BERT HOWE
  • Nationwide: (800) 482-1822    
    retail construction Morrison Illinois Medical building Morrison Illinois concrete tilt-up Morrison Illinois condominium Morrison Illinois custom homes Morrison Illinois structural steel construction Morrison Illinois multi family housing Morrison Illinois high-rise construction Morrison Illinois tract home Morrison Illinois custom home Morrison Illinois mid-rise construction Morrison Illinois parking structure Morrison Illinois Subterranean parking Morrison Illinois office building Morrison Illinois industrial building Morrison Illinois townhome construction Morrison Illinois low-income housing Morrison Illinois landscaping construction Morrison Illinois housing Morrison Illinois condominiums Morrison Illinois casino resort Morrison Illinois production housing Morrison Illinois
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Morrison, Illinois

    Illinois Builders Right To Repair Current Law Summary:

    Current Law Summary: HB4873 Pending: The Notice and Opportunity to Repair Act provides that a construction professional shall be liable to a homeowner for damages caused by the acts or omissions of the professional and his or her agents, employees, or subcontractors. This bill requires the service of notice to the professional of the complained-of defect in the construction by the homeowner prior to commencement of a lawsuit. Allows the professional to make an offer of repair or settlement and to rescind this offer if the claimant fails to respond within 30 days.


    Construction Expert Witness Contractors Licensing
    Guidelines Morrison Illinois

    No state license required for general contracting. License required for roofing.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Northern Illinois Home Builders Association Inc
    Local # 1434
    3695 Darlene Ct Ste 102
    Aurora, IL 60504
    http://www.nihba.com

    Home Builders Association of Greater Fox Valley
    Local # 1431
    PO Box 1146
    Saint Charles, IL 60174
    http://www.buildfoxvalley.com

    SouthWest Suburban Home Builders Association
    Local # 1432
    10767 W 163rd Pl
    Orland Park, IL 60467
    http://www.sshba.com

    Home Builders Association of Greater Chicago
    Local # 1425
    5999 S. New Wilke Rd Ste 104
    Rolling Meadows, IL 60008
    http://www.hbagc.com

    Home Builders Association of the Greater Rockford Area
    Local # 1465
    631 N Longwood St Suite 102
    Rockford, IL 61107
    http://www.hbarockford.com

    Home Builders Association of Kankakee
    Local # 1445
    221 S Schuyler Ave Ste B
    Kankakee, IL 60901
    http://www.hbakankakee.com/

    Home Builders Association of Greater Peoria
    Local # 1455
    1599 N Main Street
    East Peoria, IL 61611
    http://www.peoriahba.com


    Construction Expert Witness News and Information
    For Morrison Illinois

    Mississippi exclusions j(5) and j(6) “that particular part”

    Insurer Not Liable for Construction Defect Revealed by Woodpecker

    California Bill Would Notify Homeowners on Construction Defect Options

    After $15 Million Settlement, Association Gets $7.7 Million From Additional Subcontractor

    Failure to Meet Code Case Remanded to Lower Court for Attorney Fees

    Hawaii State Senate Requires CGL Carriers to Submit Premium Information To State Legislature

    West Hollywood Building: Historic Building May Be Defective

    Preparing For the Worst with Smart Books & Records

    Virginia Chinese Drywall and pollution exclusion

    Florida Contractor on Trial for Bribing School Official

    Virginia Homebuilding Slumps After Last Year’s Gain

    General Contractor/Developer May Not Rely on the Homeowner Protection Act to Avoid a Waiver of Consequential Damages in an AIA Contract

    Supreme Court of Oregon Affirms Decision in Abraham v. T. Henry Construction, et al.

    Florida: No Implied Warranties for Neighborhood Improvements

    Colorado “occurrence”

    Water Damage Covered Under Efficient Proximate Cause Doctrine

    Arizona Court of Appeals Rules Issues Were Not Covered in Construction Defect Suit

    Timing of Insured’s SIR Payment Has No Effect on Non-Participating Insurer’s Equitable Contribution to Co-Insurer

    Ensuing Loss Provision Does Not Salvage Coverage

    No Third-Quarter Gain for Construction

    Court Will Not Compel Judge to Dismiss Construction Defect Case

    Judge Kobayashi Determines No Coverage for Construction Defect Claim

    Mandatory Arbitration Provision Upheld in Construction Defect Case

    Insurer Has Duty to Defend Despite Construction Defects

    Nevada Supreme Court Reverses Decision against Grader in Drainage Case

    Water Is the Enemy

    Safe Harbors- not just for Sailors anymore (or, why advance planning can prevent claims of defective plans & specs) (law note)

    Construction Job Opening Rise in October

    Homebuilders Go Green in Response to Homebuyer Demand

    Congress Addresses Homebuilding Credit Crunch

    Boyfriend Pleads Guilty in Las Vegas Construction Defect Scam Suicide

    Contract Not So Clear in South Carolina Construction Defect Case

    No Resulting Loss From Deck Collapsing Due to Rot

    In Colorado, Repair Vendors Can Bring First-Party Bad Faith Actions For Amounts Owed From an Insurer

    Broker Not Liable for Failure to Reveal Insurer's Insolvency After Policy Issued

    Tucson Officials to Discuss Construction Defect Claim

    Bound by Group Builders, Federal District Court Finds No Occurrence

    A Call to Washington: Online Permitting Saves Money and the Environment

    Statute of Repose Dependant on When Subcontractors Finished

    LEED Certified Courthouse Square Negotiating With Insurers, Mulling Over Demolition

    An Upward Trend in Commercial Construction?

    Read Her Lips: “No New Buildings”

    Who Is To Blame For Defective — And Still LEED Certified — Courthouse Square?

    Homeowners Sue Over Sinkholes, Use Cash for Other Things

    California Supreme Court Binds Homeowner Associations To Arbitration Provisions In CC&Rs

    JDi Data Introduces Mobile App for Litigation Cost Allocation

    Harmon Tower Construction Defects Update: Who’s To Blame?

    Boston’s Tunnel Project Plagued by Water

    Crane Dangles and So Do Insurance Questions

    Battle of “Other Insurance” Clauses

    US Courts in Nevada Busy with Yellow Brass

    Five Years of Great Legal Blogging at Insurance Law Hawaii

    Brown Paint Doesn’t Cover Up Construction Defects

    School District Marks End of Construction Project by Hiring Lawyers

    New Safety Standards Issued by ASSE and ANSI

    Ensuing Loss Provision Found Ambiguous

    No Coverage For Construction Defects When Complaint Alleges Contractual Damages

    California Lawyer Gives How-To on Pursuing a Construction Defect Claim

    Retaining Wall Contractor Not Responsible for Building Damage

    Nevada Senate Rejects Construction Defect Bill

    Contractor Removed from Site for Lack of Insurance

    More Charges in Las Vegas HOA Scandal

    Hovnanian Increases Construction Defect Reserves for 2012

    Mark Van Wonterghem To Serve as Senior Forensic Consultant in the Sacramento Offices of Bert L. Howe & Associates, Inc.

    Coverage Exists Under Ensuing Loss Provision

    One to Watch: Case Takes on Economic Loss Rule and Professional Duties

    Construction Delayed by Discovery of Bones

    A Lien Might Just Save Your Small Construction Business

    History of Defects Leads to Punitive Damages for Bankrupt Developer

    Construction Defects Not Occurrences under Ohio Law

    Ceiling Collapse Attributed to Construction Defect

    Guilty Pleas Draw Renewed Interest In Nevada’s Construction Defect Laws

    The Year 2010 In Review: Design And Construction Defects Litigation

    Loss Caused by Seepage of Water Not Covered

    New Buildings in California Soon Must Be Greener

    New OSHA Fall Rules to Start Early in Minnesota

    Insurance Firm Defends against $22 Million Claim

    Does the New Jersey Right-To-Repair Law Omit Too Many Construction Defects?

    Homeowners Not Compelled to Arbitration in Construction Defect Lawsuit

    Construction Defect Journal Marks First Anniversary

    Reference to "Man Made" Movement of Earth Corrects Ambiguity

    Flooded Courtroom May be Due to Construction Defect

    Nevada Construction Defect Lawyers Dead in Possible Suicides

    Fifth Circuit Reverses Insurers’ Summary Judgment Award Based on "Your Work" Exclusion

    Are Construction Defects Covered by Your General Liability Policy?

    Fourteen More Guilty Pleas in Las Vegas Construction Defect Scam

    Another Las Vegas Tower at the Center of Construction Defect Claims

    Connecticut Gets Medieval All Over Construction Defects

    Preparing for Trial on a Cause of Action for Violation of Civil Code section 895, et seq.

    Cabinetmaker Exceeds Expectations as Conditions Improve
    Corporate Profile

    MORRISON ILLINOIS CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 5500 construction defect and claims related expert witness designations, the Morrison, Illinois Construction Expert Witness Group provides a wide range of trial support and consulting services to Morrison's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.









    Construction Expert Witness News & Info
    Morrison, Illinois

    Cogently Written Opinion Finds Coverage for Loss Caused By Defective Concrete

    November 7, 2012 — Tred Eyerly, Insurance Law Hawaii

    If ever in need of a concise, well-reasoned opinion on “occurrence,” “property damage” and applicability of the business risk exclusions, turn to Pamperin Rentals II, LLC v. R.G. Hendricks & Sons Construction, Inc., 2012 Wis Ct. App. LEXIS 698 (Wis. Ct. App. Sept. 5, 2012).

    A contractor was hired to install concrete during construction of seven gas stations. Red-D-Mix provided the concrete. The contractor and Red-D-Mix were eventually sued by the gas stations, based upon allegations that the concrete was defectively manufactured and installed. The gas stations alleged that Red-D-Mix supplied concrete that was defective and resulted in damages, including the need to repair nearby asphalt.

    Red-D-Mix tendered to its insurers, who denied coverage. Suit was filed and the insurers moved for summary judgment. The trial court determined there were no allegations of either “property damage” or an “occurrence.” Therefore, there was no duty to defend or indemnify Red-D-Mix.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    AFL-CIO Joins in $10 Billion Infrastructure Plan

    June 30, 2011 — CDJ Staff

    The AFL-CIO has announced plans to generate up to $10 billion in funding for infrastructure development, training construction workers, and making buildings more energy efficient, pledging $20 million to retrofit buildings. Bloomberg News reports that union officials made the announcement in Chicago at the Clinton Global Initiative, releasing a statement from Richard Trumka, president of the union, “we, at the AFL-CIO, believe that together, with our partners in business and government, we can profitably invest significant resources to make America more competitive and energy efficient.” A foot injury prevented Mr. Trumka from attending the event.

    The statement also quoted Mark Ayers, president of the Building and Construction Trades Department of the AFL-CIO, “the time is now to become intensely focused on the creation of jobs.”

    Read the full story…


    Faulty Workmanship Exclusion Does Not Bar Coverage

    November 18, 2011 — Tred Eyerley, Insurance Law Hawaii

    The court determined that the Faulty Workmanship Exclusion only barred coverage for damages arising from problems with the property under construction itself and not to losses incurred to correct damage from accidents during construction. See 1756 First Associates, LLC v. Continental Casualty Co., 2011 U.S. Dist. LEXIS 117100 (S.D.N.Y. Oct. 3, 2011).

    A tower crane collapsed at the construction site, causing damage. First Associates tendered the claim to its insurer, Continental. Continental reimbursed First Associates for certain costs arising from damage to and cleanup of the construction site and building stemming from the crane collapse. Continental refused, however, to reimburse First Associates for costs associated with construction delays resulting from the collapse.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Contractor Sues Supplier over Defective Products

    June 28, 2011 — CDJ Staff

    Fast Track Specialties has sued RJF International after needing to remove wall protection units at Methodist West Houston Hospital, according to an article in the Houston Chronicle. Fast Track claims that contractors had to disconnect gas, water, and electric from the area to facilitate removal of corner guards, handrails, and crash guards from the hospital. This cost the contractor more than $135,000.

    Fast Track is claiming that RJD International has committed breach of contract, breach of warranty, and negligent representation.

    Read the full story…


    OSHA Extends Temporary Fall Protection Rules

    March 1, 2012 — CDJ Staff

    OSHA announced that its current rules on fall protection for residential construction will remain in place until September 15, 2012. The current measures became effective in June 2011. Under the new rules, falls must be prevented by fall protection measures unless the measures can be shown to be unfeasible or even hazardous.

    Under the extension of the temporary enforcement measures, contractors who ask for compliance assistance with OSHA are given top priority and penalties can be reduced. OSHA has conducted more than 1,000 outreach sessions on the new rules.

    Read the full story…


    Arbitrator May Use Own Discretion in Consolidating Construction Defect Cases

    September 1, 2011 — CJD Staff

    The Mississippi Court of Appeals has ruled in the case of Harry Baker Smith Architects II, PLLC v. Sea Breeze I, LLC. Sea Breeze contracted with Harry Baker Smith Architects II, PLLC (HBSA) to design a condominium complex, which would be built by Roy Anderson Corporation. All parties agreed to arbitration.

    Subsequently, Sea Breeze alleged defects and sought arbitration against the architectural firm and started a separate arbitration proceeding against the contractor. The special arbitrator appointed by the American Arbitrators Association determined that it would be proper to consolidate the two actions “since they arose from a common question of fact or law.” HBSA filed in chancery court seeking injunctive relief and a reversal of the decision. Sea Breeze and Roy Anderson filed a motion to compel the consolidated arbitration.

    The court noted that the special arbitrator “established that the contract between Sea Breeze and Roy Anderson expressly allowed for consolidation of the two cases.” Further, the arbitrator “concluded that HBSA expressly agreed to consolidation by written consent through its 2008 letter, through which it insisted upon Roy Anderson’s involvement ‘in any mediation and/or arbitration.’”

    The court concluded that the chancery court “did not have the power to fulfill HBSA’s request.” The court affirmed the chancery court’s judgment.

    Read the court’s decision…


    Ambitious Building Plans in Boston

    November 18, 2011 — CDJ Staff

    Although most are unlikely to change the Boston skyline, there are several large projects on the drawing boards. The site BostInnovation covered ten of them in a recent post. Downtown Boston will be the site of several of these large projects, including three towers to be added to the Christian Science Plaza, a 404-unit residential tower in the Theater District, and perhaps the largest of these projects, a 47-story tower to be built over Copley Plaza, which will tower over the adjacent buildings. None of the planned buildings will challenge the Hancock Tower’s 60 stories.

    Read the full story…


    Webinar on Insurance Disputes in Construction Defects

    July 10, 2012 — CDJ Staff

    Seth Lamden, of the firm Neal Gerber Eisenberg will be presenting a webinar on “Insurance Coverage Disputes in Construction Defects” on July 17, 2012 at 1 p.m. EDT. Mr. Lamden’s presentation will focus on “handling both the construction and insurance components of construction defect claims.” He will be discussing recent case law and new insurance products. The presentation will present information on evaluating various types of insurance policies, explaining common issues, contract requirement, and the economic loss doctrine. Mr. Lamden will advise attendees on how to avoid getting into a construction defect case. He will conclude his presentation with a brief question-and-answer session.

    Read the full story…


    Bar to Raise on Green Standard

    November 7, 2012 — CDJ Staff

    Next June, members of the U.S. Green Building Council will be voting on changes to the LEED green building standard. “The bar is getting raised,” said Navad Malin of BuildingGreen, a consulting and publishing firm, in an article in USA Today. Under the proposed guidelines, builders would have to project energy and water use for five years as part of the certification process. However, if the occupants aren’t as green as the builders anticipated, the buildings will not lose their certification.

    The new rules will include higher energy standards, award points for avoiding potentially hazardous materials, and even determine what kind of plumbing items can be used.

    Read the full story…


    Retaining Wall Contractor Not Responsible for Building Damage

    July 20, 2011 — CDJ Staff

    The Court of Appeals of Indiana ruled on July 8 in the case of Rollander Enterprises, Inc. v. H.C. Nutting Co. Judge Baily wrote the opinion affirming the decision of the trial court.

    The case involved an unfinished condominium complex, the Slopes of Greendale, in Greendale, Indiana. Rollander is a real estate development company incorporated in Ohio. One of the issues in the case was whether the case should be settled in the Indiana courts or be tried in Ohio. The project was owned by a special purpose entity limited liability corporation incorporated in Indiana.

    Rollander hired Nutting to determine the geological composition of the site. Nutting’s report described the site as “a medium plastic clay containing pieces of shale and limestone.” The court summarized this as corresponding with “slope instability and landslides.” Rollander then hired Nutting to design the retaining walls, which were constructed by Scherziner Drilling.

    After cracking was discovered on State Route 1, the walls were discovered to be inadequate. More dirt was brought in and a system of tie-backs was designed to anchor the walls. Not only were the tie-backs unsightly, local officials would not approve the complex for occupancy. Further, the failure of the wall below one building lead to damage of that building.

    The court concluded that since almost all events occurred in Indiana, they rejected Rollander’s contention that the case should be tried in Ohio. Further, the court notes “the last event making Nutting potentially liable on both claims was an injury that occurred in Indiana and consequently, under the lex loci delicti analysis, Indiana law applies.”

    Nor did the court find that Nutting was responsible for the damage to the rest of the project, citing an Indiana Supreme Court ruling, that “there is no liability in tort to the owner of a major construction project for pure economic loss caused unintentionally by contractors, subcontractors, engineers, design professionals, or others engaged in the project with whom the project owner, whether or not technically in privity of contract, is connected through a network or chain of contracts.”

    The court concluded:

    Because Rollander was in contractual privity with Nutting, and Indy was connected to Nutting through a chain of contracts and no exception applies, the economic loss rule precludes their recovery in tort. Damage to Building B was not damage to "other property," and the negligent misrepresentation exception to the economic loss rule is inapplicable on these facts. The trial court therefore did not abuse its discretion by entering judgment on the evidence in favor of Nutting on the Appellants' negligence and negligent misrepresentation claims.

    Read the court’s decision…


    Know the Minnesota Statute of Limitations for Construction Defect Claims

    July 10, 2012 — CDJ Staff

    Writing on the Benson Kerrane Storz Nelson web site, Alex Nelson gives an overview of the Minnesota laws covering statutes of limitation and repose. He notes that frequently when his firm declines to take a construction defect case its’ over a missed statute of limitation. He describes the time periods as both “short” and “ambigious.” The briefest limit is that a homeowner “has only 6 months within which to give written notice of the defect to the builder once the defect has manifested itself.” Any legal action must commence within two years of the same point.

    The Minnesota statutes also have a six-year limitation, which starts for a single home at transfer of title to the first purchaser or when the purchaser takes possession, whichever happens first. For a condo, it is the last of “completion of the common element,” first unit sale or “Termination of Declarant control.” Fraud or misrepresentation also has a six-year limit, while negligence claims are limited to within the first two years “after the manifestation of the defect.”

    The statues of repose also provide limits to filing construction defect lawsuits. Mr. Nelson points out that the longest are for negligence, fraud, and “major construction defects,” all of which have a ten-year limit. On the other hand, claims against general workmanship and materials must be made in the first year.

    Read the full story…


    Appeals Court Upholds Decision by Referee in Trial Court for Antagan v Shea Homes

    May 10, 2012 — CDJ Staff

    In the case Antangan v. Shea Homes Ltd. Partnership (Cal. App., 2012), Plaintiffs appealed “an order vacating a judgment and entering a modified judgment in their construction defect action against defendants Shea Homes, Inc. and Shea Homes Limited Partnership,” while the Defendant, Shea Homes Limited Partnership (Shea Homes) appealed “an order of the judicial referee denying its motion to strike and tax costs.”

    On the Antagon issue, the appeals court concluded that “the trial court did not err by vacating and modifying its judgment so that the cost of referee’s fees would be equally divided by the parties and consistent with a prior stipulation they filed in court.”

    On the Shea Homes issue, the appeals court concluded: “1) the judicial referee did not err by ruling that plaintiffs’ offers to compromise (§ 998) were validly served on Shea Homes’ counsel, 2) the offers substantially complied with statutory requirements, 3) the offers were not required to be apportioned, and 4) the referee’s award of $5,000 as costs for a person assisting plaintiffs’ counsel was not an abuse of discretion.” The appeals court affirmed the judgment.

    Here is a brief history of the trial case: “Plaintiffs Chito Antangan, Jimmy Alcova and other homeowners brought an action against defendants Shea Homes, Inc. and Shea Homes Limited Partnership for damages alleging that the properties they purchased from these ‘developer defendants’ were defective. Plaintiffs claimed numerous construction defects required them ‘to incur expenses’ for ‘restoration and repairs’ and the value of their homes had been diminished.”

    In response, Shea Homes filed a motion for an order to appoint a judicial referee. The motion was granted and it was ruled that “a referee would ‘try all issues’ and ‘report a statement of decision to this court.’”

    On May 10, 2010 the judicial referee (Thompson) “awarded plaintiffs damages and various costs, and ruled that ‘Shea Homes shall bear all of the Referee’s fees.’” The latter ruling would become a matter for contention later on.

    In July of 2010, the plaintiffs “sought, among other things, $54,409.90 for expert fees, and $14,812.50 for the services of Melissa Fox for ‘exhibit preparation & trial presentation.’ Shea Homes filed a motion to strike and/or tax costs claiming: 1) Fox was a paralegal, 2) plaintiffs were not entitled to attorney’s fees, and 3) the fees for Fox’s services were an indirect and improper method to obtain attorney’s fees. The referee disagreed and awarded $5,000 for Fox’s services. The referee also ruled that plaintiffs had properly served valid offers to compromise (§ 998) on Shea Homes’ counsel in 2009. He said those offers to defendants in the case at that time did not have to be apportioned.”

    “Antangan contends the trial court erred when it vacated and modified its original judgment, which ordered Shea Homes to pay all the referee’s fees. We disagree.”

    Antagon contended that the trial court erred when it vacated and modified its original judgment regarding Shea Homes paying the referee’s fees. The appeals court disagreed: “A trial court has inherent authority to vacate or correct a judgment that is void on its face, incorrect, or entered by mistake. (§ 473; Rochin v. Pat Johnson Manufacturing Co. (1998),67 Cal.App.4th 1228; Olivera

    Read the court’s decision…


    Repair of Part May Necessitate Replacement of Whole

    February 10, 2012 — CDJ Staff

    Judge Gleuda E. Edmonds, a magistrate judge in the United States District Court of Arizona issued a ruling in Guadiana v. State Farm on January 25, 2012. Judge Edmonds recommended a partial summary judgment in favor of the plaintiff.

    Ms. Guandiana’s home had water damage due to pluming leaks in September 2004. She was informed that polybutylene pluming in her house could not be repaired in parts “it must be completely replaced.” She had had the plumbing replaced. State Farm denied her claim, arguing that “the tear-out provision did not cover the cost of accessing and replacing those pipes that were not leaking.”

    In September 2007, State Farm filed a motion to dismiss. The court rejected this motion, stating that “If Guadiana can establish as a matter of fact that the system that caused the covered loss included all the pipes in her house and it was necessary to replace all the pipes to repair that system, State Farm is obligated to pay the tear-out costs necessary to replace all the pipes, even those not leaking.”

    In March 2009, State Farm filed for summary judgment, which the court granted. State Farm argued that “the tear-out provision only applied to ‘repair’ and not ‘replace’ the system that caused the covered leak.” As for the rest of the piping, State Farm argued that “the policy does not cover defective materials.”

    In December 2011, Ms. Guadiana filed for summary judgment, asking the court to determine that “the policy ‘covers tear-out costs necessary to adequately repair the plumbing system, even if an adequate repair requires replacing all or part of the system.”

    In her ruling, Judge Edmonds noted that Ms. Guadiana’s claim is that “the water damage is a covered loss and she is entitled to tear-out costs necessary to repair the pluming system that caused that covered loss.” She rejected State Farm’s claim that it was not obligated to replace presumably defective pipes. Further, she rejected State Farm’s argument that they were only responsible for the leaking portion, noting “Guadiana intends to prove at trial that this is an unusual case where repair of her plumbing system requires replacement of all the PB plumbing.”

    Judge Edmonds concluded by directing the District Court to interpret the tear out issue as “the tear-out provision in State Farm’s policy requires State Farm to pay all tear-out costs necessary to repair the plumbing system (that caused the covered loss) even if repair of the system requires accessing more than the leaking portion of the system.”

    Read the court’s decision…


    Safe Harbors- not just for Sailors anymore (or, why advance planning can prevent claims of defective plans & specs) (law note)

    August 17, 2011 — Melissa Brumback

    Have you ever considered a “Safe Harbor Provision” for your Owner-Architect or Owner-Engineer contract? Maybe it is time that you do.

    As you are (probably too well) aware, on every construction project there are changes. Some of these are due to the owner’s change of heart, value engineering concerns, contractor failures, and material substitutions. Some may be because of a design error, omission, or drawing conflict. It happens.

    A “Safe Harbor Provision” is a provision that establishes an acceptable percentage of increased construction costs (that is, a percentage of the project’s contingency). The idea is that if the construction changes attributable to the designer is within this percentage, no claim will be made by the Owner for design defects.

    Read the full story…

    Reprinted courtesy of Melissa Brumback of Ragsdale Liggett PLLC. Ms. Brumback can be contacted at mbrumback@rl-law.com.


    Green Buildings Could Lead to Liabilities

    March 28, 2012 — CDJ Staff

    Attempts to build “green,” reducing energy costs and increasing the use of sustainable building materials, may lead to more lawsuits, according to a report issued by the British Columbia Construction Association. The report warned those who were going to build green look into the implications. The report looked at the result of green building practices and requirements adopted in the United States.

    The report warns that “the use of novel, less harmful building material or new construction techniques may give rise to liability due to: contractor inexperience with installation; lack of long-term evaluation of green materials; lack of understanding of how new building materials may impact existing traditional building systems; or warranties provided unintentionally about the durability or effectiveness of unproven materials or techniques.”

    Manley McLachlan, president of the BCAA noted that they are aware of “legal action around the performance of the buildings,” noting that while fast-growing trees help toward LEED certification, their wood is more prone to mold. He also felt that low-VOC paints needed more testing to prove their durability as exterior finishes.

    Read the full story…


    Product Exclusion: The Big Reason Behind The Delay of LEED 2012

    July 10, 2012 — Douglas Reiser, Builders Counsel

    By now, you have probably heard that the USGBC has decided to delay implementation of its previously named “LEED 2012” rating system. What you might not know is exactly why this is happening. Rest assured that the decision was not made willy nilly ?Äì LEED 2012 had many industrial groups running for the hills.

    I have spent the past few weeks reading a number of articles on the backlash. LEED 2012 was intended to create a seismic shift; it was not a mere update. A strict focus on reduction of chemicals, created mass panic that a large number of material providers’ products would essentially be banned from green projects ?Äì meaning most local, state and federal projects.

    Read the full story…

    Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com


    Water District Denied New Trial in Construction Defect Claim

    August 16, 2012 — CDJ Staff

    The United District Court in Tampa, Florida has rejected the motion by Tampa Bay Water for a new trial in their claims that HDR Engineering negligently designed the C.W. Bill Young Regional Reservoir. The claims went to a jury trial, at the end of nineteen days, the jury deliberated for four hours, finding for HDR Engineering. In rejecting Tampa Bay’s motion, the judge noted that “on close examination, TBW’s contentions have little to do with the factual determinations of the jury, which evidently concluded that TBW did not meet its burden of proof, an unsurprising conclusion, considering HDR’s evidence and the weaknesses in TBW’s evidence.”

    The court cited an earlier decision that “a new trial may be granted where the jury’s ‘verdict is against the great, not merely the greater weight of the evidence.’” However, the court found that the jury’s verdict “was well supported by the evidence” and that “TBW’s case showed signs of weakness at virtually every turn.” TBW’s expert “changed his opinion late in the case concerning the culpability of the contractor.” As a result, “Brumund’s change in opinions effectively bolstered HDR’s faulty construction defense.”

    TBW also raised claims a pre-trial order prevented it “from introducing evidence that HDR did not fulfill its contractual quality control responsibilities” and that evidentiary rulings prevented “TBW from introducing evidence concerning quality control.” However, TBW dismissed its claims over quality control, then “attempted no less than three times during ?Ķ testimony to introduce evidence of the purpose of the quality control requirement and quality control assurance.”

    TBW also contended “that it was precluded from introducing evidence that HDR’s inspectors never reported that the protective layer exceeded three feet after inspecting the work as part of HDR’s quality control duties.” The court noted that “TBW asked these very questions of HDR’s Engineer of Record.” The court also found that testimony regarding photographs of the construction was properly excluded as TBW never entered the photos into evidence.

    TBW had made an argument for a jury view. Prior the trial “after discussion, and to their credit, the parties agreed to a jointly-prepared helicopter ‘flyover’ video.” The court noted that “the size and physical characteristics of the reservoir were adequately and effectively depicted in the video.” The hazards the jury did not, then, have to encounter included the narrow, unpaved rim of the reservoir, snakes, and alligators.

    Read the court’s decision…



    Federal District Court Continues to Find Construction Defects do Not Arise From An Occurrence

    May 10, 2012 — CDJ Staff

    Coverage for construction defects continues to be hotly contested in Hawaii state and federal courts. In a recent decision, Judge Mollway felt bound to follow the Ninth Circuit’s decision in Burlington Ins. Co. v. Oceanic Design & Constr., Inc., 383 F.3d 940, 944 (9th Cir. 2004), where the court found construction defect claims arise from breach of contract, not from an occurrence. Judge Mollway’s most recent decision on the issue is Illinois Nat. Ins. Co. v. Nordic PCL Constr., Inc., 2012 U.S. Dist. LEXIS 58464 (D. Haw. April 26, 2012).

    Nordic constructed a grocery store for Safeway. In addition to the grocery store, Nordic built a 165-space rooftop parking deck, retail shops and related improvements. After opening for business in 2007, Safeway experienced significant leaks. Safeway demanded that Nordic repair the parking deck. Nordic sent the demand letter to the insurer, who agreed to appoint counsel subject to a reservation of rights.

    Safeway filed suit against Nordic in state court alleging, among other things, breach of contract and negligence. The insurer provided Nordic with a defense, but Nordic hired independent counsel.

    The insurer filed for declaratory relief in federal district court.

    Read the full story…