BERT HOWE
  • Nationwide: (800) 482-1822    
    institutional building Molalla Oregon parking structure Molalla Oregon casino resort Molalla Oregon hospital construction Molalla Oregon landscaping construction Molalla Oregon structural steel construction Molalla Oregon custom homes Molalla Oregon Subterranean parking Molalla Oregon industrial building Molalla Oregon mid-rise construction Molalla Oregon housing Molalla Oregon Medical building Molalla Oregon concrete tilt-up Molalla Oregon office building Molalla Oregon condominiums Molalla Oregon production housing Molalla Oregon condominium Molalla Oregon multi family housing Molalla Oregon custom home Molalla Oregon townhome construction Molalla Oregon retail construction Molalla Oregon high-rise construction Molalla Oregon
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Molalla, Oregon

    Oregon Builders Right To Repair Current Law Summary:

    Current Law Summary: (HB 2525 Chap. 701; HB2389) If an owner sends a builder a notice of defect within the time allowed for the owner to commence a court action against that contractor, the time for the owner to commence the action shall be extended, notwithstanding any statute of limitation or statute of ultimate repose, until the later of 120 days after written receipt of builders intention to repair, replace the defect, make monetary compensation or reject the claim. Upon receipt of notice, builder has 14 days to inspect the alleged defect. They then have no more than 90 days to communicate their intention The homebuyer must respond to the builder response within 30 days of receipt. The law requires builder notifies homebuyer of NOR before purchase.


    Construction Expert Witness Contractors Licensing
    Guidelines Molalla Oregon

    Commercial and Residential Contractors License Required.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Home Builders Association of Marion and Polk Counties
    Local # 3878
    385 Taylor St NE
    Salem, OR 97301
    http://www.homebuildersassociation.org

    Oregon Home Builders Association
    Local # 3800
    375 Taylor St NE
    Salem, OR 97301
    http://www.oregonhba.com

    Baker County Chapter
    Local # 3802
    3470 10th St
    Baker City, OR 97814


    Home Builders Association of Metro Portland
    Local # 3862
    15555 SW Bangy Rd Ste 301
    Lake Oswego, OR 97035
    http://www.homebuildersportland.org

    Lincoln County Home Builders Association
    Local # 3858
    PO Box 440
    Tangent, OR 97389
    http://www.lincolncountyhba.org

    Willamette Valley Home Builders Association
    Local # 3805
    PO Box 440 32054 Old Hwy 34
    Tangent, OR 97389
    http://www.wvhba.com

    Northeast Oregon Chapter
    Local # 3860
    PO Box 436
    Hermiston, OR 97838



    Construction Expert Witness News and Information
    For Molalla Oregon

    Gilroy Homeowners Sue over Leaky Homes

    Ambitious Building Plans in Boston

    One Colorado Court Allows Negligence Claim by General Contractor Against Subcontractor

    In Colorado, Primary Insurers are Necessary Parties in Declaratory Judgment Actions

    Seven Tips to Manage Construction Defect Risk

    Arizona Supreme Court Confirms Eight-Year Limit on Construction Defect Lawsuits

    Vegas Hi-Rise Not Earthquake Safe

    Construction Workers Face Dangers on the Job

    No Third-Quarter Gain for Construction

    Destruction of Construction Defect Evidence Leads to Sanctions against Plaintiff

    California Assembly Bill Proposes an End to Ten Year Statute of Repose

    Residential Construction Down in San Diego

    Mortar Insufficient to Insure Summary Judgment in Construction Defect Case

    Contractor Liable for Soils Settlement in Construction Defect Suit

    Alabama “occurrence” and subcontractor work exception to the “your completed work” exclusion

    Homeowners Must Comply with Arbitration over Construction Defects

    Ohio Adopts Energy-Efficient Building Code

    Building Inspector Jailed for Taking Bribes

    Defense for Additional Insured Not Barred By Sole Negligence Provision

    Minnesota Starts Wide-Ranging Registration of Contractors

    Contractor Manslaughter? Safety Shortcuts Are Not Worth It

    Appeals Court Reverses Summary Judgment over Defective Archway Construction

    Granting Stay, Federal Court Reviews Construction Defect Coverage in Hawaii

    Follow Up on Continental Western v. Shay Construction

    Lien Law Unlikely To Change — Yet

    Florida: No Implied Warranties for Neighborhood Improvements

    Another Colorado District Court Refuses to Apply HB 10-1394 Retroactively

    2011 West Coast Casualty Construction Defect Seminar – Recap

    Landmark San Diego Hotel Settles Defects Suit for $6.4 Million

    New Construction Laws, New Forms in California

    Homeowners Sue Over Sinkholes, Use Cash for Other Things

    Windows and Lawsuits Fly at W Hotel

    Good and Bad News on Construction Employment

    Damron Agreement Questioned in Colorado Casualty Insurance v Safety Control Company, et al.

    Water Is the Enemy

    Construction Defects Not Occurrences under Ohio Law

    Faulty Workmanship Exclusion Does Not Bar Coverage

    Insurance Firm Defends against $22 Million Claim

    Former Zurich Executive to Head Willis North America Construction Insurance Group

    No Duty to Indemnify When Discovery Shows Faulty Workmanship Damages Insured’s Own Work

    Another Guilty Plea in Las Vegas HOA Scandal

    Hilton Grand Vacations Defect Trial Delayed

    Contractor Sues Supplier over Defective Products

    Harmon Tower Construction Defects Update: Who’s To Blame?

    No Choice between Homeowner Protection and Bankrupt Developers?

    South Carolina Legislature Redefining Occurrences to Include Construction Defects in CGL Policies

    Denver Court Rules that Condo Owners Must Follow Arbitration Agreement

    Ohio “property damage” caused by an “occurrence.”

    Judge Kobayashi Determines No Coverage for Construction Defect Claim

    Official Tried to Influence Judge against Shortchanged Subcontractor

    California Lawyer Gives How-To on Pursuing a Construction Defect Claim

    No Coverage for Negligent Misrepresentation without Allegations of “Bodily Injury” or “Property Damage”

    Construction Defect Litigation at San Diego’s Alicante Condominiums?

    State Farm Too Quick To Deny Coverage, Court Rules

    California Supreme Court to Examine Arbitration Provisions in Several Upcoming Cases

    Firm Sued For Construction Defects in Parking Garage

    Environment Decision May Expand Construction Defect Claims

    Allowing The Use Of a General Verdict Form in a Construction Defect Case Could Subject Your Client to Prejudgment Interest

    California Construction Bill Dies in Committee

    The Complete and Accepted Work Doctrine and Construction Defects

    Housing Prices Up through Most of Country

    CC&Rs Not the Place for Arbitration Agreement, Court Rules

    Colorado Court of Appeals Rejects Retroactive Application of C.R.S. § 13-20-808.

    Renovation Contractors: Be Careful How You Disclose Your Projects

    Courts Are Conflicted As To Whether "Good Faith" Settlement Determinations Can Be Reviewed Via Writ Petition Or Appeal

    Las Vegas Home Builder Still in Bankruptcy

    Australian Developer Denies Building Problems Due to Construction Defects

    Ghost Employees Steal Jobs from Legit Construction Firms

    Differing Rulings On Construction Defect Claims Leave Unanswered Questions For Builders, and Construction Practice Groups. Impact to CGL Carriers, General Contractors, Builders Remains Unclear

    DA’s Office Checking Workers Comp Compliance

    Contract Not So Clear in South Carolina Construction Defect Case

    Negligent Misrepresentation in Sale of Building Altered without Permits

    Fifth Circuit Asks Texas Supreme Court to Clarify Construction Defect Decision

    The Montrose Language Interpreted: How Many Policies Are Implicated By A Construction Defect That Later Causes a Flood?

    Pennsylvania Court Extends Construction Defect Protections to Subsequent Buyers

    Florida Appeals Court Rules in Favor of Homeowners Unaware of Construction Defects and Lack of Permits

    A Lien Might Just Save Your Small Construction Business

    Florida Property Bill Passes Economic Affairs Committee with Amendments

    Construction Law: Unexpected, Fascinating, Bizarre

    Construction Defects in Home a Breach of Contract

    Remodels Replace Construction in Redding

    Dust Infiltration Due to Construction Defect Excluded from Policy

    Homebuilders Go Green in Response to Homebuyer Demand

    Houses Can Still Make Cents: Illinois’ Implied Warranty of Habitability

    Construction Defects Lead to Demolition

    Consulting Firm Indicted and Charged with Falsifying Concrete Reports

    Insurer Must Cover Construction Defects Claims under Actual Injury Rule

    Hospital Construction Firm Settles Defect Claim for $1.1 Million

    Don MacGregor To Speak at 2011 West Coast Casualty Construction Defect Seminar

    Construction Defects and Contractor-Owners
    Corporate Profile

    MOLALLA OREGON CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 5500 construction defect and claims related expert witness designations, the Molalla, Oregon Construction Expert Witness Group provides a wide range of trial support and consulting services to Molalla's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.









    Construction Expert Witness News & Info
    Molalla, Oregon

    Mississippi exclusions j(5) and j(6) “that particular part”

    June 7, 2011 — CDCoverage.com

    In Lafayete Ins. Co. v. Peerboom, No. 3:10cv336 (S.D. Miss. June 2, 2011), claimant homeowner Peerboom hired insured contractor Absolute to raise Peerboom’s house two feet to avoid future flooding. While Absolute was raising the house, it fell, resulting in physical injury to the home. Peerboom sued Absolute for negligence, breach of contract, and fraud, seeking damages for the destruction of the home. Absolute’s CGL insurer Lafayette defended under a reservation of rights and filed a declaratory judgment action.

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    Dust Infiltration Due to Construction Defect Excluded from Policy

    September 9, 2011 — CDJ Staff

    A summary judgment was affirmed in the case of Brown v. Farmers Group, by the California Court of Appeals. The Browns bought a new home in Oakley, California. At the time, they signed disclosure statement “acknowledging that the area around their home experienced gusty winds and would be in development for years to come, which might result in dust and airborne mold.”

    The Browns found an unusual amount of dust in their home, which became worse when they ran their heating and air conditioning system. Shelia Brown was later diagnosed with chronic valley fever, which was attributed to airborne mold. The Browns contacted Farmers which investigated the house. Although the adjustor from Farmers said the Browns would be covered, Farmers denied the claim.

    After the Browns moved out of the house, an inspector found that the HVAC line in the attic was disconnected, sending dust into the home. The Browns brought action against Mid-Century Insurance, which managed the policy, and Farmers. The identified the HVAC defect, window problems, and valley fever as causes, suing for breach of contact, breach of implied covenant of good faith and fair dealing, and the intentional infliction of emotional distress.

    The court rejected all these claims. The policy with Farmers excluded losses due to defective construction. This ruled out the faulty HVAC system and any problems there might have been from the windows. The policy also specifically excluded losses from contamination, fungi, pathogens, and noxious substances. The court further found that the adjustor’s opinion was irrelevant to the question of what the policy actually covered. Finally, the court found no evidence of intentional infliction of emotional stress.

    On review, the appeals court upheld the trial court’s conclusions and affirmed the summary judgment.

    Read the court’s decision…


    Ensuing Loss Provision Does Not Salvage Coverage

    October 23, 2012 — Tred Eyerly, Insurance Law Hawaii

    The insureds' home was built in 1989. In 2006, extensive water damage was found to the house. The insureds notified their carrier, Chubb. The insureds had coverage for all risks unless stated otherwise in the policy or if an exclusion applied.

    Chubb hired an adjustor who determined that defective construction had enabled water to enter the wall and beam systems. Chubb denied coverage under the faulty planning, construction or maintenance exclusion.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Damron Agreement Questioned in Colorado Casualty Insurance v Safety Control Company, et al.

    February 10, 2012 — CDJ Staff

    Safety Control and EMC appealed the judgment in Colorado Casualty Insurance Company versus Safety Control Company, Inc., et al. (Ariz. App., 2012). The Superior Court in Maricopa County addressed “the validity and effect of a Damron agreement a contractor and its excess insurer entered into that assigned their rights to sue the primary insurer.” Judge Johnsen stated, “We hold the agreement is enforceable but remand for a determination of whether the stipulated judgment falls within the primary insurer’s policy.”

    The Opinion provides some facts and procedural history regarding the claim. “The Arizona Department of Transportation (“ADOT”) hired DBA Construction Company (“DBA”) to perform a road-improvement project on the Loop 101 freeway. Safety Control Company, Inc. was one of DBA’s subcontractors. As required by the subcontract, Safety Control purchased from Employer’s Mutual Casualty Company (“EMC”) a certificate of insurance identifying DBA as an additional insured on a policy providing primary coverage for liability arising out of Safety Control’s work.”

    A collision occurred on site, injuring Hugo Roman. Roman then sued ADT and DBA for damages. “Colorado Casualty tendered DBA’s defense to the subcontractors, including Safety Control. Safety Control and EMC rejected the tender. Roman eventually settled his claims against DBA and ADOT. DBA and ADOT stipulated with Roman for entry of judgment of $750,000; Roman received $75,000 from DBA (paid by Colorado Casualty) and $20,000 from ADOT, and agreed not to execute on the stipulated judgment. Finally, DBA, ADOT and Colorado Casualty assigned to Roman their rights against the subcontractors and other insurers.”

    Colorado Casualty attempted to recover what “it had paid to defend DBA and ADOT and settle with Roman. However, Roman intervened, and argued that “Colorado Casualty had assigned its subrogation rights to him as part of the settlement agreement.” The suit was not dismissed, but the Superior Court allowed Roman to intervene. “Roman then filed a counterclaim against Colorado Casualty and a cross-claim against the subcontractors.”

    All claims were settled against all of the defendants except Safety Control and EMC. “The superior court ruled on summary judgment that EMC breached a duty to defend DBA and that as a result, ‘DBA was entitled to settle with Roman without EMC’s consent as long as the settlement was not collusive or fraudulent.’ After more briefing, the court held the stipulated judgment was neither collusive nor procured by fraud and that EMC therefore was liable to Roman on the stipulated judgment and for his attorney’s fees. The court also held Safety Control breached its subcontract with DBA by failing to procure completed-operations insurance coverage and would be liable for damages to the extent that EMC did not satisfy what remained (after the other settlements) of the stipulated judgment and awards of attorney’s fees.” Safety Control and EMC appealed the judgment.

    Four reasons were given for the decision of the ruling. First, “the disagreement between Roman and Colorado Casualty does not preclude them from pursuing their claims against EMC and Safety Control.” Second, “the settlement agreement is not otherwise invalid.” Third, “issues of fact remain about whether the judgment falls within the EMC policy.” Finally, “Safety Control breached the subcontract by failing to procure ‘Completed Operations’ coverage for DBA.”

    In conclusion, the Superior Court affirmed in part, reversed in part, and remanded . “Although, as stated above, we have affirmed several rulings of the superior court, we reverse the judgment against EMC and remand for further proceedings consistent with this Opinion to determine whether the stipulated judgment was a liability that arose out of Safety Control’s operations. In addition, we affirm the superior court’s declaratory judgment against Safety Control but remand so that the court may clarify the circumstances under which Safety Control may be liable for damages and may conduct whatever further proceedings it deems appropriate to ascertain the amount of those damages. We decline all parties’ requests for attorney’s fees pursuant to A.R.S. § 12-341.01 without prejudice to a request for fees incurred in this appeal to be filed by the prevailing party on remand before the superior court.”

    Read the court’s decision…


    Appeals Court Upholds Decision by Referee in Trial Court for Antagan v Shea Homes

    May 10, 2012 — CDJ Staff

    In the case Antangan v. Shea Homes Ltd. Partnership (Cal. App., 2012), Plaintiffs appealed “an order vacating a judgment and entering a modified judgment in their construction defect action against defendants Shea Homes, Inc. and Shea Homes Limited Partnership,” while the Defendant, Shea Homes Limited Partnership (Shea Homes) appealed “an order of the judicial referee denying its motion to strike and tax costs.”

    On the Antagon issue, the appeals court concluded that “the trial court did not err by vacating and modifying its judgment so that the cost of referee’s fees would be equally divided by the parties and consistent with a prior stipulation they filed in court.”

    On the Shea Homes issue, the appeals court concluded: “1) the judicial referee did not err by ruling that plaintiffs’ offers to compromise (§ 998) were validly served on Shea Homes’ counsel, 2) the offers substantially complied with statutory requirements, 3) the offers were not required to be apportioned, and 4) the referee’s award of $5,000 as costs for a person assisting plaintiffs’ counsel was not an abuse of discretion.” The appeals court affirmed the judgment.

    Here is a brief history of the trial case: “Plaintiffs Chito Antangan, Jimmy Alcova and other homeowners brought an action against defendants Shea Homes, Inc. and Shea Homes Limited Partnership for damages alleging that the properties they purchased from these ‘developer defendants’ were defective. Plaintiffs claimed numerous construction defects required them ‘to incur expenses’ for ‘restoration and repairs’ and the value of their homes had been diminished.”

    In response, Shea Homes filed a motion for an order to appoint a judicial referee. The motion was granted and it was ruled that “a referee would ‘try all issues’ and ‘report a statement of decision to this court.’”

    On May 10, 2010 the judicial referee (Thompson) “awarded plaintiffs damages and various costs, and ruled that ‘Shea Homes shall bear all of the Referee’s fees.’” The latter ruling would become a matter for contention later on.

    In July of 2010, the plaintiffs “sought, among other things, $54,409.90 for expert fees, and $14,812.50 for the services of Melissa Fox for ‘exhibit preparation & trial presentation.’ Shea Homes filed a motion to strike and/or tax costs claiming: 1) Fox was a paralegal, 2) plaintiffs were not entitled to attorney’s fees, and 3) the fees for Fox’s services were an indirect and improper method to obtain attorney’s fees. The referee disagreed and awarded $5,000 for Fox’s services. The referee also ruled that plaintiffs had properly served valid offers to compromise (§ 998) on Shea Homes’ counsel in 2009. He said those offers to defendants in the case at that time did not have to be apportioned.”

    “Antangan contends the trial court erred when it vacated and modified its original judgment, which ordered Shea Homes to pay all the referee’s fees. We disagree.”

    Antagon contended that the trial court erred when it vacated and modified its original judgment regarding Shea Homes paying the referee’s fees. The appeals court disagreed: “A trial court has inherent authority to vacate or correct a judgment that is void on its face, incorrect, or entered by mistake. (§ 473; Rochin v. Pat Johnson Manufacturing Co. (1998),67 Cal.App.4th 1228; Olivera

    Read the court’s decision…


    Fire Reveals Defects, Appeals Court Affirms Judgment against Builder

    July 10, 2012 — CDJ Staff

    The Arizona Court of Appeals has ruled in the case of Simms v. Nance Construction. After a fire damaged his home, Jerry Simms discovered some construction defects in the work of the builder, Nance Construction. Nance Construction completed the home in 2000 and it was damaged by fire in 2001. In the course of Simms’ suit against his neighbor, “defense experts opined both that Dusty Creek had negligently repaired the damage to Simms’ residence and that many defects found in the houses were the result of defects in the original construction.” Nance offered to make roof repairs. Simms responded with a list of “numerous construction defects,” stating this was “not a comprehensive and final list of items.” Nance offered to repair some while disputing others. Simms entered a lawsuit against Nance and other parties.

    Nance first sought a summary judgment, “asserting that Simms had failed to adequately disclose the repairs for which he sought to hold Nance responsible.” The court denied this. It also would not allow Nance to introduce evidence that Simms had been denied a license by the Arizona Department of Gaming over “questionable business practices, illegal activities, and financial transactions with a person purportedly involved in organized crime.”

    During the suit, Simms contracted with Advanced Repair Technologies “for repairs that included a complete remodel of the roof and the exterior stucco system.” Nance later claimed that the cost of ART’s repair was unreasonable, claiming that it should have cost about $600,000 instead of the $1.5 million for which Simms contracted. The jury found against Nance, with a judgment of $870,200 of which half was due to the roofing subcontractor.

    After the verdict, Nash moved for a new trial, stating that the jury should have heard expert testimony on whether the contract price was reasonable. Nance also “argued that the trial court had erred in refusing to allow Nance to impeach Simms’ credibility with his purported prior acts of dishonesty.” These motions were denied and Nance appealed.

    The appeals court upheld the trial court on all counts. The court found that, despite the contention made by Nance, the jury had sufficient information to determine if the cost of the repairs were reasonable. The court also found that Simms had given Nance an opportunity to propose repairs. The law, however, “does not require the Plaintiff to accept an offer for repairs,” adding that “the record makes clear that the parties were far apart in their belief of the nature of repairs necessary.” Nor did the court find that Nance should have been allowed to introduce evidence to impeach Simms’ credibility.

    Although judgment of the lower court was affirmed, the court took the discretion to decline to award attorneys’ fees to Simms, although he was awarded costs.

    Read the court’s decision…


    Judge Okays Harmon Tower Demolition, Also Calls for More Testing

    August 2, 2012 — CDJ Staff

    Vegas.Inc reports that Clark County District Court Judge Elizabeth Gonzalez has permitted the demolition the tower, which MGM Resorts has claimed is a safety hazard. Perini Building Co. claims that the building does not need to be demolished. CityCenter claims that repairing the building would take nearly a year longer than a demolition and cost about $200 million. Further, CityCenter assumes that the building’s reputation would cost it another $30 million.

    Subsequently, Judge Gonzalez ruled that the pattern of destructive testing would not support a claim that there were an estimated 1,400 defective items in the building. An attorney for CityCenter, Steve Morris, has suggested that they may seek more testing, impossible to do once the building is demolished. CityCenter issued a statement that “nearly every time CityCenter has chipped away concrete to review structural work at the Harmon, we have found defects.” They describe the building as “unusable.”

    Tutor Perini contends that it “remains confident that it will prevail when the issues of safety, reparability and responsibility for the issues facing the Harmon tower are considered.

    Read the full story…


    Florida Chinese drywall, pollution exclusion, “your work” exclusion, and “sistership” exclusion.

    May 26, 2011 — CDCoverage.com

    In Auto-Owners Ins. Co. v. American Building Materials, Inc., No. 8:10-CV-313-T-24-AEP (M.D. Fla. May 17, 2011), insured drywall supplier ABM was sued by general contractor KB Homes seeking damages because property damage to houses built by KB Homes using defective Chinese drywall supplied by ABM. ABM’s CGL insurer Auto-Owners defended ABM under a reservation of rights and filed suit against ABM and KB Homes seeking a judicial declaration of no to duty to defend or indemnify ABM against the KB Homes lawsuit. On cross motions for summary, the federal district trial court directed entry of judgment in favor of ABM and KB Homes and against Auto-Owners, holding that Auto-Owners had a duty to defend and indemnify ABM against the KB Homes lawsuit.

    Read the full story…

    Reprinted courtesy of CDCoverage.com


    Statutes of Limitations May be the Colorado Contractors’ Friend

    April 18, 2011 — April 18, 2011 Beverley BevenFlorez - Construction Defect Journal

    Albert Wolf, a principal in Wolf Slatkin & Madison P. C., has written an interesting article on statutes of limitations in construction defect claims in Colorado. While Wolf states that in most cases, “construction defect claims against construction industry participants (contractors, subcontractors, architects, engineers, etc.) requires that suits be started within two years after construction defects have been or should have been—in the exercise of reasonable diligence (care)—discovered,” if a project used the AIA General Conditions (AIA Document A2010) before the 2007 edition, the “statutes of limitations begin to run (accrue) at either substantial completion or breach by the contractor (installation of defective work), depending on the circumstances.”

    “That’s a huge difference,” Wolf writes in his article. “For example, if the structural defect caused by faulty foundation work is not discovered or discoverable until walls begin to exhibit cracking more than two years after the building is completed, the owner’s claim against the contractor may be barred if the AIA provision is applied.”

    Read the full story...


    Residential Construction: Shrinking Now, Growing Later?

    August 17, 2011 — CDJ Staff

    Jim Haugey, the Chief Economist for Reed Construction Data noted that new residential construction spending fell 0.2% in June and a slightly larger drop of 0.5% in residential remodeling. While economic growth is still low, Haugey states that homebuilders have “record low inventories.” He forecasts a shrinkage of 1.5% in 2011, followed by about 20% growth in 2012.

    Read the full story…


    Houses Can Still Make Cents: Illinois’ Implied Warranty of Habitability

    March 1, 2011 — Original Story by Marisa L. Saber Cozen O’Connor Subrogation & Recovery Law Blog

    In a report published earlier this week Marisa L. Saber writes about the implied warranty of habitability in the context of construction defect litigation. The piece speaks of the difficulties in alleging tort theories against builders and vendors in light of Illinois’ expansion of the economic loss doctrine, and how the implied warranty of habitability may provide another avenue for recovery.

    Read Full Story...


    Ensuing Loss Found Ambiguous, Allowing Coverage

    August 16, 2012 — Tred Eyerly, Insurance Law Hawaii

    The court determined the ensuing loss provision was ambiguous and found coverage for the home owners in Platek v. Town of Hamburg, 2012 N.Y. App. Div. LEXIS 5371 (N.Y. App. Div. July 6, 2012).

    The burst of a water main caused water damage to the insureds' basement. Allstate disclaimed coverage under exclusion 4 for losses caused by "[w]ater . . . on or below the surface of the ground, regardless of its source . . . [,] includ[ing] water . . . which exerts pressure on or flows, seeps or leaks through any part of the residence premises."

    Another policy provision covered "sudden and accidental direct physical loss caused by fire, explosion or theft resulting from item []. . . 4 . . . ." Plaintiffs argued that this exception applied because their claimed loss was caused by an "explosion" of the water main.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com


    Hovnanian Increases Construction Defect Reserves for 2012

    January 6, 2012 — CDJ Staff

    In their fourth quarter earnings call, executives of Hovnanian Enterprises made some projections for investors, covering the company’s plans for 2012. During the call, Ara K. Hovnanian, the firm’s CEO, discussed their reserves to meet construction defect claims. The firm does an annual actuarial study of their construction defect reserves.

    Mr. Hovnanian noted that there have been no changes for the past several years, but this year they are increasing their reserves by about $6.3 million. Additionally, the firm has added $2.5 million to their legal reserves. Mr. Hovnanian stated “we do not anticipate that changes of this magnitude will be recurring as we look forward to 2012.”

    Read the full story…


    Pennsylvania Court Extends Construction Defect Protections to Subsequent Buyers

    December 20, 2012 — CDJ Staff

    The Pennsylvania courts have long held that there is an implied warranty of habitability for the initial purchaser of a home. Now, as some defects may not immediately show up, the court has extended that implied warranty to second and subsequent purchasers. As Marc D. Brookman, David I. Haas, and Christopher Bender of Duane Morris note, “this judicially created doctrine shifts the risk of a latent defect in the construction of a new home from the purchaser to the builder-vendor.”

    The Pennsylvania Supreme Court concluded that a contractual relationship is not needed for an implied warranty of habitability. The court’s concern was inequalities would result when a home was sold while other homes were protected by being within the statute of repose.

    Read the full story…


    Gut Feeling Does Not Disqualify Expert Opinion

    July 6, 2011 — CDJ Staff

    The New Jersey Supreme Court issued a ruling in June on the case of Nevins v. Toll in which they reversed an earlier decision and remanded the case to a lower court for retrial. At issue in the case was the testimony of the plaintiff’s expert, J. Anthony Dowling. In depositions, Mr. Dowling said that his estimates for repair were based on a “gut feeling.” Dowling said he had “very little” experience in cost estimates for single-family homes. The defendants sought to bar Dowling’s testimony which was granted by the judge. Without an expert, Ms. Nevin’s case was dismissed.

    Describing Dowling’s report as “far from a model of how an expert’s opinion in a construction case should be presented,” the court noted that Dowling is not a professional expert witness. However, the court did note that Dowling is a professional cost estimator. Despite Mr. Dowling using his “gut feeling” to construct his estimate, the New Jersey Supreme Court felt that whether his estimate is convincing is “a question for the jury.”

    Read the court’s opinion…


    Gilroy Homeowners Sue over Leaky Homes

    February 10, 2012 — CDJ Staff

    Two years into a lawsuit against Shapell Homes, the builder of a subdivision called Eagle Ridge in Gilroy, California, homeowners have joined or left the lawsuit. About fifty homeowners are still in the suit, which contends that construction defects have lead to water intrusion in their homes. The lawyer for the homeowners contends that more than a hundred homes have construction defects.

    One homeowner said that soon after he joined the suit, Sharpell sent workers to his home who repaired problems to his satisfaction. “They came in within two weeks and fixed everything,” said Frank Lowry. Another homeowner, Wilson Haddow, said that he was “quite happy” after Shapell repaired problems.

    Others weren’t quite so happy. Greg Yancey said that problems had “been a nightmare” and that “it just doesn’t feel like home.” He said that his “house is possessed,” with problems that include walls that bow out and a balcony that drips rainwater to the front door. His home is currently worth far less than the $700,000 he paid in 2007.

    Read the full story…


    Insurer Must Defend Claims for Diminution in Value of Damaged Property

    June 19, 2012 — Tred Eyerly, Insurance Law Hawaii

    The insurer’s duty to defend a developer sued by purchasers of homes for damages for diminution in value of homes was at issue in Mid-Continent Cas. Co. v. Academy Dev., Inc., 2012 WL 1382459 (5th Cir. April 20, 2012).

    In the underlying action, plaintiffs alleged the developer knew when it sold the homes that the lake walls were falling and that water was leaking from the lakes onto adjacent home sites. They sought damages for diminution in the value of their homes resulting from the defective lakes. The action was tried in 2008, and the jury returned a verdict for the developer.

    Mid-Continent initially defended under a reservation of rights.

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com

    Read the full story…


    Construction Defect Destroys Home, Forty Years Later

    June 19, 2012 — CDJ Staff

    Fire investigators in Monroe, North Carolina have blamed a nail as the source of a fire that lead to a home being declared a total loss. The nail, part of the original construction, nicked a wire within a wall, causing a short, which started a fire. The home was built in the late 1960s.

    WBTV reported that the homeowner was awakened by a power outage. He went outside and saw flames coming from a vent in the roof. He was unable to contain the fire with a garden hose. Neighbors called firemen who were able to stop the blaze.

    Read the full story…