BERT HOWE
  • Nationwide: (800) 482-1822    
    concrete tilt-up Utica Michigan custom homes Utica Michigan multi family housing Utica Michigan condominiums Utica Michigan townhome construction Utica Michigan industrial building Utica Michigan casino resort Utica Michigan structural steel construction Utica Michigan retail construction Utica Michigan hospital construction Utica Michigan production housing Utica Michigan institutional building Utica Michigan custom home Utica Michigan housing Utica Michigan high-rise construction Utica Michigan mid-rise construction Utica Michigan condominium Utica Michigan parking structure Utica Michigan landscaping construction Utica Michigan office building Utica Michigan low-income housing Utica Michigan tract home Utica Michigan
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Utica, Michigan

    Michigan Builders Right To Repair Current Law Summary:

    Current Law Summary: Article 24 of the Occupational Code dictates that a complaint against a builder must be filed with the Department of Consumer and Industry Service within 18 months of the completion, occupancy or purchase of a residence. If building official determines complaint has merit, "Notice to Respondent: sent to provide builder with opportunity to repair; additional administrative procedures follow to conclusion; Individual townships have local rules regarding properties; Example: Bloomfield has mandated that structures must meet ongoing minimum maintenance standards.


    Construction Expert Witness Contractors Licensing
    Guidelines Utica Michigan

    Residential contractors need to be licensed. License required for plumbing and electrical trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Home Builders Association of Barry County
    Local # 2310
    2700 S Broadway
    Hastings, MI 49058
    http://www.barrycountyhba.com

    Greater Lansing Home Builders & Remodelers Assoc
    Local # 2352
    2937 Atrium Dr Ste 201
    Okemos, MI 48864
    http://www.glhba.org

    MICHIGAN ASSOCIATION OF HOME BUILDERS
    Local # 2300
    6427 Centurion Dr #150B
    Lansing, MI 48917
    http://www.buildingmichigan.org

    Home Builders Association of the Holland Area
    Local # 2340
    211 Lincoln Ave
    Holland, MI 49423
    http://www.hbaholland.com

    Building Industry Association of Southeastern Michigan
    Local # 2328
    2075 Walnut Lake Road
    West Bloomfield, MI 48323
    http://www.builders.org

    Home Builders Association of Livingston County
    Local # 2355
    132 E Grand River Ave
    Brighton, MI 48116
    http://www.hbalc.com

    Home & Builders Association of Gtr Grd Rapids
    Local # 2336
    3196 Kraft Ave SE Ste 300
    Grand Rapids, MI 49512
    http://www.hbaggr.com


    Construction Expert Witness News and Information
    For Utica Michigan

    Record-Setting Construction in Fargo

    Insurance Firm Under No Duty to Defend in Hawaii Construction Defect Case

    Condo Owners Worried Despite Settlement

    Construction Defects Are Occurrences, Says South Carolina High Court

    Court Clarifies Sequence in California’s SB800

    Construction Law: Unexpected, Fascinating, Bizarre

    South Carolina Contractors Regain General Liability Coverage

    Alabama “occurrence” and subcontractor work exception to the “your completed work” exclusion

    Homebuilders Go Green in Response to Homebuyer Demand

    Another Las Vegas Tower at the Center of Construction Defect Claims

    Florida Property Bill Passes Economic Affairs Committee with Amendments

    Nevada Assembly Sends Construction Defect Bill to Senate

    New Jersey Court Rules on Statue of Repose Case

    Contractor Sues License Board

    Construction Defects Not Occurrences under Ohio Law

    Joinder vs. Misjoinder in Colorado Construction Claims: Roche Constructors v. One Beacon

    Homeowner Has No Grounds to Avoid Mechanics Lien

    Nevada Court Adopts Efficient Proximate Cause Doctrine

    Ghost Employees Steal Jobs from Legit Construction Firms

    Construction Law Alert: A Specialty License May Not Be Required If Work Covered By Another License

    North Carolina Exclusion j(6) “That Particular Part”

    No Resulting Loss From Deck Collapsing Due to Rot

    Faulty Workmanship Causing Damage to Other Property Covered as Construction Defect

    Court Voids Settlement Agreement in Construction Defect Case

    Construction Defect Not an Occurrence in Ohio

    Geometrically Defined Drainage Cavities in EIFS as a Guard Against Defects

    Battle of “Other Insurance” Clauses

    South Carolina Legislature Defines "Occurrence" To Include Property Damage Arising From Faulty Workmanship

    Couple Sues Attorney over Construction Defect Case, Loses

    Home Repair Firms Sued for Fraud

    California Construction Bill Dies in Committee

    Construction Law Client Alert: Hirer Beware - When Exercising Control Over a Job Site’s Safety Conditions, You May be Held Directly Liable for an Independent Contractor’s Injury

    South Carolina “occurrence” and allocation

    Federal District Court Predicts Florida Will Adopt Injury In Fact Trigger

    Judge Okays Harmon Tower Demolition, Also Calls for More Testing

    US Courts in Nevada Busy with Yellow Brass

    Liability policy covers negligent construction: GA high court

    Exact Dates Not Needed for Construction Defect Insurance Claim

    Florida Chinese drywall, pollution exclusion, “your work” exclusion, and “sistership” exclusion.

    Residential Construction Down in San Diego

    Excess Carrier Successfully Appeals Primary Insurer’s Summary Judgment Award

    Ensuing Loss Provision Does Not Salvage Coverage

    Statute of Limitations Upheld in Construction Defect Case

    Plans Go High Tech

    Harmon Tower Construction Defects Update: Who’s To Blame?

    AFL-CIO Joins in $10 Billion Infrastructure Plan

    Driver’s Death May Be Due to Construction Defect

    Texas “Loser Pays” Law May Benefit Construction Insurers

    Insurance Company Must Show that Lead Came from Building Materials

    Steps to Defending against Construction Defect Lawsuits

    Texas Construction Firm Files for Bankruptcy

    Read Her Lips: “No New Buildings”

    Bad Faith and a Partial Summary Judgment in Seattle Construction Defect Case

    Colorado “occurrence”

    Contractor Underpaid Workers, Pocketed the Difference

    Drug Company Provides Cure for Development Woes

    Colorado Court of Appeals Rejects Retroactive Application of C.R.S. § 13-20-808.

    Tennessee Court: Window Openings Too Small, Judgment Too Large

    Florida “get to” costs do not constitute damages because of “property damage”

    Ensuing Loss Provision Found Ambiguous

    Texas covered versus uncovered allocation and “legally obligated to pay.”

    Save A Legal Fee? Sometimes You Better Talk With Your Construction Attorney

    Changes To Indemnification Statute Are Here! Say Hello To Defense Duties

    Harmon Towers Case to Last into 2014

    Negligent Misrepresentation in Sale of Building Altered without Permits

    History of Defects Leads to Punitive Damages for Bankrupt Developer

    Harsh New Time Limits on Construction Defect Claims

    Colorado Court of Appeals holds that insurance companies owe duty of prompt and effective communication to claimants and repair subcontractors

    Statute of Repose Dependant on When Subcontractors Finished

    Construction Defect Claim Did Not Harm Homeowner, Court Rules

    Granting Stay, Federal Court Reviews Construction Defect Coverage in Hawaii

    Firm Sued For Construction Defects in Parking Garage

    Nevada Construction Defect Lawyers Dead in Possible Suicides

    When Does a Claim Against an Insurance Carrier for Failing to Defend Accrue?

    More Charges in Las Vegas HOA Scandal

    Florida Law: Defects in Infrastructure Improvements Not Covered in Home Construction Warranties

    Court finds subcontractor responsible for defending claim

    In Colorado, Repair Vendors Can Bring First-Party Bad Faith Actions For Amounts Owed From an Insurer

    Contractor’s Coverage For Additional Insured Established by Unilateral Contract

    Failure to Meet Code Case Remanded to Lower Court for Attorney Fees

    Federal Court Denies Summary Judgment in Leaky Condo Conversion

    Construction Defects and Contractor-Owners

    Florida trigger

    More Charges in Las Vegas HOA Construction Defect Scam

    Gut Feeling Does Not Disqualify Expert Opinion

    Florida Appeals Court Rules in Favor of Homeowners Unaware of Construction Defects and Lack of Permits

    Home Builder Doesn’t See Long Impact from Hurricane

    Restitution Unlikely in Las Vegas Construction Defect Scam

    Construction Defect Journal Marks First Anniversary

    Boston’s Tunnel Project Plagued by Water
    Corporate Profile

    UTICA MICHIGAN CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Utica, Michigan Construction Expert Witness Group at BHA, leverages from the experience gained through more than 5,500 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Leveraging from this considerable body of experience, BHA provides construction related trial support and expert services to Utica's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.









    Construction Expert Witness News & Info
    Utica, Michigan

    No Coverage Under Ensuing Loss Provision

    September 9, 2011 — Tred Eyerley, Construction Law Hawaii

    The cost of removing and replacing cracked flanges to prevent future leakage was not covered as an ensuing loss under a builder’s risk policy in RK Mechanical, Inc. v. Travelers Prop. Casualty Co. of Am., 2011 U.S. Dist. LEXIS 83958 (D. Colo. Aug. 1, 2011).

    The insured, RK Mechanical Inc., was a subcontractor hired to install plumbing for a residential construction project. RK was an additional insured on the general contractor’s policy with Travelers. RK installed approximately 170 CPVC flanges on the project. Subsequently, two of the flanges cracked, allowing water to overflow and causing water damage to the project. Travelers was notified of the flange failure and resulting water damage.

    RK subsequently removed and replaced the two cracked flanges and began water remediation. Travelers paid for the cost of the water damage due to the cracked flanges.

    RK then examined all of the flanges installed in the project and discovered many were cracked and/or showed signs of potential failure. RK removed and replaced the cracked flanges. RK tendered a claim and demand for indemnity to Travelers for these repair costs. Travelers denied the claim. RK then sued for breach of contract and declaratory relief. The parties filed cross motions for summary judgment.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Court Rules on a Long List of Motions in Illinois National Insurance Co v Nordic PCL

    May 10, 2012 — CDJ Staff

    The case Illinois National Insurance Co. v Nordic PCL, et al. “involves a dispute about whether insurance benefits are available to a general contractor who built structures that allegedly have construction defects. Plaintiffs Illinois National Insurance Company (‘Illinois National’) and National Union Fire Insurance Company of Pittsburgh, PA (‘National Union’) (collectively, the ‘Insurers’), commenced this action for declaratory relief against Defendant Nordic PCL Construction, Inc., f/k/a Nordic Construction, Ltd. ("Nordic"), on August 23, 2011.”

    The court was asked to rule on a long list of motions: “Counterclaim Defendants’ Request for Judicial Notice in Support of Their (1) Motion to Dismiss the Counterclaim and (2) Motion to Strike Portions of the Counterclaim, ECF No. 16 (‘Request for Judicial Notice’); Counterclaim Defendants’ Motion to Dismiss Counterclaim Filed October 24, 2011, ECF No. 14 (‘Motion to Dismiss Counterclaim’); Counterclaim Defendants’ Motion to Strike Portions of the Counterclaim Filed October 24, 2011, ECF No. 15 (‘Motion to Strike’); Third-Party Defendant Marsh USA, Inc.’s Motion to Dismiss or, in the Alternative, Stay Proceedings in Favor of Pending State Action, ECF No. 33 (‘Marsh’s Motion To Dismiss Or Stay’); Defendant and Third-Party Plaintiff Nordic PCL Construction, Inc., f/k/a Nordic Construction Ltd.’s Substantive Joinder to Third-Party Defendant Marsh USA Inc.’s Motion to Dismiss or, in the Alternative, Stay Proceedings in Favor of Pending State Action, ECF No. 36 (‘Nordic’s Joinder’); and Third-Party Defendant Marsh USA, Inc.’s Motion for Judgment on the Pleadings on Counts V and VI of Defendant/Third-Party Plaintiff Nordic PCL Construction, Inc.’s Third-Party Complaint, ECF No. 29 (‘Marsh’s Motion for Judgment on the Pleadings’).”

    In result, the court reached the following decisions: “The court GRANTS IN RELEVANT PART the Insurers’ Request for Judicial Notice to the extent it covers matters relevant to these motions; GRANTS IN PART the Insurers’ Motion to Dismiss Counterclaim, but gives Nordic leave to amend the Counterclaim in certain respects; DENIES the Insurers’ Motion to Strike; DENIES Marsh’s Motion To Dismiss Or Stay and Nordic’s Joinder; and GRANTS Marsh’s Motion for Judgment on the Pleadings.”

    The court provides a bit of background on the case: “This action arises out of alleged construction defects involving two projects on which Nordic acted as the general contractor. Nordic is a defendant in a pending state court action with respect to one of the projects and says it spent more than $400,000 on repairs with respect to the other project. Nordic tendered the defense of the pending state court action to the Insurers and sought reimbursement of the cost of repairs already performed. The Insurers responded by filing this action to determine their rights under the insurance policies issued to Nordic.”

    Furthermore, the court presented a brief procedural history: “The Insurers commenced this declaratory action in this court on August 23, 2011. The Complaint asserts two claims, one seeking a declaration that the Insurers have no duty to provide a defense or indemnification regarding the Safeway Action, the other seeking such a declaration regarding the Moanalua Claims. Along with its Answer, Nordic filed a Counterclaim against the Insurers. The Counterclaim asserts breach of contract, breach of the covenant of good faith and fair dealing, misrepresentations and omissions of material fact, and bad faith, and seeks declaratory relief against the Insurers.”

    The procedural history continues: “Nordic also filed a Third-Party Complaint against Marsh, the broker that had procured the Policies from the Insurers for Nordic. Nordic alleges that it reasonably believed that the Policies would provide completed operations insurance coverage for the types of construction defects alleged in the Safeway Action and Moanalua Claims. The Third-Party Complaint asserts breach of contract, negligence, promissory estoppel, breach of fiduciary duties, implied indemnity, and contribution and equitable subrogation.”

    In conclusion, “The court GRANTS IN RELEVANT PART the Insurers’ Request for Judicial Notice. With regard to the Insurers’ Motion to Dismiss Counterclaim, the court GRANTS the motion as to Count I (breach of contract), Count II (duty of good faith and fair dealing), Count III (fraudulent and negligent misrepresentation), the portion of Count IV (bad faith) premised on fraud, and Count IV (declaratory relief). The court DENIES the motion as to Count IV (bad faith) that is not premised on fraud. Except with respect to the "occurrence" issue, which the court disposes of here on the merits, and Count V, which concerns only a form of relief, Nordic is given leave to amend its Counterclaim within three weeks of the date of this order. The court DENIES the Insurers’ Motion to Strike, DENIES Marsh’s Motion to Dismiss or Stay and Nordic’s Joinder, and GRANTS Marsh’s Motion for Judgment on the Pleadings with respect to Counts V and VI of the Third-Party Complaint.”

    Read the court’s decision…


    In Oregon Construction Defect Claims, “Contract Is (Still) King”

    April 25, 2012 — CDJ Staff

    Writing in Oregon’s Daily Journal of Commerce, David Anderson looks at the aftermath of the case Abraham v. T. Henry Construction, Inc. In that case, Anderson notes that “the homeowners hired a contractor to build their house, and subsequently discovered extensive water damage” “after expiration of the time to sue for breach of contract.” The homeowners claimed negligence. Oregon’s Supreme Court concluded that “homeowners only had to prove that the contractor negligently caused reasonably foreseeable harm to the homeowner’s property.”

    Anderson views this decision as leading to two risks for contractors. “First, contractors can be held liable in tort for breaching building code standards; second, they can be held liable for violating the often-difficult-to-define ‘reasonable care’ standard.” But here, “contract can be king.” The Oregon Supreme Court noted that the contractor “could have avoided exposure to the general ‘reasonable care’ standard by more carefully defining its obligations in the original construction contract.”

    He notes that contractors who fail to define their obligations or use generic definitions “may be exposing themselves to a more vague scope of liability.”

    Read the full story…


    Georgia Supreme Court Rules Construction Defects Can Constitute an Occurrence in CGL Policies

    April 5, 2011 — April 5, 2011 Beverley BevenFlorez - Construction Defect Journal

    Recently, the Supreme Court of Georgia reversed the decision in American Empire Surplus Lines Insurance Company v Hathaway Development Company, Inc. stating that because Whisnant’s faulty workmanship caused damage to the surrounding properties, the construction defects constituted “occurrences” under the Commercial General Liability (CGL) policy. Unlike the South Carolina Supreme court ruling in the case of Crossman Communities v Harleysville Mutual, the Georgia Supreme Court stated that an accident can happen intentionally if the effect is not the intended result.

    Interestingly, the only dissenting judge, J. Melton, disagreed with his colleagues on the basis that “although the term ‘accident’ is not specifically defined in the policy, it is axiomatic that an ‘accident’ cannot result from ‘intentional’ behavior.” It is clear that what constitutes an occurrence in CGL policies is still being hotly debated.

    Read the full story...


    Court Strikes Down Reasonable Construction Defect Settlement

    December 20, 2012 — CDJ Staff

    The Court of Appeals of Washington has struck down a construction defect settlement between a building owner and the companies she hired to repair the siding, among other repairs to bring the building up to code. Yuan Zhang hired Hawk Construction LLC to do repair work. Hawk, in turn, hired Ready Construction LLC for some aspects of the project. Hawk and Ready were both insured by Capital Specialty Insurance Corporation.

    There were several problems with Ready’s work. After removing old siding, they did not protect the building, nor did they remove all of the damaged layers. Ready covered, but did not fix, a mildew problem under the old siding. When new siding was reattached, the nails used were too short to adequately attach it.

    After paying for an inspection of the work, Zhang had Hawk and Ready begin the repairs again, but the work was abandoned without being completed. Zhang sued Hawk for breach of contract. Hawk then sued Ready, claiming that “Ready was liable to Hawk to the extent that Hawk was liable to Zhang.” Capitol retained defense for both contractors.

    Zhang settled with Hawk, in an agreement that gave her “the right to collect and/or pursue all costs and attorney fees paid by Hawk or its insurance company defending against the Zhang’s claims and pursuing claims against Ready.” Subsequently, she also settled with Ready. Both companies ceased operations.

    Zhang had the settlements reviewed by a court, which concluded that the settlements were reasonable. Capital was allowed to appeal, claiming that the settlement included costs that were Zhang’s responsibility. The appeals court did not examine the question of the reasonableness of the settlement, concluding that Capitol’s interests were relevant only to “questions of bad faith, collusion, and fraud.”

    In the case of Zhang, the court concluded that the relationship between Zhang and her former contractors was collusive. The court noted that “bad faith or collusion may exist when the evidence indicates a joint effort to create, in a non-adversarial atmosphere, a resolution beneficial to both parties, yet highly prejudicial to the insurer as intervener.” The court noted that both companies had minimal assets which were, in any case, exempted from the agreement. Further, the court found that the agreements failed to determine “what amount of the repairs related to preexisting water damage.” Zhang’s calculation of costs also included her expenses for architectural and engineering services, which the court points out, “where always Zhang’s costs to bear.”

    The court concluded that “the overall structure of the settlements is highly probative of collusion, fraud, or bad faith.” Zhang’s agreements with Hawk and Ready allowed her to collect compensation from Hawk and then collect Ready’s compensation to Hawk for their portion of the settlement, allowing Zhang to collect the monies twice. Further, she was allowed to pursue Capitol for Hawk’s attorney expenses, even though Hawk had none. “The right to recover Hawk’s fees merely set up a windfall recovery for Zhang.” The court described the agreements among Zhang, Hawk, and Ready as “precisely the type of manipulation [the law] is intended to preclude.”

    Read the court’s decision…


    In Re Golba: The Knaubs v. Golba and Rollison, Debtors

    June 19, 2012 — Brady Iandiorio

    Now comes another cautionary tale for builders and developers, especially those using single purpose business entities to handle individual construction projects. The United States Bankruptcy Court in Denver, Colorado, through the Honorable Michael Romero, provided an order regarding plaintiffs’ problems with a home they purchased from an entity controlled or represented by defendants. Plaintiffs, Kelvin and Holly Knaub (the “Knaubs”) filed adversary proceedings against debtor Robert Golba in his bankruptcy proceeding and against debtor Greg Rollison in his separate bankruptcy proceeding. The adversary proceedings were partially consolidated to proceed in parallel but not substantively.

    The Knaubs purchased a home from Gemm Homes (“Gemm”) in May 2003. Problems stemming from the foundation caused the Knaubs to seek an explanation and ultimately a solution from Gemm and then from Avalon Homes (“Avalon”), which the Knaubs claim is just a continuation of Gemm. Through their complaint, the Knaubs seek relief for 1) damages caused by fraudulent representations and false pretenses under 11 U.S.C. § 523(a)(2)(A), based on Golba’s misrepresentation that Gemm and Rollison were not involved in Avalon; 2) damages caused by actual fraud under § 523(a)(2)(A), based on Golba’s and Rollison’s alleged conspiracy fraudulently to convey the assets of Gemm to the Avalon entities; and 3) damages caused by breach of fiduciary duty under § 523(a)(4), alleging Gemm was an insolvent company which owed a fiduciary duty to its creditors, and alleging Golba participated in transferring Gemm’s assets to Avalon for no consideration. In the Golba action, the third claim for relief was dismissed.

    The facts of the case are important and somewhat convoluted. In an effort to make the cases clear, the evidence, allegations, and facts will be laid out in detail below. The Knaubs’ house was purchased from Gemm and soon after both Gemm and Rollison had an engineering company perform an analysis which discovered the foundation was not laid on stable ground.

    Read the full story…

    Reprinted courtesy of Brady Iandiorio, Higgins, Hopkins, McLain & Roswell, LLC. Mr. Iandiorio can be contacted at iandiorio@hhmrlaw.com


    Parking Garage Collapse May Be Due to Construction Defect

    November 7, 2012 — CDJ Staff

    A parking garage under construction at the Doral campus of Miami Dade College collapsed on October 9. Experts state that the collapse may have been due to errors in the construction process, either in the fabrication of the pre-cast components or in their assembly. The Bradenton Herald quotes Mark Santos, a structural engineer, who “would look at erection procedures ?Äì that’s probably the one question to ask first.”

    During the failure, floors separated from the south wall of the structure. The contractor responsible for the garage, Ajax Building Corp, said there was “no indication of any potential cause.”

    Read the full story…


    Construction Defect Litigation at San Diego’s Alicante Condominiums?

    March 25, 2011 — Alicante HOA Website

    According to recent posts in the Alicante HOA website, construction experts and legal counsel have been retained. The HOA board has been informed that testing of a variety of the building’s components are underway or will begin in the near future.

    Read More...


    Insurer Rejects Claim on Dolphin Towers

    July 22, 2011 — CDJ Staff

    A year after residents were forced to leave Dolphin Towers in Sarasota, Florida because of concrete problems, some residents are defaulting on their obligations, abandoning their units. In June, the building’s insurer, Great American, rejected a claim, arguing that the building’s problems were due to latent defects, not covered under the policy. Repair estimates, previously put at $8.2 million, have now risen to $11.5 million. If homeowners cover this cost, it would require an assessment of about $100,000 for each unit.

    About thirty owners are in arrears on dues and fees. Charlotte Ryan, the president of the Dolphin Tower board, wrote to owners, that “the board will have no choice but to lien your property and pursue foreclosure if you do nothing to bring your delinquencies up to date.” However, as homeowners default, the funding for repairs is imperiled. The board has already spent more than $500,000 on shoring up the building and hiring consultants. Their lawyers, on the other hand, are working on a contingency basis.

    Read the full story…


    Colorado “occurrence”

    January 6, 2012 — CDCoverage.com

    In Greystone Construction, Inc. v. National Fire & Marine Insurance Co., No. 09-1412 (10th Cir. November 1, 2011), general contractors Greystone and Branan were each sued by purchases of homes built by each alleging defective construction performed by subcontractors. CGL insurer American Family Mutual Insurance Company defended both Greystone and Brannon while co-insurer National Fire & Marine Insurance Company denied a defense. Greystone, Branan, and American Family sued National Fire for contribution towards defense costs. The federal district trial court entered summary judgment for National Fire.

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    School Sues over Botched Pool

    October 23, 2012 — CDJ Staff

    The Daily American reports that the Somerset Area School District has alleged that the contractor who repaired and renovated the district’s swimming pool “botched” the job. Now the school has filed a civil case in the Somerset County Court of Common Pleas. The contractor, Wilson Construction Co. would prefer the matter to be settled in binding arbitration.

    The school district alleges that the surface installed by Wilson Construction cracked and bubbled due to improper installation. The manufacturer of the waterproofing system, Dryvit Systems, tested the installation and concluded it was an installation failure instead of a product defect. Dryvit told the district that the exterior walls would have be removed.

    The school district paid Wilson Construction $591,081 for their work. In their lawsuit, they are seeking $594,596 to cover the cost of draining the pool and repairing it.

    Read the full story…


    Homeowners Not Compelled to Arbitration in Construction Defect Lawsuit

    January 6, 2012 — CDJ Staff

    A California appeals court has ruled that developers cannot enforce CC&Rs in a case where a developer cited an arbitration clause it had inserted into the CC&R. The homeowners are alleging construction defect and wished to sue the developer who claimed a right to this under the CC&Rs.

    The Marina del Rey Argonaut reports that particular appeal dealt only with whether the developer could compel arbitration. The underlying construction defect issues will subsequently have to be determined at trial.

    The attorney for the homeowners’ association, Dan Clifford, noted that “arbitration has to be agreed to by both parties.” The covenant was drafted by the developer and in addition to requiring arbitration, it had a clause that it could not be amended without the consent of the developers. The court ruled that CC&Rs “can be enforced only by the homeowners association, the owner of a condominium or both.”

    Read the full story…


    Texas Windstorm Insurance Agency Under Scrutiny

    April 5, 2011 — April 5, 2011 Beverley BevenFlorez - Construction Defect Journal

    Representative Larry Taylor has introduced a bill in the Texas Legislature (HB 2818) that would further regulate the Texas Windstorm Insurance Agency (TWIA). According to Taylor, “In order to be adequately prepared for future hurricane seasons, it is imperative that TWIA be operating at maximum efficiency, that the Reserve Trust Fund be solvent and that the agency have adequate management measures in place to protect consumers and ensure that claims are paid in a timely manner. House Bill 2818 is an important step in the right direction toward restoring public confidence in TWIA.”

    HB 2818 includes measures that would create an expert panel that would advise the commissioner on how to evaluate loss from the storm, and a greater transparency of TWIA Board meetings and actions.

    In addition, the Texas Department of Insurance (TDI) has placed TWIA on Administrative Oversight. According to TDI, “While under Administrative Oversight, the Department may require its prior review and approval of executive decisions, certain expenditures, and other transactions. The insurer is required to fully cooperate with the Department and provide complete and timely disclosure of all information responsive to Department requests.”

    Read the full story (Rep. Taylor’s Press Release)...

    Read the full story (Texas Department of Insurance’s Press Release)...


    Gut Feeling Does Not Disqualify Expert Opinion

    July 6, 2011 — CDJ Staff

    The New Jersey Supreme Court issued a ruling in June on the case of Nevins v. Toll in which they reversed an earlier decision and remanded the case to a lower court for retrial. At issue in the case was the testimony of the plaintiff’s expert, J. Anthony Dowling. In depositions, Mr. Dowling said that his estimates for repair were based on a “gut feeling.” Dowling said he had “very little” experience in cost estimates for single-family homes. The defendants sought to bar Dowling’s testimony which was granted by the judge. Without an expert, Ms. Nevin’s case was dismissed.

    Describing Dowling’s report as “far from a model of how an expert’s opinion in a construction case should be presented,” the court noted that Dowling is not a professional expert witness. However, the court did note that Dowling is a professional cost estimator. Despite Mr. Dowling using his “gut feeling” to construct his estimate, the New Jersey Supreme Court felt that whether his estimate is convincing is “a question for the jury.”

    Read the court’s opinion…


    Harmon Hotel Construction Defect Update

    July 18, 2011 — CDJ Staff

    Coverage of the ongoing litigation concerning the Harmon Hotel continues to proliferate. Architectural Record and a number of other news outlets continue to provide additional details and coverage of the matter. Chief among the conditions alleged are improperly installed reinforcing steel inside link beams on 15 floors. MGM Claims that the conditions amount to hundreds of millions of dollars in damages, while Perini (the builder) indicated in a July 12th statement that the buildings problems are related to the design, and the they are “fixable.”

    There is significant speculation that MGM Resorts International isn’t interested in repairing the hotel due to a glut of hotel rooms attendant to the troubled economy. In a statement Tuesday Perini reportedly stated that “Repairing and opening the Harmon would only create a greater glut of unused hotel rooms for MGM,” “If market conditions were better and MGM found that demand existed for the Harmon hotel rooms, MGM would not be claiming that the Harmon is unstable.”

    MGM asserts that Perini failed to ”properly construct” the project. Clark County’s Department of Development Services has reportedly asked MGM to provide a plan to fix the project by August 15th.

    The Harmon is part of the $8.5 billion CityCenter project that opened in the fourth quarter of 2009 and is jointly owned by MGM Resorts and Dubai World.

    Prior reports indicated that the owner (MGM) had considered razing the entire project. The future of the project remains uncertain.


    Contractor Removed from Site for Lack of Insurance

    October 28, 2011 — CDJ Staff

    The MetroWest Daily News reports that a demolition firm was told to leave the construction site at Natick High School since their failure to have workers compensation insurance makes them unable to work on the project. The contractor, Atlantic Dismantling and Site Construction, Inc. may have been working illegally since September.

    The equipment that Atlantic had rented for the job was repossessed in August. Brait Builders Corp, the general contractor for the site had rented equipment so Atlantic could continue their work.

    Their lack of insurance was discovered when a worker had a minor job-related injury. The state had issued a stop-work order for the firm and they could not legally bid on public projects. The school system did not receive any notice of this, and the school’s facilities director said of the general contractor, “chances are Brait never heard of anything either.”

    Read the full story...


    Exact Dates Not Needed for Construction Defect Insurance Claim

    March 1, 2012 — CDJ Staff

    The Texas Court of Appeals reversed the decision of the trial court in Vines-Herrin Custom Homes v Great American Lloyds Insurance Company on December 21, 2011. Vines-Herrin Custom Homes built a single-family home in Plano, Texas in 1999. They obtained a commercial general liability policy from Great American, later purchasing coverage from Mid-Continent, which the decision describes as “a sister company of Great American.”

    While the home was under construction, Emil G. Cerullo sought to purchase it. At the time, it was under contract to another buyer. Two months later, Vines-Herrin told Cerullo that the deal had “fell through.” Cerullo bought the house with modifications from the original plan. Upon moving in, Cerullo began having water intrusion and other problems. “Cerullo noticed water gathering on window sills and damage to the sheetrock and baseboard.” Additional problems followed, including cracks, leaks, “and in early 2002, the ceiling and roof began to sag.”

    Cerullo sued Vines-Herrin, claiming negligent construction. Vines-Herrin filed a claim seeking defense and indemnification under the insurance policies. Coverage was denied and Vines-Herrin filed suit to require coverage and also bringing claims for “breach of the duty of good faith and fair dealing, breach of contract, and DTPA and insurance code violations.”

    In May, 2006 Vines-Herrin stated that it had no more defense funds and went into arbitration with Cerullo. The underlying construction defect action was settled for about $2.5 million. As part of the settlement, “Cerullo became the rightful owner of all remaining claims, rights, and causes of action against” Vines-Herrin’s insurers. He then joined the coverage lawsuit.

    The non-jury trial was held under the controlling law of the time which “imposed a duty to defend only if the property damage manifested or became apparent during the policy period.” The court concluded in Cerullo’s favor. During the post-judgment motions, the Texas Supreme Court rejected the manifestation rule. Under this ruling, the trial court set aside its judgment and found in favor of the insurance companies. The trial court noted that although “the Residence was covered by an uninterrupted period of insurance (which began before the Residence was constructed) and that the damages to the Residence manifested during the uninterrupted period of insurance coverage,” “Mr. Cerullo failed to allege the date when actual physical damage to the property occurred.”

    The first claim by Cerullo and Vines-Herrin was that the “Final Judgment” occurred in October 2004, and that all proceedings thereafter were void. The court rejected this as the “final judgment” is not “final for the purposes of an appeal unless it actually disposes of every pending claim and party or unless it clearly and unequivocally states that it finally disposes of all claims and all parties.” Despite the use of the word “final,” the trial court’s decision did not do this.

    The second issue was the application of the Texas Supreme Court case Don’s Building Supply Inc. v. OneBeacon Insurance. In this case, framing rot due to defective stucco was not discovered until after the end of the policy period. The Supreme Court noted that “the key date is when injury happens, not when someone happens on it.”

    The appeals court found that the trial court misapplied the Don’s Building Supply decision. Rather than an exact date, “so long as that damage occurred within the policy period, coverage was provided.” The appeals court noted that “Cerullo alleged the house was constructed in 1999 and he purchased it in May 2000.” “By April of 2001, Cerullo noticed that the windowsills in the study were showing signs of leakage and water damage.” As the court put it, “the petitions then alleged a litany of defects.”

    The court noted that coverage by Great American was in effect from November 9, 1999 to November 9, 2000. In May of 2000, the house suffered “substantial flooding from a rainstorm that caused damage.” This was during the policy period. “As a matter of law, actual damages must occur no later than when they manifest.”

    The court concluded that as damage manifested during the period of coverage, so must have the damage. The court ruled that “contrary to the trial court’s determination otherwise, the evidence showed Great American’s duty to indemnify was triggered, and expert testimony establishing the exact date of injury was not required to trigger the duty.”

    Read the court’s decision…


    One World Trade Center Due to Be America’s Tallest and World’s Priciest

    February 10, 2012 — CDJ Staff

    As One World Trade Center rises, so does the price tag. After construction delays and cost overruns, the cost of the building at the site of the September 11 attacks has risen to $3.8 billion. Part of the expense of the skyscraper is the heavily reinforced base of the building. The elevator shafts are also heavily reinforced, all part of guarding against future terrorist attacks.

    In comparison, the world’s tallest tower, the Burj Khalifa in Dubai, cost only $1.5 billion, less than half the cost of One World Trade Center. As a result, the Port Authority does not see the building as being profitable in near future. In order to fund it, the agency is raising tolls on bridge and tunnel traffic.

    Currently, about the half the unfinished building is leased. Construction is expected to conclude in 2013.

    Read the full story…