BERT HOWE
  • Nationwide: (800) 482-1822    
    institutional building Wichita County Texas condominiums Wichita County Texas low-income housing Wichita County Texas industrial building Wichita County Texas townhome construction Wichita County Texas production housing Wichita County Texas office building Wichita County Texas structural steel construction Wichita County Texas Subterranean parking Wichita County Texas casino resort Wichita County Texas hospital construction Wichita County Texas tract home Wichita County Texas retail construction Wichita County Texas custom homes Wichita County Texas parking structure Wichita County Texas housing Wichita County Texas high-rise construction Wichita County Texas landscaping construction Wichita County Texas concrete tilt-up Wichita County Texas condominium Wichita County Texas multi family housing Wichita County Texas custom home Wichita County Texas
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Wichita County, Texas

    Texas Builders Right To Repair Current Law Summary:

    Current Law Summary: HB 730 amended the Texas Property Code by adding Title 16 and amending chapter 27. Overseen by the Texas Residential Construction Commission (TRCC) the code asserts that a contractor is not liable for any percentage of damages caused by failure to take reasonable action to mitigate damages or take reasonable action to maintain the residence. It also limits damages, requires written notification and response for right of repair and defines warranty periods. Additionally, SB 754 states“(5-10 Sec. 27.107) a contractor may assert as an affirmative defense to an allegation of a defect made in a complaint filed under this subchapter that the defect is the result of abuse, neglect, or unauthorized modifications or alterations of the home.”


    Construction Expert Witness Contractors Licensing
    Guidelines Wichita County Texas

    No state license is required, however, general contractors must get permits at the local level. Separate boards license HVAC, and plumbing trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    North Texas Home Builders Association
    Local # 4578
    4410 Fairway Blvd
    Wichita Falls, TX 76308
    http://www.nthba.com

    Home Builders Association of Grayson - Fannin and Cooke Counties
    Local # 4563
    PO Box 1421
    Sherman, TX 75091
    http://www.hbagfc.org

    Home Builders Association of West Texas
    Local # 4545
    4223 85th St
    Lubbock, TX 79423
    http://www.wthba.com

    Home Builders Association of Texarkana
    Local # 4566
    PO Box 7048
    Texarkana, TX 75505
    http://www.texarkanahomebuilders.com

    Home Builders Association of Greater Dallas
    Local # 4524
    5816 West Plano Pkwy
    Plano, TX 75093
    http://www.dallasbuilders.com

    Builders Association of Greater Fort Worth
    Local # 4530
    70001 Blvd 26 Ste 323
    Fort Worth, TX 76180
    http://www.fortworthbuilders.org

    Texas Panhandle Builders Association
    Local # 4509
    5601 Enterprise Cir
    Amarillo, TX 79106
    http://www.tpba.org


    Construction Expert Witness News and Information
    For Wichita County Texas

    Court Sends Construction Defect Case from Kansas to Missouri

    Webinar on Insurance Disputes in Construction Defects

    Texas Law Bars Coverage under Homeowner’s Policy for Mold Damage

    Fourteen More Guilty Pleas in Las Vegas Construction Defect Scam

    Colorado “property damage” caused by an “occurrence” and exclusions j(5) and j(6) “that particular part”

    Cleveland Condo Board Says Construction Defects Caused Leaks

    Construction Suit Ends with Just an Apology

    Lower Court “Eminently Reasonable” but Wrong in Construction Defect Case

    Court Orders House to be Demolished or Relocated

    Counterpoint: Washington Supreme Court to Rule on Resulting Losses in Insurance Disputes

    Nevada Supreme Court Reverses Decision against Grader in Drainage Case

    Homeowners Sue Over Sinkholes, Use Cash for Other Things

    Construction Company Head Pleads Guilty to Insurance and Tax Fraud

    The Montrose Language Interpreted: How Many Policies Are Implicated By A Construction Defect That Later Causes a Flood?

    More Charges in Las Vegas HOA Construction Defect Scam

    Remodels Replace Construction in Redding

    District Court Awards Summary Judgment to Insurance Firm in Framing Case

    Colorado Court of Appeals holds that insurance companies owe duty of prompt and effective communication to claimants and repair subcontractors

    When Does a Claim Against an Insurance Carrier for Failing to Defend Accrue?

    California Appeals Court Remands Fine in Late Completion Case

    Certificate of Merit to Sue Architects or Engineers Bill Proposed

    Virginia Homebuilding Slumps After Last Year’s Gain

    Construction Bright Spot in Indianapolis

    Construction Delayed by Discovery of Bones

    United States District Court Confirms That Insurers Can Be Held Liable Under The CCPA.

    Architect Not Responsible for Injuries to Guests

    Insurer Not Entitled to Summary Judgment on Construction Defect Claims

    Judge Concludes Drywall Manufacturer Sold in Florida

    Lawsuit over Construction Defects Not a Federal Case

    Instant Hotel Tower, But Is It Safe?

    California Bill Would Notify Homeowners on Construction Defect Options

    Construction Defect Claim Did Not Harm Homeowner, Court Rules

    Contractor Sues License Board

    All Risk Policy Only Covers Repair to Portion of Dock That Sustains Damage

    Boyfriend Pleads Guilty in Las Vegas Construction Defect Scam Suicide

    More Charges in Las Vegas HOA Scandal

    Plaintiff Not Entitled to Further Damages over Defective Decking

    Ensuing Loss Found Ambiguous, Allowing Coverage

    South Carolina Legislature Redefining Occurrences to Include Construction Defects in CGL Policies

    Legislatures Shouldn’t Try to Do the Courts’ Job

    Home Sales Still Low, But Enough to Spur Homebuilders

    Contractor Underpaid Workers, Pocketed the Difference

    Seven Tips to Manage Construction Defect Risk

    There is No Non-Delegable Duty on the Part of Residential Builders in Colorado

    Homeowner may pursue negligence claim for construction defect, Oregon Supreme Court holds

    Unfinished Building Projects Litter Miami

    Construction Demand Unsteady, Gains in Some Regions

    Nevada Budget Remains at Impasse over Construction Defect Law

    Was Jury Right in Negligent Construction Case?

    No Coverage for Negligent Misrepresentation without Allegations of “Bodily Injury” or “Property Damage”

    Australian Group Seeks Stronger Codes to Combat Dangerous Defects

    JDi Data Introduces Mobile App for Litigation Cost Allocation

    Mobile Home Owners Not a Class in Drainage Lawsuit

    South Carolina Contractors Regain General Liability Coverage

    Federal Court Denies Summary Judgment in Leaky Condo Conversion

    Construction Defect Notice in the Mailbox? Respond Appropriately

    Builder Cannot Receive Setoff in Construction Defect Case

    The Year 2010 In Review: Design And Construction Defects Litigation

    No-Show Contractor Can’t Hide from Construction Defect Claim

    Defense for Additional Insured Not Barred By Sole Negligence Provision

    Construction Workers Face Dangers on the Job

    Badly Constructed Masonry Walls Not an Occurrence in Arkansas Law

    Ninety-Day Extension Denied to KB Home in Construction Defect Insurance Claim

    Colorado Court of Appeals Rejects Retroactive Application of C.R.S. § 13-20-808.

    Court Grants Summary Judgment to Insurer in HVAC Defect Case

    Can Negligent Contractors Shift Blame in South Carolina?

    Conspirators Bilked Homeowners in Nevada Construction Defect Claims

    Colorado Senate Bill 12-181: 2012’s Version of a Prompt Pay Bill

    Appeals Court Reverses Summary Judgment over Defective Archway Construction

    Read Her Lips: “No New Buildings”

    California Lawyer Gives How-To on Pursuing a Construction Defect Claim

    Statutes of Limitations May be the Colorado Contractors’ Friend

    Boston’s Tunnel Project Plagued by Water

    Builder to Appeal Razing of Harmon Tower

    North Carolina Exclusion j(6) “That Particular Part”

    Insurers Reacting to Massachusetts Tornadoes

    Preparing For the Worst with Smart Books & Records

    Homeowner’s Policy Excludes Coverage for Loss Caused by Chinese Drywall

    Courts Are Conflicted As To Whether "Good Faith" Settlement Determinations Can Be Reviewed Via Writ Petition Or Appeal

    Yellow Brass Fittings Play a Crucial Role in Baker v Castle & Cooke Homes

    Contractor’s Coverage For Additional Insured Established by Unilateral Contract

    Surveyors Statute Trumps Construction Defect Claim in Tennessee

    Largest Per Unit Settlement Ever in California Construction Defect Case?

    Bound by Group Builders, Federal District Court Finds No Occurrence

    FHA Lists Bridges and Overpasses that May Have Defective Grout

    Important Information Regarding Colorado Mechanic’s Lien Rights.

    Fifth Circuit Asks Texas Supreme Court to Clarify Construction Defect Decision

    Architect Not Liable for Balcony’s Collapse

    Insurance Policy Provides No Coverage For Slab Collapse in Vision One

    Nevada Senate Rejects Construction Defect Bill
    Corporate Profile

    WICHITA COUNTY TEXAS CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 5500 construction defect and claims related expert witness designations, the Wichita County, Texas Construction Expert Witness Group provides a wide range of trial support and consulting services to Wichita County's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.

    Wichita County Texas general contracting defective construction expertWichita County Texas general contracting civil engineer expert witnessWichita County Texas general contracting engineering expert witnessWichita County Texas general contracting construction cost estimating expert witnessWichita County Texas general contracting slope failure expert witnessWichita County Texas general contracting OSHA expert witness constructionWichita County Texas general contracting consulting engineersWichita County Texas general contracting expert witness structural engineerWichita County Texas general contracting construction expert witness consultant
    Construction Expert Witness News & Info
    Wichita County, Texas

    North Carolina Exclusion j(6) “That Particular Part”

    February 10, 2012 — CDCoverage.com

    In Alliance Mutual Insurance Co. v. Dove, 714 S.E.2d 782 (N.C. Ct. App. 2011), claimant Murphy-Brown hired insured Dove to repair a broken elevator belt in a grain elevator in Murphy-Brown’s feed mill. The elevator was inside a metal duct and, to access the broken belt, Dove had to cut out a section of the duct. After replacing the belt, Dove welded the metal section back to the duct. Immediately after Dove completed the welding, dust inside the duct ignited, causing an explosion in the elevator, resulting in property damage to the elevator and other property. Murphy-Brown sued Dove for negligence seeking damages for the repair and replacement of the elevator, repair and replacement of the other property, increased grain handling costs during the repairs, and loss of use.

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    Tacoma Construction Site Uncovers Gravestones

    August 11, 2011 — CDJ Staff

    The Seattle Times reports that a transit construction project has uncovered about twenty-five gravestones. The area was historically sensitive, as it is in territory once occupied by the Puyallup Tribe. At current report, no human remains have been found and the article cites the project?s archeological consultant as describing the gravestones as “not historically significant.”

    Read the full story…


    Construction Defects in Home a Breach of Contract

    September 9, 2011 — CDJ Staff

    The Supreme Court of North Dakota has ruled in Leno v. K & L Homes, affirming the verdict of the lower court. K & L Homes argued that district court had erred in several ways, including by refusing to instruct the jury on comparative fault, denying a request for inspection, and not allowing a defendant to testify on his observations during jury viewing.

    The Lenos purchased a home constructed by K & L Homes, after which they alleged they found cracks, unevenness, and shifting, which they attributed to improper construction. They claimed negligence on the part of K & L Homes. K & L Homes responded that the Lenos were responsible for damage to the home. The Lenos dropped their negligence claim, arguing breach of contract and implied warranties.

    Before the trial, after the discovery period had passed, K & L Homes requested to inspect the home. This was rejected by the court. Kelly Moldenhauer, the owner of K & L Homes sought to testify about his observations during the jury’s viewing of the house. The court denied this too. The jury found that K & L was in breach of contract and awarded damages to the Lenos.

    The North Dakota Supreme Court noted that K & L Homes gave “warranties that the home had been built according to local building codes and laws, and that the house was fit for its particular purpose as a residence.” The court found that a defective home breached this warranty. Further, the home violated an implied warranty of fitness.

    The district court had denied K & L’s request to inspect the home, as the discovery period had ended and it would not give the Lenos time to do further discovery of their own. At the time of the request, there was only twenty-two days before the trial. The Supreme Court ruled that this was not an abuse of discretion of the part of the district court.

    The Lenos had requested that Moldenhauer’s testimony not be permitted, as it would “have the same effect as if the court had granted K & L Homes’ pretrial request for inspection.” K & L Homes agreed to this in court, replying, “okay.”

    The decision affirms the judgment of the district court and the damages awarded to the Lenos by the jury.

    Read the court’s decision…


    Arizona Court of Appeals Rules Issues Were Not Covered in Construction Defect Suit

    December 9, 2011 — CDJ Staff

    The Arizona Court of Appeals has ruled in the case of Peters v. Marque Homes. In this case, Walter Peters provided the land and funding for Marque Homes to build a luxury residence in Glendale, Arizona. By the terms of the “Joint Venture Agreement,” Peters provided the land and funding, while Marque would not charge Peters for overhead, profits, or supervision fees. The agreement specified that profits would be divided equally.

    Two years later, Marque sued Peters claiming he had breached his obligations by refusing several offers for the home. Peters replied that Marque had “failed to complete the home so it is habitable to prospective purchasers.” Peters stated he had “retained an expert inspector who had identified numerous defects.” The court appointed a Special Commissioner to list the home for sale. Peters purchased the home with two stipulations ordered by the court. At this point, the earlier case was dismissed with prejudice.

    Peters then sued Marque “asserting express and implied warranty claims arising out of alleged construction defects in the home.” Marque claimed that Peters’s claims were “precluded by the prior joint venture dispute.” The court granted Marque’s motion.

    The appeals court reversed the lower court’s decision, determining that Peters’s claims were not precluded by the agreement. Although there had been a prior case between the two parties, warranty issues did not form a part of that case. “Peters never raised these allegations nor presented this evidence in support of any warranty claim.”

    The court also noted that the “parties never agreed to preclude future warranty claims.” Marque and Peters “agreed in the stipulated sale order that ‘the sale of the property to a third party shall be “as is” with a 10-year structural warranty.’” The court noted that the agreement said nothing about one of the parties buying the house.

    The appeals court left open a claim by Marque that there are no implied or express warranties available to Peters. They asked the Superior Court to address this.

    Read the court’s decision…


    Court Orders House to be Demolished or Relocated

    April 26, 2011 — April 26, 2011 Beverley BevenFlorez - Construction Defect Journal

    Decision Affirmed in Central Arkansas Foundation Homes, LLC v. Rebecca Choate

    The Arkansas Court of Appeals affirmed the decision by the trial court in Central Arkansas Foundation Homes, LLC v. Rebecca Choate. In the trial case, Central Arkansas Foundation Homes (CAFH) sought payment for a home built for Choate, while Choate alleged that the builders committed multiple construction defects including using the wrong foundation materials and positioning the house in the wrong direction.

    After the house was built, CAFH contacted Choate regarding payment, however, Choate alleged that the finished product did not match the contract. “ After CAFH completed construction, it obtained permanent home financing for Choate and tried to contact her to close the transaction. Choate did not respond until October 2005, when she sent CAFH a list of alleged construction defects, including that the house was facing in the wrong direction; that it was not built on a slab; and that the fireplace, garbage disposal, driveway, and storage area were missing. CAFH replied to Choate in writing, telling her that she had until January 6, 2006, to close on the house or CAFH would sell it. The correspondence enclosed worksheets showing that the amount Choate would owe at closing exceeded $94,000, which included interest that had accrued on the as-yet unpaid construction loan.”

    Initially, the court found in favor of CAFH. “On April 18, 2007, Choate’s attorney withdrew from representing her. Soon thereafter, CAFH’s attorney asked the court to set a final hearing on the case. The attorney purportedly sent Choate a letter by regular mail on May 15, 2007, advising her that the case was set for trial on July 9, 2007. Choate, however, did not appear. CAFH did appear, and its general manager, John Oldner, testified to events leading up to the case and the amount of damages claimed. According to Oldner, the interest on the construction loan had accrued to the point that CAFH now sought $104,965.88 from Choate. The court found in favor of CAFH and entered judgment for that amount, plus attorney fees, on July 18, 2007. The court ruled that CAFH could sell the house and either remit any excess to Choate or look to Choate for the deficiency if the sales price did not cover the judgment.”

    However, Choate successfully argued that she did not receive notice of the trial. A new trial was ordered, and the outcome was quite different. “On June 6, 2008, the circuit court entered judgment for Choate, ruling that the house was not in substantial compliance with the parties’ contract and that the contract should be rescinded. The court found that the house suffered from numerous construction defects, that the contract contemplated a slab rather than a concrete-pier foundation, and that CAFH ignored Choate’s complaints that the house was facing the wrong way. The judgment directed CAFH to hold Choate harmless on the construction loan, to deed Choate’s two acres back to her, and to remove the house from Choate’s property.”

    The Court of Appeals “found that Choate would be unjustly enriched by retaining the benefit of the septic systems and utility lines that CAFH installed on her land. The court therefore awarded $5340 to CAFH as a quantum-meruit recovery for the value of that work. CAFH contends that the award is not sufficient, but we see no clear error.” In the end, the Court of Appeals provided this reason for declining to reverse the trial court’s decision: “The court in this case apparently concluded that the house constructed by CAFH was so fundamentally at odds with Choate’s contractual expectations that she was not unjustly enriched and should simply be, as nearly as possible, returned to the status quo ante. Accordingly, the court ordered the house removed from her property and permitted CAFH to either relocate the house or salvage the house’s materials and unused appliances. We decline to reverse the court’s weighing of the equities in this manner.”

    Read the court’s decision…


    Nevada Court Adopts Efficient Proximate Cause Doctrine

    February 10, 2012 — Tred Eyerly, Insurance Law Hawaii

    Although the Nevada Supreme Court adopted the efficient proximate cause doctrine, it determined it did not apply to salvage coverage under an all-risk policy for a rain-damaged building. Fourth Street Place, LLC v. The Travelers Indemn. Co., 2011 Nev LEXIS 114 (Nev. Dec. 29, 2011).

    Fourth Street owned an office building which was insured by an all-risk policy issued by Travelers. Fourth Street hired Above It All Roofing to repair the roof of the office building. Above It All removed the waterproof membrane on the roof and prepared to replace the membrane the following week. Over the weekend, however, substantial rain hit. On Sunday, Above It All returned to cover the exposed portions of the roof with tarps, but wind later blew the tarps away. The building suffered significant interior damage as it continued to be exposed to the rain.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    A Performance-Based Energy Code in Seattle: Will It Save Existing Buildings?

    August 11, 2011 — Douglas Reiser, Builders Counsel

    The City of Seattle has one of the most stringent energy codes in the nation. Based upon the Washington State Energy Code (which has been embroiled in litigation over its high standards), the code demands a lot from commercial developers. But, does it prevent developers from saving Seattle?s classic and old buildings? Perhaps.

    The general compliance procedure requires buildings to be examined during the permitting process. This means that buildings are examined before they begin operating. The procedure is not malleable and is applicable to all buildings, old and new, big and small.

    The downside of this procedure is that it eliminates awarding compliance to those buildings exhibiting a number of passive features, such as siting, thermal mass, and renewable energy production. This problem has prevented a number of interesting and architecturally pleasing existing building retrofits from getting off the ground. The cost of complying with the current system can be 20% more, and it might prevent builders from preserving a building?s historical integrity.

    Read the full story…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com

    Hilton Grand Vacations Defect Trial Delayed

    October 23, 2012 — CDJ Staff

    A settlement agreement between Conti Electric and Westgate Resorts has lead to a delay in starting the trial over construction defect claims and billing disputes over Hilton Grand Vacations a time share tower in Las Vegas. According to the Las Vegas Review-Journal, the dispute includes claims of $23.3 million owed to the general contractor against which the developer has placed $30 million in construction defect claims.

    Read the full story…


    Pipes May Be Defective, But Owners Lack Standing

    September 13, 2012 — CDJ Staff

    The United States District Court in Minnesota has determined that Steven and Cecilia Thundander cannot make a class-action claim against Uponor, Inc. over the plumbing in their home, as they do not have Article III standing. In this situation, the alleged defect is that Uponor made fraudulent claims that the pipes met National Sanitation Foundation (NSF) standards for use in potable water systems. Uponor submitted samples of other pipes, and their substitution was discovered when the NSF made an inspection of the manufacturing facility. The court noted that “the Thunanders contend that Uponor failed to inform homeowners, plumbers and consumers that it had been selling pipe that failed to meet NSF toxicity requirements at the time of sale and installation.”

    The Court noted that the Thunanders have not tested their piping to determine if they “demonstrate toxicity or lack of compliance with the NSF 61 standards,” noting also that the Complaint seeks to require Uponor to instruct the plaintiffs on “how to test the piping and water to determine the level of risk.” Lacking testing, the Court could not find that the Thundanders have defective pipes. The Court found that the “Plaintiffs have failed to adequately plead an injury in fact sufficient to confer standing as to their product liability claims.”

    The Court also concluded that it could not determine if the Plaintiff’s warranty actions could not be applied, as they “have failed to allege a plausible defect.” Even in the presence of a defect, the Court noted that more than eight years had passed before the filing of the suit, when the warranties under both Indiana and Minnesota law have a four-year statute of limitations. The Court also rejected the Thunanders tort claims, once again because “Plaintiffs have not tested their pipes,” noting that “a tort requires the existence of an injury.”

    In conclusion, Judge Nelson rejected the entirety of the complaint, granting the motions to dismiss by the defendants. However, despite the problems with the Thunanders’ claims, she found that they were not “patently frivolous or groundless.” Therefore, she denied attorney fees requested by one of the defendants.

    Read the court’s decision…


    Construction Case Alert: Appellate Court Confirms Engineer’s Duty to Defend Developer Arises Upon Tender of Indemnity Claim

    January 27, 2010 — By Steven M. Cvitanovic, Haight Brown & Bonesteel, LLP, January 27, 2010

    In the recent case of UDC-Universal Development, L.P. v. CH2M Hill, 2010 Cal.App.LEXIS 47 (filed January 15, 2010), the Sixth District Court of Appeal provided a stunning illustration of the far-reaching effects of the California Supreme Court’s holding in Crawford v. Weather Shield Manufacturing Inc. (2008) 44 Cal.4th 541. In Crawford, the Court held the duty to defend under an indemnity agreement arose upon the mere tender of defense of a claim covered by the indemnity.

    In the UDC case, CH2M Hill provided engineering and environmental planning services to developer UDC on a project that ultimately wound up in a construction defect lawsuit by the homeowners association ( HOA ). UDC tendered its defense to CH2M Hill, the tender was rejected, and UDC filed a cross-complaint for negligence, breach of contract and indemnity against CH2M Hill and others. After the HOA’s construction defect claims were settled, UDC proceeded to trial against CH2M Hill. The jury found in favor of CH2M Hill on the claims for negligence and breach of contract. At the request of the parties prior to trial, the trial court ruled on the application of the indemnity agreement in light of Crawford and, in so doing, found that the defense obligation arose upon the tender and that CH2M Hill breached that duty despite the jury finding in favor of CH2M Hill.

    The Court of Appeal affirmed, noting that the defense obligation arose as soon as the defense was tendered and did not depend on the outcome of the litigation, and that the HOA’s general description of the defects along with an allegation that Doe engineers were negligent triggered the duty to defend.

    Although this case did not expand the crushing impact of Crawford’s holding, it is

    Read the full story...


    The Flood Insurance Reform Act May be Extended to 2016

    April 7, 2011 — April 7, 2011 Beverley BevenFlorez - Construction Defect Journal

    The Flood Insurance Reform Act of 2011 (H. R. 1309) has been referred to the House Committee on Financial Services—the first step in the legislative process. The bill, if passed, would extend the program to September 30, 2016. It is currently slated to be terminated September 30 of this year. The bill also contains changes to premium rates, mapping protocols, and privatization initiatives.

    H. R. 1309 has garnered the support of several Insurance organizations. Leigh Ann Pusey, president and CEO of the American Insurance Association (AIA), sent a letter of support to the Chair and Ranking member of the House Financial Services Subcommittee. “AIA has advocated for a long term reauthorization of the NFIP to protect consumers and help increase stability for real estate transactions and policyholders,” Pusey said. “AIA believes the five-year extension contained in HR 1309, will provide certainty in the flood program thereby increasing consumer and business confidence in the NFIP.”

    Jimi Grande, senior vice president of federal and political affairs for the National Association of Mutual Insurance Companies (NAMIC) spoke out in support of the bill. “For the NFIP to survive, the prices for flood insurance must reflect the actual costs of flood risk for a property,” Grande said. “HR 1309 will provide that transparency. In addition, the Technical Mapping Advisory Council will give communities a voice in the flood mapping process, fostering a better understanding of what flood maps represent and how they are made.”

    Read H. R. 1309...
    Read the American Insurance Association statement...
    Read the NAMIC Press Release...


    Delays in Filing Lead to Dismissal in Moisture Intrusion Lawsuit

    September 9, 2011 — CDJ Staff

    The Alabama Court of Civil Appeals has upheld a summary judgment in the case of Franklin v. Mitchell. Walter Mitchell, doing business as Southern Classic Construction built a new home for the Franklins. The Franklins moved into the home in October 2001. In April 2006 they discovered sagging floors in both the bathroom and kitchen. They contacted Mitchell who suggested the flooring might be defective. The Franklins spent eight months attempting to contact the flooring manufacturer.

    In March 2007, the Franklins had the home inspected. The sagging was determined to be due to a loss of strength in the decking because of condensation from the air conditioning system. Air returns were not properly sealed and drawing moisture into the structure. There was mold on the decking and floor joints.

    When Mitchell was contacted by the Franklins, he told them his one-year warranty had expired but had the HVAC subcontractor, Southern Mechanical Heating & Air (owned by Mitchell’s father, Jim Mitchell), look at the situation. SMHA replaced and braced subfloors. Later, they entered the crawl space to tape ducts, seal the air return, and insulate the air vent housing. The Franklins were not satisfied with the repairs, as not all the ducts were taped, nor were the air vent housings insulated.

    Franklin complained to Walter Mitchell who again cited his one-year warranty. Jim Mitchell said he would not report complaints to his insurer, stating that the repairs were unnecessary, that the work had been done correctly in the first place, and it was only done at the request of Walter Mitchell.

    In February 2009, the Franklins sued Walker Mitchell. Mitchell denied the claims, citing in part the statute of limitations. Mitchell also filed complaints against three subcontractors, including his father’s firm. Mitchell received a summary judgment as the case started after Alabama’s six-year statute of limitations.

    The appeals court rejected the Franklin’s argument that the claim of damage did not start until they were aware it was due to a construction defect. The court noted that as Walter Mitchell was licensed as a “residential home builder, the statute the Franklins cite did not apply, as it concerns architects, engineers, and licensed general contactors.”

    Nor did they feel that Mitchells’ claim that his warranty had expired were sufficient to override the statute of limitations, quoting an earlier case, “Vague assurances do not amount to an affirmative inducement to delay filing suit.” Their claim of subsequent negligent repairs was rejected because Mitchell did not direct the specific actions taken by his father’s firm.

    Read the court’s decision…


    Arizona Supreme Court Confirms Eight-Year Limit on Construction Defect Lawsuits

    July 18, 2011 — CDJ Staff

    Acting on the case of Albano v. Shea Homes Ltd. Partnership, the Arizona Supreme Court has ruled that Arizona’s eight-year statute of repose applies. The case was referred to the court by the Ninth Circuit Court of Appeals which had asked for a clarification of Arizona law. The case focused on three questions:

    1. Does the filing of a motion for class certification in an Arizona court toll the statute of limitations for individuals, who are included within the class, to file individual causes of action involving the same defendants and the same subject matter? 2. If so, does this class-action tolling doctrine apply to statutes of repose, and more specifically, to the statute of repose for construction defects set forth in Arizona Revised Statutes ("A.R.S.") § 12-552? 3. If the doctrine applies to statutes of repose, and specifically § 12-552, may a court weigh the equities of the case in determining whether, and to what extent, an action is tolled?

    The litigation at hand has a lengthy history, starting with a case referred to as “Hoffman” in 2003. The Albano plaintiffs were not able to join in Hoffman, and they filed their own lawsuit in 2006. An additional lawsuit was filed by the Albano plaintiffs in 2007. The courts decided that the Albano plaintiffs’ lawsuit was untimely.

    The Arizona Supreme Court concluded that the statute of repose was the appropriate standard for this case. They noted that “the eight-year statute of repose period began to run on November 6, 1997, the date of the Town of Gilbert’s final inspection. Albano II was filed on November 5, 2007.”

    The court found that the plaintiffs had waited too long for start their suit. As a result, they found it unnecessary to answer the first or third questions. Justice A. John Pelander of the Arizona Supreme Court wrote the opinion, dated June 30, 2011.

    Read the court’s decision…


    Home Sales Still Low, But Enough to Spur Homebuilders

    August 16, 2012 — CDJ Staff

    Although new home sales are still fifty percent below the average over the last forty years, the housing rebound has sent stock of homebuilders up 53 percent this year, during the same period, the S&P 500 rose only 12 percent. The San Francisco Chronicle reports that from 2005 through 2011, homebuilder stocks trailed the S&P 500.

    The growth isn’t limited to homebuilders alone. Building suppliers are also seeing a growth in sales, with profits for companies that make gypsum wallboard, cabinetry, plumbing products, and other items used in home building.

    Homebuilders have also been able to raise prices. Standard Pacific Corp of Irvine, California has raised prices and cut incentives. Nevertheless, the buyers still come. PulteGroup and D.R. Horton are also raising prices.

    Read the full story…


    Montrose Language Interpreted: How Many Policies Are Implicated By A Construction Defect That Later Causes a Flood?

    March 17, 2011 — By Shaun McParland Baldwin, March 17, 2011

    The Court of Appeals of Indiana recently addressed the “Montrose” language added to the CGL ISO form in 2001 in the context of a construction defect claim where a fractured storm drain caused significant flooding a year after the drain was damaged. The insuring agreement requires that “bodily injury” or “property damage” be caused by an “occurrence” and that the “bodily injury” or “property damage” occur during the policy period. The Montrose language adds that the insurance applies only if, prior to the policy period, no insured knew that the “bodily injury” or “property damage” had occurred in whole or in part. Significantly, it also states that any “bodily injury“ or “property damage” which occurs during the policy period and was not, prior to the policy period known to have occurred, includes a continuation, change or resumption of that “bodily injury” or “property damage” after the end of the policy period.

    In Grange Mutual Cas. Co. v. West Bend Mut. Ins. Co., No. 29D04-0706-PL-1112 (Ct. App. IN March 15, 2011), http://www.ai.org/judiciary/opinions/pdf/03151109ehf.pdf, Sullivan was the General Contractor for a school construction project. Its subcontractor, McCurdy, installed the storm drain pipes. One of the storm pipes was fractured in 2005 while McCurdy was doing its installation work. More than a year later, the school experienced significant water damage due to flooding. It was later discovered that the flooding was due to the fractured storm drain. Sullivan’s insurer paid $146,403 for the water damage. That insurer brought a subrogation claim against McCurdy and its two insurers: West Bend and Grange. West Bend had issued CGL coverage to McCurdy while the construction was ongoing , including the date in which the storm pipe was fractured. Grange issued CGL coverage to McCurdy at the time of the flooding. Those two carriers jointly settled the subrogation claim and then litigated which insurer actually owed coverage for the loss. Significantly, the loss that was paid included only damages from the flooding, not any damages for the cost of repairing the pipe.

    Read the full story...

    Reprinted courtesy of Shaun McParland Baldwin of Tressler LLP. Ms Baldwin can be contacted at sbaldwin@tresslerllp.com


    Construction Defects Lead to Demolition of Seattle’s 25-story McGuire Apartments Building

    March 16, 2011 — March 16, 2011 Construction Defect Journal Staff

    According to a story published last Thursday in Seattle PI: " The 25-story McGuire Apartments, at Second Avenue and Wall Street, would cost more to fix than the building is worth, according to its owners. Its most serious defect involves steel cables that are corroding inside of concrete slabs because the ends weren’t properly treated with a rust-proof coating and a pocket in the edge of the concrete that wasn’t properly sealed"

    The report by Aubrey Cohen outlines the demolition plans which are expected to take between 12 and 18 months, and will utilize robotic Brokk Machines. The demolition plan calls for one story at a time to be demolished, with the debris to be trucked offsite. Demolition plans aim to minimize disruption to residents and businesses in the area by Limiting work 7 a.m. to 6 p.m. on weekdays and 9 a.m. to 6 p.m. Saturdays with "impact and percussive activities" limited to 8 a.m to 5 p.m weekdays.

    Read More...


    Boyfriend Pleads Guilty in Las Vegas Construction Defect Scam Suicide

    November 7, 2012 — CDJ Staff

    One of the odder twists of the Las Vegas construction defect scandal was the charge that Nancy Quon’s boyfriend helped her in an initial suicide attempt. Quon, implicated by not charged in the case of taking control of homeowner boards in order to profit from construction defect settlements. William Webb was alleged to have bought the drug GBH in order to allow Quon, his girlfriend, to commit suicide. Ms. Quon later overdosed on a combination of alcohol and prescription drugs.

    In addition to pleading guilty to the drug charges, Webb also made a plea bargain with prosecutors in which he did not admit guilt in an insurance fraud charge, but acknowledged that prosecutors would likely be successful at obtaining a conviction. Webb will be sentenced February 7 and is expected to receive a sentence of six years imprisonment.

    Read the full story…


    Damron Agreement Questioned in Colorado Casualty Insurance v Safety Control Company, et al.

    February 10, 2012 — CDJ Staff

    Safety Control and EMC appealed the judgment in Colorado Casualty Insurance Company versus Safety Control Company, Inc., et al. (Ariz. App., 2012). The Superior Court in Maricopa County addressed “the validity and effect of a Damron agreement a contractor and its excess insurer entered into that assigned their rights to sue the primary insurer.” Judge Johnsen stated, “We hold the agreement is enforceable but remand for a determination of whether the stipulated judgment falls within the primary insurer’s policy.”

    The Opinion provides some facts and procedural history regarding the claim. “The Arizona Department of Transportation (“ADOT”) hired DBA Construction Company (“DBA”) to perform a road-improvement project on the Loop 101 freeway. Safety Control Company, Inc. was one of DBA’s subcontractors. As required by the subcontract, Safety Control purchased from Employer’s Mutual Casualty Company (“EMC”) a certificate of insurance identifying DBA as an additional insured on a policy providing primary coverage for liability arising out of Safety Control’s work.”

    A collision occurred on site, injuring Hugo Roman. Roman then sued ADT and DBA for damages. “Colorado Casualty tendered DBA’s defense to the subcontractors, including Safety Control. Safety Control and EMC rejected the tender. Roman eventually settled his claims against DBA and ADOT. DBA and ADOT stipulated with Roman for entry of judgment of $750,000; Roman received $75,000 from DBA (paid by Colorado Casualty) and $20,000 from ADOT, and agreed not to execute on the stipulated judgment. Finally, DBA, ADOT and Colorado Casualty assigned to Roman their rights against the subcontractors and other insurers.”

    Colorado Casualty attempted to recover what “it had paid to defend DBA and ADOT and settle with Roman. However, Roman intervened, and argued that “Colorado Casualty had assigned its subrogation rights to him as part of the settlement agreement.” The suit was not dismissed, but the Superior Court allowed Roman to intervene. “Roman then filed a counterclaim against Colorado Casualty and a cross-claim against the subcontractors.”

    All claims were settled against all of the defendants except Safety Control and EMC. “The superior court ruled on summary judgment that EMC breached a duty to defend DBA and that as a result, ‘DBA was entitled to settle with Roman without EMC’s consent as long as the settlement was not collusive or fraudulent.’ After more briefing, the court held the stipulated judgment was neither collusive nor procured by fraud and that EMC therefore was liable to Roman on the stipulated judgment and for his attorney’s fees. The court also held Safety Control breached its subcontract with DBA by failing to procure completed-operations insurance coverage and would be liable for damages to the extent that EMC did not satisfy what remained (after the other settlements) of the stipulated judgment and awards of attorney’s fees.” Safety Control and EMC appealed the judgment.

    Four reasons were given for the decision of the ruling. First, “the disagreement between Roman and Colorado Casualty does not preclude them from pursuing their claims against EMC and Safety Control.” Second, “the settlement agreement is not otherwise invalid.” Third, “issues of fact remain about whether the judgment falls within the EMC policy.” Finally, “Safety Control breached the subcontract by failing to procure ‘Completed Operations’ coverage for DBA.”

    In conclusion, the Superior Court affirmed in part, reversed in part, and remanded . “Although, as stated above, we have affirmed several rulings of the superior court, we reverse the judgment against EMC and remand for further proceedings consistent with this Opinion to determine whether the stipulated judgment was a liability that arose out of Safety Control’s operations. In addition, we affirm the superior court’s declaratory judgment against Safety Control but remand so that the court may clarify the circumstances under which Safety Control may be liable for damages and may conduct whatever further proceedings it deems appropriate to ascertain the amount of those damages. We decline all parties’ requests for attorney’s fees pursuant to A.R.S. § 12-341.01 without prejudice to a request for fees incurred in this appeal to be filed by the prevailing party on remand before the superior court.”

    Read the court’s decision…