BERT HOWE
  • Nationwide: (800) 482-1822    
    structural steel construction Molalla Oregon Medical building Molalla Oregon condominiums Molalla Oregon townhome construction Molalla Oregon production housing Molalla Oregon parking structure Molalla Oregon retail construction Molalla Oregon hospital construction Molalla Oregon landscaping construction Molalla Oregon institutional building Molalla Oregon Subterranean parking Molalla Oregon tract home Molalla Oregon concrete tilt-up Molalla Oregon office building Molalla Oregon multi family housing Molalla Oregon housing Molalla Oregon casino resort Molalla Oregon mid-rise construction Molalla Oregon high-rise construction Molalla Oregon custom home Molalla Oregon industrial building Molalla Oregon custom homes Molalla Oregon
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Molalla, Oregon

    Oregon Builders Right To Repair Current Law Summary:

    Current Law Summary: (HB 2525 Chap. 701; HB2389) If an owner sends a builder a notice of defect within the time allowed for the owner to commence a court action against that contractor, the time for the owner to commence the action shall be extended, notwithstanding any statute of limitation or statute of ultimate repose, until the later of 120 days after written receipt of builders intention to repair, replace the defect, make monetary compensation or reject the claim. Upon receipt of notice, builder has 14 days to inspect the alleged defect. They then have no more than 90 days to communicate their intention The homebuyer must respond to the builder response within 30 days of receipt. The law requires builder notifies homebuyer of NOR before purchase.


    Construction Expert Witness Contractors Licensing
    Guidelines Molalla Oregon

    Commercial and Residential Contractors License Required.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Home Builders Association of Marion and Polk Counties
    Local # 3878
    385 Taylor St NE
    Salem, OR 97301
    http://www.homebuildersassociation.org

    Oregon Home Builders Association
    Local # 3800
    375 Taylor St NE
    Salem, OR 97301
    http://www.oregonhba.com

    Baker County Chapter
    Local # 3802
    3470 10th St
    Baker City, OR 97814


    Home Builders Association of Metro Portland
    Local # 3862
    15555 SW Bangy Rd Ste 301
    Lake Oswego, OR 97035
    http://www.homebuildersportland.org

    Lincoln County Home Builders Association
    Local # 3858
    PO Box 440
    Tangent, OR 97389
    http://www.lincolncountyhba.org

    Willamette Valley Home Builders Association
    Local # 3805
    PO Box 440 32054 Old Hwy 34
    Tangent, OR 97389
    http://www.wvhba.com

    Northeast Oregon Chapter
    Local # 3860
    PO Box 436
    Hermiston, OR 97838



    Construction Expert Witness News and Information
    For Molalla Oregon

    Fifth Circuit Asks Texas Supreme Court to Clarify Construction Defect Decision

    Avoid Gaps in Construction Defect Coverage

    School Sues over Botched Pool

    Homeowners May Not Need to Pay Lien on Defective Log Cabin

    El Paso Increases Surety Bond Requirement on Contractors

    A Loud Boom, But No Serious Injuries in World Trade Center Accident

    Nevada Court Adopts Efficient Proximate Cause Doctrine

    Mobile Home Owners Not a Class in Drainage Lawsuit

    Building Inspector Jailed for Taking Bribes

    Unit Owners Have No Standing to Sue under Condominium Association’s Policy

    Crane Dangles and So Do Insurance Questions

    Coverage Exists Under Ensuing Loss Provision

    Safety Officials Investigating Death From Fall

    Florida Chinese drywall, pollution exclusion, “your work” exclusion, and “sistership” exclusion.

    Harmon Tower Construction Defects Update: Who’s To Blame?

    Pictorial Construction Terminology Dictionary — A Quick and Helpful Reference

    Contractor’s Coverage For Additional Insured Established by Unilateral Contract

    Equipment Costs? It’s a Steal!

    Construction Defects in Home a Breach of Contract

    Background Owner of Property Cannot Be Compelled to Arbitrate Construction Defects

    State Farm Too Quick To Deny Coverage, Court Rules

    Know the Minnesota Statute of Limitations for Construction Defect Claims

    Seller Cannot Compel Arbitration for Its Role in Construction Defect Case<

    Construction Defect Bill Introduced in California

    There Is No Non-Delegable Duty on the Part of Residential Builders in Colorado

    Home Builder Doesn’t See Long Impact from Hurricane

    Lien Claimant’s Right to Execute against Bond Upheld in Court of Appeals

    Timing of Insured’s SIR Payment Has No Effect on Non-Participating Insurer’s Equitable Contribution to Co-Insurer

    Ohio subcontractor work exception to the “your work” exclusion

    New Web Site Tracks Settled Construction Defect Claims

    Eighth Circuit Remands to Determine Applicability of Collapse Exclusion

    Insurer Has Duty to Defend Despite Construction Defects

    SB800 Cases Approach the Courts

    Foundation Arbitration Doesn’t Preclude Suing Over Cracks

    Florida Contractor on Trial for Bribing School Official

    General Contractor/Developer May Not Rely on the Homeowner Protection Act to Avoid a Waiver of Consequential Damages in an AIA Contract

    Analysis of the “owned property exclusion” under Panico v. State Farm

    Application of Efficient Proximate Cause Doctrine Supports Coverage

    Celebrities Lose Case in Construction Defect Arbitration

    Insurer Rejects Claim on Dolphin Towers

    Construction Defect Lawsuits? There’s an App for That

    Construction Workers Unearth Bones

    Insurer Able to Refuse Coverage for Failed Retaining Wall

    Massachusetts Couple Seek to Recuse Judge in Construction Defect Case

    Battle of “Other Insurance” Clauses

    Construction Defects Lead to Demolition

    HOA Has No Claim to Extend Statute of Limitations in Construction Defect Case

    Water Drainage Case Lacks Standing

    Texas Windstorm Insurance Agency Under Scrutiny

    Negligent Construction an Occurrence Says Ninth Circuit

    No Coverage For Construction Defects When Complaint Alleges Contractual Damages

    Colorado “occurrence”

    Court Orders House to be Demolished or Relocated

    Construction Law: Unexpected, Fascinating, Bizarre

    “Details Matter” is the Foundation in a Texas Construction Defect Suit

    Does the New Jersey Right-To-Repair Law Omit Too Many Construction Defects?

    New Jersey Court Rules on Statue of Repose Case

    Tucson Officials to Discuss Construction Defect Claim

    Demand for Urban Living Leads to Austin Building Boom

    Insurer Has Duty to Defend in Water Intrusion Case

    Preparing for Trial on a Cause of Action for Violation of Civil Code section 895, et seq.

    Construction Defects Are Occurrences, Says Georgia Supreme Court

    More Charges in Las Vegas HOA Construction Defect Scam

    Landmark San Diego Hotel Settles Defects Suit for $6.4 Million

    Construction Upturn in Silicon Valley

    Tacoma Construction Site Uncovers Gravestones

    Court Rejects Anti-SLAPP Motion in Construction Defect Suit

    Contractor Burns Down Home, Insurer Refuses Coverage

    FHA Lists Bridges and Overpasses that May Have Defective Grout

    Flooded Courtroom May be Due to Construction Defect

    Water Is the Enemy

    Allowing the Use of a General Verdict Form in a Construction Defect Case Could Subject Your Client to Prejudgment Interest

    Changes to Arkansas Construction and Home Repair Laws

    Lawsuit over Construction Defects Not a Federal Case

    Renovation Contractors: Be Careful How You Disclose Your Projects

    Damage During Roof Repairs Account for Three Occurrences

    Tennessee Court: Window Openings Too Small, Judgment Too Large

    2011 Worst Year Ever for Home Sales

    Construction Defects: 2010 in Review

    US Courts in Nevada Busy with Yellow Brass

    Exclusion Bars Coverage for Mold, Fungus

    Ensuing Loss Provision Does Not Salvage Coverage

    Condominium Exclusion Bars Coverage for Construction Defect

    Utah Construction Defect Claims Dependant on Contracts

    Florida trigger

    Hawaii Building Codes to Stay in State Control

    Insurer Not Liable for Construction Defect Revealed by Woodpecker

    Southern California Lost $8 Billion in Construction Wages

    Destruction of Construction Defect Evidence Leads to Sanctions against Plaintiff

    Contractor Convicted of Additional Fraud
    Corporate Profile

    MOLALLA OREGON CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Molalla, Oregon Construction Expert Witness Group at BHA, leverages from the experience gained through more than 5,500 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Molalla's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Molalla Oregon general contracting construction project management expert witnessesMolalla Oregon general contracting roofing and waterproofing expert witnessMolalla Oregon general contracting expert witnesses fenestrationMolalla Oregon general contracting building code compliance expert witnessMolalla Oregon general contracting building consultant expertMolalla Oregon general contracting expert witness windowsMolalla Oregon general contracting construction project management expert witnessMolalla Oregon general contracting construction cost estimating expert witnessMolalla Oregon general contracting soil failure expert witness
    Construction Expert Witness News & Info
    Molalla, Oregon

    Building Inspector Jailed for Taking Bribes

    September 30, 2011 — CDJ Staff

    The LA Times reports that Raoul Germain, a city Los Angeles building inspector has been sentenced to 21 months in prison after pleading guilty to taking bribes. Germain was caught as part of an FBI sting operation in which he approved work in exchange for thousands of dollars in bribes. The Times notes that that in some cases, Germain never visited the construction sites. Germain was offered a chance to cooperate with investigators. His lawyer, Steve Cron asked the Times, “What do you think happens to someone who cooperates?”

    In addition to Germain, another city inspector has pleaded guilty to taking bribes and two more employees of the Department of Building and Safety have been fired in connection with the investigation.

    Read the full story…


    Construction Worker Dies after Building Collapse

    November 18, 2011 — CDJ Staff

    A Bronx construction worker died when the pillars gave way in the basement where he was working. The two-story commercial building collapsed, burying Mr. Kebbeh under about six feet of rubble. The New York Times reports that firefighters dug him out with their bare hands. Mr. Kebbeh was taken to Jacobi Medical Center where he died. Two other construction workers escaped unharmed.

    Read the full story…


    Ensuing Loss Provision Does Not Salvage Coverage

    December 9, 2011 — Tred R. Eyerly, Insurance Law Hawaii

    Water intrusion caused by a construction defect was not covered under the all risk policy’s ensuing loss provision. See Friedberg v. Chubb & Son, Inc., 2011 U.S. Dist. LEXIS 123582 (D. Minn. Oct. 25, 2011).

    Extensive water damage was discovered in the insureds’ home when a small hole in the exterior wall was being repaired. Chubb’s adjuster and an expert found water intrusion causing rot, mold, and damage to the home’s wood framing and insulation. Chubb denied coverage because water intruded through the roof and wall, resulting in gradual deterioration. The insureds filed suit.

    The policy excluded coverage for construction defects, but insured "ensuing covered loss unless another exclusion applies."

    The court agreed there was a prima facie case for coverage because the home suffered a physical loss.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    LEED Certified Courthouse Square Negotiating With Insurers, Mulling Over Demolition

    June 6, 2011 — Douglas Reiser in the Builders Counsel Blog

    Apparently, Courthouse Square is still unresolved. The County hasnow hired an attorney to handle its insurance claim against Affiliated FM. Is there a lawsuit coming?

    Right now, no lawsuit is expected. According to officials, the insurer has been acting in good faith. But, its been quite a while since Salem officials learned that the Courthouse Square building had significant concrete issues that would result in probable demolition of the LEED certified building.

    If you have yet to hear about Courthouse Square, let me fill you in briefly. The Salem building was substantially completed in 2000 and LEED certified by the US Green Building Council in 2002. The project cost more than $30 Million to complete and the building was revered for its innovation as a crowning achievement for city leaders.

    But, structural problems in the building’s core were discovered as early as 2002, writes Chris Cheatham of Green Building Law Update. Final tests earlier in the year, determined that the building had to be vacated. The building has been clear since July 2010.

    Read the full story…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com


    Coverage Exists Under Ensuing Loss Provision

    July 10, 2012 — Tred Eyerly, Insurance Law Hawaii

    Finding coverage under the ensuing loss provision, the Washington Supreme Court overruled a Court of Appeals decision we previously reported here. Vision One, LLC v. Philadelphia Indem. Ins. Co., 276 P.3d 300 (Wash. 2012).

    Vision developed a condominium project. Before concrete was poured, a subcontractor supplied the shoring to temporarily support the poured concrete slabs. After the shoring installation was completed, concrete was poured on the first floor. When the pouring was finished, the shoring gave way. The framing, rebar and newly poured concrete came crashing down onto the the lower level parking area, where the wet concrete eventually hardened. It took several weeks to clean up the debris and repair the damage.

    Vision had a builders’ risk policy with Philadelphia. The policy excluded losses caused by or resulting from deficient design or faulty workmanship. Collapse, however, was not listed as an excluded event. Further, the exclusion for faulty workmanship contained a resulting loss clause providing that "if loss or damage by a Covered Cause of Loss results, [Philadelphia] will pay for the loss or damage caused by that Covered Cause of Loss."

    Philadelphia denied coverage under the faulty workmanship exclusion.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Nevada Court Adopts Efficient Proximate Cause Doctrine

    February 10, 2012 — Tred Eyerly, Insurance Law Hawaii

    Although the Nevada Supreme Court adopted the efficient proximate cause doctrine, it determined it did not apply to salvage coverage under an all-risk policy for a rain-damaged building. Fourth Street Place, LLC v. The Travelers Indemn. Co., 2011 Nev LEXIS 114 (Nev. Dec. 29, 2011).

    Fourth Street owned an office building which was insured by an all-risk policy issued by Travelers. Fourth Street hired Above It All Roofing to repair the roof of the office building. Above It All removed the waterproof membrane on the roof and prepared to replace the membrane the following week. Over the weekend, however, substantial rain hit. On Sunday, Above It All returned to cover the exposed portions of the roof with tarps, but wind later blew the tarps away. The building suffered significant interior damage as it continued to be exposed to the rain.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    One to Watch: Case Takes on Economic Loss Rule and Professional Duties

    June 28, 2011 — Douglas Reiser, Builders Counsel

    According to the Supreme Court of Washington Blog, The Supreme Court heard oral argument in Jackowski v. Hawkins Poe on Thursday, June 16, 2011. The court’s synopsis of the case can be found on the Washington State Court website.

    In short, two home purchasers brought a lawsuit against the home’s sellers, the sellers’ agent and the purchasers’ own agent, alleging claims of fraud, fraudulent concealment, negligent misrepresentation and breach of common law and statutory duties. The trial court dismissed the buyers’ claims on the basis of the economic loss doctrine and Division II reversed, opining that the ELR does not apply to professional duties. The Supreme Court will now look at applying the Independent Duty Doctrine established last year, and whether professional duties (those of the real estate agents) should be reviewed under a different light.

    Read the full story…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com


    Fifth Circuit Reverses Insurers’ Summary Judgment Award Based on "Your Work" Exclusion

    November 18, 2011 — Tred Eyerley, Insurance Law Hawaii

    Application of the facts to the "your work" exclusion was the key to resolving coverage issued in Am. Home Assurance Co. v. Cat Tech L.L.C., 2011 U.S. App. LEXIS 21076 (5th Cir. Oct. 5, 2011).

    Ergon Refining, Inc. hired Cat Tech L.L.C. to service a hydrotreating reactor. In January 2005, Cat Tech replaced certain parts in the reactor. After Cat Tech finished the job and left, Ergon noticed a high pressure drop in the reactor, forcing it to be shut down. Cat Tech returned in February 2005, removed, repaired and replaced the damaged parts, and loaded new parts. After completion, a second large pressure drop occurred during the reactor’s start-up process. The reactor was shut down until October 2005, when Ergon hired a different contractor to perform the repair work. Additional damage to the reactor was found.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Construction Defects Are Occurrences, Says South Carolina High Court

    December 20, 2012 — CDJ Staff

    The South Carolina Supreme Court has left the legislature’s new, expanded definition of “occurrence” in place, declining to declare it unconstitutional. South Carolina included faulty workmanship as an occurrence in response to a Supreme Court decision, which the court later reversed. One of the parties in that earlier decision, Harleysville Insurance, challenged the new law, claiming that the legislature didn’t have the power to pass a law to overturn a court ruling. The court did not concur.

    However, the court did determine that the law was not retroactive and covered only claims filed after the law became effective in May 2011. The Chief Justice of South Carolina noted that “insurance coverage for construction liability lacks clarity, particularly with respect to whether construction defects constitute ‘occurrences’ under construction general insurance policies.”

    Read the full story…


    The Montrose Language Interpreted: How Many Policies Are Implicated By A Construction Defect That Later Causes a Flood?

    March 17, 2011 — By Shaun McParland Baldwin, March 17, 2011

    The Court of Appeals of Indiana recently addressed the “Montrose” language added to the CGL ISO form in 2001 in the context of a construction defect claim where a fractured storm drain caused significant flooding a year after the drain was damaged. The insuring agreement requires that “bodily injury or “property damage” be caused by an occurrence and that the “bodily injury or “property damage” occur during the policy period. The Montrose language adds that the insurance applies only if, prior to the policy period, no insured knew that the “bodily injury or “property damage” had occurred in whole or in part. Significantly, it also states that any “bodily injury” or “property damage” which occurs during the policy period and was not, prior to the policy period known to have occurred, includes a continuation, change or resumption of that “bodily injury” or “property damage” after the end of the policy period.

    In Grange Mutual Cas. Co. v. West Bend Mut. Ins. Co., No. 29D04-0706-PL-1112 (Ct. App. IN March 15, 2011), http://www.ai.org/judiciary/opinions/pdf/03151109ehf.pdf, Sullivan was the General Contractor for a school construction project. Its subcontractor, McCurdy, installed the storm drain pipes. One of the storm pipes was fractured in 2005 while McCurdy was doing its installation work. More than a year later, the school experienced significant water damage due to flooding. It was later discovered that the flooding was due to the fractured storm drain. Sullivanrsquo;s insurer paid $146,403 for the water damage. That insurer brought a subrogation claim against McCurdy and its two insurers: West Bend and Grange. West Bend had issued CGL coverage to McCurdy while the construction was ongoing, including the date in which the storm pipe was fractured. Grange issued CGL coverage to McCurdy at the time of the flooding. Those two carriers jointly settled the subrogation claim and then litigated which insurer actually owed coverage for the loss. Significantly, the loss that was paid included only damages from the flooding, not any damages for the cost of repairing the pipe.

    Read the full story...

    Reprinted courtesy of Shaun McParland Baldwin of Tressler LLP. Ms Baldwin can be contacted at sbaldwin@tresslerllp.com


    Retaining Wall Contractor Not Responsible for Building Damage

    July 20, 2011 — CDJ Staff

    The Court of Appeals of Indiana ruled on July 8 in the case of Rollander Enterprises, Inc. v. H.C. Nutting Co. Judge Baily wrote the opinion affirming the decision of the trial court.

    The case involved an unfinished condominium complex, the Slopes of Greendale, in Greendale, Indiana. Rollander is a real estate development company incorporated in Ohio. One of the issues in the case was whether the case should be settled in the Indiana courts or be tried in Ohio. The project was owned by a special purpose entity limited liability corporation incorporated in Indiana.

    Rollander hired Nutting to determine the geological composition of the site. Nutting’s report described the site as “a medium plastic clay containing pieces of shale and limestone.” The court summarized this as corresponding with “slope instability and landslides.” Rollander then hired Nutting to design the retaining walls, which were constructed by Scherziner Drilling.

    After cracking was discovered on State Route 1, the walls were discovered to be inadequate. More dirt was brought in and a system of tie-backs was designed to anchor the walls. Not only were the tie-backs unsightly, local officials would not approve the complex for occupancy. Further, the failure of the wall below one building lead to damage of that building.

    The court concluded that since almost all events occurred in Indiana, they rejected Rollander’s contention that the case should be tried in Ohio. Further, the court notes “the last event making Nutting potentially liable on both claims was an injury that occurred in Indiana and consequently, under the lex loci delicti analysis, Indiana law applies.”

    Nor did the court find that Nutting was responsible for the damage to the rest of the project, citing an Indiana Supreme Court ruling, that “there is no liability in tort to the owner of a major construction project for pure economic loss caused unintentionally by contractors, subcontractors, engineers, design professionals, or others engaged in the project with whom the project owner, whether or not technically in privity of contract, is connected through a network or chain of contracts.”

    The court concluded:

    Because Rollander was in contractual privity with Nutting, and Indy was connected to Nutting through a chain of contracts and no exception applies, the economic loss rule precludes their recovery in tort. Damage to Building B was not damage to "other property," and the negligent misrepresentation exception to the economic loss rule is inapplicable on these facts. The trial court therefore did not abuse its discretion by entering judgment on the evidence in favor of Nutting on the Appellants' negligence and negligent misrepresentation claims.

    Read the court’s decision…


    Know the Minnesota Statute of Limitations for Construction Defect Claims

    July 10, 2012 — CDJ Staff

    Writing on the Benson Kerrane Storz Nelson web site, Alex Nelson gives an overview of the Minnesota laws covering statutes of limitation and repose. He notes that frequently when his firm declines to take a construction defect case its’ over a missed statute of limitation. He describes the time periods as both “short” and “ambigious.” The briefest limit is that a homeowner “has only 6 months within which to give written notice of the defect to the builder once the defect has manifested itself.” Any legal action must commence within two years of the same point.

    The Minnesota statutes also have a six-year limitation, which starts for a single home at transfer of title to the first purchaser or when the purchaser takes possession, whichever happens first. For a condo, it is the last of “completion of the common element,” first unit sale or “Termination of Declarant control.” Fraud or misrepresentation also has a six-year limit, while negligence claims are limited to within the first two years “after the manifestation of the defect.”

    The statues of repose also provide limits to filing construction defect lawsuits. Mr. Nelson points out that the longest are for negligence, fraud, and “major construction defects,” all of which have a ten-year limit. On the other hand, claims against general workmanship and materials must be made in the first year.

    Read the full story…


    Anti-Assignment Provision Unenforceable in Kentucky

    December 20, 2012 — Tred Eyerly, Insurance Law Hawaii

    On a certified question from the Federal District Court, the Supreme Court of Kentucky decided that an anti-assignment provision in a policy is unenforceable.Wehr Constructors v. Paducah Div. Assur. Co. of Am., 2012 Ky. LEXIS 183 (Ky. Oct. 25, 2012).

    Before building an addition to its hospital, Murray Calloway County Hospital purchased a builder's risk policy from Assurance Company of America.The policy provided, "Your rights and duties under this policy may not be transferred without Assurance's written consent . . . ." The Hospital contracted with Wehr Constructors to install concrete subsurfaces and vinyl floors in order to expand the hospital. After installation, a portion of the floors and subsurface work was damaged. The Hospital submitted a claim to Assurance for $75,000, but the claim was denied.

    Wehr sued the Hospital to recover money for its work on the construction project. In settling the case, the Hospital assigned to Wehr any claim or rights the Hospital had against Assurance.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Insurer Has Duty to Defend in Water Intrusion Case

    July 10, 2012 — CDJ Staff

    The Seventh Circuit Court of Appeals has upheld a summary judgment against an insurance company in a construction defect suit. Lagestee-Mulder, Incorporated (LMI) was hired by Crown Centre to construct a multi-story office building in Franfort, Illinois. LMI hired Frontrunner Glass & Metal to supply and install windows and doors. Frontrunner purchased an insurance policy from Consolidated which named LMI as an additional insured. The project experienced water intrusion and other construction defects and Crown sued LMI. Consolidated denied coverage. LMI sued Consolidated and the US District Court granted a summary judgment against Consolidated.

    The appeals court reviewed the grounds for summary judgment and determined that under Illinois law, Consolidated had a duty to defend. The court cited an earlier opinion that “if the underlying compliant alleges facts within or potentially within policy coverage, an insurer is obligated to defend its insured even if the allegations are groundless, false, or fraudulent.”

    Read the court’s decision…


    History of Defects Leads to Punitive Damages for Bankrupt Developer

    March 1, 2012 — CDJ Staff

    The South Carolina Court of Appeals has ruled that evidence of construction defects at a developer’s other projects were admissible in a construction defect lawsuit. They issued their ruling on Magnolia North Property Owners’ Association v. Heritage Communities, Inc. on February 15, 2012.

    Magnolia North is a condominium complex in South Carolina. The initial builder, Heritage Communities, had not completed construction when they filed for bankruptcy protection under Chapter 11. The remaining four buildings were completed by another contractor. The Property Owners’ Association subsequently sued Heritage Communities, Inc. (HCI) alleging defects. The POA also sued Heritage Magnolia North, and the general contractor, BuildStar.

    The trial court ruled that all three entities were in fact one. On appeal, the defendants claimed that the trial court improperly amalgamated the defendants. The appeals court noted, however, that “all these corporations share officers, directors, office space, and a phone number with HCI.” Until Heritage Communities turned over control of the POA to the actual homeowners, all of the POA’s officers were officers of HCI. The appeals court concluded that “the trial court’s ruling that Appellants’ entities were amalgamated is supported by the law and the evidence.”

    Heritage also claimed that the trial court should not have allowed the plaintiffs to produce evidence of construction defects at other Heritage properties. Heritage argued that the evidence was a violation of the South Carolina Rules of Evidence. The court cited a South Carolina Supreme Court case which made an exception for “facts showing the other acts were substantially similar to the event at issue.” The court noted that the defects introduced by the plaintiffs were “virtually identical across all developments.” This included identical use of the same products from project to project. Further, these were used to demonstrate that “HCI was aware of water issues in the other projects as early as 1998, before construction on Magnolia North had begun.”

    The trial case ended with a directed verdict. Heritage charged that the jury should have determined whether the alleged defects existed. The appeals court noted that there was “overwhelming evidence” that Heritage failed “to meet the industry standard of care.” Heritage did not dispute the existence of the damages during the trial, they “merely contested the extent.”

    Further, Heritage claimed in its appeal that the case should have been rejected due to the three-year statute of limitations. They note that the first meeting of the POA was on March 8, 2000, yet the suit was not filed until May 28, 2003, just over three years. The court noted that here the statute of limitation must be tolled, as Heritage controlled the POA until September 9, 2002. The owner-controlled POA filed suit “approximately eight months after assuming control.”

    The court also applied equitable estoppel to the statute of limitations. During the time in which Heritage controlled the board, Heritage “assured the unit owners the construction defects would be repaired, and, as a result, the owners were justified in relying on those assurances.” Since “a reasonable owner could have believed that it would be counter-productive to file suit,” the court found that also prevented Heritage from invoking the statute of limitations. In the end, the appeals court concluded that the even apart from equitable tolling and equitable estoppel, the statute of limitations could not have started until the unit owners took control of the board in September, 2002.

    Heritage also contested the jury’s awarding of damages, asserting that “the POA failed to establish its damages as to any of its claims.” Noting that damages are determined “with reasonable certainty or accuracy,” and that “proof with mathematical certainty of the amount of loss or damage is not required,” the appeals court found a “sufficiently reasonable basis of computation of damages to support the trial court’s submission of damages to the jury.” Heritage also claimed that the POA did not show that the damage existed at the time of the transfer of control. The court rejected this claim as well.

    Finally, Heritage argued that punitive damages were improperly applied for two reasons: that “the award of punitive damages has no deterrent effect because Appellants went out of business prior to the commencement of the litigation” and that Heritages has “no ability to pay punitive damages.” The punitive damages were upheld, as the relevant earlier decision includes “defendant’s degree of culpability,” “defendants awareness or concealment,” “existence of similar past conduct,” and “likelihood of deterring the defendant or others from similar conduct.”

    The appeals court rejected all of the claims made by Heritage, fully upholding the decision of the trial court.

    Read the court’s decision…


    Federal District Court Continues to Find Construction Defects do Not Arise From An Occurrence

    May 10, 2012 — CDJ Staff

    Coverage for construction defects continues to be hotly contested in Hawaii state and federal courts. In a recent decision, Judge Mollway felt bound to follow the Ninth Circuit’s decision in Burlington Ins. Co. v. Oceanic Design & Constr., Inc., 383 F.3d 940, 944 (9th Cir. 2004), where the court found construction defect claims arise from breach of contract, not from an occurrence. Judge Mollway’s most recent decision on the issue is Illinois Nat. Ins. Co. v. Nordic PCL Constr., Inc., 2012 U.S. Dist. LEXIS 58464 (D. Haw. April 26, 2012).

    Nordic constructed a grocery store for Safeway. In addition to the grocery store, Nordic built a 165-space rooftop parking deck, retail shops and related improvements. After opening for business in 2007, Safeway experienced significant leaks. Safeway demanded that Nordic repair the parking deck. Nordic sent the demand letter to the insurer, who agreed to appoint counsel subject to a reservation of rights.

    Safeway filed suit against Nordic in state court alleging, among other things, breach of contract and negligence. The insurer provided Nordic with a defense, but Nordic hired independent counsel.

    The insurer filed for declaratory relief in federal district court.

    Read the full story…


    Texas “your work” exclusion

    January 6, 2012 — CDCoverage.com

    In American Home Assurance Co. v. Cat Tech, L.L.C., No. 10-20499 (5th Cir. Oct. 5, 2011), claimant Ergon hired insured Cat Tech to perform service on a reactor at Ergon’s refinery. During a start-up of the reactor after Cat Tech had completed its work, the reactor suffered damage. Cat Tech performed additional service and repairs. However, again upon start-up of the reactor, it suffered additional damage. Ergon hired another contractor to repair the reactor. Ergon initiated arbitration proceedings against Cat Tech. Cat Tech’s CGL insurer American Home defended Cat Tech against the Ergon arbitration under a reservation of rights.

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    General Contractor/Developer May Not Rely on the Homeowner Protection Act to Avoid a Waiver of Consequential Damages in an AIA Contract

    August 4, 2011 — Higgins, Hopkins, McLain & Roswell, LLC

    Recently, in Caribou Ridge Homes, LLC v. Zero Energy, LLC, et al., Case No. 10CV1094, Boulder County District Court Judge Ingrid S. Bakke entered a ruling and order on the Plaintiff’s Motion for Determination of Question of Law Pursuant to C.R.C.P. 56(h) on Issue of Damages. The Order found that the Plaintiff was not a homeowner intended to be protected by the Homeowner Protection Act (the “HPA”) and thus could not pursue its claims for consequential damages against Defendant.

    By way of background, on June 18, 2008, Plaintiff Caribou Ridge Homes, LLC (“Caribou”) entered into a Standard Form Agreement Between Owner and Contractor AIA Document A114-2001 (the “Contract”) with Defendant Zero Energy, LLC (“Zero Energy”). Plaintiff hired Zero Energy to serve as a general contractor for the construction of a single-family home in the Caribou Ridge subdivision in Nederland, Colorado. A provision in the contract contained a mutual waiver of consequential damages (“Waiver”).

    Read the full story…

    Reprinted courtesy Higgins, Hopkins, McLain & Roswell, LLC