    townhome construction Lacoochee Florida multi family housing Lacoochee Florida concrete tilt-up Lacoochee Florida parking structure Lacoochee Florida tract home Lacoochee Florida retail construction Lacoochee Florida structural steel construction Lacoochee Florida custom home Lacoochee Florida institutional building Lacoochee Florida casino resort Lacoochee Florida low-income housing Lacoochee Florida condominiums Lacoochee Florida hospital construction Lacoochee Florida mid-rise construction Lacoochee Florida industrial building Lacoochee Florida office building Lacoochee Florida Subterranean parking Lacoochee Florida high-rise construction Lacoochee Florida custom homes Lacoochee Florida production housing Lacoochee Florida housing Lacoochee Florida condominium Lacoochee Florida
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Lacoochee, Florida

    Florida Builders Right To Repair Current Law Summary:

    Current Law Summary: In Title XXXIII Chapter 558, the Florida Legislature establishes a requirement that homeowners who allege construction defects must first notify the construction professional responsible for the defect and allow them an opportunity to repair the defect before the homeowner canbring suit against the construction professional. The statute, which allows homeowners and associations to file claims against certain types of contractors and others, defines the type of defects that fall under the authority of the legislation and the types of housing covered in thelegislation. Florida sets strict procedures that homeowners must follow in notifying construction professionals of alleged defects. The law also establishes strict timeframes for builders to respond to homeowner claims. Once a builder has inspected the unit, the law allows the builder to offer to repair or settle by paying the owner a sum to cover the cost of repairing the defect. The homeowner has the option of accepting the offer or rejecting the offer and filing suit. Under the statute the courts must abate any homeowner legal action until the homeowner has undertaken the claims process. The law also requires contractors, subcontractors and other covered under the law to notify homeowners of the right to cure process.


    Construction Expert Witness Contractors Licensing
    Guidelines Lacoochee Florida

    Commercial and Residential Contractors License Required.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Hernando Bldrs Assoc
    Local # 1010
    7391 Sunshine Grove Rd
    Brooksville, FL 34613
    http://www.hernandobuilders.com

    Home Builders Association of Metro Orlando
    Local # 1040
    544 Mayo Ave
    Maitland, FL 32751
    http://www.hbaofmetroorlando.com

    Home Builders Association of Lake County
    Local # 1026
    1100 N Joanna Ave
    Tavares, FL 32778
    http://www.lakehba.com

    Home Builders & CA of Brevard
    Local # 1012
    1500 W Eau Gallie Blvd Ste A
    Melbourne, FL 32935
    http://www.hbca-brevard.org

    Citrus Cty Bldr Assn
    Local # 1006
    1196 S Lecanto Hwy
    Lecanto, FL 34461
    http://www.citrusbuilders.com

    Polk County Builders Association
    Local # 1028
    2232 Heritage Dr
    Lakeland, FL 33801
    http://www.pcba.com

    Tampa Bay Builders Association
    Local # 1036
    11242 Winthrop Main St
    Riverview, FL 33578
    http://www.tbba.net


    Construction Expert Witness News and Information
    For Lacoochee Florida

    Construction Law Client Alert: California Is One Step Closer to Prohibiting Type I Indemnity Agreements In Private Commercial Projects

    Unlicensed Contractors Nabbed in Sting Operation

    Increased Expenditure on Injuries for New York City School Construction

    Lower Court “Eminently Reasonable” but Wrong in Construction Defect Case

    North Carolina Exclusion j(6) “That Particular Part”

    Nevada Construction Defect Lawyers Dead in Possible Suicides

    Construction Defects in Home a Breach of Contract

    Ceiling Collapse Attributed to Construction Defect

    Construction Defects Are Occurrences, Says Georgia Supreme Court

    Construction Defects Are Occurrences, Says South Carolina High Court

    Faulty Workmanship may be an Occurrence in Indiana CGL Policies

    Delays in Filing Lead to Dismissal in Moisture Intrusion Lawsuit

    Late Filing Contractor Barred from Involving Subcontractors in Construction Defect Claim

    Residential Construction: Shrinking Now, Growing Later?

    Alabama “occurrence” and subcontractor work exception to the “your completed work” exclusion

    Negligent Misrepresentation in Sale of Building Altered without Permits

    Can Negligent Contractors Shift Blame in South Carolina?

    Bill Seeks to Protect Legitimate Contractors

    Arizona Court of Appeals Decision in $8.475 Million Construction Defect Class Action Suit

    Crane Dangles and So Do Insurance Questions

    Park District Sues over Leaky Roof

    Housing Prices Up through Most of Country

    Illinois Court Determines Insurer Must Defend Negligent Misrepresentation Claim

    Texas Law Bars Coverage under Homeowner’s Policy for Mold Damage

    Businesspeople to Nevada: Revoke the Construction Defect Laws

    Supreme Court of New York Denies Motion in all but One Cause of Action in Kikirov v. 355 Realty Assoc., et al.

    Insurer Rejects Claim on Dolphin Towers

    Insurer Able to Refuse Coverage for Failed Retaining Wall

    Allowing the Use of a General Verdict Form in a Construction Defect Case Could Subject Your Client to Prejudgment Interest

    New OSHA Fall Rules to Start Early in Minnesota

    Local Government Waives Construction Fees to Spur Jobs

    Des Moines Home Builders Building for Habitat for Humanity

    Defective Grout May Cause Trouble for Bridges

    Supreme Court of Oregon Affirms Decision in Abraham v. T. Henry Construction, et al.

    Colorado Court of Appeals holds that insurance companies owe duty of prompt and effective communication to claimants and repair subcontractors

    Arizona Contractor Designs Water-Repellant Cabinets

    Destruction of Construction Defect Evidence Leads to Sanctions against Plaintiff

    Bound by Group Builders, Federal District Court Finds No Occurrence

    No Coverage For Damage Caused by Chinese Drywall

    Court Grants Summary Judgment to Insurer in HVAC Defect Case

    Firm Sued For Construction Defects in Parking Garage

    Rihanna Finds Construction Defects Hit a Sour Note

    Tenth Circuit Finds Insurer Must Defend Unintentional Faulty Workmanship

    Former New York Governor to Head Construction Monitoring Firm

    Insurer Not Entitled to Summary Judgment on Construction Defect Claims

    Construction Defect Lawsuits? There’s an App for That

    Reference to "Man Made" Movement of Earth Corrects Ambiguity

    Green Buildings Could Lead to Liabilities

    Safe Harbors- not just for Sailors anymore (or, why advance planning can prevent claims of defective plans & specs) (law note)

    History of Defects Leads to Punitive Damages for Bankrupt Developer

    An Upward Trend in Commercial Construction?

    Construction Defects Leave Animal Shelter Unusable

    Construction Defect Exception Does Not Lift Bar in Payment Dispute

    Construction Law: Unexpected, Fascinating, Bizarre

    Ninety-Day Extension Denied to KB Home in Construction Defect Insurance Claim

    Construction on the Rise in Washington Town

    Florida trigger

    In Re Golba: The Knaubs v. Golba and Rollison, Debtors

    The U.S. Tenth Circuit Court of Appeals Rules on Greystone

    Fifth Circuit Reverses Insurers’ Summary Judgment Award Based on "Your Work" Exclusion

    Bad Faith and a Partial Summary Judgment in Seattle Construction Defect Case

    HOA Has No Claim to Extend Statute of Limitations in Construction Defect Case

    Vegas Hi-Rise Not Earthquake Safe

    In Oregon Construction Defect Claims, “Contract Is (Still) King”

    After Katrina Came Homes that Could Withstand Isaac

    Arbitration Clause Found Ambiguous in Construction Defect Case

    Liability policy covers negligent construction: GA high court

    After $15 Million Settlement, Association Gets $7.7 Million From Additional Subcontractor

    Five Years of Great Legal Blogging at Insurance Law Hawaii

    Eighth Circuit Remands to Determine Applicability of Collapse Exclusion

    No Coverage For Construction Defects When Complaint Alleges Contractual Damages

    Texas exclusions j(5) and j(6).

    David McLain to Speak at the CDLA 2012 Annual Conference

    Subcontractor Not Liable for Defending Contractor in Construction Defect Case

    Colorado Court of Appeals Finds Damages to Non-Defective Property Arising From Defective Construction Covered Under Commercial General Liability Policy

    Orange County Home Builder Dead at 93

    In Colorado, Repair Vendors Can Bring First-Party Bad Faith Actions For Amounts Owed From an Insurer

    Construction Defect Lawsuit Stayed by SB800

    There is No Non-Delegable Duty on the Part of Residential Builders in Colorado

    Injured Construction Worker Settles for Five Hundred Thousand

    Colorado statutory “property damage” caused by an “occurrence”

    Save A Legal Fee? Sometimes You Better Talk With Your Construction Attorney

    Continuous Trigger of Coverage Adopted for Loss Under First Party Policy

    Lien Claimant’s Right to Execute against Bond Upheld in Court of Appeals

    Pier Fire Started by Welders

    Court Consolidates Cases and Fees in Soil Construction Defect Case

    The Flood Insurance Reform Act May be Extended to 2016

    Lien Law Unlikely To Change — Yet

    “Details Matter” is the Foundation in a Texas Construction Defect Suit

    Negligent Construction an Occurrence Says Ninth Circuit
    Corporate Profile

    LACOOCHEE FLORIDA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Lacoochee, Florida Construction Expert Witness Group at BHA, leverages from the experience gained through more than 5,500 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Leveraging from this considerable body of experience, BHA provides construction related trial support and expert services to Lacoochee's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.









    Construction Expert Witness News & Info
    Lacoochee, Florida

    Hilton Grand Vacations Defect Trial Delayed

    October 23, 2012 — CDJ Staff

    A settlement agreement between Conti Electric and Westgate Resorts has lead to a delay in starting the trial over construction defect claims and billing disputes over Hilton Grand Vacations a time share tower in Las Vegas. According to the Las Vegas Review-Journal, the dispute includes claims of $23.3 million owed to the general contractor against which the developer has placed $30 million in construction defect claims.

    Read the full story…


    Insurer’s Discovery Requests Ruled to be Overbroad in Construction Defect Suit

    October 28, 2011 — CDJ Staff

    The US District Court has ruled in the case of D.R. Horton Los Angeles Holding Co. Inc. v. American Safety Indemnity, Co. D.R. Horton was involved in a real estate development project. Its subcontractor, Ebensteiner Co., was insured by ASIC and named D.R. Horton as an additional insured and third-party beneficiary. D.R. Horton, in response to legal complaints and cross-complaints, filed for coverage from ASIC under the Ebensteiner policy. This was refused by ASIC. ASIC claimed that “there is no potential coverage for Ebensteiner as a Named Insurer and/or D.R. Horton as an Additional Insured.” They stated that “the requirements for coverage are not satisfied.”

    The case same to trial with the deadline for discovery set at March 1, 2011. ASIC stated they were seeking the developer’s “job file” for the Canyon Gate project. D.R. Horton claimed that ASIC’s discovery request was overbroad and that it would be “unduly burdensome for it to produce all documents responsive to the overbroad requests.”

    D.R. Horton did agree to produce several categories of documents, which included:

    “(1) final building inspection sign-offs for the homes that are the subject of the underlying litigation;(2) an updated homeowner matrix for the underlying actions; (3) the concrete subcontractor files; (4) the daily field logs for D.R. Horton’s on-site employee during Ebensteiner’s work; (5) documents relating to concrete work, including documents for concrete suppliers; (6) documents relating to compacting testing; (7) documents relating to grading; and (8) D.R. Horton’s request for proposal for grading”

    The court found that the requests from ASIC were overbroad, noting that the language of the ASIC Request for Production of Documents (RFP) 3-5 would include “subcontractor files for plumbing, electric, flooring, etc. - none of these being at issue in the case.” The court denied the ASIC’s motion to compel further documents.

    The court also found fault with ASIC’s RFPs 6 and 7. Here, D.R. Horton claimed the language was written so broadly it would require the production of sales information and, again, subcontractors not relevant to the case.

    Further, the court found that RFPs 8, 10, 11, and 13 were also overbroad. RFP 8 covered all subcontractors. D.R. Horton replied that they had earlier complied with the documents covered in RFPs 10 and 11. The court concurred. RFP 13 was denied as it went beyond the scope of admissible evidence, even including attorney-client communication.

    The court denied all of ASIC’s attempts to compel further discovery.

    Read the court’s decision…


    Fire Reveals Defects, Appeals Court Affirms Judgment against Builder

    July 10, 2012 — CDJ Staff

    The Arizona Court of Appeals has ruled in the case of Simms v. Nance Construction. After a fire damaged his home, Jerry Simms discovered some construction defects in the work of the builder, Nance Construction. Nance Construction completed the home in 2000 and it was damaged by fire in 2001. In the course of Simms’ suit against his neighbor, “defense experts opined both that Dusty Creek had negligently repaired the damage to Simms’ residence and that many defects found in the houses were the result of defects in the original construction.” Nance offered to make roof repairs. Simms responded with a list of “numerous construction defects,” stating this was “not a comprehensive and final list of items.” Nance offered to repair some while disputing others. Simms entered a lawsuit against Nance and other parties.

    Nance first sought a summary judgment, “asserting that Simms had failed to adequately disclose the repairs for which he sought to hold Nance responsible.” The court denied this. It also would not allow Nance to introduce evidence that Simms had been denied a license by the Arizona Department of Gaming over “questionable business practices, illegal activities, and financial transactions with a person purportedly involved in organized crime.”

    During the suit, Simms contracted with Advanced Repair Technologies “for repairs that included a complete remodel of the roof and the exterior stucco system.” Nance later claimed that the cost of ART’s repair was unreasonable, claiming that it should have cost about $600,000 instead of the $1.5 million for which Simms contracted. The jury found against Nance, with a judgment of $870,200 of which half was due to the roofing subcontractor.

    After the verdict, Nash moved for a new trial, stating that the jury should have heard expert testimony on whether the contract price was reasonable. Nance also “argued that the trial court had erred in refusing to allow Nance to impeach Simms’ credibility with his purported prior acts of dishonesty.” These motions were denied and Nance appealed.

    The appeals court upheld the trial court on all counts. The court found that, despite the contention made by Nance, the jury had sufficient information to determine if the cost of the repairs were reasonable. The court also found that Simms had given Nance an opportunity to propose repairs. The law, however, “does not require the Plaintiff to accept an offer for repairs,” adding that “the record makes clear that the parties were far apart in their belief of the nature of repairs necessary.” Nor did the court find that Nance should have been allowed to introduce evidence to impeach Simms’ credibility.

    Although judgment of the lower court was affirmed, the court took the discretion to decline to award attorneys’ fees to Simms, although he was awarded costs.

    Read the court’s decision…


    Important Information Regarding Colorado Mechanic’s Lien Rights.

    November 7, 2012 — David McLain, Colorado Construction Litigation

    With payment problems in the construction economy having accelerated over the past few years, there has been a substantial increase in mechanic’s lien activity and associated litigation. The typical mechanic’s lien claimant is a material supplier, a trade subcontractor, or even a general contractor that has not been paid by the developer/owner of the construction project. The reason for filing a mechanic’s lien claim is that it offers the prospect in many cases to make the unpaid construction professional a priority creditor, with a lien on the real estate that is superior to the construction lender.

    One of the primary rules governing a mechanic’s lien claim is that the creditor’s formal written “Notice of Intent to File a Mechanic’s Lien” (hereafter “Lien Notice”) must be (1) served on the owner of the property for which the work was done or the materials used, and (2) served at the same time on the general contractor who has handled the construction project. After the creditor has made service of the lien claim by USPS certified mail (using the green return receipt card for proof of service) or separate personal delivery of the notice to the property owner and general contractor, ten full days must pass (not including the date of mailing of the notices) before the lien notice is filed in the public records.

    After ten days have expired following the date of mailing using certified mail, or personal delivery of the notice to the property owner and the general contractor, the lien notice can be filed to make the lien valid.

    Reprinted courtesy of David M. McLain, Higgins, Hopkins, McLain & Roswell, LLC. Mr. McLain can be contacted at mclain@hhmrlaw.com

    Read the full story…


    Amerisure Case to be Heard by Texas Supreme Court

    August 16, 2012 — CDJ Staff

    The Fifth Circuit Court of Appeals has withdrawn its decision in Ewing Construction Company Inc. v. Amerisure Insurance Company, according to Insurance Developments. The Fifth Circuit had concluded that “a contractor’s obligation to perform its contact in a workmanlike manner constituted an ‘assumption of liability.’” Two questions have now been certified to the Texas Supreme Court. The dissent in the case argued the majority had misread Texas Supreme Court precedent. The court will now have the opportunity to clarify this matter.

    Read the full story…


    Court finds subcontractor responsible for defending claim

    May 18, 2011 — May 18, 2011 - CDJ Staff

    In an unpublished decision, the California Fourth Appellate District Court has reversed the judgment of Judge Linda B. Quinn of the Superior Court of San Diego. In the case Inland California, Inc. v. G.A. Abell, Inland, a general contractor had subcontracted with Apache Construction and Precision Electric Company (G.A. Abell).

    Apache alleged that extra demolition and drywall work was needed due to Precision’s electrical work. Inland tendered a defense of Apache’s claims. However, Precision did not provide any defense. Inland withheld payment from Precision.

    At trial, Inland “conceded Precision earned the $98,000 in progress payments Inland withheld.” They were obligated to additionally pay Precision’s costs and attorney fees.

    The Fourth Appellate District court has overturned this and remanded the case back to the lower court. The judges determined that Precision was obligated to defend itself against the claims raised by Apache and therefore vacated the judgment against Inland.

    Read the court’s decision…


    Arizona Homeowners Must Give Notice of Construction Defect Claims

    August 2, 2012 — CDJ Staff

    Chris Combs of the Combs Law Group notes that “the new home construction industry is recovering” and that some of the buyers of these homes “will have claims for construction defects.” But not so quick on filing that claim.

    Under Arizona law, as Mr. Combs notes the law “requires that, at least 90 days before filing any lawsuit, the buyer furnish notice by certified mail to the homebuilder specifying in detail the construction defect.” Only if there is no agreement over proposed repair can the homeowner file a lawsuit.

    Read the full story…


    Timing of Insured’s SIR Payment Has No Effect on Non-Participating Insurer’s Equitable Contribution to Co-Insurer

    April 25, 2012 — Aarti Kewalramani, Gatzke Dillon & Balance LLP

    In a case of first impression, the California Court of Appeal, Fourth District, Division One, examined whether a non-participating insurer can evade its defense and indemnity obligations because the insured only paid the policy’s self-insured retention ("SIR") as part of a settlement. In Axis Surplus Lines Insurance Company v. Glencoe Insurance LTD. (April 11, 2012, D058963) __ Cal.App.4th __ [2012 WL 11903203], the critical issue for the Court was whether an insurer, with full notice and continued investigation of a claim, can "hide behind the SIR requirement in its policy." The Court declined to "sanction such gamesmanship."

    The dispute involved an equitable contribution claim between two insurers. Axis Surplus Insurance Company provided commercial general liability insurance to Pacifica Pointe L.P. During the same time period, Glencoe Insurance Ltd. provided an owner-controlled insurance policy (i.e., wrap policy) to Pacifica Pointe L.P. Both policies included provisions requiring co-carriers to split the defense and indemnity on equal shares. Pacifica was sued in a construction defect lawsuit, involving alleged resultant damages to condominiums it converted and sold. Pacifica tendered the claim to both Axis and Glencoe. While Axis agreed to defend Pacifica, subject to a reservation of rights, Glencoe declined to participate until Pacifica satisfied the $250,000 SIR on the policy. Glencoe continued to monitor the litigation from the sidelines.

    Axis and Pacifica settled the underlying construction defect lawsuit for $1 million. Pacifica advised Glencoe of the settlement, and received Glencoe’s approval to contribute its $250,000 SIR towards the settlement. Axis contributed $750,000 towards the settlement. After the settlement, Axis sued Glencoe for declaratory relief and equitable contribution, to recover a portion of the defense and indemnity it paid. The trial court found in favor of Axis and allocated Glencoe 60% of the settlement payment. Glencoe appealed.

    On appeal, the Court scrutinized whether Glencoe, as the non-participating insurer, had a legal obligation to provide a defense and indemnity to the insured, despite the timing of the SIR’s satisfaction. The Court determined that in an equitable contribution action, the participating insurer has the burden of proving merely the potential for coverage under the non-participating insurer’s policy. On this showing, the burden of proof shifts to the non-participating insurer to prove the absence of actual coverage under its policy. The Court emphasized that the timing of the SIR’s payment was inconsequential to either insurer’s burden. Because Glencoe admitted coverage existed under its policy, the Court affirmed the trial court’s decision.

    As a result, the result ultimately turned on whether the non-participating carrier had full notice of the claim and cannot use the timing of the satisfaction of the SIR to shield itself from an equitable contribution claim from the participating co-carrier.

    Published courtesy of Aarti Kewalramani of Gatzke Dillon & Balance LLP. Ms. Kewalramani can be contacted at akewalramani@gdandb.com.


    State Audit Questions College Construction Spending in LA

    August 17, 2011 — CDJ Staff

    A state audit of the Los Angeles Community College District found many problems with their construction spending. Their report, as described in the Los Angeles Times, found construction money spent for other purposes, such as promotional photography and public relation tours, $28.3 million spent on projects that were later cancelled, and oversight committees that provided no oversight.

    Earlier this year, the LA Times ran a series of articles detailing problems with the Los Angles Community College District’s construction program. The LA Times reported that the State Controller’s audit reached many of the same conclusions.

    The Community College District disputed the findings.

    Read the full story…


    Developer’s Fraudulent Statements Are His Responsibility Alone in Construction Defect Case

    February 10, 2012 — CDJ Staff

    The Texas Court of Appeals ruled on December 21 in the case of Helm v Kingston, a construction defect case. After purchasing what was described as “an extremely well-built” two-bedroom townhouse, Mr. Kingston made complaints of construction defects. Greenway Development did not repair the defects to Kingston’s satisfaction, and he filed notice of suit. In his suit, he claimed that GDI and its president, John Helm, had committed fraud and negligent misrepresentation. Kingston claimed that Helm “fraudulently induced Kingston to believe that the townhouse evidenced the highest quality of workmanship when in fact the quality of workmanship was atrocious.” Helms brought a counterclaim that Kingston’s suit was frivolous.

    About four years after Kingston purchased the townhome, the suit proceeded to trial. The trial court determined that Helm was not “liable in his individual capacity,” but this was reversed at appeal.

    A second trial was held ten years later on the question of whether Kingston’s unit was a townhome or an apartment. A jury found that Helm “engaged in a false, misleading or deceptive act or practice that Kingston relied on to his detriment.” Kingston was awarded $75,862.29 and an additional $95,000 in attorney fees by the jury. Helms made an unsuccessful appeal to the Appeals Court, after which Kingston was awarded an additional $10,000. Helms then made an unsuccessful appeal to the Texas Supreme Court, which lead to an additional $3,000 for Kingston. There was also a verdict of $48,770.09 in pre-judgment interest and “five percent post-judgment interest accruing from the date of the judgment until the time the judgment is paid. Helm appealed.

    In his appeal, Helm raised seven issues, which the court reorganized into five Kingston raised one issue on cross-appeal.

    Helms’ first claim was that Kingston “failed to satisfy the requirement of” Texas’s Residential Construction Liability Act and that by not filing under the RCLA, Kingston’s fraud and misrepresentation claims were preempted. Further Helms claimed that the RCLA limited Kingston’s damages. The court rejected this, as the RCLA deals with complaints made to a contractor and not only did Helm fail to “conclusively establish” his “status as a ‘contractor’ under the statutory definition,” Helm testified that he was “not a contactor” at the pre-trial hearing.

    Helms’s second claim was that Kingston’s later claim of a misconstructed firewall should be barred, claiming that Kingston “‘had knowledge of a defect in the firewall’ as early as 1997 but did not assert them until 2007.” The court rejected this because Kingston’s claim was that “Helm ‘fraudulently induced Kingston to believe that the townhouse evidenced the highest quality of workmanship when in fact the quality of the workmanship was atrocious.’”

    Helms also challenged whether his statements that the residence was of “good quality” constituted fraud and misrepresentation under Texas’s Deceptive Trade Practices-Consumer Protection Act. The court concluded that Helm was in a position to make knowledgeable statements and further that “residential housing units are not artistic works for which quality is inherently a matter of subjective judgment.” Helm also claimed that Kingston could have avoided certain repair expenses through the “exercise of reasonable care.” Helms argued that the repairs could have been made for $6,400. The court disagreed, as these claims were cited only to invoke the DTPA, and that later petitions established additional defects.

    Helms’s next claim was that he was not allowed to designate responsible third parties. The court rejected this because there GDI represented matters concerning the residence only through Helm’s statements. The court noted that “Helm is correct that?third parties may be liable for fraud if they ‘participated in the fraudulent transactions and reaped the benefits,’” but they note that “Helm never specifically alleged that GDI or CREIC participated in Helm’s alleged fraudulent transactions.

    The final issue in the decision was about court costs, and here the court denied claims on both sides. Helm argued that the award of legal fees were excessive, as they exceeded the actual damages. The court noted that they “may not substitute our judgment for that of the jury,” and also that “the ratio between the actual damages awarded and the attorney’s fees is not a factor that determines the reasonableness of the fees.” But the court also rejected Kingston’s claim for post-judgment interest on $10,312.30 that Helm had deposited in the trial court’s registry. The court noted that the monies were to be paid out upon final judgment, but the mandate did not include any reference to interest.

    Read the court’s decision…


    Save a Legal Fee: Prevent Costly Lawsuits With Claim Limitation Clauses

    April 25, 2012 — Douglas Reiser, Builders Cousel

    Ever had that lingering problem with a contracting partner that went away for awhile and then came back to bite you ? years later? In Washington, construction contract claims can be raised for up to six years after substantial completion. Six years!? Why would I want to wait that long to find out if I have a problem? You don’t have to.

    Over the past few years, I have discussed the notion of “contractual claim periods” on The Builders Counsel. For today’s Save a Legal Fee column, I cannot think of a better topic. These provisions are specifically intended to save you from unnecessary legal fees that might arise if a problem goes unnoticed for too long.

    Contractual claim periods are simply a way to reduce the amount of time that a contracting party has to raise a claim against its contracting partner. For example, a subcontractor might require that a general contractor raise any claim that it might have ? for defective or incomplete work, injury, damages, etc ? within a particular amount of time or forever lose the ability to raise the claim in a legal proceeding.

    Read the full story…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com


    Federal Judge Dismisses Insurance Coverage Lawsuit In Construction Defect Case

    December 9, 2011 — CDJ Staff

    A federal judge dismissed a coverage lawsuit brought by Mid Continent Casualty Company against its insured, Greater Midwest Builders Ltd.

    Plaintiff brought this declaratory judgment action in response to a suit filed in Johnson County District Court, seeking a judicial determination that it had no coverage obligation for claims asserted against its insured. This case was stayed until the state court action entered judgment against the insured. The prevailing parties then commenced a garnishment action against the plaintiff, and another insurance company, in state court in Missouri. The court was asked whether it should lift the stay and proceed with the case, or decline jurisdiction in favor of resolution in the Missouri state court.

    The court granted the motion to dismiss holding that proceeding with the case would lead to protracted, piecemeal litigation, while deferring to the Missouri state court would decide all the claims involved in the dispute.

    Read the court’s decision…


    Appeals Court Upholds Decision by Referee in Trial Court for Antagan v Shea Homes

    May 10, 2012 — CDJ Staff

    In the case Antangan v. Shea Homes Ltd. Partnership (Cal. App., 2012), Plaintiffs appealed “an order vacating a judgment and entering a modified judgment in their construction defect action against defendants Shea Homes, Inc. and Shea Homes Limited Partnership,” while the Defendant, Shea Homes Limited Partnership (Shea Homes) appealed “an order of the judicial referee denying its motion to strike and tax costs.”

    On the Antagon issue, the appeals court concluded that “the trial court did not err by vacating and modifying its judgment so that the cost of referee’s fees would be equally divided by the parties and consistent with a prior stipulation they filed in court.”

    On the Shea Homes issue, the appeals court concluded: “1) the judicial referee did not err by ruling that plaintiffs’ offers to compromise (§ 998) were validly served on Shea Homes’ counsel, 2) the offers substantially complied with statutory requirements, 3) the offers were not required to be apportioned, and 4) the referee’s award of $5,000 as costs for a person assisting plaintiffs’ counsel was not an abuse of discretion.” The appeals court affirmed the judgment.

    Here is a brief history of the trial case: “Plaintiffs Chito Antangan, Jimmy Alcova and other homeowners brought an action against defendants Shea Homes, Inc. and Shea Homes Limited Partnership for damages alleging that the properties they purchased from these ‘developer defendants’ were defective. Plaintiffs claimed numerous construction defects required them ‘to incur expenses’ for ‘restoration and repairs’ and the value of their homes had been diminished.”

    In response, Shea Homes filed a motion for an order to appoint a judicial referee. The motion was granted and it was ruled that “a referee would ‘try all issues’ and ‘report a statement of decision to this court.’”

    On May 10, 2010 the judicial referee (Thompson) “awarded plaintiffs damages and various costs, and ruled that ‘Shea Homes shall bear all of the Referee’s fees.’” The latter ruling would become a matter for contention later on.

    In July of 2010, the plaintiffs “sought, among other things, $54,409.90 for expert fees, and $14,812.50 for the services of Melissa Fox for ‘exhibit preparation & trial presentation.’ Shea Homes filed a motion to strike and/or tax costs claiming: 1) Fox was a paralegal, 2) plaintiffs were not entitled to attorney’s fees, and 3) the fees for Fox’s services were an indirect and improper method to obtain attorney’s fees. The referee disagreed and awarded $5,000 for Fox’s services. The referee also ruled that plaintiffs had properly served valid offers to compromise (§ 998) on Shea Homes’ counsel in 2009. He said those offers to defendants in the case at that time did not have to be apportioned.”

    “Antangan contends the trial court erred when it vacated and modified its original judgment, which ordered Shea Homes to pay all the referee’s fees. We disagree.”

    Antagon contended that the trial court erred when it vacated and modified its original judgment regarding Shea Homes paying the referee’s fees. The appeals court disagreed: “A trial court has inherent authority to vacate or correct a judgment that is void on its face, incorrect, or entered by mistake. (§ 473; Rochin v. Pat Johnson Manufacturing Co. (1998),67 Cal.App.4th 1228; Olivera

    Read the court’s decision…


    Texas Court of Appeals Conditionally Grant Petition for Writ of Mandamus to Anderson

    April 25, 2011 — April 25, 2011 Beverley BevenFlorez - Construction Defect Journal

    The Texas Court of Appeals conditionally grant mandamus relief to Anderson Construction Company and Ronnie Anderson (collectively “Anderson”)… from the trial court in a construction defect lawsuit filed by Brent L. Mainwaring and Tatayana Mainwaring. See Tex. Prop. Code Ann. 27.001-.007 (West 2000 & Supp. 2010). Relators contend the trial court abused its discretion by compelling discovery while the case was abated by operation of law.

    The Court of Appeals opinion describes what led up to the proceedings: “The Mainwarings’ original petition identified certain defects in their Anderson-constructed home. Those defects concerned the roof trusses and framing, air conditioning, mortar and masonry, exterior doors and windows, and weep holes. With respect to the five areas of defects identified in their original petition, the Mainwarings gave Anderson the statutorily required notice on January 13, 2010. After implementing agreed extensions, Anderson made an offer of settlement for the defects the Mainwarings identified in their notice. Almost eight months later, the Mainwarings filed an amended petition adding defects they had not included in their original petition and notice. The additional defects the Mainwarings included in their amended petition had not been addressed by Anderson’s offer of settlement.”

    Following these events, Anderson claimed the Mainwarings did not respond in writing to their settlement offer. “Anderson filed a verified plea in abatement on December 2, 2010. In the trial court, Anderson claimed that the Mainwarings failed to respond in writing to Anderson’s settlement offer, as required by Section 27.004(b) of the RCLA. See Tex. Prop. Code Ann. 27.004(b)(1). The Mainwarings moved to compel discovery responses from Anderson. The Mainwarings alleged that they rejected Anderson’s settlement offer, and that if their response was insufficient, they contend that Anderson’s offer was rejected by operation of law on the twenty-fifth day after the Mainwarings received it. See Tex. Prop. Code Ann. 27.004(i). The Mainwarings’ motion to compel was not supported by affidavit. See Tex. Prop. Code Ann. 27.004(d)(2). On January 13, 2011, Anderson filed a verified supplemental plea in abatement. Anderson alleged that the Mainwarings failed to provide written notice concerning the newly alleged defects and complained the Mainwarings were attempting to circumvent the inspection and resolution procedure of the RCLA. Over Anderson’s objection that the lawsuit had been abated, the trial court granted the Mainwarings’ motion to compel discovery.”

    After listening to both sides, the Court of Appeals offered this reasoning for their opinion: “The parties do not dispute that Anderson inspected the property before the Mainwarings alleged the existence of additional defects in their amended pleading, nor do the Mainwarings claim that Anderson has been given an opportunity to inspect the additional defects the Mainwarings identified in their amended pleadings. We conclude the trial court did not have the discretion to deny or lift the abatement until the Mainwarings established their compliance with the statute. In other words, the Mainwarings are required to provide Anderson a reasonable opportunity to inspect the additional defects identified by their amended pleading, which will allow Anderson the opportunity to cure or settle with respect to the newly identified defects.”

    The Court of Appeals spoke directly on the issue of mandamus relief: “The Mainwarings contend that mandamus relief is not available because the trial court’s ruling does not prevent Anderson from making settlement offers during the discovery process. ‘An appellate remedy is “adequate” when any benefits to mandamus review are outweighed by the detriments.’ In re Prudential Ins. Co. of Am., 148 S.W.3d 124, 136 (Tex. 2004). The failure to abate a case is typically not subject to mandamus. See In re Allstate Cnty. Mut. Ins. Co., 85 S.W.3d 193, 196 (Tex. 2002) (citing Abor v. Black, 695 S.W.2d 564, 567 (Tex. 1985)). In this case, however, the case was abated by operation of law. By ignoring the statutory abatement, the trial court interfered with the statutory procedure for developing and resolving construction defect claims. See In re Kimball Hill Homes Tex., Inc., 969 S.W.2d 522, 525 (Tex. App. Houston [14th Dist.] 1998, orig. proceeding) (An appeal provides an inadequate remedy for the trial court’s failure to observe automatic abatement pursuant to the RCLA.). The benefits of mandamus review are not outweighed by the detriments of mandamus review in this case.“

    In conclusion, “The trial court had no discretion to compel discovery while the case was abated, and Anderson, who has been compelled to respond to discovery during a period the case was under an automatic abatement, has no adequate remedy on appeal. Accordingly, we conditionally grant the petition for writ of mandamus. The writ will issue only if the trial court fails to vacate its order of February 3, 2011, and fails to refrain from proceeding with the case until a motion to reinstate is filed that establishes compliance with the notice and inspection requirements of the Residential Construction Liability Act.”

    Read the trial court’s decision…


    Home Sales Still Low, But Enough to Spur Homebuilders

    August 16, 2012 — CDJ Staff

    Although new home sales are still fifty percent below the average over the last forty years, the housing rebound has sent stock of homebuilders up 53 percent this year, during the same period, the S&P 500 rose only 12 percent. The San Francisco Chronicle reports that from 2005 through 2011, homebuilder stocks trailed the S&P 500.

    The growth isn’t limited to homebuilders alone. Building suppliers are also seeing a growth in sales, with profits for companies that make gypsum wallboard, cabinetry, plumbing products, and other items used in home building.

    Homebuilders have also been able to raise prices. Standard Pacific Corp of Irvine, California has raised prices and cut incentives. Nevertheless, the buyers still come. PulteGroup and D.R. Horton are also raising prices.

    Read the full story…


    Bar to Raise on Green Standard

    November 7, 2012 — CDJ Staff

    Next June, members of the U.S. Green Building Council will be voting on changes to the LEED green building standard. “The bar is getting raised,” said Navad Malin of BuildingGreen, a consulting and publishing firm, in an article in USA Today. Under the proposed guidelines, builders would have to project energy and water use for five years as part of the certification process. However, if the occupants aren’t as green as the builders anticipated, the buildings will not lose their certification.

    The new rules will include higher energy standards, award points for avoiding potentially hazardous materials, and even determine what kind of plumbing items can be used.

    Read the full story…


    Senate Committee Approves Military Construction Funds

    June 29, 2011 — CDJ Staff

    With a decrease in funding, as compared to the House bill, the Military Construction and Veteran’s Affairs subcommittee of the Senate moved on a $72 billion construction bill. The House version had approved an additional half billion dollars in funding. Senator Tim Johnson, Democrat of South Carolina, said that he expected easy reconciliation with the House version. The Senate bill will move to the full Senate Appropriations Committee on June 30.

    The bill, S 1255, includes funding for construction and remodeling of military housing, as well as construction and remodeling of base facilities.

    Read the full story…

    Read S1255


    Pier Fire Started by Welders

    August 2, 2012 — CDJ Staff

    Welders working on Pier 29 in San Francisco were preparing the building for the America’s Cup sailing race. Instead, they accidentally caused $2.4 million in damages. Mindy Talmadge, a fire department spokesperson, attributed the fire to crews welding a latter to a wall. According to Talmadge, a spark entered a crack in the concrete wall and “the wood on the building underneath was really dry.” It took firefighters more than two hours to extinguish the blaze.

    Read the full story…