BERT HOWE
  • Nationwide: (800) 482-1822    
    institutional building Lisco Nebraska production housing Lisco Nebraska custom homes Lisco Nebraska mid-rise construction Lisco Nebraska condominiums Lisco Nebraska office building Lisco Nebraska high-rise construction Lisco Nebraska custom home Lisco Nebraska housing Lisco Nebraska tract home Lisco Nebraska concrete tilt-up Lisco Nebraska parking structure Lisco Nebraska landscaping construction Lisco Nebraska retail construction Lisco Nebraska structural steel construction Lisco Nebraska Subterranean parking Lisco Nebraska condominium Lisco Nebraska Medical building Lisco Nebraska low-income housing Lisco Nebraska hospital construction Lisco Nebraska industrial building Lisco Nebraska townhome construction Lisco Nebraska
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Lisco, Nebraska

    Nebraska Builders Right To Repair Current Law Summary:

    Current Law Summary: Actions alleging a breach of warranty and construction defect are governed by a four-year statute of limitations (which may be extended by two years if the cause of action is not or could not reasonably have been discovered within the four-year period) and a ten-year statute of repose for latent defects.


    Construction Expert Witness Contractors Licensing
    Guidelines Lisco Nebraska

    Businesses must register with the Secretary of State. No state license is required for general contracting, however, local licensure is needed in counties with populations over 100,000. Licensure is required for the electrical trade.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Columbus Home Builders Association
    Local # 2805
    3121 39th St
    Columbus, NE 68601


    Metro Omaha Builders Assn
    Local # 2872
    4141 N 156th Street Ste 100
    Omaha, NE 68116
    http://www.moba.com

    North Platte Chapter
    Local # 2854
    PO Box 146
    North Platte, NE 69103


    Home Builders Association of the Norfolk Area
    Local # 2890
    PO Box 425
    Tilden, NE 68781


    Central Nebraska Home Builders Association
    Local # 2818
    131 North Grace
    Grand Island, NE 68803


    Nebraska State Home Builders Association
    Local # 2800
    PO Box 22375
    Lincoln, NE 68542
    http://www.nshba.org

    West Central Nebraska Home Builders Association
    Local # 2897
    5817 Ave O Place
    Kearney, NE 68847



    Construction Expert Witness News and Information
    For Lisco Nebraska

    Ninety-Day Extension Denied to KB Home in Construction Defect Insurance Claim

    Can Negligent Contractors Shift Blame in South Carolina?

    Park District Sues over Leaky Roof

    After Breaching its Duty to Defend, Insurer Must Indemnify

    Colorado statutory “property damage” caused by an “occurrence”

    Renovation Contractors: Be Careful How You Disclose Your Projects

    Housing Market on Way to Recovery

    No Choice between Homeowner Protection and Bankrupt Developers?

    Minnesota Starts Wide-Ranging Registration of Contractors

    Michigan Supreme Court Concludes No Statute of Repose on Breach of Contract

    Nevada Bill Aims to Reduce Legal Fees For Construction Defect Practitioners

    Nevada Assembly Bill Proposes Changes to Construction Defect Litigation

    Homeowner Loses Suit against Architect and Contractor of Resold Home

    Plaintiffs In Construction Defect Cases to Recover For Emotional Damages?

    OSHA Extends Temporary Fall Protection Rules

    More Charges in Las Vegas HOA Scandal

    Water District Denied New Trial in Construction Defect Claim

    Insurance Policy Provides No Coverage For Slab Collapse in Vision One

    Homeowner Has No Grounds to Avoid Mechanics Lien

    Workers Hurt in Casino Floor Collapse

    Condo Board May Be Negligent for not Filing Construction Defect Suit in a Timely Fashion

    Hovnanian Sees Second-Quarter Profit, Points to Recovery

    Louisiana Politicians Struggle on Construction Bills, Hospital Redevelopment

    State Audit Questions College Construction Spending in LA

    Hovnanian Increases Construction Defect Reserves for 2012

    Construction Defect Litigation at San Diego’s Alicante Condominiums?

    Construction Defects Leave Animal Shelter Unusable

    Delaware “occurrence” and exclusions j(5) and j(6)

    Defective Drains Covered Despite Water Intrusion Exclusion

    Damron Agreement Questioned in Colorado Casualty Insurance v Safety Control Company, et al.

    MGM Seeks to Demolish Harmon Towers

    Bar to Raise on Green Standard

    Homebuilding Still on the Rise

    Failure to Meet Code Case Remanded to Lower Court for Attorney Fees

    Eleventh Circuit Asks Georgia Supreme Court if Construction Defects Are Caused by an "Occurrence"

    Ensuing Loss Found Ambiguous, Allowing Coverage

    State Farm Too Quick To Deny Coverage, Court Rules

    School District Marks End of Construction Project by Hiring Lawyers

    Lower Court “Eminently Reasonable” but Wrong in Construction Defect Case

    General Contractor/Developer May Not Rely on the Homeowner Protection Act to Avoid a Waiver of Consequential Damages in an AIA Contract

    When Does a Claim Against an Insurance Carrier for Failing to Defend Accrue?

    Statutes of Limitations May be the Colorado Contractors’ Friend

    Boston’s Tunnel Project Plagued by Water

    Product Exclusion: The Big Reason Behind The Delay of LEED 2012

    Construction Defects as Occurrences, Better Decided in Law than in Courts

    Lawsuit over Construction Defects Not a Federal Case

    Insurance Firm Defends against $22 Million Claim

    Ensuing Loss Provision Does Not Salvage Coverage

    Harmon Towers Duty to Defend Question Must Wait, Says Court

    Home Sales Still Low, But Enough to Spur Homebuilders

    Association May Not Make Claim Against Builder in Vermont Construction Defect Case

    California Posts Nation’s Largest Gain in Construction Jobs

    Contractor Liable for Soils Settlement in Construction Defect Suit

    Ohio Casualty’s and Beazer’s Motions were Granted in Part, and Denied in Part

    Federal Judge Dismisses Insurance Coverage Lawsuit In Construction Defect Case

    Homeowners Sue Over Sinkholes, Use Cash for Other Things

    Nevada Court Adopts Efficient Proximate Cause Doctrine

    Court Voids Settlement Agreement in Construction Defect Case

    Steps to Defending against Construction Defect Lawsuits

    Irene May Benefit Construction Industry

    Colorado Court of Appeals Finds Damages to Non-Defective Property Arising From Defective Construction Covered Under Commercial General Liability Policy

    Insurer Able to Refuse Coverage for Failed Retaining Wall

    In Colorado, Primary Insurers are Necessary Parties in Declaratory Judgment Actions

    Construction on the Rise in Denver

    Pennsylvania Court Extends Construction Defect Protections to Subsequent Buyers

    Construction Job Opening Rise in October

    Guilty Pleas Draw Renewed Interest In Nevada’s Construction Defect Laws

    Homeowner’s Policy Excludes Coverage for Loss Caused by Chinese Drywall

    Denver Court Rules that Condo Owners Must Follow Arbitration Agreement

    No Duty to Indemnify When Discovery Shows Faulty Workmanship Damages Insured’s Own Work

    Insurance Company Prevails in “Chinese Drywall” Case

    Georgia Law: “An Occurrence Can Arise Where Faulty Workmanship Causes Unforeseen or Unexpected Damage to Other Property”

    Gut Feeling Does Not Disqualify Expert Opinion

    California Supreme Court Binds Homeowner Associations To Arbitration Provisions In CC&Rs

    Water Drainage Case Lacks Standing

    Insurer’s Motion for Summary Judgment Based on Earth Movement Exclusion Denied

    Construction Company Head Pleads Guilty to Insurance and Tax Fraud

    Consulting Firm Indicted and Charged with Falsifying Concrete Reports

    Arbitration Clause Not Binding on Association in Construction Defect Claim

    Construction Law: Unexpected, Fascinating, Bizarre

    Alabama “occurrence” and subcontractor work exception to the “your completed work” exclusion

    Water Is the Enemy

    OSHA Cites Construction Firm for Safety Violations

    Judge Concludes Drywall Manufacturer Sold in Florida

    Arizona Contractor Designs Water-Repellant Cabinets

    California insured’s duty to cooperate and insurer’s right to select defense counsel

    In Oregon Construction Defect Claims, “Contract Is (Still) King”

    Was Jury Right in Negligent Construction Case?

    A Loud Boom, But No Serious Injuries in World Trade Center Accident

    Coverage Rejected Under Owned Property and Alienated Property Exclusions
    Corporate Profile

    LISCO NEBRASKA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Lisco, Nebraska Construction Expert Witness Group at BHA, leverages from the experience gained through more than 5,500 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Lisco's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Lisco Nebraska general contracting construction expertsLisco Nebraska general contracting slope failure expert witnessLisco Nebraska general contracting fenestration expert witnessLisco Nebraska general contracting building consultant expertLisco Nebraska general contracting consulting engineersLisco Nebraska general contracting soil failure expert witnessLisco Nebraska general contracting consulting general contractorLisco Nebraska general contracting construction expert witnessesLisco Nebraska general contracting construction claims expert witness
    Construction Expert Witness News & Info
    Lisco, Nebraska

    Can Negligent Contractors Shift Blame in South Carolina?

    July 10, 2012 — CDJ Staff

    Clay Olson looks back to a 1991 Carolina case, Nelson v. Concrete Supply Company. The court concluded in that case that “a plaintiff in South Carolina may recover only if his/her negligence does not exceed that of the defendant’s and amount of plaintiff’s recovery shall be reduced in proportion to amount of his or her negligence; if there is more than one defendant, plaintiff’s negligence shall be compared to combined negligence of all defendants.” In 2005, he reports, as part of tort reform in South Carolina, the legislature further addressed this.

    He then suggests a possible outcome of this is that negligent contractors may be able to shift some of the blame (and cost of the settlement) to other defendants who may not be to blame. He offers a scenario in which a contractor is sued for construction defects and a jury has to allocate responsibility for indivisible damage. “A jury need only find the two subcontractors to have each contributed 15% of the indivisible damage.” He adds in another 15% for claims against the architect. Minor blame is given to the manufacturers, and suddenly the negligent contractor is paying less than 50% of the total settlement.

    He notes that the previous system in place also had its problems, but notes that this one may not be “fair and equitable.”

    Read the full story…


    Bound by Group Builders, Federal District Court Finds No Occurrence

    August 11, 2011 — Tred Eyerly, Insurance Law Hawaii

    The homeowners sued their contractor, alleging the contractor had defectively constructed and failed to complete their home.  State Farm Fire and Casualty Co. v. Vogelgesang, 2011 U.S. Dist. LEXIS 72618 (D. Haw. July 6, 2011).  The homeowners' complaint pled, among other things, damage caused by breach of contract and negligence.  State Farm agreed to defend under a reservation of rights.

    State Farm filed suit in federal court for declaratory relief.  Judge Mollway granted State Farm's motion for summary judgment.  Relying on the Hawaii Intermediate Court of Appeal's decision in Group Builders, Inc. v. Admiral Ins. Co., 123 Haw. 142, 231 P.3d 67 (Haw. Ct. App. 2010), Judge Mollway determined that the claims asserted in the underlying litigation arose from the contractor's alleged breach of contract.  Group Builders held that breach of contract claims based on allegations of shoddy performance were not covered under CGL policies.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Arizona Contractor Designs Water-Repellant Cabinets

    September 9, 2011 — CDJ Staff

    Dubbing his product “Baltic Duck,” a Mesa, Arizona building contractor is offering household cabinets made with specially treated water-repellent plywood instead of the usual particle board. Pete Celano calls his product Baltic Duck because the plywood is made in the Baltic region of Eastern Europe. To further protect the cabinets from moisture, a silicone-based sealant is applied to the corners and edges.

    Celano’s cabinets use standard decorative fronts. The design of the cabinets allows spilled liquids to drain away without encountering the decorative wood.

    Read the full story…


    Certificate of Merit to Sue Architects or Engineers Bill Proposed

    May 3, 2011 — May 3, 2011 Beverley BevenFlorez - Construction Defect Journal

    North Carolina may become the twelfth state to require a Certificate of Merit to sue an architect or engineer. If North Carolina Senate Bill 435 (SB435) passes, then plaintiffs when filing a complaint will need to also attach an affidavit of a third-party licensed professional engineer or architect stating that the case has merit.

    SB435 is a short two pages in its current form. The bill states that the “third-party licensed professional engineer or licensed architect shall (i) be competent to testify and hold the same professional license and practice in the same area of practice as the defendant design professional and (ii) offer testimony based upon knowledge, skill, experience, education, training, and practice. The affidavit shall specifically state for each theory of recovery for which damages are sought, the negligence, if any, or other action, error, or omission of the design professional in providing the professional service, including any error or omission in providing advice, judgment, opinion, or a similar professional skill claimed to exist and the factual basis for each such claim. The third-party licensed professional engineer or licensed architect shall be licensed in this State and actively engaged in the practice of engineering or architecture respectively.”

    A few of the amendments allude to disciplining design professionals who certify civil actions that are without merit. The bill has been referred to the Committee on Judiciary I.

    While North Carolina is considering enacting a Certificate of Merit law, eleven other states already require one, including Arizona, California, Colorado, Georgia, Maryland, Minnesota, New Jersey, Oregon, Pennsylvania, South Carolina, and Texas. Christopher D. Montez, a partner with Thomas, Feldman & Wilshusen, LLP, has written a useful summary for each state’s certificate of merit scheme.

    Read the text of SB435

    Track the progress of SB435

    Read more from Christopher D. Montez’s article on Thomas, Feldman & Wilshusen, LLP site


    Insurance Policy Provides No Coverage For Slab Collapse in Vision One

    August 17, 2011 — Douglas Reiser, Builders Counsel

    This post will examine whether Division Two of the Washington Court of Appeals properly reversed and remanded several lower court decisions in the case of Vision One LLC v. Philadelphia Indemnity Insurance. In short, and from the perspective of an appellate attorney, the court of appeals got the decision right. Given the rules of contract interpretation and causation in tort claims, there was really no other way the court could have ruled. I understand that from a contractor’s perspective and insurance perspective, the decision seems odd. But from a purely legal standpoint, the decision is well-reasoned and well-supported. Let me explain.

    Background

    First, here are the facts in a nutshell. Vision One is a construction company that undertook to construct a condo complex in Tacoma. Vision then contracted with D&D Concrete to pour a concrete slab for a section of the foundation. To shore the concrete slab, D&D further contracted Berg Equipment to provide necessary equipment to stabilize the structure. Well, something down the line went wrong. The shoring failed and the slab collapsed, causing a great deal of damage.

    Read the full story…

    Read the court’s decision…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com


    Architectural Firm Disputes Claim of Fault

    May 27, 2011 — CDJ Staff

    Lake-Flato Architects has disputed the arbitration panel’s conclusion that problems with the home of Tom Hanks and Rita Wilson were due to design flaws. The firm settled with the couple for $900,000, however the Idaho Mountain Express reports that David Lake said, “the settlement in the case in no way represents that Lake Flato was responsible for faulty design.” The Express reported that “the arbitrators found that problems at the home were attributable to design errors that did not take into account the cold winter climate of the Sun Valley area.”

    Read the full story…


    Senate Committee Approves Military Construction Funds

    June 29, 2011 — CDJ Staff

    With a decrease in funding, as compared to the House bill, the Military Construction and Veteran’s Affairs subcommittee of the Senate moved on a $72 billion construction bill. The House version had approved an additional half billion dollars in funding. Senator Tim Johnson, Democrat of South Carolina, said that he expected easy reconciliation with the House version. The Senate bill will move to the full Senate Appropriations Committee on June 30.

    The bill, S 1255, includes funding for construction and remodeling of military housing, as well as construction and remodeling of base facilities.

    Read the full story…

    Read S1255


    Supreme Court of New York Denies Motion in all but One Cause of Action in Kikirov v. 355 Realty Assoc., et al.

    April 28, 2011 — April 28, 2011 Beverley BevenFlorez - Construction Defect Journal

    In the construction defect suit Kikirov v. 355 Realty Associates, LLC, et al., the Supreme Court of the State of New York granted a dismissal of the plaintiff’s fourth cause of action, but denied the defendants’ motion in all other respects. The plaintiff alleged breach of contract, among other claims. “355 Realty was the sponsor of 355 Kings Highway Condominium, a condominium project located at 355 Kings Highway, in Brooklyn, New York. The condominium units were allegedly marketed as ‘ultra luxury condos,’ and a ‘Manhattan style condominium building,’ which would be the ‘epitome of luxury and quality.’ The construction of the six-story 28 unit residential condominium building began in approximately November 2003. […] Plaintiff entered into a purchase agreement, dated December 21, 2005, with 355 Realty (which was executed on behalf of 355 Realty by Michael Marino, as its member) for the purchase of Unit 2G in the building.”

    The plaintiff alleged that construction defects emerged soon after moving into the unit: “After taking occupancy of his condominium unit, plaintiff allegedly experienced serious leakage and moisture problems in his unit, which caused a dangerous mold condition to develop, in addition to causing actual damage to the structural elements of his unit. According to plaintiff, the walls, moldings, and wood floors of his unit are constantly wet and moist, and there is severe buckling of the wood floors. Plaintiff claims that these problems have caused his unit to be uninhabitable. Plaintiff alleges that he has been forced to remove all of his personal belongings from his unit and has been unable to occupy his unit.”

    According to the plaintiff, Foremost attempted to repair the defects, but only made the situation worse: “Specifically, plaintiff asserts that Foremost’s contractors opened his walls to remove the stained drywall, but never corrected the cause of the leaks, destroyed the walls, and never properly taped and painted the sheet rock. Plaintiff alleges that Foremost repaired the openings in a defective manner. Plaintiff also claims that his floor was repaired at that time by a subcontractor hired by Foremost, but the basic structural problem was never resolved and the leaks continued, compromising the beams and causing the mold conditions, in addition to all of the physical damage present in the unit. On or about July 16, 2009, plaintiff allegedly sent a notice of the defects to 355 Realty and to the managing agent designated by the condominium board, by certified mail, return receipt requested. Plaintiff asserts that defendants have failed and refused to repair and remedy the defective condition, and that the damage is extensive and requires major structural repairs.”

    The plaintiff filed suit on May 4, 2010, and the original complaint asserted eight causes of action. “By decision and order dated September 13, 2010, the court granted a motion by defendants to dismiss plaintiff’s second cause of action for breach of implied covenants of good faith and fair dealing, his third cause of action for breach of implied warranties, his fifth cause of action for negligence as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his seventh cause of action for negligence as against Vision, Foremost, and MMJ, and his eighth cause of action for violations of General Business Law § 349 and § 350, and granted plaintiff leave to replead his first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, his fourth cause of action for breach of statutory warranties, and his sixth cause of action for breach of contract as against Vision, Foremost, and MMJ.”

    The plaintiff amended their complaint on October 18, 2010, and “has repleaded these three causes of action by asserting a first cause of action for breach of contract as against 355 Realty, Michael Marino, Anthony Piscione, Ahron Hersh, and Toby Hersh, a second cause of action for breach of statutory warranties, and a third cause of action for breach of contract as against Vision, Foremost, and MMJ. In addition, plaintiff, in his amended complaint, has added a fourth cause of action for fraud.”

    The defendants, on the other hand, “argue that each of the four causes of action alleged by plaintiff in his amended complaint fail to state a claim upon which relief may be granted, and that plaintiff’s amended complaint must be dismissed pursuant to CPLR 3211 (a) (7). Defendants also cite to CPLR 3211 (a) (1), and (5), asserting that dismissal is also required based upon documentary evidence and the Statute of Limitations contained in the limited warranty.” The defendants’ motion to dismiss the first cause of action, breach of contract against 355 Realty, was denied: “While defendants dispute that the alleged defects are actually structural in nature, plaintiff’s allegations as to their structural nature are sufficient, at this juncture, to withstand defendants’ motion to dismiss. Thus, dismissal of plaintiff’s first cause of action must be denied.”

    Next, the court reviewed the second cause of action, which was breach of statutory warranties: “Defendants’ motion also seeks dismissal of plaintiff’s second cause of action for breach of statutory warranties, which alleges that, under applicable law, including General Business Law § 777-a, et seq., the sponsor warranted to purchasers of units that the units would be constructed in a skillful, careful, and workmanlike manner, consistent with proper design, engineering, and construction standards and practices, and free of material latent, design, and structural defects. Defendants argue that General Business Law § 777-a, known as the housing merchant implied warranty, is inapplicable to this case because it is limited to the construction of a ‘new home,’ defined in General Business Law § 777 (5) as ‘any single family house or for-sale unit in a multi-unit residential structure of five stories or less.’ As noted above, the building in which plaintiff’s condominium unit is located is a six-story building.”

    The motion to dismiss the second cause of action is denied. The court provided this reasoning: “the full text of the offering plan has not been provided, the court is unable to examine the entire written agreement so as to determine the purpose of the inclusion of the text of General Business Law § 777.”

    In the third cause of action, the plaintiff alleges “a breach of contract claim as against Vision, Foremost, and MMJ based upon their contract with 355 Realty, pursuant to which they agreed to be the general contractors/construction managers for the condominium, to undertake oversight responsibility for the design and construction of the condominium, to prepare and/or review drawings, plans, and specifications for the condominium, and to otherwise manage and oversee the project. Plaintiff alleges that Vision, Foremost, and MMJ breached their contractual obligations in that the condominium units were improperly and inadequately designed and constructed, and completed in an incompetent and unworkmanlike manner, with material design and construction defects.”

    The motion to dismiss the third cause of action was denied as well: “Plaintiff alleges, in his amended complaint, that Vision, Foremost, and MMJ have acknowledged notice of the defects and have not denied that they are responsible for providing a warranty to plaintiff. Plaintiff also refers to this warranty, in his amended complaint, by noting that paragraph 16 of the purchase agreement stated that the ‘[s]eller shall not be liable to . . . the [p]urchaser for any matter as to which an assignable warranty . . . has been assigned . . . to [p]urchaser and in such case the sole recourse of such . . . [p]urchaser . . . shall be against the warrantor . . . except that in the event a contractor or subcontractor is financially unable or refuses to perform its warranty . . . [s]eller shall not be excused from its obligations enumerated in the [offering p]lan under Rights and Obligations of Sponsor.’ Consequently, the court finds that dismissal of plaintiff’s third cause of action as against Foremost and MMJ must also be denied.”

    In the fourth cause of action, the plaintiff alleges “that defendants made false statements and representations orally, in advertisements, and in the purchase agreement, that the condominium was properly and adequately designed and constructed and completed in a competent and workmanlike manner, in accordance with the condominium plans and specifications and proper design, engineering, and construction standards and practices consistent with applicable standards for a first class, luxury condominium in Brooklyn.”

    The court dismissed the fourth cause of action stating, “it must be dismissed because it is duplicative of his first cause of action for breach of contract.” Therefore, “defendants’ motion to dismiss plaintiff’s amended complaint is granted to the extent that it seeks dismissal of plaintiff’s fourth cause of action, and it is denied in all other respects.”

    Read the court’s decision…

    Kansas Man Caught for Construction Scam in Virginia

    December 20, 2012 — CDJ Staff

    A Virginia court sent charges of construction fraud against a Kansas man to a grand jury. Larry Foster visited homes in Bedford County, Virginia, tested the water, and told homeowners that they needed new water filtration systems. The homeowners paid, but Mr. Foster never delivered. One homeowner who testified paid him $1,690. Another paid even more, giving $3,090 to Mr. Foster. In order to dupe his victims, Foster used the address of a chiropractor as a business address, unbeknownst to the actual business there.. He is wanted for charges in other states as well.

    Read the full story…


    General Contractors Must Plan to Limit Liability for Subcontractor Injury

    May 18, 2011 — May 18, 2011 - Douglas Reiser in the Builders Counsel Blog

    It takes more than a hard hat, but safety checks, a good policy and a smart contract might save you some problems.If you are a general contractor, you will want to pay close attention to this article. A new Washington appellate decision showcases a general contractor’s liability to subcontractors who are injured on the job, when security barriers fail. But can a general limit this liability? Will its contract help?

    In Wrought Corporation, Inc., Appellant V. Mario Interiano (quick note: this opinion is unpublished, but we are here to talk about an issue that was not determined on appeal – WISHA compliance), a subcontractor was injured when a security barrier failed and he fell into an elevator shaft.

    A jury awarded a $1.56 million verdict against the general contractor, and the court of appeals affirmed on the basis that the general contractor has a non-delegable duty to ensure compliance with the Washington Industrial Safety and Health Act of 1973, codified under RCW 49.17 (WISHA).

    Read the full story…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com


    Residential Construction Down in San Diego

    September 13, 2012 — CDJ Staff

    While new home construction is on the rise in some parts of the country, San Diego has seen a fall, comparing the first seven months of 2012 with the first seven months of 2011, dropping nine percent, according to an article in the San Diego Business Journal. The news isn’t all bad, since although July residential construction dropped sharply, nonresidential construction increased thirty-six percent.

    Read the full story…


    Louisiana Politicians Struggle on Construction Bills, Hospital Redevelopment

    June 16, 2011 — CDJ Staff

    Louisiana politicians are still working on a compromise in the state’s construction budget, as reported in the Times-Picayune. Rob Marrianneax, the chair of the Senate Revenue and Fiscal Affairs Committee, removed a $45 million request from Governor Bobby Jindal and added $4 million for projects that Jindal vetoed last year.

    Two senators have formed competing plans to fund redevelopment construction for New Orleans’s Methodist Hospital. Mitch Landrieu, the mayor of New Orleans, hoped for $30 million dollars in state bonds. Senator Cynthia Willard-Lewis proposed an amendment that would supply $1.6 million, while Senator J.P. Morrell has an amendment that would supply $4 million.

    Read the full story…


    Loose Bolts Led to Sagging Roof in Construction Defect Claim

    February 10, 2012 — CDJ Staff

    Though the sagging roof is neither leaking nor a safety hazard, the town of Waynesville, North Carolina is suing the builder of its new fire station, as reported in the Smoky Mountain News. The engineers who examined the roof found a substantial number of loose bolts in the roof trusses. Additionally, the trusses themselves have become bent.

    Tom Galloway, Waynesville’s Town Manager said “it needs to be remedied and fixed.” He said that the builder, Construction Logic, “never indicated a willingness to fix the roof.” The town is seeking the cost of repair, which Galloway estimated could be $400,000, and an additional $30,000 in damages. The suit states that Construction Logic failed to follow the plan specifications for the roof.

    Read the full story…


    Arizona Court of Appeals Rules Issues Were Not Covered in Construction Defect Suit

    December 9, 2011 — CDJ Staff

    The Arizona Court of Appeals has ruled in the case of Peters v. Marque Homes. In this case, Walter Peters provided the land and funding for Marque Homes to build a luxury residence in Glendale, Arizona. By the terms of the “Joint Venture Agreement,” Peters provided the land and funding, while Marque would not charge Peters for overhead, profits, or supervision fees. The agreement specified that profits would be divided equally.

    Two years later, Marque sued Peters claiming he had breached his obligations by refusing several offers for the home. Peters replied that Marque had “failed to complete the home so it is habitable to prospective purchasers.” Peters stated he had “retained an expert inspector who had identified numerous defects.” The court appointed a Special Commissioner to list the home for sale. Peters purchased the home with two stipulations ordered by the court. At this point, the earlier case was dismissed with prejudice.

    Peters then sued Marque “asserting express and implied warranty claims arising out of alleged construction defects in the home.” Marque claimed that Peters’s claims were “precluded by the prior joint venture dispute.” The court granted Marque’s motion.

    The appeals court reversed the lower court’s decision, determining that Peters’s claims were not precluded by the agreement. Although there had been a prior case between the two parties, warranty issues did not form a part of that case. “Peters never raised these allegations nor presented this evidence in support of any warranty claim.”

    The court also noted that the “parties never agreed to preclude future warranty claims.” Marque and Peters “agreed in the stipulated sale order that ‘the sale of the property to a third party shall be “as is” with a 10-year structural warranty.’” The court noted that the agreement said nothing about one of the parties buying the house.

    The appeals court left open a claim by Marque that there are no implied or express warranties available to Peters. They asked the Superior Court to address this.

    Read the court’s decision…


    Hospital Construction Firm Settles Defect Claim for $1.1 Million

    September 13, 2012 — CDJ Staff

    Law360 reports that Bovis Lend Lease has settled claims of $10 million in damages for $1.1 million. Bovis was building three annexes to a hospital in Oklahoma. The hospital alleged that a faulty moisture barrier system lead to damage throughout the hospital.

    Bovis is a division of the Lend Lease Group, a multinational construction firm based Sydney, Australia.

    Read the full story…


    Foundation Arbitration Doesn’t Preclude Suing Over Cracks

    March 28, 2012 — CDJ Staff

    The Louisiana Court of Appeals has reversed the decision of a lower court, allowing a construction defect case to go through. In Greer v. Town Construction Company, the Greers hired Town Construction to build a home in Baton Rouge. The business relationship went sour, with disputes over “costs, change orders, workmanship, and timeliness issues.”

    Town Construction filed an arbitration claim for the unpaid contract balance. In the counterclaim, the Greers made claims of mold and mildew problems, and wall cracks that they attributed to a “structural defect in the foundation.” In arbitration, Town Construction was awarded the full contract balance plus extra costs and interest, while the Greers were awarded for their structural claims.

    Three years later, the Greers found additional cracks and filed a suit against Town Construction. Town Construction argued that the Greer’s lawsuit should be dismissed, as the claims had already been through the arbitration process. The district court agreed with Town Construction and dismissed the suit.

    The appeals court noted that the Greers would have no ground for a suit if the arbitration was a “valid and final judgment,” and went on to note that there was no evidence in the trial record that the arbitration met this qualification. The court noted that although it was clear that both parties had agreed to the decisions of the arbiter, under Louisiana law, arbitration is not final until it has been “rendered by a court with jurisdiction over subject mater and over parties.”

    The court remanded the case to the lower court, noting that “the district court is obligated to first determine whether a valid arbitration award is in existence and had been confirmed before considering the merits of the exception. The court noted that their decision “should not be read to express any opinion as to the merits of the claims or as to the propriety of damages sought in the Greer’s lawsuit.”

    Read the court’s decision…


    Court Strikes Down Reasonable Construction Defect Settlement

    December 20, 2012 — CDJ Staff

    The Court of Appeals of Washington has struck down a construction defect settlement between a building owner and the companies she hired to repair the siding, among other repairs to bring the building up to code. Yuan Zhang hired Hawk Construction LLC to do repair work. Hawk, in turn, hired Ready Construction LLC for some aspects of the project. Hawk and Ready were both insured by Capital Specialty Insurance Corporation.

    There were several problems with Ready’s work. After removing old siding, they did not protect the building, nor did they remove all of the damaged layers. Ready covered, but did not fix, a mildew problem under the old siding. When new siding was reattached, the nails used were too short to adequately attach it.

    After paying for an inspection of the work, Zhang had Hawk and Ready begin the repairs again, but the work was abandoned without being completed. Zhang sued Hawk for breach of contract. Hawk then sued Ready, claiming that “Ready was liable to Hawk to the extent that Hawk was liable to Zhang.” Capitol retained defense for both contractors.

    Zhang settled with Hawk, in an agreement that gave her “the right to collect and/or pursue all costs and attorney fees paid by Hawk or its insurance company defending against the Zhang’s claims and pursuing claims against Ready.” Subsequently, she also settled with Ready. Both companies ceased operations.

    Zhang had the settlements reviewed by a court, which concluded that the settlements were reasonable. Capital was allowed to appeal, claiming that the settlement included costs that were Zhang’s responsibility. The appeals court did not examine the question of the reasonableness of the settlement, concluding that Capitol’s interests were relevant only to “questions of bad faith, collusion, and fraud.”

    In the case of Zhang, the court concluded that the relationship between Zhang and her former contractors was collusive. The court noted that “bad faith or collusion may exist when the evidence indicates a joint effort to create, in a non-adversarial atmosphere, a resolution beneficial to both parties, yet highly prejudicial to the insurer as intervener.” The court noted that both companies had minimal assets which were, in any case, exempted from the agreement. Further, the court found that the agreements failed to determine “what amount of the repairs related to preexisting water damage.” Zhang’s calculation of costs also included her expenses for architectural and engineering services, which the court points out, “where always Zhang’s costs to bear.”

    The court concluded that “the overall structure of the settlements is highly probative of collusion, fraud, or bad faith.” Zhang’s agreements with Hawk and Ready allowed her to collect compensation from Hawk and then collect Ready’s compensation to Hawk for their portion of the settlement, allowing Zhang to collect the monies twice. Further, she was allowed to pursue Capitol for Hawk’s attorney expenses, even though Hawk had none. “The right to recover Hawk’s fees merely set up a windfall recovery for Zhang.” The court described the agreements among Zhang, Hawk, and Ready as “precisely the type of manipulation [the law] is intended to preclude.”

    Read the court’s decision…


    Washington Court Limits Lien Rights of Construction Managers

    August 17, 2011 — Douglas Reiser, Builders Counsel

    A newly filed, yet unpublished, court opinion opines that a construction manager cannot file a construction lien in Washington state. So, how far reaching is this opinion?

    In the case of Blue Diamond Group Inc. v. KB Seattle 1, Inc., et al, a New York construction manager filed a lien against the Westfield Southcenter Mall in Tukwila, Washington. The lien was filed after the owner of a coffee stand failed to pay Blue Diamond for consulting services used in the construction of a kiosk.

    Blue Diamond served as the owner’s agent, assisting with managing subcontractors, vendors and other tasks. The manager’s tasks also included paying invoices, managing deliveries, setting schedules and other site managerial tasks. Blue Diamond was not registered as a contractor under Washington’s RCW 18.27.

    Read the full story…

    Read the court’s decision…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com