    custom home Langlade County Wisconsin low-income housing Langlade County Wisconsin Medical building Langlade County Wisconsin landscaping construction Langlade County Wisconsin parking structure Langlade County Wisconsin condominium Langlade County Wisconsin retail construction Langlade County Wisconsin concrete tilt-up Langlade County Wisconsin townhome construction Langlade County Wisconsin institutional building Langlade County Wisconsin production housing Langlade County Wisconsin condominiums Langlade County Wisconsin structural steel construction Langlade County Wisconsin industrial building Langlade County Wisconsin tract home Langlade County Wisconsin multi family housing Langlade County Wisconsin high-rise construction Langlade County Wisconsin Subterranean parking Langlade County Wisconsin office building Langlade County Wisconsin hospital construction Langlade County Wisconsin mid-rise construction Langlade County Wisconsin custom homes Langlade County Wisconsin
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Langlade County, Wisconsin

    Wisconsin Builders Right To Repair Current Law Summary:

    Current Law Summary: SB448 specifies 90 day notice with details and evidence prior to commencing legal action. It provides for a 15 day written response from contractor or 25 days if cross-claims against subcontractors; The law states “The claimant and contractor or supplier are bound by any contractor or supplier warranty terms pertaining to products or services supplied for the dwelling.”


    Construction Expert Witness Contractors Licensing
    Guidelines Langlade County Wisconsin

    Contractors are required to have the correct credentials for their trade. Not all classifications require credentialing. For a list of credentials, see the website.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Wausau Area Builders Association
    Local # 5172
    141 W Thomas St
    Wausau, WI 54401
    http://www.wausauareabuilders.com

    St Croix Valley Home Builders Association
    Local # 5182
    1632 ROLLING HILLS LN
    River Falls, WI 54022
    http://www.scvhba.com

    Door County Home Builders Association
    Local # 5103
    PO Box 112 4087
    Sturgeon Bay, WI 54235
    http://www.dchba.org

    Chippewa Valley Home Builders Association
    Local # 5104
    4319 Jeffers Rd Ste 200
    Eau Claire, WI 54703
    http://www.cvhomebuilders.com

    Wolf River Builders Association
    Local # 5193
    PO Box 595
    Shawano, WI 54166


    Heart of the North Builders Association
    Local # 5137
    PO Box 6
    Rice Lake, WI 54868
    http://www.hnbawi.org

    Brown County Home Builders Association
    Local # 5124
    PO Box 13194 811 Packerland Drive
    Green Bay, WI 54307
    http://www.bchba.org


    Construction Expert Witness News and Information
    For Langlade County Wisconsin

    Insurer Not Liable for Construction Defect Revealed by Woodpecker

    Construction Workers Face Dangers on the Job

    In Re Golba: The Knaubs v. Golba and Rollison, Debtors

    Architectural Firm Disputes Claim of Fault

    Demand for Urban Living Leads to Austin Building Boom

    Renovation Contractors: Be Careful How You Disclose Your Projects

    New Buildings in California Soon Must Be Greener

    Wisconsin “property damage” caused by an “occurrence.”

    Broker Not Liable for Failure to Reveal Insurer's Insolvency After Policy Issued

    Nevada Senate Rejects Construction Defect Bill

    Celebrities Lose Case in Construction Defect Arbitration

    Record-Setting Construction in Fargo

    Florida Appeals Court Rules in Favor of Homeowners Unaware of Construction Defects and Lack of Permits

    No Choice between Homeowner Protection and Bankrupt Developers?

    Coverage Exists Under Ensuing Loss Provision

    Judge Okays Harmon Tower Demolition, Also Calls for More Testing

    Allowing The Use Of a General Verdict Form in a Construction Defect Case Could Subject Your Client to Prejudgment Interest

    Drug Company Provides Cure for Development Woes

    United States District Court Confirms That Insurers Can Be Held Liable Under The CCPA.

    A Call to Washington: Online Permitting Saves Money and the Environment

    Preparing for Trial on a Cause of Action for Violation of Civil Code section 895, et seq.

    Massachusetts Couple Seek to Recuse Judge in Construction Defect Case

    California Supreme Court Binds Homeowner Associations To Arbitration Provisions In CC&Rs

    Eleventh Circuit Asks Georgia Supreme Court if Construction Defects Are Caused by an "Occurrence"

    Rihanna Finds Construction Defects Hit a Sour Note

    Application of Efficient Proximate Cause Doctrine Supports Coverage

    Construction Defects Are Occurrences, Says Georgia Supreme Court

    Court Will Not Compel Judge to Dismiss Construction Defect Case

    Homebuilders Go Green in Response to Homebuyer Demand

    Workers Hurt in Casino Floor Collapse

    Las Vegas Home Builder Still in Bankruptcy

    Contractor’s Home Not Covered for Construction Defects

    Ohio “property damage” caused by an “occurrence.”

    Florida Chinese drywall, pollution exclusion, “your work” exclusion, and “sistership” exclusion.

    Construction Firm Charged for Creating “Hail” Damage

    Insurer Has Duty to Defend Despite Construction Defects

    California Bill Would Notify Homeowners on Construction Defect Options

    BHA Expands Construction Experts Group

    Mortar Insufficient to Insure Summary Judgment in Construction Defect Case

    Insurers Reacting to Massachusetts Tornadoes

    Retaining Wall Contractor Not Responsible for Building Damage

    Fourteen More Guilty Pleas in Las Vegas Construction Defect Scam

    Construction Workers Unearth Bones

    Construction Defects Lead to Demolition of Seattle’s 25-story McGuire Apartments Building

    Fifth Circuit Asks Texas Supreme Court to Clarify Construction Defect Decision

    Exclusions Bar Coverage for Damage Caused by Chinese Drywall

    Insurance Firm Defends against $22 Million Claim

    Pier Fire Started by Welders

    Safe Harbors- not just for Sailors anymore (or, why advance planning can prevent claims of defective plans & specs) (law note)

    Denver Court Rules that Condo Owners Must Follow Arbitration Agreement

    Crane Dangles and So Do Insurance Questions

    Changes to Arkansas Construction and Home Repair Laws

    Williams v. Athletic Field: Hugely Important Lien Case Argued Before Supreme Court

    Gut Feeling Does Not Disqualify Expert Opinion

    Green Buildings Could Lead to Liabilities

    Exclusion Bars Coverage for Mold, Fungus

    Policyholder Fails to Build Adequate Record to Support Bad Faith Claim

    Partial Settlement in DeKalb Construction Management Case

    OSHA Extends Delay of Residential Construction Fall Protection Requirements

    Eighth Circuit Remands to Determine Applicability of Collapse Exclusion

    General Contractor/Developer May Not Rely on the Homeowner Protection Act to Avoid a Waiver of Consequential Damages in an AIA Contract

    Going Green for Lower Permit Fees

    Loose Bolts Led to Sagging Roof in Construction Defect Claim

    Supreme Court of New York Denies Motion in all but One Cause of Action in Kikirov v. 355 Realty Assoc., et al.

    Loss Caused by Seepage of Water Not Covered

    Colorado Court of Appeals holds that insurance companies owe duty of prompt and effective communication to claimants and repair subcontractors

    Public Relations Battle over Harmon Tower

    Ceiling Collapse Attributed to Construction Defect

    Virginia Homebuilding Slumps After Last Year’s Gain

    MGM Seeks to Demolish Harmon Towers

    Exact Dates Not Needed for Construction Defect Insurance Claim

    Surveyors Statute Trumps Construction Defect Claim in Tennessee

    Businesspeople to Nevada: Revoke the Construction Defect Laws

    Court Sends Construction Defect Case from Kansas to Missouri

    Five Years of Great Legal Blogging at Insurance Law Hawaii

    Lower Court “Eminently Reasonable” but Wrong in Construction Defect Case

    Coverage Rejected Under Owned Property and Alienated Property Exclusions

    Construction Defect Claim Did Not Harm Homeowner, Court Rules

    After Breaching its Duty to Defend, Insurer Must Indemnify

    Condominium Communities Must Complete Construction Defect Repairs, Says FHA

    Connecticut Gets Medieval All Over Construction Defects

    Construction Case Alert: Appellate Court Confirms Engineer’s Duty to Defend Developer Arises Upon Tender of Indemnity Claim

    Death of Construction Defect Lawyer Ruled a Suicide

    California insured’s duty to cooperate and insurer’s right to select defense counsel

    Construction Defect Case Not Over, Despite Summary Judgment

    Hovnanian Increases Construction Defect Reserves for 2012

    Consulting Firm Indicted and Charged with Falsifying Concrete Reports

    Manhattan Developer Breaks Ground on $520 Million Project

    Official Tried to Influence Judge against Shortchanged Subcontractor

    Battle of “Other Insurance” Clauses
    Corporate Profile

    LANGLADE COUNTY WISCONSIN CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Langlade County, Wisconsin Construction Expert Witness Group at BHA, leverages from the experience gained through more than 5,500 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Langlade County's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Langlade County Wisconsin general contracting window expert witnessLanglade County Wisconsin general contracting construction expert witnessLanglade County Wisconsin general contracting expert witness concrete failureLanglade County Wisconsin general contracting construction defect expert witnessLanglade County Wisconsin general contracting engineering expert witnessLanglade County Wisconsin general contracting construction claims expert witnessLanglade County Wisconsin general contracting construction expert witness consultantLanglade County Wisconsin general contracting testifying construction expert witnessLanglade County Wisconsin general contracting building code expert witness
    Construction Expert Witness News & Info
    Langlade County, Wisconsin

    California insured’s duty to cooperate and insurer’s right to select defense counsel

    April 14, 2011 — April 14, 2011 - CDCoverage.com

    In Travelers Property Casualty Co. v. Centex Homes, No. C 10-02757 (N.D. Cal. April 1, 2011), general contractor Centex was sued by homeowners for construction defects. Centex tendered its defense to Travelers as an additional insured under policies issued by Travelers to two Centex subcontractors. Travelers agreed to defend Centex under a reservation of rights and selected defense counsel to defend Centex. Centex refused to accept the defense, asserting that it was entitled to select defense counsel. Travelers filed suit against Centex seeking a declaratory judgment that Centex had breached the duty to cooperate condition in the Travelers’ policy.

    Read the full story...

    Reprinted courtesy of CDCoverage.com


    Policing Those Subcontractors: It Might Take Extra Effort To Be An Additional Insured

    June 14, 2011 — Douglas Reiser, Builders Council Blog

    I just came across a case that I think truly paints the insurance dilemma for contractors. Thanks to this recent Illinois case, I don’t have to make up any factual scenarios—so kudos to Attorney Robert Boylan for posting it.

    In reading over my RSS feeds this weekend, I noticed a great writeup on long-time blogger Josh Glazov’s Construction Law Today. Attorney Robert Boylan’s post describes a recent Illinois case where a general contractor was denied its additional insured status on a second-tier subcontractor’s insurance. The reason for the denial: the general contractor failed to procure an agreement in writing with the second-tier subcontractor, requiring it to be listed as an additional insured.

    Read the full story…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com


    Florida Contractor on Trial for Bribing School Official

    October 28, 2011 — CDJ Staff

    Lloyd Whann, an executive in M. M. Parrish Construction, a Gainesville, Florida firm, is going to trial over claims that he bribed a school district official with more than $50,000 in gifts. The trial has been pushed to March of 2012, in order for his defense to review documents.

    Bob Williams, the former school official, plead guilty to conspiracy to commit bribery. He agreed to testify against Whann and M.M. Parrish Construction.

    Read the full story...


    When Does a Claim Against an Insurance Carrier for Failing to Defend Accrue?

    November 7, 2012 — David McLain, Colorado Construction Litigation

    The following is an update on our December 20, 2010 article regarding United States Fire Insurance Company v. Pinkard Construction Company, Civil Action No. 09-CV-01854-MSK-MJW, and its underlying dispute, Legacy Apartments v. Pinkard Construction Company, Case No. 2003 CV 703, Boulder County Dist. Ct. That article can be found here.

    The present action, St. Paul Fire and Marine Insurance Co., et al. v. The North River Insurance Co., et al., Civil Action No. 10-CV-02936-MSK-CBS, encompasses the coverage battle that ensued between Pinkard’s insurers, Travelers Indemnity Company of America (“Travelers”) and United States Fire Insurance Company (“USFI”), following the settlement of Legacy’s construction defect claims against Pinkard. A short history of the underlying facts is as follows:

    In 1995, Pinkard constructed the Legacy Apartments housing complex in Longmont, Colorado. Following construction, Legacy notified Pinkard of water leaks associated with various elements of construction. Legacy ultimately filed suit against Pinkard in 2003, and would go on to clarify and amend its defect claims in 2004, 2006, and again in 2008. Following Pinkard’s notification of Legacy’s claims, USFI provided a defense to Pinkard, but Travelers refused to do so, on the purported basis that Legacy’s allegations did not implicate property damage under the terms of Travelers’ policy.

    Read the full story…

    Reprinted courtesy of David M. McLain, Higgins, Hopkins, McLain & Roswell, LLC. Mr. McLain can be contacted at mclain@hhmrlaw.com


    Limitations of Liability in Subcontractors’ Contracts May Not Be Enforceable in Colorado to Limit Claims by Construction Professionals.

    October 23, 2012 — Heidi J. Gassman, Higgins, Hopkins, McLain & Roswell

    The Colorado Homeowner Protection Act of 2007 (“HPA”), codified at C.R.S. § 13-20-806(7), specifically voids express waivers of, or limitations on, a residential property owner’s ability to enforce any rights, remedies, and damages provided by law in a construction defect case. Practically speaking, this means that limitation of liability provisions in contracts between construction professionals and residential homeowners are void and will not be enforced in Colorado. The HPA can extend even further, however, to subcontractors on residential projects, as seen in a recent District Court ruling.

    The HPA was tested in Thacker v. Gallery Homes, et al., v. Terracon Consultants, Inc., et al., Larimer County District Court Case No. 2007CV1195. Gallery Homes hired Terracon to provide geotechnical and structural engineering services at the Colony Ridge subdivision in Loveland, Colorado. Terracon performed work for Gallery Homes under three separate contracts, each of which included a provision limiting Terracon’s total liability to Gallery Homes.

    After the project was completed, two homeowners filed suit against Gallery Homes for alleged construction defects involving movement of their basement floor systems and foundations and damage to porches, patios, garages, and driveways. Gallery Homes sued Terracon as a third-party defendant, and Terracon sought to enforce its limitation of liability provisions via a partial summary judgment motion.

    Read the full story…

    Reprinted courtesy of Heidi J. Gassman, Higgins, Hopkins, McLain & Roswell, LLC. Ms. Gassman can be contacted at gassman@hhmrlaw.com


    Nebraska Man Sentenced for Insurance Fraud in Construction Projects

    July 10, 2012 — CDJ Staff

    Thomas Herink has been ordered to repay more than $5 million to his victims and will be serving three years of probation after 18 months in jail for defrauding banks and insurance companies, according to a report in the Insurance Journal. Herink falsified financial statements to lenders and insurers so that his company, Golf Services Group Inc. could participate in construction projects.

    Read the full story…


    Construction Defects and Contractor-Owners

    July 10, 2012 — CDJ Staff

    On the expert advice site Avvo.com, a user asks if he can be sued for construction defects by the new owner of a building for which he served as general contractor and then owned for four years. He had construction insurance, but does not think he had construction defect insurance.

    A lawyer responding to his question says that “you could be sued.” In the event of a suit, “you would have to bring claims against all of your subcontractors.”

    Read the full story…


    Read Her Lips: “No New Buildings”

    November 18, 2011 — CDJ Staff

    Martha Johnson, the head of the General Services Administration, has said that her agency will not be building any new buildings in the near future. Among other duties, the GSA is responsible for the building, renovating, and leasing of federal office space. The White House had proposed $840 million in new construction, the Senate only $56 million. The House did not appropriate any money for the agency to use for new construction.

    In addition to cutbacks on new buildings, Congress is suggesting only $280 million in repairs of existing government buildings. In order to cut back, the GSA has dropped plans to renovate their own offices in favor of renovations at the Department of Homeland Security and the Food and Drug Administration.

    Read the full story…


    Construction Law: Unexpected, Fascinating, Bizarre

    April 25, 2012 — CDJ Staff

    Guy Randles offers an amusing set of odd construction law cases in the Daily Journal of Commerce, which he describes as “the unexpected, the fascinating and even the bizarre.” He noted that in one case “a whistleblower claimed he was terminated for reporting to the owner that the contractor’s painters had not applied the required coating thickness.” The whistleblower was the project manager and “was responsible for ensuring the proper coating thickness.”

    A less amusing case was that of an architect who was arrested for manslaughter. Gerard Baker “told investigators that the considered the fireplaces to be merely decorative.” Randles notes that “the mansion’s fireplaces were built of wood framing and lined with combustible drywall.” Further, a “gas fireplace even vented into the house’s interior.” Building officials called the house “a death trap.” According to the LA police chief this may be the only case in which building defects lead to a manslaughter charge.

    Read the full story…


    California Supreme Court Binds Homeowner Associations To Arbitration Provisions In CC&Rs

    September 13, 2012 — Stephen A. Sunseri and Aarti Kewalramani, Gatzke Dillon & Ballance LLP (http://www.gdandb.com).

    The California Supreme Court ruled in Pinnacle Museum Tower Assn. v. Pinnacle Market Development (August 16, 2012, S186149) __ Cal.4th __ [2012 WL 3516134], that arbitration provisions within the covenants, conditions, and restrictions (“CC&Rs”) for condominium projects are enforceable against their homeowner associations. The ruling — two years in the making — was based on legislative history of laws governing common interest developments, and decades of decisional authority involving contracts and arbitration provisions.

    In Pinnacle, a homeowners association sued a condominium builder for construction defects and resultant property damage to the common areas, and to the separate property interests held by the individual members. The builder moved to compel arbitration, based on a provision contained in the CC&Rs which required resolution of all construction disputes through binding arbitration. The association argued it could not be compelled to arbitrate these claims because it was not a party to the agreement to arbitrate, asserting “the Association did not bargain with [the builder] over the terms of the Project CC&R's or participate in their drafting.”

    The Supreme Court rejected the association's argument on the grounds that the builder-authored CC&Rs complied with the Davis-Stirling Act (“the Act”) (Civil Code §1350, et seq.) ? the law that governs all common interest developments in California. Under the Act, builders and sellers of common interest residential units are required to provide a copy of the CC&Rs to all purchasers, as well as copies of the Department of Real Estate's public report, which informs purchasers of their rights and remedies as members of the association, and encourages each prospective purchaser to review the terms carefully before entering into any agreement. Further, the Act states all CC&Rs are enforceable, unless unreasonable, and inure to the benefit of and bind all owners in the development. (Civ. Code, §1354, subd. (a).) The Court found each owner who purchased a condominium in the project either expressly consented to the terms and provisions of the CC&Rs or was deemed to have consented to the terms at the time of purchase.

    The Court also did not find the arbitration provision to be unconscionable. The Court indicated the provision was drafted and recorded in accordance with the Act, which allowed each prospective purchaser to make an informed decision prior buying a condominium unit. The provision also limited arbitration to construction defect disputes. The Court did not find any evidence the provision “shocked the conscience” or was “oppressive” in any way.

    Pinnacle settles a decades-long conflict over whether arbitration provisions in CC&Rs for condominium projects are enforceable against homeowner associations and their members. It remains unclear, however, whether Pinnacle’s rationale will be applied to cases involving homeowner associations for single-family residences (as opposed to condominiums), assuming those CC&Rs have similar arbitration requirements. Regardless, the result of Pinnacle is clear, if arbitration provisions contained in condominium CC&Rs meet the fairness and unconscionability tests set out by the Court, more condominium construction defect cases brought by homeowner associations will be resolved through the arbitration process.

    Read the court’s decision…

    Printed courtesy of Stephen A. Sunseri and Aarti Kewalramani, Gatzke Dillon & Ballance LLP. Mr. Sunseri can be contacted at ssunseri@gdandb.com and Ms. Kewalramani can be contacted at akewalramani@gdandb.com.


    South Carolina Contractors Regain General Liability Coverage

    May 20, 2011 — CDJ Staff

    PR Newswire reports that the Carolinas Associated General Contractors (CAGC) have successfully persuaded the South Carolina legislature to pass a bill restoring commercial general liability (CGL) coverage. Governor Nikki Hartley signed the legislation on May 17.

    A South Carolina Supreme Court decision given on January 7, 2011, had ended commercial general liability coverage in the state. Senate Bill 431 addressed this decision, restoring the ability of home builders to obtain CGL coverage.

    PR Newswire quotes South Carolina homebuilder, Allen Amsler: “We have seen a lot of legislation with substantial impact to our business over the years. However, I would place this in the same level of importance with the original tort reform legislation. The effects of the Supreme Court’s ruling could have been catastrophic to our industry in South Carolina had it not been for this bill. Thanks to all those in the House, Senate and the Governor’s office who assisted us.”

    Read the full story…


    Supreme Court of New York Denies Motion in all but One Cause of Action in Kikirov v. 355 Realty Assoc., et al.

    April 28, 2011 — April 28, 2011 Beverley BevenFlorez - Construction Defect Journal

    In the construction defect suit Kikirov v. 355 Realty Associates, LLC, et al., the Supreme Court of the State of New York granted a dismissal of the plaintiff’s fourth cause of action, but denied the defendants’ motion in all other respects. The plaintiff alleged breach of contract, among other claims. “355 Realty was the sponsor of 355 Kings Highway Condominium, a condominium project located at 355 Kings Highway, in Brooklyn, New York. The condominium units were allegedly marketed as ‘ultra luxury condos,’ and a ‘Manhattan style condominium building,’ which would be the ‘epitome of luxury and quality.’ The construction of the six-story 28 unit residential condominium building began in approximately November 2003. […] Plaintiff entered into a purchase agreement, dated December 21, 2005, with 355 Realty (which was executed on behalf of 355 Realty by Michael Marino, as its member) for the purchase of Unit 2G in the building.”

    The plaintiff alleged that construction defects emerged soon after moving into the unit: “After taking occupancy of his condominium unit, plaintiff allegedly experienced serious leakage and moisture problems in his unit, which caused a dangerous mold condition to develop, in addition to causing actual damage to the structural elements of his unit. According to plaintiff, the walls, moldings, and wood floors of his unit are constantly wet and moist, and there is severe buckling of the wood floors. Plaintiff claims that these problems have caused his unit to be uninhabitable. Plaintiff alleges that he has been forced to remove all of his personal belongings from his unit and has been unable to occupy his unit.”

    According to the plaintiff, Foremost attempted to repair the defects, but only made the situation worse: “Specifically, plaintiff asserts that Foremost’s contractors opened his walls to remove the stained drywall, but never corrected the cause of the leaks, destroyed the walls, and never properly taped and painted the sheet rock. Plaintiff alleges that Foremost repaired the openings in a defective manner. Plaintiff also claims that his floor was repaired at that time by a subcontractor hired by Foremost, but the basic structural problem was never resolved and the leaks continued, compromising the beams and causing the mold conditions, in addition to all of the physical damage present in the unit. On or about July 16, 2009, plaintiff allegedly sent a notice of the defects to 355 Realty and to the managing agent designated by the condominium board, by certified mail, return receipt requested. Plaintiff asserts that defendants have failed and refused to repair and remedy the defective condition, and that the damage is extensive and requires major structural repairs.”

    The plaintiff filed suit on May 4, 2010, and the original complaint asserted eight causes of action. “By decision and order dated September 13, 2010, the court granted a motion by defendants to dismiss plaintiff’s second cause of action for breach of implied covenants of good faith and fair dealing, his third cause of action for breach of implied warranties, his fifth cause of action for negligence as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his seventh cause of action for negligence as against Vision, Foremost, and MMJ, and his eighth cause of action for violations of General Business Law § 349 and § 350, and granted plaintiff leave to replead his first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his fourth cause of action for breach of statutory warranties, and his sixth cause of action for breach of contract as against Vision, Foremost, and MMJ.”

    The plaintiff amended their complaint on October 18, 2010, and “has repleaded these three causes of action by asserting a first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, a second cause of action for breach of statutory warranties, and a third cause of action for breach of contract as against Vision, Foremost, and MMJ. In addition, plaintiff, in his amended complaint, has added a fourth cause of action for fraud.”

    The defendants, on the other hand, “argue that each of the four causes of action alleged by plaintiff in his amended complaint fail to state a claim upon which relief may be granted, and that plaintiff’s amended complaint must be dismissed pursuant to CPLR 3211 (a) (7). Defendants also cite to CPLR 3211 (a) (1), and (5), asserting that dismissal is also required based upon documentary evidence and the Statute of Limitations contained in the limited warranty.” The defendants’ motion to dismiss the first cause of action, breach of contract against 355 Realty, was denied: “While defendants dispute that the alleged defects are actually structural in nature, plaintiff’s allegations as to their structural nature are sufficient, at this juncture, to withstand defendants’ motion to dismiss. Thus, dismissal of plaintiff’s first cause of action must be denied.”

    Next, the court reviewed the second cause of action, which was breach of statutory warranties: “Defendants’ motion also seeks dismissal of plaintiff’s second cause of action for breach of statutory warranties, which alleges that, under applicable law, including General Business Law § 777-a, et seq., the sponsor warranted to purchasers of units that the units would be constructed in a skillful, careful, and workmanlike manner, consistent with proper design, engineering, and construction standards and practices, and free of material latent, design, and structural defects. Defendants argue that General Business Law § 777-a, known as the housing merchant implied warranty, is inapplicable to this case because it is limited to the construction of a ‘new home,’ defined in General Business Law § 777 (5) as ‘any single family house or for-sale unit in a multi-unit residential structure of five stories or less.’ As noted above, the building in which plaintiff’s condominium unit is located is a six-story building.”

    The motion to dismiss the second cause of action is denied. The court provided this reasoning: “the full text of the offering plan has not been provided, the court is unable to examine the entire written agreement so as to determine the purpose of the inclusion of the text of General Business Law § 777.”

    In the third cause of action, the plaintiff alleges “a breach of contract claim as against Vision, Foremost, and MMJ based upon their contract with 355 Realty, pursuant to which they agreed to be the general contractors/construction managers for the condominium, to undertake oversight responsibility for the design and construction of the condominium, to prepare and/or review drawings, plans, and specifications for the condominium, and to otherwise manage and oversee the project. Plaintiff alleges that Vision, Foremost, and MMJ breached their contractual obligations in that the condominium units were improperly and inadequately designed and constructed, and completed in an incompetent and unworkmanlike manner, with material design and construction defects.”

    The motion to dismiss the third cause of action was denied as well: “Plaintiff alleges, in his amended complaint, that Vision, Foremost, and MMJ have acknowledged notice of the defects and have not denied that they are responsible for providing a warranty to plaintiff. Plaintiff also refers to this warranty, in his amended complaint, by noting that paragraph 16 of the purchase agreement stated that the ‘[s]eller shall not be liable to . . . the [p]urchaser for any matter as to which an assignable warranty . . . has been assigned . . . to [p]urchaser and in such case the sole recourse of such . . . [p]urchaser . . . shall be against the warrantor . . . except that in the event a contractor or subcontractor is financially unable or refuses to perform its warranty . . . [s]eller shall not be excused from its obligations enumerated in the [offering p]lan under Rights and Obligations of Sponsor.’ Consequently, the court finds that dismissal of plaintiff’s third cause of action as against Foremost and MMJ must also be denied.”

    In the fourth cause of action, the plaintiff alleges “that defendants made false statements and representations orally, in advertisements, and in the purchase agreement, that the condominium was properly and adequately designed and constructed and completed in a competent and workmanlike manner, in accordance with the condominium plans and specifications and proper design, engineering, and construction standards and practices consistent with applicable standards for a first class, luxury condominium in Brooklyn.”

    The court dismissed the fourth cause of action stating, “it must be dismissed because it is duplicative of his first cause of action for breach of contract.” Therefore, “defendants’ motion to dismiss plaintiff’s amended complaint is granted to the extent that it seeks dismissal of plaintiff’s fourth cause of action, and it is denied in all other respects.”

    Read the court’s decision…

    Construction on the Rise in Denver

    September 13, 2012 — CDJ Staff

    In another sign of a recovery in the housing industry, the Denver Business Journal reports that the pace of new home construction has accelerated in the Denver area. According to the article, in the first seven months of 2012, forty-eight percent more permits were issued than in the first seven months of 2011. In July, 2012, there were sixty-six percent more permits than a year previously. For the Denver metropolitan area, July was the sixteenth consecutive month in which permits were up from a year previously.

    Read the full story…


    Consulting Firm Indicted and Charged with Falsifying Concrete Reports

    August 17, 2011 — CDJ Staff

    The New York Times reports that a company paid to inspect concrete at major public works projects in New York has been charged with falsifying results. They had been hired by the city three years ago after their predecessor was found to have falsified results.

    According to the Times, investigators found nothing legitimate in nearly three thousand reports. The owner and five employees of American Standard Testing and Consulting Laboratories have been indicted on twenty-nine counts, including charges under New York’s racketeering law. Prison terms could be up to twenty-five years.

    Prior to the city’s contract with American Standard, the city employed a firm called Testwell. Testwell was found in 2008 to have falsified its test results.

    Read the full story…


    Wisconsin “property damage” caused by an “occurrence.”

    April 4, 2011 — April 4, 2011 in CDCoverage.com

    In American Family Mut. Ins. Co. v. American Girl, Inc., 673 N.W.2d 65 (Wis. 2004), the insured general contractor was hired by the owner to design and build a warehouse on the owner s property. The general contractor hired a soil engineer to do a soil analysis and make site preparation recommendations. The soil engineer determined that the soil conditions were poor and recommended a compression process which the general contractor followed. After the warehouse was completed and the owner took possession, excessive soil settlement caused the foundation to sink which in turn caused structural damage to the warehouse. The warehouse had to be torn down.

    Read the full story...

    Reprinted courtesy of CDCoverage.com


    Ensuing Loss Provision Does Not Salvage Coverage

    August 2, 2012 — Tred Eyerly, Insurance Law Hawaii

    The Minnesota Court of Appeals affirmed the trial court's decision finding no coverage due to exclusions from the all-risk policy for losses related to mold, rot and condensation. Koskovich v. Am Family Mut. Ins. Co., 2012 Minn. App. Unpub. LEXIS 581 (Minn. Ct. App. June 25, 2012).

    In 1978, the insureds purchased a home that was built in 1904. From 1991 to 1995, they remodeled, which included rotating the house 45 degrees, removing a wing and adding a new section. Polypropylene vapor barriers were installed, with pinholes for ventilation.

    In 2008, water was observed on an interior floor. An investigation revealed that the sheathing under the siding and the house's framing were wet and rotten, requiring removal and replacement of the siding and studs. Repairs were made and a claim was submitted to American Family Mutual Insurance Company.

    American's structural engineer inspected and determined that moisture was likely caused by condensation of water vapor where the vapor barrier was held tight to the sheathing and by inward water migration from wet siding during rainy periods through the vapor-barrier perforations. The structural engineer opined that, although the home's framing was deteriorated and structurally compromised, it did not appear as though the home was in imminent danger of collapse.

    American denied coverage.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Is There a Conflict of Interest When a CD Defense Attorney Becomes Coverage Counsel Post-Litigation?

    September 1, 2011 — Chad Johnson of Higgins, Hopkins, McLain & Roswell, LLC

    In Weitz Co., LLC v. Ohio Cas. Ins. Co., the U.S. District Court for the District of Colorado was asked to rule on a motion to disqualify counsel in an insurance coverage action. 11-CV-00694-REB-BNB, 2011 WL 2535040 (D. Colo. June 27, 2011). Motions to disqualify counsel are viewed with suspicion, as courts “must guard against the possibility that disqualification is sought to ‘secure a tactical advantage in the proceedings.’” Id. at *2 (citing Religious Technology Center v. F.A.C.T. Net, Inc., 945 F. Supp. 1470, 1473 (D. Colo. 1996).

    Weitz Company, LLC (“Weitz”) is a general contractor and defendant in an underlying construction defect suit which had concluded before the action bringing rise to this order. In the underlying action, Weitz made third-party claims against subcontractors, including NPW Contracting (“NPW”). Weitz was listed as an additional insured under NPW’s policies with both Ohio Casualty Insurance Company and Mountain States Mutual Casualty Company (collectively “the Carriers”). The Carriers accepted Weitz’s tender of defense under a reservation of rights. However, neither insurance carrier actually contributed to Weitz’s defense costs in the underlying action. At the conclusion of the construction defect action, the parties unsuccessfully attempted to apportion the attorney’s fees and costs. Eventually, Weitz brought suit against the recalcitrant carriers. The Lottner firm, which had previously represented Weitz in the underlying construction defect action, continued to represent Weitz in this coverage action. 

    Read the full story…

    Reprinted courtesy of Higgins, Hopkins, McLain & Roswell, LLC. Mr. Johnson can be contacted at johnson@hhmrlaw.com


    CC&Rs Not the Place for Arbitration Agreement, Court Rules

    May 24, 2011 — CDJ Staff

    In January, the California Court of Appeals ruled that an arbitration clause inserted in a development’s CC&Rs by the developer could not be enforced. The case, Villa Vicenza Homeowners Association v. Noble Court Development, involved a case in which, according to the opinion, “following the first sale Nobel controlled the board of directors of the Association and because the initial condominium buyers noticed defects in common areas and common facilities and did not believe Nobel had provided a reserve fund sufficient to repair the defects, the condominium owners brought a derivative action on behalf of the Association against Nobel.”

    The court concluded, “The use of CC&R's as a means of providing contractual rights to parties with no interest in or responsibility for a common interest development is also problematic from the standpoint of determining what if any consideration would support such third-party agreements. By their terms the CC&R's bind all successors, even those with whom a third party such as Nobel has never had any contractual relationship and to whom Nobel has not provided any consideration.” The court determined that “the trial court did not err in denying Nobel's motion to compel arbitration.”

    Read the court’s decision