’s first cause of action must be denied.”

    Next, the court reviewed the second cause of action, which was breach of statutory warranties: “Defendants’ motion also seeks dismissal of plaintiff’s second cause of action for breach of statutory warranties, which alleges that, under applicable law, including General Business Law § 777-a, et seq., the sponsor warranted to purchasers of units that the units would be constructed in a skillful, careful, and workmanlike manner, consistent with proper design, engineering, and construction standards and practices, and free of material latent, design, and structural defects. Defendants argue that General Business Law § 777-a, known as the housing merchant implied warranty, is inapplicable to this case because it is limited to the construction of a ‘new home,’ defined in General Business Law § 777 (5) as ‘any single family house or for-sale unit in a multi-unit residential structure of five stories or less.’ As noted above, the building in which plaintiff’s condominium unit is located is a six-story building.”

    The motion to dismiss the second cause of action is denied. The court provided this reasoning: “the full text of the offering plan has not been provided, the court is unable to examine the entire written agreement so as to determine the purpose of the inclusion of the text of General Business Law § 777.”

    In the third cause of action, the plaintiff alleges “a breach of contract claim as against Vision, Foremost, and MMJ based upon their contract with 355 Realty, pursuant to which they agreed to be the general contractors/construction managers for the condominium, to undertake oversight responsibility for the design and construction of the condominium, to prepare and/or review drawings, plans, and specifications for the condominium, and to otherwise manage and oversee the project. Plaintiff alleges that Vision, Foremost, and MMJ breached their contractual obligations in that the condominium units were improperly and inadequately designed and constructed, and completed in an incompetent and unworkmanlike manner, with material design and construction defects.”

    The motion to dismiss the third cause of action was denied as well: “Plaintiff alleges, in his amended complaint, that Vision, Foremost, and MMJ have acknowledged notice of the defects and have not denied that they are responsible for providing a warranty to plaintiff. Plaintiff also refers to this warranty, in his amended complaint, by noting that paragraph 16 of the purchase agreement stated that the ‘[s]eller shall not be liable to . . . the [p]urchaser for any matter as to which an assignable warranty . . . has been assigned . . . to [p]urchaser and in such case the sole recourse of such . . . [p]urchaser . . . shall be against the warrantor . . . except that in the event a contractor or subcontractor is financially unable or refuses to perform its warranty . . . [s]eller shall not be excused from its obligations enumerated in the [offering p]lan under Rights and Obligations of Sponsor.’ Consequently, the court finds that dismissal of plaintiff’s third cause of action as against Foremost and MMJ must also be denied.”

    In the fourth cause of action, the plaintiff alleges “that defendants made false statements and representations orally, in advertisements, and in the purchase agreement, that the condominium was properly and adequately designed and constructed and completed in a competent and workmanlike manner, in accordance with the condominium plans and specifications and proper design, engineering, and construction standards and practices consistent with applicable standards for a first class, luxury condominium in Brooklyn.”

    The court dismissed the fourth cause of action stating, “it must be dismissed because it is duplicative of his first cause of action for breach of contract.” Therefore, “defendants’ motion to dismiss plaintiff’s amended complaint is granted to the extent that it seeks dismissal of plaintiff’s fourth cause of action, and it is denied in all other respects.”

    Read the court’s decision…

    Nevada Budget Remains at Impasse over Construction Defect Law

    June 1, 2011 — CDJ Staff

    Negotiations for the Nevada state budget have stalled over proposals to amend the state’s construction defect laws. Assembly Republicans had offered changes to the law to make it friendlier to contractors; however, after a state Supreme Court ruling that the state could not move a local government entity’s funds into state coffers, pressure has increased on the governor to lift the expiration dates of taxes approved in 2009.

    The Reno Gazette-Journal quotes John Madole, a construction industry lobbyist, “We agree with them that you have to address the issue of the attorney fees, and for all practical purposes, they are automatically awarded when anybody brings any kind of suit.”

    Speaker of the Assembly, John Oceguera, a Democrat, has proposed a bill that “makes it absolutely crystal clear that the only time you get attorney's fees is if you're the prevailing party.”

    Read the full story…


    Harsh New Time Limits on Construction Defect Claims

    April 26, 2011 — April 26, 2011 by Scott F. Sullan, Esq., Mari K. Perczak, Esq., and Leslie A. Tuft, Esq. of Sullan2, Sandgrund, Smith & Perczak, P.C. in the HindemanSanchez blog

    A recent Colorado Supreme Court decision, Smith v. Executive Custom Homes, Inc., 230 P.3d 1186 (Colo. 2010), considerably shortens the time limit for bringing many construction defect lawsuits. Homeowners and homeowner associations risk losing the right to seek reimbursement from builders, developers and other construction professionals unless they carefully and quickly act upon discovery of evidence of any potential construction defect.

    The Statute of Limitations for Construction Defect Claims
    Colorado’s construction defect statute of limitations limits the time for homeowners and homeowners associations to bring lawsuits for construction defects against “construction professionals,” including developers, general contractors, builders, engineers, architects, other design professionals, inspectors and subcontractors. The statute requires homeowners and associations to file suit within two years “after the claim for relief arises.” A claim for relief “arises” when a homeowner or association discovers or reasonably should have discovered the physical manifestation of a construction defect.

    The two-year time limitation applies to each construction defect separately, and will begin to run upon the appearance of a “manifestation” of a construction defect (which may include, for example, a condition as simple as a roof leak or drywall cracks), even if the homeowner or association does not know the cause of the apparent problem.

    The Smith Opinion and its Effect on the Statute of Limitations
    In Smith v. Executive Custom Homes, Inc., the plaintiff homeowner, Mrs. Smith, slipped on ice that had accumulated on her sidewalk because of a leaking gutter and suffered injury. When she first noticed the leak, she reported it to her property manager, who reported it to the builder. The builder attempted to repair the gutter, unbeknownst to Mrs. Smith, and she did not notice further problems until approximately one year after she first observed the leak, when she fell and suffered serious injury. She sued the builder within two years of her injury, but nearly three years after she first learned of the leak.

    The Colorado Supreme Court dismissed Mrs. Smith’s claims as untimely and held that under the construction defect statute of limitations, the two-year period for suing for injuries due to construction defects begins when the homeowner first observes the physical manifestation of the defect, even if the resulting injury has not yet occurred. The court acknowledged that this ruling could result in “unfair results,” especially if a serious and unforeseeable injury occurs more than two years after the first time the homeowner noticed the problem, and as a result the victim is unable to seek redress from those responsible for the defect.

    Read the full story…

    Reprinted courtesy of Scott F. Sullan, Esq., Mari K. Perczak, Esq., and Leslie A. Tuft, Esq. of Sullan2, Sandgrund, Smith & Perczak, P.C., and they can be contacted through their web site.


    Safer Schools Rendered Unsafe Due to Construction Defects

    February 10, 2012 — CJD Staff

    Built on a program for safer school buildings, schools in Neenan County, Colorado have been shown to have mild-to-moderate structural problems, rendering some of them unsafe. The Denver Post reports that a third-party review of schools built by the Neenan Company has shown structural issues in all fifteen school buildings.

    One school, Meeker Elementary, has been closed as it could collapse under high winds or during an earthquake. Sargent Junior-Senior High School is in use, but there are plans to evacuate the buildings if winds exceed 25 mile per hour. Two schools have roofs that are unable to bear expected loads of snow during the winter.

    The Neenan Company says that the school buildings are not up to their standards and is working with the school districts to repair the buildings. Repairs are expected to be complete by August.

    Read the full story…


    Virginia Chinese Drywall “property damage” caused by an “occurrence” and number of “occurrences”

    August 4, 2011 — CDCoverage.com

    In Dragas Management Corp. v. Hanover Insurance Co., No. 2:10cv547 (E.D. Va. July 21, 2011), claimant residential home general contractor and developer DMC filed for arbitration against insured drywall supply and install subcontractor Porter-Blaine seeking damages for (1) the replacement of defective Chinese drywall, and (2) the repair of resulting property to other components of the DMC homes and homeowners’ personal property in seventy-four homes. Porter-Blaine’s CGL insurer Citizens and excess insurer Hanover defended Porter-Blaine in the DMC arbitration.

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    Contractual Liability Exclusion Bars Coverage

    August 2, 2012 — Tred Eyerly, Insurance Law Hawaii

    The Fifth Circuit Court of Appeals considered whether coverage existed for a defectively built tennis court in light of a contractual liability exclusion. Ewing Construction Company, Inc. v. Amerisure Ins. Co., 2012 U.S. App. LEXIS 12154 (5th Cir. June 15, 2012).

    Ewing Construction Company entered a contract with the School District to construct tennis courts at a school. After completion, the School District complained that the courts were cracking and flaking, rendering them unfit for playing tennis. The School District filed suit, seeking damages for defective construction. It alleged that Ewing breached its contract and performed negligently.

    Ewing tendered the underlying lawsuit to Amerisure. Amerisure denied coverage and Ewing filed suit.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Arizona Supreme Court Confirms Eight-Year Limit on Construction Defect Lawsuits

    July 18, 2011 — CDJ Staff

    Acting on the case of Albano v. Shea Homes Ltd. Partnership, the Arizona Supreme Court has ruled that Arizona’s eight-year statute of repose applies. The case was referred to the court by the Ninth Circuit Court of Appeals which had asked for a clarification of Arizona law. The case focused on three questions:

    1. Does the filing of a motion for class certification in an Arizona court toll the statute of limitations for individuals, who are included within the class, to file individual causes of action involving the same defendants and the same subject matter? 2. If so, does this class-action tolling doctrine apply to statutes of repose, and more specifically, to the statute of repose for construction defects set forth in Arizona Revised Statutes ("A.R.S.") § 12-552? 3. If the doctrine applies to statutes of repose, and specifically § 12-552, may a court weigh the equities of the case in determining whether, and to what extent, an action is tolled?

    The litigation at hand has a lengthy history, starting with a case referred to as “Hoffman” in 2003. The Albano plaintiffs were not able to join in Hoffman, and they filed their own lawsuit in 2006. An additional lawsuit was filed by the Albano plaintiffs in 2007. The courts decided that the Albano plaintiffs’ lawsuit was untimely.

    The Arizona Supreme Court concluded that the statute of repose was the appropriate standard for this case. They noted that “the eight-year statute of repose period began to run on November 6, 1997, the date of the Town of Gilbert’s final inspection. Albano II was filed on November 5, 2007.”

    The court found that the plaintiffs had waited too long for start their suit. As a result, they found it unnecessary to answer the first or third questions. Justice A. John Pelander of the Arizona Supreme Court wrote the opinion, dated June 30, 2011.

    Read the court’s decision…


    Fourteen More Guilty Pleas in Las Vegas Construction Defect Scam

    June 19, 2012 — CDJ Staff

    The ongoing case over claims that a group fixed homeowner board elections in order to supply the conspirators with a stream of construction defect cases and repairs has lead to fourteen guilty pleas. The judge recently issued charges against fifteen of the accused; one defendant did not join in the group as he was recovering from pneumonia. The prosecutors have asked the judge to delay sentencing, as the investigation is continuing. Prosecutors note that another dozen people may be indicted.

    Along with an earlier group who plead guilty, this brings the total number of guilty pleas in the case to twenty-five. All have promised to cooperate with authorities.

    The case has also involved four deaths, although authorities have not suspected foul play in the deaths. Nancy Quon, one of the four, was the construction defect attorney suspected to be at the center of the conspiracy.

    Read the full story…


    Late Filing Contractor Barred from Involving Subcontractors in Construction Defect Claim

    March 1, 2012 — CDJ Staff

    The Colorado Court of Appeals looked at that state’s Construction Defect Action Reform Act in determining if a general contractor could add subcontractors as third-party defendants to a construction defect lawsuit. Shaw Construction, LLC was the general contraction of the Roslyn Court condominium complex, and was sued by the homeowners’ association in a construction defect case. United Builder Services was the drywall subcontractor on the project. MB Roofing had installed roofs, gutters, and downspouts. The certificate of occupancy for the last building was issued on March 10, 2004. The project architect certified completion of all known remaining architectural items in June, 2004.

    The HOA filed a claim against the developers of the property on January, 21, 2009. A week later, the HOA amended its complaint to add Shaw, the general contractor. Shaw did not file its answer and third-party complaint until March 29, 2010, sending its notice of claim under the CDARA on March 30.

    The subcontractors claimed that the six-year statute of limitations had ended twenty days prior. Shaw claimed that the statute of limitations ran until six years after the architect’s certification, or that the HOA’s suit had tolled all claims.

    The trial court granted summary judgment to the subcontractors, determining that “substantial completion occurs ‘when an improvement to real property achieves a degree of completion at which the owner can conveniently utilize the improvement of the purpose it was intended.’”

    The appeals court noted that “Shaw correctly points out that the CDARA does not define ‘substantial completion.’” The court argued that Shaw’s interpretation went against the history and intent of the measure. “Historically, a construction professional who received a complaint responded by ‘cross-nam[ing] or add[ing] everybody and anybody who had a part to play in the construction chain.’” The court concluded that the intent of the act was to prevent unnamed subcontractors from being tolled.

    The court further rejected Shaw’s reliance on the date of the architect’s certification as the time of “substantial completion,” instead agreeing with the trial court that “the architect’s letter on which Shaw relies certified total completion.”

    The appeals court upheld the trial court’s determination that the statute of limitation began to run no later than March 10, 2004 and that Shaw’s complaint of March 29, 2010 was therefore barred. The summary judgment was upheld.

    Read the court’s decision…


    Appropriation Bill Cuts Military Construction Spending

    June 15, 2011 — CDJ Staff

    The Hill reports that HR 2055, the Military Construction, Veterans Affairs (VA) and Related Agencies bill, has passed with only five votes in opposition. The bill cuts the budget for military construction spending by $2.6 billion due to anticipated base closures.

    The bill includes $186 million for family housing construction by the Army, $100 million for family housing construction by the Navy and Marines, and $84 million for family construction by the Air Force, with an additional $50 million allocated for the DOD outside the military branches. By the act, these funds will remain available until September 30, 2016.

    Read the full story…

    Read HR 2055


    California Supreme Court to Examine Arbitration Provisions in Several Upcoming Cases

    December 9, 2011 — CDJ Staff

    Glen C. Hansen, writing on Abbott & Kinderman’s Land Use Law Blog looks at several cases pending before the California Supreme Court which ask if a developer can insist on arbitration of construction defect claims, based on provision in the CC&Rs. Currently, there is a split of opinions in the California appeals courts on the issue.

    Four of the cases are in California’s Fourth Appellate District. In the earliest case, Villa Milano Homeowners Association v. Il Davorge, from 2000, the court concluded that the arbitration clause was sufficient to require that construction defect claims undergo arbitration. However, the Fourth Appellate District Court concluded in three later cases that the arbitration clauses did not allow the developer to compel arbitration. In two cases, argued in 2008 and 2010, the court concluded that to do otherwise would deprive the homeowners of their right to a jury trial. In the most recent case, Villa Vicenza Homeowners Association v. Nobel Court Development, the court decided that the CC&Rs did not create contractual rights for the developer.

    The Second Appellate District Court came to a similar decision in Promenade at Playa Vista Homeowners Association v. Western Pacific Housing, Inc. In their decision, the court noted that CC&Rs could be enforced by homeowners and homeowners associations, but not developers.

    Read the full story…


    Housing Prices Up through Most of Country

    December 20, 2012 — CDJ Staff

    Home prices in October were up more than six percent compared with prices in October 2011. The LA Times noted that some of the strongest gains were in California and Arizona. The Phoenix metropolitan area saw a 24.5% rise in home prices. In California, Riverside and Los Angeles were just above the national average, at 7.3% and 6.4%, contributing to the state’s overall nine percent increase.

    The news wasn’t good throughout the entire country, as five states did not see any price increases. Mark Fleming, the chief economist at CoreLogic, a research firm in Irvine, California said that “the housing recovery that started earlier in 2012 continues to gain momentum.

    Read the full story…


    Broker Not Liable for Failure to Reveal Insurer's Insolvency After Policy Issued

    March 28, 2012 — Tred Eyerly, Insurance Law Hawaii

    Faced with an issue of first impression in California, the Court of Appeals held that a broker was not liable for failing to reveal the insurer's insolvency occurring after issuance of the policy. Pacific Rim Mechanical Contractors, Inc. v. Aon Risk Ins. Serv. West, Inc., 2012 Cal. App. LEXIS 232 (Cal. Ct. App. Feb. 28, 2012).

    The developer for a construction project in downtown San Diego retained Aon as its broker to secure coverage. Aon procured a general liability policy for the project with Legion Indemnity Company. Legion was solvent when it issued the policy.

    The developer hired Pacific Rim (“PacRim”) as one of several subcontractors on the project. The parties entered into a contract in which the developer agreed to provide PacRim with liability insurance through an Owner Controlled Insurance Program (“OCIP”). Aon was not a party to the contract and PacRim was never its client. PacRim, however, enrolled in the OCIP by contacting Aon and providing all necessary paperwork.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Architect Not Liable for Balcony’s Collapse

    September 13, 2012 — CDJ Staff

    The Texas Supreme Court declined to hear an appeal from a woman who was partially paralyzed due to the collapse of a balcony. She had sued the architect of her friends’ home, but the Texas Third Circuit Court of Appeals had reversed a jury ruling against the architect, Sinclair Black. Black’s firm, Black + Vernooy, had designed the home and had supervised “administration of the construction contract.” Despite a contractual obligation to “endeavor to guard the owner against defects and deficiencies,” the balcony builder had not followed the architect’s specifications, including in the construction of the balcony.

    While the jury found Black liable for ten percent of the blame, Black argued that he could not be held liable for the contractor’s negligence, nor did he have any duty to third parties.

    Read the full story…


    California Assembly Bill Proposes an End to Ten Year Statute of Repose

    May 9, 2011 — May 9, 2011 Beverley BevenFlorez - Construction Defect Journal

    California Assemblyman Furutani has introduced a bill that if passed would eliminate the ten year statute of repose in certain construction defect cases. The statute of repose would not apply when “an action in tort to recover damages for damage to real or personal property, or for personal injury or wrongful death from exposure to hazardous or toxic materials, pollution, hazardous waste, or associates environmental remediation activities,” according to the latest amended version of AB 1207.

    When Furutani first introduced the bill, it was aimed at small businesses only. However, the description of the bill, which read, “An act to amend Section 14010 of the Corporations Code, relating to small businesses” has been stricken from the bill, and it has been amended to read, “An act to amend Section 337.15 of the Code of Civil Procedure, relating to civil actions.”

    The change in the bill’s intent has caused some outcry among attorneys in the blogosphere. For instance, Sean Sherlock of Snell & Wilmer stated that “the proposed amendment is unnecessary, and would upset nearly 50 years of deliberative legislation and judicial precedent on construction defects liability and the 10–year statute — all apparently motivated by a decision in a single, isolated Superior Court lawsuit that has not yet been reviewed by the court of appeal.” Sherlock is referring to Acosta v. Shell Oil Company, in which the Superior Court agreed to dismiss the plaintiffs’ claims against the developer based in part on the ten year statute of repose. AB 1207 was amended five days after the ruling in Acosta v. Shell Oil Company.

    California AB 1207 has been re-referred to the Judiciary Committee.

    Read the full story…


    Boston Tower Project to Create 450 Jobs

    November 18, 2011 — CDJ Staff

    Continuing the development of Boston’s Theater District, Millennium Partners broke ground for the building of Hayward Place, a 15-story residential tower with street-level shops. The project is expected to take two years to complete and will employ about 450 construction workers.

    Thomas Menino, the mayor of Boston said that the “ground breaking of Hayward Place is another sign of economic growth and forward progress on the revitalization of this area.” The project will be built by Suffolk Construction. John Fish, their CEO, said they were “fortunate as a contractor to be the beneficiary of this.”

    The report in the Boston Herald notes that a few blocks away, the site of the former Filenes department store is still “an empty eyesore.” Menino joked, “anyone want to bid for it?” He promised that site would also be developed.

    Read the full story…


    Nebraska Man Sentenced for Insurance Fraud in Construction Projects

    July 10, 2012 — CDJ Staff

    Thomas Herink has been ordered to repay more than $5 million to his victims and will be serving three years of probation after 18 months in jail for defrauding banks and insurance companies, according to a report in the Insurance Journal. Herink falsified financial statements to lenders and insurers so that his company, Golf Services Group Inc. could participate in construction projects.

    Read the full story…


    Does the New Jersey Right-To-Repair Law Omit Too Many Construction Defects?

    January 6, 2012 — CDJ Staff

    A post on the blog of Liberty Building Forensics Group find fault with the New Jersey Home Warranty and Builders’ Registration Act for not being stringent enough. The poster notes the coverage given under the bill. In the first year, builders are responsible to remedy faulty workmanship and materials and major structural defects. While other protections expire in the first or second year, there is a ten year coverage of major construction defects.

    The blogger finds fault with the exclusion New Jersey law places on these claims, arguing that “due to the stringent definition of ‘major construction defects,” the warranty affords no coverage unless the house is practically collapsing.” The bill excludes leaks, cracks, and mold, and further limits claims if the homeowner has failed to inform the builder or insurer of defects, failure to maintain the home, and alterations made by the homeowner.

    The intent of the New Jersey law is given as “requiring that newly constructed homes conform to certain construction and quality standards as well as to provide buyers of new homes with insurance-backed warranty protection in the event such standards are not met.” It’s argued in the piece that it instead serves to “strip homeowners of any meaningful means of recovery for discovered construction defects.”

    Read the full story…